NCDOT contract C204898 bid tabulation
GRADING, DRAINAGE, PAVING, AND CULVERT. BUSINESS PARK ACCESS ROAD FROM FUJI DIOSYTH BIOTECHNOLOGIES TO BUMGARDNER ROAD EXT. Let by North Carolina DOT on June 17, 2025, Wake. 5 bids received; low bid $4,509,744 by Cardinal Civil Contracting LLC.
- Owner
- North Carolina DOT
- Letting
- 17 JUN 2025
- Pay items
- 91
- Data through
- 20 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Cardinal Civil Contracting LLC | $4,509,744 | Low |
| 2 | FSC II LLC DBA Fred Smith Company | $4,642,464 | +3.0% |
| 3 | Branch Civil Inc | $4,885,000 | +8.0% |
| 4 | Roadworks Construction Company LLC | $5,901,208 | +31% |
| 5 | Chatham Civil Contracting LLC | $7,066,397 | +57% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Cardinal Civil Contracting LLC | 2. FSC II LLC DBA Fred Smith Company | 3. Branch Civil Inc | 4. Roadworks Construction Company LLC | 5. Chatham Civil Contracting LLC |
|---|---|---|---|---|---|---|---|---|
| 0001 | Mobilization (0000100000-N) | LS | 1 | $185,000 | $230,000 | $240,000 | $295,050 | $353,300 |
| 0002 | Construction surveying (0000400000-N) | LS | 1 | $45,000 | $50,000 | $82,900 | $231,490 | $113,155 |
| 0003 | Clearing & grubbing (0001000000-E) | LS | 1 | $116,000 | $1,000,000 | $134,215 | $188,460 | $888,277 |
| 0004 | Supplementary clearing & grubbing (0008000000-E) | ACRE | 2 | $1.00 | $1.00 | $9,100.00 | $30,470 | $24,836 |
| 0005 | Unclassified excavation (0022000000-E) | CY | 27,500 | $16.00 | $13.00 | $5.50 | $24.40 | $21.34 |
| 0006 | Undercut excavation (0036000000-E) | CY | 4,000 | $51.50 | $15.00 | $30.00 | $15.30 | $34.90 |
| 0007 | Borrow excavation (0106000000-E) | CY | 26,500 | $13.50 | $5.00 | $28.00 | $25.80 | $39.45 |
| 0008 | Drainage ditch excavation (0134000000-E) | CY | 1,570 | $23.50 | $9.50 | $6.00 | $16.80 | $25.73 |
| 0009 | Select granular material (0195000000-E) | CY | 3,100 | $48.00 | $20.00 | $60.00 | $49.70 | $50.46 |
| 0010 | Geotextile for soil stabilization (0196000000-E) | SY | 6,400 | $2.50 | $4.75 | $2.75 | $2.85 | $3.32 |
| 0011 | Foundation conditioning material, minor structures (0318000000-E) | TON | 110 | $38.50 | $60.00 | $68.00 | $75.00 | $54.20 |
| 0012 | FND condit geotextile (4A) (0321000000-E) | SY | 340 | $3.30 | $5.00 | $4.75 | $5.30 | $6.65 |
| 0013 | 24" RC pipe culverts, class III (0378000000-E) | LF | 244 | $125.00 | $103.00 | $161.00 | $136.80 | $200.18 |
| 0014 | 36" RC pipe culverts, class III (0390000000-E) | LF | 144 | $185.00 | $169.00 | $256.00 | $210.30 | $439.62 |
| 0015 | 42" RC pipe culverts, class III (0396000000-E) | LF | 128 | $265.00 | $230.00 | $349.00 | $289.90 | $445.16 |
| 0016 | 54" RC pipe culverts, class III (0408000000-E) | LF | 84 | $445.00 | $345.00 | $587.00 | $463.90 | $786.98 |
| 0017 | ***" RCP culv class IV - (60") (0448000000-E) | LF | 160 | $430.00 | $500.00 | $1,350.00 | $597.80 | $1,116.89 |
| 0018 | 24" RC pipe culverts, class IV (0448400000-E) | LF | 96 | $195.00 | $109.00 | $169.00 | $152.90 | $242.94 |
| 0019 | 36" RC pipe culverts, class IV (0448600000-E) | LF | 164 | $285.00 | $200.00 | $285.00 | $243.50 | $475.17 |
| 0020 | Pipe removal (0995000000-E) | LF | 67 | $25.00 | $35.00 | $42.00 | $47.20 | $58.01 |
| 0021 | Fine grading (1011000000-N) | LS | 1 | $440,000 | $210,000 | $101,000 | $219,970 | $172,305 |
| 0022 | Shallow undercut (1099500000-E) | CY | 1,200 | $26.50 | $15.00 | $18.00 | $46.60 | $27.69 |
| 0023 | Class IV subgrade stabilization (1099700000-E) | TON | 2,400 | $31.00 | $27.00 | $36.50 | $35.40 | $31.07 |
| 0024 | Geotextile for subgrade stabilization (1112000000-E) | SY | 3,600 | $3.50 | $3.00 | $2.25 | $2.80 | $5.16 |
| 0025 | Aggregate base course (1121000000-E) | TON | 10,800 | $27.00 | $34.00 | $34.50 | $40.40 | $38.27 |
| 0026 | Incidental stone base (1220000000-E) | TON | 100 | $39.50 | $65.00 | $41.50 | $56.80 | $41.26 |
| 0027 | Asphalt conc intermediate course, type I19.0C (1503000000-E) | TON | 3,600 | $64.00 | $55.00 | $60.00 | $91.50 | $88.85 |
| 0028 | Asphalt conc surface course, type S9.5C (1523000000-E) | TON | 2,600 | $62.00 | $65.00 | $70.00 | $86.80 | $84.57 |
| 0029 | Asphalt binder for plant mix (1575000000-E) | TON | 330 | $630.00 | $700.00 | $750.00 | $807.00 | $551.31 |
| 0030 | Right-of-way markers (2000000000-N) | EACH | 20 | $325.00 | $350.00 | $83.50 | $1,740.00 | $374.67 |
| 0031 | Subdrain excavation (2022000000-E) | CY | 336 | $18.50 | $30.00 | $17.75 | $7.60 | $30.36 |
| 0032 | Geotextile for subsurface drains (2026000000-E) | SY | 1,500 | $5.00 | $3.00 | $15.25 | $1.42 | $2.00 |
| 0033 | Subdrain coarse aggregate (2036000000-E) | CY | 252 | $71.00 | $45.00 | $120.00 | $48.20 | $89.01 |
| 0034 | 6" perforated subdrain pipe (2044000000-E) | LF | 1,500 | $10.50 | $5.00 | $17.25 | $4.00 | $5.24 |
| 0035 | Subdrain pipe outlet (2070000000-N) | EACH | 3 | $380.00 | $450.00 | $2,200.00 | $520.00 | $1,083.85 |
| 0036 | 6" outlet pipe (2077000000-E) | LF | 18 | $26.50 | $75.00 | $33.00 | $42.00 | $28.22 |
| 0037 | Endwalls (2209000000-E) | CY | 30.20 | $1,400.00 | $1,780.00 | $1,800.00 | $1,520.00 | $960.84 |
| 0038 | Reinforced endwalls (2220000000-E) | CY | 21.20 | $1,500.00 | $2,810.00 | $2,300.00 | $1,730.00 | $2,487.43 |
| 0039 | Masonry drainage structures (2286000000-N) | EACH | 2 | $4,450.00 | $5,800.00 | $7,000.00 | $6,215.00 | $4,968.13 |
| 0040 | Masonry drainage structures (2308000000-E) | LF | 4.90 | $530.00 | $230.00 | $1,300.00 | $930.00 | $658.62 |
| 0041 | Frame with grate, STD 840.22 (2354000000-N) | EACH | 1 | $1,400.75 | $2,100.00 | $1,700.00 | $1,390.00 | $972.70 |
| 0042 | Frame with cover, STD 840.54 (2396000000-N) | EACH | 1 | $1,750.00 | $1,243.00 | $1,500.00 | $1,170.00 | $851.70 |
| 0043 | Steel beam guardrail (3030000000-E) | LF | 625 | $23.50 | $23.00 | $26.50 | $31.50 | $25.69 |
| 0044 | 25' clear span guardrail sections (3140000000-E) | EACH | 2 | $1,500.00 | $1,450.00 | $1,900.00 | $2,232.00 | $1,819.85 |
| 0045 | Additional guardrail posts (3150000000-N) | EACH | 5 | $12.00 | $11.00 | $28.00 | $32.80 | $26.76 |
| 0046 | Guardrail end units, type TL-2 (3288000000-N) | EACH | 6 | $3,350.00 | $3,250.00 | $3,700.00 | $4,330.00 | $3,532.64 |
| 0047 | Rip rap, class I (3628000000-E) | TON | 880 | $71.00 | $85.00 | $98.00 | $76.70 | $64.16 |
| 0048 | Rip rap, class II (3635000000-E) | TON | 400 | $81.00 | $92.00 | $137.00 | $77.60 | $71.57 |
| 0049 | Rip rap, class B (3649000000-E) | TON | 580 | $76.00 | $83.00 | $106.00 | $75.50 | $63.63 |
| 0050 | Geotextile for drainage (3656000000-E) | SY | 5,320 | $2.60 | $1.00 | $2.75 | $3.60 | $3.05 |
| 0051 | Supports, 3-LB steel U-channel (4072000000-E) | LF | 230 | $10.50 | $10.00 | $12.50 | $10.50 | $16.06 |
| 0052 | Sign erection, type E (4102000000-N) | EACH | 15 | $77.50 | $75.00 | $93.50 | $262.00 | $80.29 |
| 0053 | Thermoplastic pavement marking lines (4", 90 mils) (4685000000-E) | LF | 19,180 | $0.60 | $0.90 | $1.00 | $1.20 | $0.96 |
| 0054 | Thermoplastic pavement marking lines (24", 90 mils) (4709000000-E) | LF | 20 | $56.50 | $55.00 | $16.00 | $98.50 | $58.88 |
| 0055 | Object markers (end of road) (4955000000-N) | EACH | 3 | $80.00 | $75.00 | $93.50 | $197.00 | $107.05 |
| 0056 | Temporary silt fence (6000000000-E) | LF | 8,345 | $2.90 | $2.35 | $3.00 | $4.50 | $3.00 |
| 0057 | Stone for erosion control, class A (6006000000-E) | TON | 120 | $53.00 | $100.00 | $99.00 | $77.50 | $50.45 |
| 0058 | Stone for erosion control, class B (6009000000-E) | TON | 1,715 | $53.50 | $35.00 | $49.00 | $77.90 | $60.95 |
| 0059 | Sediment control stone (6012000000-E) | TON | 805 | $37.50 | $30.00 | $83.50 | $67.70 | $37.06 |
| 0060 | Temporary mulching (6015000000-E) | ACRE | 30.50 | $1,850.00 | $375.00 | $1,900.00 | $2,430.00 | $2,199.20 |
| 0061 | Seed for temporary seeding (6018000000-E) | LB | 2,000 | $2.10 | $1.00 | $2.25 | $2.60 | $3.77 |
| 0062 | Fertilizer for temporary seeding (6021000000-E) | TON | 11 | $925.00 | $420.00 | $1,000.00 | $1,434.00 | $1,371.92 |
| 0063 | Temporary slope drains (6024000000-E) | LF | 290 | $33.50 | $39.00 | $45.00 | $48.50 | $27.24 |
| 0064 | Safety fence (6029000000-E) | LF | 260 | $3.10 | $3.00 | $2.75 | $3.60 | $3.54 |
| 0065 | Silt excavation (6030000000-E) | CY | 6,240 | $11.50 | $1.00 | $9.50 | $12.80 | $10.62 |
| 0066 | Matting for erosion control (6036000000-E) | SY | 29,371 | $1.65 | $1.75 | $1.75 | $2.60 | $1.71 |
| 0067 | Coir fiber mat (6037000000-E) | SY | 200 | $5.20 | $10.00 | $4.50 | $5.70 | $3.76 |
| 0068 | 1/4" hardware cloth (6042000000-E) | LF | 1,035 | $5.80 | $5.00 | $4.50 | $4.90 | $5.89 |
| 0069 | Low permeability geotextile (6043000000-E) | SY | 2,500 | $9.20 | $8.00 | $2.00 | $3.50 | $3.31 |
| 0070 | Temporary pipe for stream crossing (6046000000-E) | LF | 75 | $74.50 | $190.00 | $120.00 | $160.00 | $228.66 |
| 0071 | Special stilling basins (6070000000-N) | EACH | 4 | $3,050.00 | $2,000.00 | $3,100.00 | $965.00 | $530.14 |
| 0072 | Wattle (6071010000-E) | LF | 140 | $9.30 | $20.00 | $10.00 | $15.10 | $9.63 |
| 0073 | Coir fiber baffle (6071030000-E) | LF | 5,280 | $8.20 | $5.55 | $6.75 | $11.20 | $8.56 |
| 0074 | **" skimmer - (1-1/2") (6071050000-E) | EACH | 22 | $1,300.00 | $2,200.00 | $1,700.00 | $1,400.00 | $8,471.91 |
| 0075 | Seeding and mulching (6084000000-E) | ACRE | 30 | $2,800.00 | $825.00 | $2,900.00 | $6,500.00 | $2,890.34 |
| 0076 | Mowing (6087000000-E) | ACRE | 18 | $205.00 | $225.00 | $227.00 | $390.00 | $214.10 |
| 0077 | Seed for repair seeding (6090000000-E) | LB | 350 | $4.10 | $3.45 | $4.50 | $5.45 | $4.28 |
| 0078 | Fertilizer for repair seeding (6093000000-E) | TON | 1 | $1,250.00 | $1,200.00 | $1,400.00 | $1,434.00 | $1,284.60 |
| 0079 | Seed for supplemental seeding (6096000000-E) | LB | 675 | $3.10 | $3.00 | $3.50 | $6.50 | $3.21 |
| 0080 | Fertilizer topdressing (6108000000-E) | TON | 20 | $980.00 | $500.00 | $1,000.00 | $1,175.00 | $1,016.97 |
| 0081 | Impervious dike (6111000000-E) | LF | 79 | $110.00 | $250.00 | $7.25 | $128.00 | $49.40 |
| 0082 | Specialized hand mowing (6114500000-N) | MHR | 10 | $180.00 | $145.00 | $198.00 | $98.50 | $187.34 |
| 0083 | Response for erosion control (6117000000-N) | EACH | 25 | $145.00 | $50.00 | $112.00 | $130.00 | $160.57 |
| 0084 | Concrete washout structure (6117500000-N) | EACH | 1 | $3,500.00 | $1,750.00 | $1,200.00 | $3,040.00 | $982.44 |
| 0085 | Culvert diversion channel (6120000000-E) | CY | 367 | $77.00 | $169.00 | $52.50 | $28.40 | $60.14 |
| 0086 | Reforestation (6123000000-E) | ACRE | 4 | $2,600.00 | $1,250.00 | $2,800.00 | $3,808.00 | $2,676.24 |
| 0087 | Generic erosion control item (EA) - prefabricated concrete washout (6132000000-N) | EACH | 3 | $1,150.00 | $1,250.00 | $1,900.00 | $1,035.00 | $1,265.12 |
| 0088 | Box culv excav @ ******** - (33+83.86 -L-) (8130000000-N) | LS | 1 | $11,400 | $60,000 | $39,600 | $28,550 | $80,559 |
| 0089 | Foundation conditioning material, box culvert (8133000000-E) | TON | 122.20 | $63.00 | $75.00 | $110.00 | $85.00 | $119.73 |
| 0090 | Class A concrete (culvert) (8196000000-E) | CY | 195.90 | $930.00 | $1,100.00 | $1,100.00 | $905.00 | $2,002.74 |
| 0091 | Reinforcing steel (culvert) (8245000000-E) | LB | 17,634 | $2.00 | $2.00 | $3.25 | $2.70 | $3.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
Every contract let that day: NCDOT letting of June 17, 2025. Compiled by Mirage Metrics.