NCDOT contract C205041 bid tabulation
GRADING, DRAINAGE, PAVING, AND STRUCTURES. FORUM PARKWAY CONNECTOR FROM SR-3955 (FORUM PARKWAY) TO NC-66 (UNIVERSITY PARKWAY). Let by North Carolina DOT on June 17, 2025, Forsyth. 8 bids received; low bid $13,453,482 by Smith-Rowe, LLC.
- Owner
- North Carolina DOT
- Letting
- 17 JUN 2025
- Pay items
- 215
- Data through
- 20 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Smith-Rowe, LLC | $13,453,482 | Low |
| 2 | Triangle Grading & Paving Inc | $13,504,148 | 0.0% |
| 3 | Zachry Construction Corporation | $13,867,719 | +3.0% |
| 4 | Branch Civil Inc | $14,385,000 | +7.0% |
| 5 | W C English Incorporated | $15,903,333 | +18% |
| 6 | Blythe Construction Inc | $16,778,049 | +25% |
| 7 | Vecellio & Grogan Inc | $16,810,000 | +25% |
| 8 | Caton Construction Group Inc | $17,144,619 | +27% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Smith-Rowe, LLC | 2. Triangle Grading & Paving Inc | 3. Zachry Construction Corporation | 4. Branch Civil Inc | 5. W C English Incorporated | 6. Blythe Construction Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Mobilization (0000100000-N) | LS | 1 | $672,650 | $650,000 | $698,000 | $725,000 | $795,000 | $835,000 |
| 0002 | Construction surveying (0000400000-N) | LS | 1 | $120,000 | $135,000 | $305,000 | $113,000 | $155,723 | $250,000 |
| 0003 | Clearing & grubbing (0001000000-E) | LS | 1 | $2,123,019 | $1,760,000 | $1,005,000 | $83,600 | $1,202,703 | $1,660,000 |
| 0004 | Supplementary clearing & grubbing (0008000000-E) | ACRE | 1 | $1.00 | $3,000.00 | $1,000.00 | $15,000 | $50,675 | $5,000.00 |
| 0005 | Unclassified excavation (0022000000-E) | CY | 32,000 | $10.80 | $8.00 | $7.72 | $8.00 | $11.77 | $15.00 |
| 0006 | Undercut excavation (0036000000-E) | CY | 5,030 | $0.01 | $14.00 | $22.73 | $25.00 | $20.35 | $15.00 |
| 0007 | Borrow excavation (0106000000-E) | CY | 84,000 | $0.01 | $10.00 | $16.00 | $14.75 | $17.75 | $21.00 |
| 0008 | Drainage ditch excavation (0134000000-E) | CY | 615 | $28.45 | $13.00 | $7.93 | $16.25 | $19.30 | $12.00 |
| 0009 | Removal of existing asphalt pavement (0156000000-E) | SY | 4,700 | $11.07 | $13.00 | $11.17 | $15.25 | $15.50 | $10.00 |
| 0010 | Breaking of existing asphalt pavement (0177000000-E) | SY | 600 | $4.75 | $8.00 | $3.38 | $7.75 | $5.65 | $8.00 |
| 0011 | Select granular material (0195000000-E) | CY | 500 | $0.01 | $34.00 | $36.76 | $61.00 | $92.95 | $85.00 |
| 0012 | Geotextile for soil stabilization (0196000000-E) | SY | 4,440 | $6.20 | $3.50 | $1.85 | $5.25 | $3.55 | $4.00 |
| 0013 | Rock plating (0223000000-E) | SY | 390 | $103.00 | $65.00 | $137.20 | $293.00 | $80.15 | $110.00 |
| 0014 | Generic grading item (LS) - type 2 bridge approach fill, station 32+73.75 -L- (0248000000-N) | LS | 1 | $138,750 | $40,000 | $85,237 | $155,395 | $1,123,000 | $150,000 |
| 0015 | Generic grading item (TON) - hauling and disposal of petroleum contaminated soil (0255000000-E) | TON | 50 | $111.75 | $80.00 | $129.33 | $119.00 | $69.70 | $180.00 |
| 0016 | Foundation conditioning material, minor structures (0318000000-E) | TON | 635 | $59.60 | $65.00 | $60.03 | $104.00 | $68.30 | $65.00 |
| 0017 | FND condit geotextile (4A) (0321000000-E) | SY | 1,985 | $6.15 | $4.50 | $3.12 | $6.75 | $3.80 | $4.00 |
| 0018 | 15" side drain pipe (0343000000-E) | LF | 140 | $116.40 | $70.00 | $65.09 | $122.00 | $57.60 | $75.00 |
| 0019 | 18" side drain pipe (0344000000-E) | LF | 68 | $97.84 | $80.00 | $78.22 | $134.00 | $87.15 | $100.00 |
| 0020 | 15" RC pipe culverts, class III (0366000000-E) | LF | 536 | $107.30 | $90.00 | $98.73 | $109.00 | $80.05 | $80.00 |
| 0021 | 18" RC pipe culverts, class III (0372000000-E) | LF | 260 | $95.78 | $98.00 | $111.19 | $123.00 | $95.05 | $95.00 |
| 0022 | 24" RC pipe culverts, class III (0378000000-E) | LF | 200 | $188.26 | $135.00 | $152.19 | $164.00 | $127.85 | $125.00 |
| 0023 | 30" RC pipe culverts, class III (0384000000-E) | LF | 112 | $161.87 | $195.00 | $190.99 | $209.00 | $153.80 | $140.00 |
| 0024 | 36" RC pipe culverts, class III (0390000000-E) | LF | 520 | $210.54 | $225.00 | $247.40 | $276.00 | $178.55 | $170.00 |
| 0025 | 15" RC pipe culverts, class IV (0448200000-E) | LF | 1,112 | $104.05 | $105.00 | $98.20 | $120.00 | $86.15 | $110.00 |
| 0026 | 18" RC pipe culverts, class IV (0448300000-E) | LF | 84 | $167.10 | $115.00 | $117.71 | $136.00 | $100.70 | $120.00 |
| 0027 | 30" RC pipe culverts, class IV (0448500000-E) | LF | 840 | $186.95 | $225.00 | $222.40 | $257.00 | $160.55 | $155.00 |
| 0028 | **" CS pipe culv *****" - (36", 0.079") (0576000000-E) | LF | 48 | $155.68 | $200.00 | $177.48 | $176.00 | $105.65 | $100.00 |
| 0029 | 15" CS pipe culverts, 0.064" thick (0582000000-E) | LF | 140 | $79.85 | $80.00 | $85.38 | $90.00 | $62.65 | $65.00 |
| 0030 | 18" CS pipe culverts, 0.064" thick inlet used based on county (0588000000-E) | LF | 64 | $113.66 | $85.00 | $103.08 | $116.00 | $68.05 | $75.00 |
| 0031 | 30" CS pipe culverts, 0.079" thick (0600000000-E) | LF | 52 | $146.89 | $155.00 | $138.94 | $144.00 | $99.35 | $90.00 |
| 0032 | **" CS elbow *****" thick - (15", 0.064") (0636000000-E) | EACH | 4 | $858.39 | $675.00 | $1,009.63 | $1,164.00 | $421.90 | $450.00 |
| 0033 | **" CS elbow *****" thick - (18", 0.064") (0636000000-E) | EACH | 2 | $906.29 | $725.00 | $932.75 | $1,337.00 | $461.95 | $500.00 |
| 0034 | **" CS elbow *****" thick - (30", 0.079") (0636000000-E) | EACH | 2 | $1,791.87 | $1,350.00 | $1,079.57 | $1,895.00 | $730.64 | $850.00 |
| 0035 | **" CS elbow *****" thick - (36", 0.079") (0636000000-E) | EACH | 2 | $1,832.01 | $1,450.00 | $1,128.07 | $2,196.00 | $826.90 | $1,000.00 |
| 0036 | **"WLD STL pipe grad B in soil - (36", 0.532") (0973100000-E) | LF | 40 | $4,251.45 | $1,150.00 | $1,653.70 | $1,395.00 | $1,053.50 | $2,200.00 |
| 0037 | **"WLD STL pipe grad B not in soil - (36", 0.532") (0973300000-E) | LF | 40 | $0.01 | $2,650.00 | $3,160.72 | $2,741.00 | $2,343.50 | $4,700.00 |
| 0038 | Pipe removal (0995000000-E) | LF | 1,063 | $29.23 | $17.00 | $28.27 | $94.50 | $20.15 | $40.00 |
| 0039 | Fine grading (1011000000-N) | LS | 1 | $674,339 | $950,000 | $100,339 | $63,000 | $727,339 | $1,400,000 |
| 0040 | Shallow undercut (1099500000-E) | CY | 770 | $19.75 | $18.00 | $23.43 | $46.00 | $22.35 | $13.00 |
| 0041 | Class IV subgrade stabilization (1099700000-E) | TON | 1,540 | $46.70 | $45.00 | $49.85 | $76.00 | $46.75 | $50.00 |
| 0042 | Geotextile for subgrade stabilization (1112000000-E) | SY | 2,310 | $6.40 | $4.50 | $4.18 | $6.75 | $6.45 | $5.00 |
| 0043 | Aggregate base course (1121000000-E) | TON | 309 | $78.40 | $55.00 | $53.43 | $77.50 | $64.30 | $70.00 |
| 0044 | Incidental stone base (1220000000-E) | TON | 80 | $88.96 | $65.00 | $45.59 | $79.50 | $57.80 | $100.00 |
| 0045 | Prime coat (1275000000-E) | GAL | 60 | $20.00 | $20.00 | $24.99 | $5.00 | $21.00 | $20.00 |
| 0046 | Mill asp PVMT *****" DTH - (1-1/2") (1297000000-E) | SY | 2,060 | $7.65 | $6.50 | $4.88 | $4.25 | $12.65 | $5.00 |
| 0047 | Mill asp PVMT *****" DTH - (3") (1297000000-E) | SY | 4,620 | $6.67 | $5.50 | $5.73 | $4.75 | $12.10 | $6.00 |
| 0048 | Incidental milling (1330000000-E) | SY | 3,160 | $13.46 | $16.00 | $9.66 | $8.00 | $16.90 | $5.00 |
| 0049 | Asphalt conc base course, type B25.0C (1491000000-E) | TON | 5,000 | $87.00 | $87.00 | $95.38 | $95.00 | $91.35 | $95.00 |
| 0050 | Asphalt conc intermediate course, type I19.0C (1503000000-E) | TON | 3,710 | $88.00 | $88.00 | $96.48 | $95.00 | $92.40 | $95.00 |
| 0051 | Asphalt conc surface course, type S9.5B (1519000000-E) | TON | 6,430 | $91.00 | $91.00 | $99.77 | $100.00 | $95.55 | $100.00 |
| 0052 | Asphalt binder for plant mix (1575000000-E) | TON | 825 | $720.00 | $720.00 | $789.38 | $775.00 | $756.00 | $775.00 |
| 0053 | Asphalt plant mix, pavement repair (1693000000-E) | TON | 290 | $285.14 | $190.00 | $325.65 | $135.00 | $198.40 | $225.00 |
| 0054 | Right-of-way markers (2000000000-N) | EACH | 35 | $275.00 | $275.00 | $353.52 | $84.00 | $381.25 | $275.00 |
| 0055 | Subdrain excavation (2022000000-E) | CY | 68 | $43.95 | $18.00 | $26.96 | $40.00 | $42.60 | $35.00 |
| 0056 | Geotextile for subsurface drains (2026000000-E) | SY | 300 | $4.15 | $12.00 | $2.30 | $7.25 | $4.00 | $12.00 |
| 0057 | Subdrain coarse aggregate (2036000000-E) | CY | 51 | $93.30 | $89.00 | $92.52 | $203.00 | $96.70 | $80.00 |
| 0058 | 6" perforated subdrain pipe (2044000000-E) | LF | 300 | $7.80 | $13.00 | $23.01 | $19.75 | $15.65 | $17.00 |
| 0059 | Subdrain pipe outlet (2070000000-N) | EACH | 1 | $533.00 | $425.00 | $204.83 | $1,161.00 | $365.64 | $400.00 |
| 0060 | 6" outlet pipe (2077000000-E) | LF | 6 | $61.85 | $41.00 | $49.49 | $193.00 | $64.75 | $40.00 |
| 0061 | Temporary steel plate covers for masonry drainage structure (2190000000-N) | EACH | 1 | $2,406.14 | $1,200.00 | $334.58 | $3,143.00 | $1,216.00 | $2,500.00 |
| 0062 | Endwalls (2209000000-E) | CY | 5.60 | $2,131.99 | $1,330.00 | $2,103.89 | $2,300.00 | $1,334.90 | $1,200.00 |
| 0063 | Flowable fill (2275000000-E) | CY | 32.42 | $857.02 | $625.00 | $421.68 | $640.00 | $368.09 | $500.00 |
| 0064 | Masonry drainage structures (2286000000-N) | EACH | 50 | $4,118.31 | $2,950.00 | $4,587.79 | $6,493.00 | $3,292.00 | $3,200.00 |
| 0065 | Masonry drainage structures (2308000000-E) | LF | 52.30 | $634.23 | $1,100.00 | $756.52 | $1,250.00 | $847.39 | $400.00 |
| 0066 | Frame with two grates, STD 840.16 (2364000000-N) | EACH | 15 | $1,670.48 | $950.00 | $1,253.16 | $2,076.00 | $1,366.13 | $1,500.00 |
| 0067 | Frame with two grates, STD 840.24 (2366000000-N) | EACH | 4 | $2,721.78 | $900.00 | $1,104.35 | $1,858.00 | $1,463.70 | $1,500.00 |
| 0068 | Frame-GRT-HD 840.03 ** - (E) (2374000000-N) | EACH | 5 | $1,328.68 | $1,100.00 | $1,336.67 | $2,198.00 | $1,182.85 | $1,800.00 |
| 0069 | Frame-GRT-HD 840.03 ** - (F) (2374000000-N) | EACH | 14 | $1,328.68 | $1,200.00 | $1,384.02 | $2,198.00 | $1,185.85 | $1,800.00 |
| 0070 | Frame-GRT-HD 840.03 ** - (G) (2374000000-N) | EACH | 8 | $1,328.68 | $921.25 | $1,384.02 | $2,198.00 | $1,391.00 | $1,800.00 |
| 0071 | Frame with cover, STD 840.54 (2396000000-N) | EACH | 2 | $968.75 | $850.00 | $985.73 | $1,685.00 | $1,054.75 | $1,500.00 |
| 0072 | Steel frame with two grates, STD 840.37 (2407000000-N) | EACH | 2 | $3,114.07 | $3,500.00 | $3,092.37 | $4,766.00 | $1,750.60 | $3,500.00 |
| 0073 | Concrete transitional section for drop inlet (2451000000-N) | EACH | 4 | $1,100.00 | $1,100.00 | $1,107.57 | $1,234.00 | $4,730.00 | $1,100.00 |
| 0074 | **'-**" concrete curb & gutter - (2'-9") (2538000000-E) | LF | 1,070 | $41.50 | $36.50 | $39.19 | $49.50 | $44.80 | $36.50 |
| 0075 | 2'-6" concrete curb & gutter (2549000000-E) | LF | 5,700 | $36.75 | $31.75 | $34.41 | $44.00 | $39.70 | $31.75 |
| 0076 | Shoulder berm gutter (2556000000-E) | LF | 295 | $48.70 | $43.70 | $48.06 | $58.00 | $52.55 | $43.70 |
| 0077 | 6" concrete driveway (2612000000-E) | SY | 210 | $144.51 | $105.00 | $111.82 | $132.00 | $118.45 | $105.00 |
| 0078 | 5" monolithic concrete islands (keyed in) (2655000000-E) | SY | 470 | $90.35 | $90.35 | $90.97 | $101.00 | $97.10 | $90.35 |
| 0079 | Precast reinforced concrete barrier, single faced (2724000000-E) | LF | 84 | $144.28 | $170.00 | $148.02 | $79.00 | $102.50 | $160.25 |
| 0080 | Generic paving item (SY) - 6" jointed concrete with wire mesh (2738000000-E) | SY | 320 | $92.65 | $92.65 | $123.95 | $118.00 | $99.60 | $92.65 |
| 0081 | Adjustment of manholes (2830000000-N) | EACH | 6 | $2,793.56 | $1,300.00 | $4,836.03 | $1,368.00 | $1,444.00 | $500.00 |
| 0082 | Adjustment of meter boxes or valve boxes (2845000000-N) | EACH | 7 | $897.01 | $1,450.00 | $6,201.63 | $43.00 | $1,123.00 | $500.00 |
| 0083 | Steel beam guardrail (3030000000-E) | LF | 1,587.50 | $23.50 | $23.50 | $29.52 | $26.50 | $25.26 | $23.50 |
| 0084 | Steel beam guardrail, shop curved (3045000000-E) | LF | 262.50 | $26.50 | $26.50 | $33.28 | $29.50 | $28.49 | $26.50 |
| 0085 | Steel beam guardrail terminal sections (3105000000-N) | EACH | 2 | $150.00 | $150.00 | $188.38 | $168.00 | $161.25 | $150.00 |
| 0086 | Additional guardrail posts (3150000000-N) | EACH | 10 | $1.00 | $1.00 | $1.25 | $1.00 | $1.08 | $1.00 |
| 0087 | Guardrail end units, type at-1 (3195000000-N) | EACH | 2 | $850.00 | $850.00 | $1,067.47 | $953.00 | $913.75 | $850.00 |
| 0088 | Guardrail end units, type cat-1 (3210000000-N) | EACH | 1 | $950.00 | $950.00 | $1,193.04 | $1,066.00 | $1,021.25 | $950.00 |
| 0089 | Guardrail anchor units, type III (3215000000-N) | EACH | 4 | $2,300.00 | $2,300.00 | $2,888.44 | $2,580.00 | $2,472.50 | $2,300.00 |
| 0090 | Guardrail end units, type TL-2 (3288000000-N) | EACH | 4 | $3,100.00 | $3,100.00 | $3,893.11 | $3,477.00 | $3,332.50 | $3,100.00 |
| 0091 | Guardrail anchor units, type B-77 (3317000000-N) | EACH | 2 | $2,600.00 | $2,600.00 | $3,265.19 | $2,916.00 | $2,902.50 | $2,600.00 |
| 0092 | Remove existing guardrail (3360000000-E) | LF | 780 | $0.50 | $0.50 | $0.63 | $0.55 | $0.54 | $0.50 |
| 0093 | Rip rap, class I (3628000000-E) | TON | 30 | $94.33 | $75.00 | $100.39 | $196.00 | $78.30 | $75.00 |
| 0094 | Rip rap, class II (3635000000-E) | TON | 54 | $103.58 | $70.00 | $105.65 | $217.00 | $95.55 | $81.00 |
| 0095 | Rip rap, class B (3649000000-E) | TON | 190 | $84.90 | $65.00 | $80.41 | $123.00 | $74.90 | $71.00 |
| 0096 | Geotextile for drainage (3656000000-E) | SY | 2,199 | $5.20 | $3.50 | $3.94 | $7.00 | $3.03 | $5.00 |
| 0097 | Supports, 3-LB steel U-channel (4072000000-E) | LF | 346 | $10.00 | $7.50 | $9.92 | $12.00 | $10.75 | $7.50 |
| 0098 | Supports, steel square tube (4080200000-E) | LF | 38 | $10.00 | $7.50 | $9.92 | $12.00 | $10.75 | $7.50 |
| 0099 | Sign erection, type D (4096000000-N) | EACH | 1 | $200.00 | $100.00 | $198.40 | $235.00 | $215.00 | $100.00 |
| 0100 | Sign erection, type E (4102000000-N) | EACH | 20 | $65.00 | $75.00 | $64.48 | $77.00 | $69.88 | $75.00 |
| 0101 | Sign erection, type F (4108000000-N) | EACH | 3 | $200.00 | $75.00 | $198.40 | $235.00 | $215.00 | $75.00 |
| 0102 | Sign erect, reloc ** GRD MTD - (D) (4116100000-N) | EACH | 1 | $200.00 | $150.00 | $198.40 | $235.00 | $215.00 | $150.00 |
| 0103 | Disposal of sign system, U-channel (4155000000-N) | EACH | 18 | $1.00 | $25.00 | $0.99 | $1.00 | $1.10 | $25.00 |
| 0104 | Disposal of support, U-channel (4192000000-N) | EACH | 1 | $1.00 | $25.00 | $0.99 | $1.00 | $1.10 | $25.00 |
| 0105 | Generic signing item (EA) - supports, omni-directional breakaway (4360000000-N) | EACH | 4 | $500.00 | $225.00 | $496.00 | $590.00 | $537.50 | $225.00 |
| 0106 | Work zone signs (stationary) (4400000000-E) | SF | 303 | $7.00 | $7.50 | $10.04 | $8.00 | $7.55 | $6.75 |
| 0107 | Work zone signs (portable) (4405000000-E) | SF | 422 | $22.31 | $33.00 | $10.23 | $77.50 | $18.80 | $13.00 |
| 0108 | Work zone signs (barricade mounted) (4410000000-E) | SF | 158 | $5.00 | $7.00 | $9.99 | $5.50 | $5.40 | $6.50 |
| 0109 | Flashing arrow board (4415000000-N) | EACH | 2 | $3,300.00 | $2,400.00 | $3,761.25 | $6,750.00 | $1,794.50 | $2,400.00 |
| 0110 | Portable changeable message sign (4420000000-N) | EACH | 2 | $11,369 | $13,500 | $13,808 | $18,600 | $2,684.35 | $13,000 |
| 0111 | Drums (4430000000-N) | EACH | 130 | $65.82 | $85.00 | $55.26 | $62.00 | $79.70 | $41.00 |
| 0112 | Cones (4435000000-N) | EACH | 25 | $74.75 | $45.00 | $26.37 | $30.00 | $52.55 | $25.00 |
| 0113 | Barricades (type III) (4445000000-E) | LF | 264 | $20.00 | $24.00 | $27.62 | $26.00 | $21.50 | $24.00 |
| 0114 | Flagger (4455000000-N) | DAY | 240 | $799.18 | $450.00 | $387.84 | $575.00 | $426.30 | $360.00 |
| 0115 | Temporary crash cushions (4465000000-N) | EACH | 2 | $8,091.85 | $9,000.00 | $12,373 | $7,000.00 | $5,565.75 | $9,000.00 |
| 0116 | TMA (4480000000-N) | EACH | 2 | $1.00 | $25,000 | $56,419 | $10,000 | $2,229.50 | $60,000 |
| 0117 | Portable concrete barrier (4485000000-E) | LF | 110 | $57.90 | $52.00 | $64.16 | $57.50 | $56.00 | $120.00 |
| 0118 | Temporary raised pavement markers (4650000000-N) | EACH | 120 | $5.00 | $15.00 | $14.88 | $17.75 | $16.13 | $5.00 |
| 0119 | Thermoplastic pavement marking lines (4", 90 mils) (4685000000-E) | LF | 21,033 | $1.00 | $2.20 | $0.65 | $2.50 | $2.37 | $1.00 |
| 0120 | Thermoplastic pavement marking lines (8", 90 mils) (4695000000-E) | LF | 700 | $3.00 | $3.00 | $3.02 | $3.50 | $3.23 | $3.00 |
| 0121 | Thermoplastic pavement marking lines (24", 90 mils) (4709000000-E) | LF | 49 | $8.00 | $20.00 | $13.09 | $23.50 | $21.50 | $8.00 |
| 0122 | Thermoplastic pavement marking character (90 mils) (4720000000-E) | EACH | 8 | $350.00 | $120.00 | $151.03 | $142.00 | $129.00 | $350.00 |
| 0123 | Thermoplastic pavement marking symbol (90 mils) (4725000000-E) | EACH | 35 | $200.00 | $155.00 | $201.38 | $183.00 | $166.63 | $200.00 |
| 0124 | 4" cold appl plstic lines type ** - (III) (4770000000-E) | LF | 1,012 | $14.00 | $7.00 | $9.06 | $8.25 | $7.53 | $14.00 |
| 0125 | Paint pavement marking lines (4") (4810000000-E) | LF | 54,699 | $0.35 | $0.50 | $0.38 | $0.60 | $0.54 | $0.35 |
| 0126 | Paint pavement marking lines (8") (4820000000-E) | LF | 1,050 | $0.50 | $1.25 | $0.76 | $1.50 | $1.34 | $0.50 |
| 0127 | Paint pavement marking lines (24") (4835000000-E) | LF | 840 | $1.00 | $5.00 | $3.78 | $7.00 | $6.45 | $1.00 |
| 0128 | Paint pavement marking symbol (4845000000-N) | EACH | 17 | $50.00 | $75.00 | $74.40 | $88.50 | $80.63 | $50.00 |
| 0129 | Removal of pavement marking lines (4") (4850000000-E) | LF | 6,532 | $0.80 | $1.00 | $1.01 | $1.25 | $1.08 | $0.80 |
| 0130 | Removal of pavement marking lines (24") (4870000000-E) | LF | 65 | $5.00 | $5.00 | $4.03 | $6.00 | $5.38 | $5.00 |
| 0131 | Removal of pavement marking symbols & characters (4875000000-N) | EACH | 6 | $50.00 | $100.00 | $50.34 | $118.00 | $107.50 | $50.00 |
| 0132 | Generic pavement marking item (EA) - polycarbonate H-shaped markers (4895000000-N) | EACH | 33 | $100.00 | $290.00 | $60.41 | $342.00 | $311.75 | $100.00 |
| 0133 | 6" water line (5325600000-E) | LF | 974 | $92.71 | $100.00 | $84.00 | $131.00 | $146.20 | $165.00 |
| 0134 | 12" water line (5326200000-E) | LF | 500 | $207.49 | $160.00 | $129.94 | $182.00 | $203.20 | $235.00 |
| 0135 | DI H2O pipe fittings (5329000000-E) | LB | 2,915 | $14.84 | $13.00 | $9.57 | $32.50 | $16.15 | $16.00 |
| 0136 | 6" valve (5540000000-E) | EACH | 4 | $4,657.88 | $2,650.00 | $2,259.22 | $4,569.00 | $3,225.00 | $3,550.00 |
| 0137 | 12" valve (5558000000-E) | EACH | 2 | $7,217.93 | $5,700.00 | $5,617.98 | $9,270.00 | $7,740.00 | $7,900.00 |
| 0138 | **" insertion valve - (12") (5562000000-E) | EACH | 1 | $37,964 | $32,000 | $51,200 | $46,300 | $43,000 | $29,800 |
| 0139 | 6" tapping sleeve & valve (5571600000-E) | EACH | 1 | $12,964 | $6,500.00 | $18,117 | $27,900 | $12,363 | $17,550 |
| 0140 | 12" tapping sleeve & valve (5572200000-E) | EACH | 1 | $18,952 | $12,000 | $29,119 | $39,800 | $17,093 | $23,390 |
| 0141 | **" water meter - (1") (5643000000-E) | EACH | 1 | $2,494.54 | $2,100.00 | $3,251.39 | $4,706.00 | $3,332.50 | $5,250.00 |
| 0142 | Relocate water meter (5648000000-N) | EACH | 6 | $2,229.52 | $980.00 | $1,288.37 | $3,017.00 | $3,762.50 | $3,650.00 |
| 0143 | Reconnect water meter (5649000000-N) | EACH | 4 | $1,959.62 | $1,250.00 | $1,516.33 | $2,168.00 | $3,225.00 | $3,650.00 |
| 0144 | Fire hydrant (5666000000-N) | EACH | 3 | $9,063.66 | $6,750.00 | $9,229.00 | $14,700 | $9,675.00 | $8,200.00 |
| 0145 | Fire hydrant leg (5673000000-E) | LF | 95 | $114.04 | $145.00 | $108.25 | $160.00 | $129.00 | $165.00 |
| 0146 | **" water service line - (1") (5686000000-E) | LF | 464 | $45.97 | $45.00 | $39.15 | $85.00 | $107.50 | $70.00 |
| 0147 | 10" sanitary gravity sewer (5691400000-E) | LF | 222 | $266.02 | $198.00 | $177.03 | $339.00 | $349.40 | $245.00 |
| 0148 | Sewer service line (5768500000-E) | LF | 11 | $430.59 | $115.00 | $110.22 | $342.00 | $161.25 | $150.00 |
| 0149 | 4' dia utility manhole (5775000000-E) | EACH | 4 | $21,434 | $4,800.00 | $8,404.81 | $9,506.00 | $9,675.00 | $9,250.00 |
| 0150 | Utility manhole wall 4' dia (5781000000-E) | LF | 21 | $741.69 | $900.00 | $340.44 | $648.00 | $752.50 | $750.00 |
| 0151 | Abandon 6" utility pipe (5800000000-E) | LF | 992 | $16.82 | $16.00 | $11.69 | $21.50 | $19.35 | $27.00 |
| 0152 | Abandon 10" utility pipe (5802000000-E) | LF | 207 | $29.08 | $19.00 | $15.29 | $37.50 | $26.88 | $35.00 |
| 0153 | Abandon 12" utility pipe (5804000000-E) | LF | 441 | $33.25 | $20.00 | $18.10 | $37.50 | $30.10 | $45.00 |
| 0154 | Remove water meter (5815000000-N) | EACH | 7 | $1,264.26 | $850.00 | $865.25 | $605.00 | $1,290.00 | $2,800.00 |
| 0155 | Remove fire hydrant (5815500000-N) | EACH | 2 | $804.53 | $1,800.00 | $3,103.85 | $1,800.00 | $3,762.50 | $3,250.00 |
| 0156 | Remove utility manhole (5828000000-N) | EACH | 1 | $2,461.80 | $1,300.00 | $3,782.57 | $3,500.00 | $6,450.00 | $2,200.00 |
| 0157 | Generic utility item (EA) - relocate sewer clean-out (5882000000-N) | EACH | 2 | $2,216.42 | $750.00 | $2,681.77 | $4,500.00 | $3,762.50 | $1,800.00 |
| 0158 | Temporary silt fence (6000000000-E) | LF | 9,590 | $2.01 | $2.01 | $2.52 | $3.25 | $2.15 | $2.01 |
| 0159 | Stone for erosion control, class A (6006000000-E) | TON | 720 | $80.08 | $60.00 | $78.34 | $125.00 | $70.25 | $70.00 |
| 0160 | Stone for erosion control, class B (6009000000-E) | TON | 2,680 | $0.01 | $65.00 | $80.01 | $92.00 | $73.60 | $75.00 |
| 0161 | Sediment control stone (6012000000-E) | TON | 1,580 | $0.01 | $55.00 | $59.90 | $93.50 | $65.60 | $65.00 |
| 0162 | Temporary mulching (6015000000-E) | ACRE | 31.50 | $985.00 | $985.00 | $1,237.01 | $1,907.00 | $1,058.80 | $985.00 |
| 0163 | Seed for temporary seeding (6018000000-E) | LB | 1,800 | $1.00 | $1.00 | $1.25 | $2.25 | $1.10 | $1.00 |
| 0164 | Fertilizer for temporary seeding (6021000000-E) | TON | 10.50 | $1,000.00 | $1,000.00 | $1,255.84 | $1,009.00 | $1,075.00 | $1,000.00 |
| 0165 | Temporary slope drains (6024000000-E) | LF | 1,125 | $22.40 | $29.00 | $27.68 | $47.00 | $14.25 | $22.00 |
| 0166 | Safety fence (6029000000-E) | LF | 320 | $3.36 | $2.36 | $2.96 | $3.00 | $2.55 | $2.36 |
| 0167 | Silt excavation (6030000000-E) | CY | 10,250 | $0.01 | $2.50 | $0.00 | $16.00 | $0.01 | $28.00 |
| 0168 | Matting for erosion control (6036000000-E) | SY | 29,930 | $1.45 | $1.45 | $1.46 | $1.75 | $1.56 | $1.45 |
| 0169 | Coir fiber mat (6037000000-E) | SY | 100 | $28.00 | $18.00 | $18.12 | $6.75 | $19.35 | $18.00 |
| 0170 | 1/4" hardware cloth (6042000000-E) | LF | 1,795 | $4.00 | $4.00 | $4.03 | $5.50 | $4.30 | $4.00 |
| 0171 | Low permeability geotextile (6043000000-E) | SY | 500 | $5.85 | $2.50 | $4.96 | $5.00 | $4.15 | $5.00 |
| 0172 | Special stilling basins (6070000000-N) | EACH | 6 | $695.15 | $585.00 | $898.61 | $107.00 | $1,177.25 | $350.00 |
| 0173 | Flocculant (6071002000-E) | LB | 865 | $1.00 | $1.00 | $1.01 | $4.50 | $18.50 | $1.00 |
| 0174 | Coir fiber wattle (6071012000-E) | LF | 1,440 | $9.00 | $9.00 | $9.06 | $10.00 | $9.65 | $9.00 |
| 0175 | Wattle barrier (6071013000-E) | LF | 771 | $9.00 | $9.00 | $9.06 | $13.50 | $9.65 | $9.00 |
| 0176 | Coir fiber baffle (6071030000-E) | LF | 1,485 | $7.00 | $7.00 | $7.05 | $12.50 | $7.53 | $7.00 |
| 0177 | **" skimmer - (1-1/2") (6071050000-E) | EACH | 8 | $1,406.00 | $1,850.00 | $1,714.42 | $1,301.00 | $1,213.40 | $1,300.00 |
| 0178 | **" skimmer - (3") (6071050000-E) | EACH | 2 | $2,166.15 | $2,600.00 | $1,916.97 | $2,473.00 | $1,867.50 | $1,600.00 |
| 0179 | Seeding and mulching (6084000000-E) | ACRE | 30 | $2,600.00 | $2,600.00 | $2,617.90 | $3,028.00 | $2,795.00 | $2,600.00 |
| 0180 | Mowing (6087000000-E) | ACRE | 15 | $100.00 | $100.00 | $100.69 | $280.00 | $107.50 | $100.00 |
| 0181 | Seed for repair seeding (6090000000-E) | LB | 350 | $5.00 | $5.00 | $5.03 | $5.50 | $5.40 | $5.00 |
| 0182 | Fertilizer for repair seeding (6093000000-E) | TON | 1 | $800.00 | $800.00 | $805.51 | $1,234.00 | $860.00 | $800.00 |
| 0183 | Seed for supplemental seeding (6096000000-E) | LB | 725 | $3.00 | $3.00 | $3.02 | $3.25 | $3.25 | $3.00 |
| 0184 | Fertilizer topdressing (6108000000-E) | TON | 21.50 | $925.00 | $925.00 | $931.37 | $1,009.00 | $994.35 | $925.00 |
| 0185 | Impervious dike (6111000000-E) | LF | 37 | $117.85 | $105.00 | $198.06 | $18.75 | $69.36 | $300.00 |
| 0186 | Specialized hand mowing (6114500000-N) | MHR | 10 | $100.00 | $100.00 | $100.69 | $196.00 | $107.50 | $100.00 |
| 0187 | Manual litter removal (6114800000-N) | MHR | 14 | $116.15 | $100.00 | $220.94 | $196.00 | $234.55 | $85.00 |
| 0188 | Litter disposal (6114900000-E) | TON | 1 | $389.40 | $350.00 | $618.63 | $280.00 | $2,052.65 | $200.00 |
| 0189 | Response for erosion control (6117000000-N) | EACH | 75 | $0.01 | $120.00 | $125.59 | $112.00 | $107.50 | $100.00 |
| 0190 | Concrete washout structure (6117500000-N) | EACH | 2 | $1,858.95 | $850.00 | $1,019.10 | $1,265.00 | $3,152.00 | $1,000.00 |
| 0191 | Generic erosion control item (EA) - fabric insert inlet protection cleanout (6132000000-N) | EACH | 174 | $0.01 | $100.00 | $162.50 | $485.00 | $177.65 | $190.00 |
| 0192 | Generic erosion control item (EA) - fabric insert inlet protection, type 1 (6132000000-N) | EACH | 23 | $257.55 | $195.00 | $383.32 | $641.00 | $292.40 | $190.00 |
| 0193 | Generic erosion control item (EA) - fabric insert inlet protection, type 2 (6132000000-N) | EACH | 35 | $257.55 | $195.00 | $383.32 | $560.00 | $292.40 | $190.00 |
| 0194 | Generic erosion control item (EA) - prefabricated concrete washout (6132000000-N) | EACH | 12 | $635.00 | $850.00 | $515.53 | $1,495.00 | $1,495.45 | $750.00 |
| 0195 | Generic erosion control item (SY) - permanent soil reinforcement mat, type 1 (6141000000-E) | SY | 1,235 | $5.00 | $6.00 | $4.05 | $4.50 | $10.75 | $8.00 |
| 0196 | MSE retain wall no ** - (1) (8801000000-E) | SF | 5,326 | $134.27 | $135.00 | $178.88 | $150.00 | $141.00 | $150.00 |
| 0197 | MSE retain wall no ** - (2) (8801000000-E) | SF | 4,660 | $151.54 | $135.00 | $208.21 | $169.00 | $141.00 | $150.00 |
| 0198 | 4'-0" dia drilled piers in soil (8105560000-E) | LF | 42 | $2,544.41 | $1,745.00 | $2,382.15 | $2,863.00 | $2,500.00 | $2,000.00 |
| 0199 | 4'-0" dia drilled piers not in soil (8105660000-E) | LF | 72 | $2,544.41 | $250.00 | $553.43 | $2,863.00 | $2,500.00 | $2,500.00 |
| 0200 | Permanent steel casing for 4'-0" dia drilled pier (8111600000-E) | LF | 39 | $569.88 | $390.00 | $489.78 | $639.00 | $450.00 | $400.00 |
| 0201 | Reinforced concrete deck slab (8147000000-E) | SF | 12,018 | $53.98 | $49.00 | $25.65 | $60.00 | $45.00 | $52.00 |
| 0202 | Grooving bridge floors (8161000000-E) | SF | 11,729 | $1.04 | $1.10 | $0.45 | $1.25 | $0.80 | $1.50 |
| 0203 | Class A concrete (bridge) (8182000000-E) | CY | 201 | $1,121.81 | $900.00 | $1,477.45 | $1,258.00 | $1,620.00 | $1,500.00 |
| 0204 | BRG appr slab *********** - (32+73.75 -L-) (8210000000-N) | LS | 1 | $116,425 | $73,000 | $119,580 | $131,000 | $127,000 | $100,000 |
| 0205 | Reinforcing steel (bridge) (8217000000-E) | LB | 37,841 | $1.55 | $2.10 | $1.33 | $1.75 | $1.14 | $1.25 |
| 0206 | Spiral column reinforcing steel (bridge) (8238000000-E) | LB | 4,861 | $3.56 | $3.00 | $2.73 | $4.00 | $2.36 | $3.00 |
| 0207 | Fib **" prestr conc girdr - (54") (8278000000-E) | LF | 1,213 | $493.70 | $457.00 | $390.00 | $550.00 | $600.00 | $500.00 |
| 0208 | Pile DRV equip setup ** steel piles - (HP 14 X 89) (8328200000-E) | EACH | 18 | $2,602.79 | $1,400.00 | $5,555.56 | $2,919.00 | $3,285.00 | $1,800.00 |
| 0209 | HP**X** piles - (14 X 89) (8355000000-E) | LF | 925 | $77.90 | $98.00 | $120.62 | $87.50 | $120.00 | $80.00 |
| 0210 | Steel pile points (8391000000-N) | EACH | 18 | $216.85 | $240.00 | $833.33 | $243.00 | $180.00 | $150.00 |
| 0211 | Three bar metal rail (8482000000-E) | LF | 391.50 | $312.56 | $218.00 | $352.97 | $351.00 | $341.00 | $280.00 |
| 0212 | **" chain link fence - (122") (8524000000-E) | LF | 403 | $243.25 | $210.00 | $209.43 | $273.00 | $224.00 | $208.00 |
| 0213 | 4" slope protection (8531000000-E) | SY | 87 | $227.17 | $160.00 | $193.36 | $255.00 | $185.00 | $250.00 |
| 0214 | Elastomeric bearings (8657000000-N) | LS | 1 | $6,650.00 | $11,700 | $34,728 | $7,459.00 | $32,500 | $15,000 |
| 0215 | Foam joint seals (8692000000-N) | LS | 1 | $47,000 | $21,700 | $55,575 | $52,700 | $32,800 | $20,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
Every contract let that day: NCDOT letting of June 17, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.