Caton Construction Group Inc: NCDOT bid record
Caton Construction Group Inc submitted 91 bids on North Carolina DOT contracts in the data, from 15 DEC 2020 to 20 OCT 2026, and was the low bidder on 6 of them (7%). When it was not low, its total sat a median +32% above the low bid.
- Owner
- North Carolina DOT
- Low bid volume
- $81,139,373
- Latest bid
- 20 OCT 2026
- Data through
- 20 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 4 | 0 | 0% |
| 2021 | 12 | 1 | 8% |
| 2022 | 18 | 1 | 6% |
| 2023 | 16 | 3 | 19% |
| 2024 | 11 | 0 | 0% |
| 2025 | 21 | 1 | 5% |
| 2026 | 9 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Rockingham | 10 | 0 | 0% |
| Forsyth | 8 | 1 | 13% |
| Mecklenburg | 4 | 2 | 50% |
| Wake | 3 | 1 | 33% |
| Brunswick | 3 | 0 | 0% |
| Cabarrus | 3 | 0 | 0% |
| Stokes | 3 | 0 | 0% |
| Rutherford | 3 | 0 | 0% |
| Guilford | 3 | 0 | 0% |
| Davidson | 3 | 0 | 0% |
| Robeson | 3 | 0 | 0% |
| Alamance | 3 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Steel beam guardrail | 3030000000-E | LF | 88 | 36 (41%) | $24.25 | $24.00 |
| Seed for temporary seeding | 6018000000-E | LB | 91 | 32 (35%) | $2.50 | $3.00 |
| Fertilizer for repair seeding | 6093000000-E | TON | 90 | 32 (36%) | $1,100.00 | $1,110.00 |
| Mowing | 6087000000-E | ACRE | 90 | 31 (34%) | $200.00 | $150.00 |
| Additional guardrail posts | 3150000000-N | EACH | 85 | 31 (36%) | $12.25 | $13.00 |
| Work zone signs (stationary) | 4400000000-E | SF | 89 | 29 (33%) | $7.50 | $7.25 |
| Work zone signs (barricade mounted) | 4410000000-E | SF | 89 | 29 (33%) | $8.00 | $7.50 |
| Matting for erosion control | 6036000000-E | SY | 91 | 28 (31%) | $1.85 | $1.75 |
| Seed for supplemental seeding | 6096000000-E | LB | 91 | 28 (31%) | $5.00 | $4.50 |
| Grooving bridge floors | 8161000000-E | SF | 71 | 28 (39%) | $0.75 | $0.80 |
| Safety fence | 6029000000-E | LF | 90 | 27 (30%) | $2.67 | $2.20 |
| Geotextile for soil stabilization | 0196000000-E | SY | 90 | 27 (30%) | $4.00 | $2.50 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Smith-Rowe, LLC | 55 | 52 of 55 |
| W C English Incorporated | 50 | 40 of 50 |
| Dane Construction, Inc. | 40 | 25 of 40 |
| Blythe Construction Inc | 30 | 24 of 30 |
| Zachry Construction Corporation | 30 | 21 of 30 |
| Conti Civil LLC | 22 | 16 of 22 |
| S T Wooten Corporation | 19 | 18 of 19 |
| Vecellio & Grogan Inc | 18 | 9 of 18 |
| Kemp Sigmon Construction Co Inc | 17 | 16 of 17 |
| Sanford Contractors Inc | 16 | 14 of 16 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 20 OCT 2026 | C205207 | Pender | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #700037 OVER ANGOLA CREEK ON NC-53 | 5 of 5 | $11,463,280 | +79% |
| 15 SEP 2026 | C204990 | Randolph | GRADING, DRAINAGE, PAVING, SIGNALS, AND CULVERT. SR-1712 (PINEVIEW ST) FROM W OF SYLVAN DR TO US-220 BUSINESS | 8 of 9 | $9,749,124 | +16% |
| 15 SEP 2026 | C205214 | Wilkes | GRADING, DRAINAGE, PAVING, AND STRUCTURE., GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURE. BRIDGE #960029 OVER CUB CREEK ON SR-1001 (OAKW | 5 of 5 | $8,512,074 | +31% |
| 18 AUG 2026 | C204877 | Rutherford | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #800145 OVER FLOYDS CREEK ON SR-2125 (HARRIS HENRIETTA ROAD) | 8 of 8 | $2,952,810 | +58% |
| 18 AUG 2026 | C205070 | Rutherford | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #800012 OVER US-74 BYPASS ON NC-120 | 7 of 9 | $8,999,061 | +27% |
| 21 JUL 2026 | C205194 | Rockingham | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #780177 OVER MATRIMONY CREEK ON SR-1535 (PRICE RD) | 5 of 5 | $4,934,277 | +42% |
| 16 JUN 2026 | C205160 | Forsyth | GRADING DRAINAGE, PAVING, SIGNALS AND STRUCTURE., GRADING DRAINAGE, PAVING, SIGNALS, AND STRUCTURE. BRIDGE #330289 OVER US-52 ON SR-4000 | 5 of 5 | $22,950,014 | +21% |
| 17 FEB 2026 | C204936 | Alamance | GRADING, DRAINAGE, PAVING, AND STRUCTURES., GRADING, DRAINAGE, PAVING, AND STURCTURES. BRIDGE #000014 OVER CANE CREEK ON NC-87 | 7 of 7 | $9,883,100 | +28% |
| 20 JAN 2026 | C204814 | Wayne | GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. BRIDGE #950020 OVER CSX TRANSPORTATION RAILROAD TRACKS ON US-70 BUS | 7 of 7 | $10,796,165 | +23% |
| 16 DEC 2025 | C205018 | Rockingham | GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. UPGRADE FUTURE I-73/US-220 AT US-311/NC-135 INTERCHANGE AND REPLACE BRIDGE #780074 | 6 of 6 | $24,614,278 | +36% |
| 16 DEC 2025 | C205071 | Rockingham | GRADING, DRAINAGE, PAVING, AND STRUCTURES. BRIDGE #780163 OVER HOGAN'S CREEK ON US-158 | 3 of 3 | $7,445,283 | +64% |
| 18 NOV 2025 | C205069 | Robeson | GRADING, DRAINAGE, PAVING, AND STRUCTURES., GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. BRIDGE #770175 OVER LUMBER RIVER ON SR-1600 | 6 of 6 | $8,140,999 | +24% |
| 18 NOV 2025 | C205044 | Surry, Yadkin | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #850006 OVER NC-268, SOUTHERN RAILROAD TRACKS, AND THE YADKIN RIVER ON I-77 | 4 of 6 | $19,548,450 | +16% |
| 21 OCT 2025 | C204711 | Beaufort | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #060009 OVER BLOUNTS CREEK ON SR-1112 (MOUTH OF THE CREEK ROAD) | 6 of 8 | $16,415,770 | +49% |
| 16 SEP 2025 | C205033 | Bertie | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #070024 OVER CASHIE RIVER ON NC-11 | 5 of 6 | $6,936,678 | +62% |
| 19 AUG 2025 | C204832 | Nash, Halifax | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #630036 OVER FISHING CREEK ON NC-561 | 7 of 7 | $8,627,900 | +103% |
| 19 AUG 2025 | C204991 | Mecklenburg | BRIDGE #590165 OVER COFFEY CREEK ON SHOPTON RD., BRIDGE #590165 OVER COFFEY CREEK ON SR 5469 (SHOPTON RD)., BRIDGE #590165 OVER COFFEY CREEK | 5 of 6 | $8,864,872 | +30% |
| 17 JUN 2025 | C205041 | Forsyth | GRADING, DRAINAGE, PAVING, AND STRUCTURES. FORUM PARKWAY CONNECTOR FROM SR-3955 (FORUM PARKWAY) TO NC-66 (UNIVERSITY PARKWAY) | 8 of 8 | $17,144,619 | +27% |
| 17 JUN 2025 | C205016 | Davidson | GRADING, DRAINAGE, PAVING, AND STRUCTURES. REPLACE BRIDGE #58 OVER US-64 ON NC-109 | 8 of 9 | $9,719,373 | +27% |
| 20 MAY 2025 | C205043 | Catawba | GRADING, DRAINAGE, PAVING, AND SIGNALS. NC-127 FROM 1ST AVENUE SOUTHEAST TO 2ND AVENUE SOUTHEAST | 1 of 3 | $8,533,743 | Low, 5.0% under the second |
| 15 APR 2025 | C205061 | Guilford | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #400224 OVER SOUTH BUFFALO CREEK ON SR-3000 (MCCONNELL RD) | 8 of 8 | $6,407,961 | +61% |
| 15 APR 2025 | C205059 | Stokes | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #840286 OVER LITTLE YADKIN RIVER ON SR-1236 (NORTH OLD 52) | 7 of 7 | $9,209,964 | +41% |
| 18 MAR 2025 | C204938 | Cleveland | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #220025 OVER BUFFALO CREEK ON SR-2033 (OAK GROVE ROAD) | 5 of 6 | $6,614,235 | +27% |
| 18 MAR 2025 | C204766 | Madison | GRADING, DRAINAGE, PAVING, AND STRUCTURES., GRADING, DRAINAGE, PAVING, RETAINING WALL, AND STRUCTURE. BRIDGE #560067 OVER THE FRENCH BROAD R | 2 of 8 | $17,651,097 | +5.0% |
| 18 FEB 2025 | C204980 | Forsyth | GRADING, DRAINAGE, PAVING, AND WALLS. GREAT WAGON ROAD FROM SR-1001 (SHALLOWFORD ROAD) TO SR-1308 (LEWISVILLE-VIENNA ROAD) | 6 of 7 | $25,369,934 | +28% |
How this record was read
NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; NCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.