NCDOT contract C205018 bid tabulation
GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. UPGRADE FUTURE I-73/US-220 AT US-311/NC-135 INTERCHANGE AND REPLACE BRIDGE #780074. Let by North Carolina DOT on December 16, 2025, Rockingham. 6 bids received; low bid $18,156,837 by Smith-Rowe, LLC.
- Owner
- North Carolina DOT
- Letting
- 16 DEC 2025
- Pay items
- 273
- Data through
- 20 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Smith-Rowe, LLC | $18,156,837 | Low |
| 2 | Vecellio & Grogan Inc | $20,023,500 | +10% |
| 3 | Zachry Construction Corporation | $20,794,730 | +15% |
| 4 | W C English Incorporated | $21,082,735 | +16% |
| 5 | Blythe Construction Inc | $23,764,315 | +31% |
| 6 | Caton Construction Group Inc | $24,614,278 | +36% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Smith-Rowe, LLC | 2. Vecellio & Grogan Inc | 3. Zachry Construction Corporation | 4. W C English Incorporated | 5. Blythe Construction Inc | 6. Caton Construction Group Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Mobilization (0000100000-N) | LS | 1 | $907,800 | $990,000 | $1,040,000 | $1,050,000 | $1,184,000 | $1,230,714 |
| 0002 | Construction surveying (0000400000-N) | LS | 1 | $135,000 | $332,916 | $250,000 | $196,900 | $350,000 | $54,120 |
| 0003 | Clearing & grubbing (0001000000-E) | LS | 1 | $2,181,310 | $32,500 | $1,500,000 | $592,340 | $1,750,000 | $25,654 |
| 0004 | Supplementary clearing & grubbing (0008000000-E) | ACRE | 1 | $1.00 | $15,000 | $17,649 | $0.01 | $10,000 | $13,357 |
| 0005 | Sealing abandoned wells (0015000000-N) | EACH | 2 | $3,800.00 | $3,150.00 | $2,733.79 | $3,240.00 | $2,500.00 | $1,886.52 |
| 0006 | Unclassified excavation (0022000000-E) | CY | 5,200 | $17.65 | $20.00 | $6.45 | $14.35 | $50.00 | $13.39 |
| 0007 | Undercut excavation (0036000000-E) | CY | 4,250 | $10.00 | $12.00 | $25.05 | $27.15 | $35.00 | $39.96 |
| 0008 | Borrow excavation (0106000000-E) | CY | 74,000 | $0.01 | $20.00 | $16.72 | $13.55 | $15.00 | $20.25 |
| 0009 | Drainage ditch excavation (0134000000-E) | CY | 61.90 | $19.00 | $45.00 | $9.80 | $21.90 | $50.00 | $26.80 |
| 0010 | Removal of existing asphalt pavement (0156000000-E) | SY | 1,030 | $23.65 | $11.00 | $10.90 | $16.85 | $10.00 | $115.17 |
| 0011 | Breaking of existing asphalt pavement (0177000000-E) | SY | 1,030 | $5.05 | $2.50 | $13.42 | $6.65 | $7.00 | $52.18 |
| 0012 | Select granular material (0195000000-E) | CY | 4,050 | $0.01 | $95.00 | $83.97 | $42.10 | $72.00 | $135.37 |
| 0013 | Geotextile for soil stabilization (0196000000-E) | SY | 5,550 | $5.41 | $4.00 | $3.50 | $3.60 | $5.00 | $7.04 |
| 0014 | Temporary shoring (0199000000-E) | SF | 1,915 | $65.60 | $35.00 | $225.00 | $150.00 | $100.00 | $33.07 |
| 0015 | Rock plating (0223000000-E) | SY | 180 | $120.75 | $175.00 | $155.94 | $79.80 | $160.00 | $119.07 |
| 0016 | Generic grading item (LS) - type 2 bridge approach fill, station 119+69.55 -Y- (0248000000-N) | LS | 1 | $147,525 | $260,000 | $105,619 | $90,000 | $70,000 | $237,416 |
| 0017 | Foundation conditioning material, minor structures (0318000000-E) | TON | 390 | $63.05 | $60.00 | $68.93 | $73.45 | $60.00 | $86.25 |
| 0018 | FND condit geotextile (4A) (0321000000-E) | SY | 1,210 | $6.21 | $3.00 | $4.83 | $4.30 | $3.00 | $6.70 |
| 0019 | 15" drainage pipe (0335200000-E) | LF | 36 | $111.80 | $80.00 | $116.55 | $69.10 | $100.00 | $221.90 |
| 0020 | **" drainage pipe elbow - (15") (0335850000-E) | EACH | 2 | $966.04 | $625.00 | $1,316.74 | $716.05 | $350.00 | $260.15 |
| 0021 | ***" RCP culv class IV - (54") (0448000000-E) | LF | 244 | $567.70 | $600.00 | $740.20 | $738.72 | $450.00 | $750.93 |
| 0022 | 15" RC pipe culverts, class IV (0448200000-E) | LF | 1,520 | $126.79 | $100.00 | $121.84 | $85.30 | $100.00 | $155.00 |
| 0023 | 18" RC pipe culverts, class IV (0448300000-E) | LF | 1,268 | $170.18 | $115.00 | $146.95 | $113.40 | $110.00 | $185.00 |
| 0024 | 24" RC pipe culverts, class IV (0448400000-E) | LF | 164 | $172.66 | $170.00 | $192.96 | $173.90 | $130.00 | $259.27 |
| 0025 | 30" RC pipe culverts, class IV (0448500000-E) | LF | 192 | $178.98 | $215.00 | $251.42 | $247.30 | $180.00 | $308.37 |
| 0026 | 42" RC pipe culverts, class IV (0448700000-E) | LF | 196 | $331.67 | $370.00 | $449.68 | $447.10 | $300.00 | $479.73 |
| 0027 | Generic pipe item (LF) - 42" pipe rehabilitation cipp liner (0986000000-E) | LF | 252 | $636.69 | $565.00 | $592.31 | $1,037.90 | $470.00 | $490.61 |
| 0028 | Generic pipe item (LF) - pre installation inspection (0986000000-E) | LF | 252 | $68.26 | $55.00 | $19.76 | $57.25 | $11.00 | $11.35 |
| 0029 | Pipe removal (0995000000-E) | LF | 1,537 | $55.11 | $25.00 | $27.23 | $25.90 | $45.00 | $77.12 |
| 0030 | Fine grading (1011000000-N) | LS | 1 | $1,053,589 | $190,000 | $271,764 | $690,633 | $2,190,000 | $583,000 |
| 0031 | Shallow undercut (1099500000-E) | CY | 1,480 | $19.25 | $12.00 | $26.72 | $26.60 | $27.00 | $60.84 |
| 0032 | Class IV subgrade stabilization (1099700000-E) | TON | 2,805 | $49.05 | $55.00 | $49.83 | $45.05 | $48.00 | $95.42 |
| 0033 | Stabilizer aggregate (1110000000-E) | TON | 100 | $53.90 | $65.00 | $65.65 | $66.65 | $50.00 | $103.38 |
| 0034 | Geotextile for subgrade stabilization (1112000000-E) | SY | 6,230 | $6.65 | $5.25 | $5.95 | $4.80 | $3.00 | $6.71 |
| 0035 | Aggregate base course (1121000000-E) | TON | 104 | $66.00 | $65.00 | $66.84 | $74.95 | $70.00 | $81.05 |
| 0036 | Incidental stone base (1220000000-E) | TON | 100 | $103.75 | $72.00 | $51.55 | $56.35 | $52.00 | $98.70 |
| 0037 | Mill asp PVMT *****" DTH - (1-1/2") (1297000000-E) | SY | 5,490 | $6.55 | $3.65 | $5.30 | $12.60 | $2.95 | $1.67 |
| 0038 | Mill asp PVMT *****" DTH - (3") (1297000000-E) | SY | 1,930 | $11.45 | $7.95 | $9.39 | $13.70 | $3.95 | $4.29 |
| 0039 | Milln asphalt PVMT ***** - ***** - (0" to 1-1/2") (1308000000-E) | SY | 1,210 | $18.80 | $12.45 | $11.99 | $23.45 | $12.95 | $6.69 |
| 0040 | Incidental milling (1330000000-E) | SY | 100 | $38.78 | $105.00 | $111.78 | $23.45 | $12.95 | $78.25 |
| 0041 | Asphalt conc base course, type B25.0C (1491000000-E) | TON | 7,710 | $83.55 | $83.55 | $112.23 | $87.75 | $105.00 | $83.55 |
| 0042 | Asphalt conc intermediate course, type I19.0C (1503000000-E) | TON | 7,250 | $83.89 | $83.89 | $112.23 | $88.10 | $105.00 | $83.89 |
| 0043 | Asphalt conc surface course, type S9.5C (1523000000-E) | TON | 6,140 | $85.66 | $85.66 | $108.69 | $89.95 | $115.00 | $85.66 |
| 0044 | Asphalt binder for plant mix (1575000000-E) | TON | 1,065 | $657.44 | $657.44 | $855.87 | $690.30 | $730.00 | $657.44 |
| 0045 | Asphalt plant mix, pavement repair (1693000000-E) | TON | 100 | $541.47 | $350.00 | $390.53 | $218.50 | $172.74 | $800.00 |
| 0046 | Subdrain excavation (2022000000-E) | CY | 67.20 | $20.65 | $40.00 | $11.02 | $43.00 | $40.00 | $74.62 |
| 0047 | Geotextile for subsurface drains (2026000000-E) | SY | 300 | $4.30 | $5.75 | $2.14 | $4.00 | $12.00 | $11.34 |
| 0048 | Subdrain coarse aggregate (2036000000-E) | CY | 50.40 | $96.45 | $70.00 | $69.84 | $91.00 | $85.00 | $199.29 |
| 0049 | 6" perforated subdrain pipe (2044000000-E) | LF | 300 | $6.21 | $40.00 | $22.17 | $17.00 | $20.00 | $53.13 |
| 0050 | Subdrain pipe outlet (2070000000-N) | EACH | 1 | $565.00 | $465.00 | $167.60 | $372.00 | $400.00 | $3,732.74 |
| 0051 | 6" outlet pipe (2077000000-E) | LF | 6 | $66.70 | $85.00 | $34.55 | $55.50 | $20.00 | $109.51 |
| 0052 | Endwalls (2209000000-E) | CY | 2.09 | $3,641.33 | $7,100.00 | $3,355.90 | $5,237.20 | $4,500.00 | $3,729.04 |
| 0053 | Reinforced endwalls (2220000000-E) | CY | 10 | $2,712.87 | $1,250.00 | $873.05 | $6,334.20 | $1,100.00 | $2,722.20 |
| 0054 | Pipe collars (2253000000-E) | CY | 3.87 | $4,628.16 | $1,000.00 | $2,581.16 | $3,862.25 | $3,700.00 | $4,125.68 |
| 0055 | Flowable fill (2275000000-E) | CY | 38 | $1,179.81 | $350.00 | $601.59 | $1,198.80 | $490.00 | $416.12 |
| 0056 | Masonry drainage structures (2286000000-N) | EACH | 58 | $6,061.43 | $6,500.00 | $4,881.25 | $4,829.75 | $4,000.00 | $8,000.00 |
| 0057 | Masonry drainage structures (2297000000-E) | CY | 14 | $8,795.44 | $5,100.00 | $2,990.73 | $6,327.50 | $6,200.00 | $1,076.60 |
| 0058 | Masonry drainage structures (2308000000-E) | LF | 66 | $576.66 | $275.00 | $877.85 | $1,055.15 | $400.00 | $980.13 |
| 0059 | Frame with two grates, STD 840.16 (2364000000-N) | EACH | 2 | $2,948.20 | $1,025.00 | $1,295.47 | $2,167.55 | $1,500.00 | $1,434.94 |
| 0060 | Frame with two grates, STD 840.20 (2364200000-N) | EACH | 1 | $2,830.38 | $1,025.00 | $1,195.10 | $1,932.10 | $1,500.00 | $1,270.35 |
| 0061 | Frame with two grates, STD 840.22 (2365000000-N) | EACH | 5 | $2,831.68 | $1,025.00 | $1,158.20 | $1,981.80 | $1,500.00 | $1,310.45 |
| 0062 | Frame with two grates, STD 840.24 (2366000000-N) | EACH | 1 | $2,839.44 | $1,025.00 | $1,143.58 | $1,967.75 | $1,500.00 | $1,294.10 |
| 0063 | Frame-GRT-HD 840.03 ** - (E) (2374000000-N) | EACH | 10 | $1,524.03 | $1,125.00 | $1,380.79 | $1,663.20 | $1,500.00 | $1,499.22 |
| 0064 | Frame-GRT-HD 840.03 ** - (F) (2374000000-N) | EACH | 24 | $1,524.03 | $1,125.00 | $1,429.13 | $1,735.55 | $1,500.00 | $1,654.67 |
| 0065 | Frame-GRT-HD 840.03 ** - (G) (2374000000-N) | EACH | 14 | $1,524.03 | $1,125.00 | $1,429.13 | $1,735.55 | $1,500.00 | $1,618.70 |
| 0066 | Frame with cover, STD 840.54 (2396000000-N) | EACH | 8 | $1,179.64 | $1,050.00 | $1,022.38 | $1,037.90 | $1,500.00 | $1,017.92 |
| 0067 | Concrete transitional section for catch basin (2440000000-N) | EACH | 10 | $2,000.00 | $1,500.00 | $1,195.06 | $2,160.00 | $2,000.00 | $1,615.00 |
| 0068 | Concrete transitional section for drop inlet (2451000000-N) | EACH | 1 | $2,000.00 | $1,500.00 | $1,195.06 | $2,160.00 | $2,000.00 | $1,615.00 |
| 0069 | Generic drainage item (EA) 840 - frame with cover, STD 840.55 (2472000000-N) | EACH | 1 | $1,179.64 | $1,050.00 | $928.22 | $1,011.65 | $1,100.00 | $1,017.92 |
| 0070 | Generic drainage item (EA) - DE-watering (2473000000-N) | EACH | 1 | $5,000.00 | $15,500 | $43,634 | $21,882 | $2,500.00 | $4,342.57 |
| 0071 | 1'-6" concrete curb & gutter (2542000000-E) | LF | 2,820 | $28.00 | $35.00 | $33.20 | $30.50 | $23.00 | $31.25 |
| 0072 | 2'-6" concrete curb & gutter (2549000000-E) | LF | 5,200 | $32.00 | $45.00 | $35.25 | $34.80 | $27.00 | $41.50 |
| 0073 | Shoulder berm gutter (2556000000-E) | LF | 183 | $70.00 | $76.00 | $58.41 | $75.85 | $65.00 | $66.00 |
| 0074 | 4" concrete sidewalk (2591000000-E) | SY | 1,440 | $91.55 | $78.00 | $63.75 | $75.85 | $65.00 | $74.50 |
| 0075 | Concrete curb ramps (2605000000-N) | EACH | 14 | $5,115.00 | $3,200.00 | $3,115.55 | $3,780.00 | $3,500.00 | $3,800.00 |
| 0076 | 6" concrete driveway (2612000000-E) | SY | 60 | $195.50 | $150.00 | $98.38 | $167.65 | $150.00 | $162.00 |
| 0077 | 5" monolithic concrete islands (surface mounted) (2647000000-E) | SY | 1,960 | $90.00 | $118.00 | $94.26 | $97.20 | $90.00 | $109.00 |
| 0078 | Precast reinforced concrete barrier, single faced (2724000000-E) | LF | 166 | $145.80 | $180.00 | $89.65 | $122.05 | $145.00 | $137.00 |
| 0079 | Adjustment of catch basins (2800000000-N) | EACH | 5 | $1,747.44 | $3,200.00 | $6,525.05 | $1,663.20 | $1,600.00 | $3,150.30 |
| 0080 | Adjustment of drop inlets (2815000000-N) | EACH | 1 | $2,782.80 | $3,200.00 | $6,525.06 | $1,395.35 | $1,600.00 | $3,638.28 |
| 0081 | Convert existing catch basin to junction box (2860000000-N) | EACH | 1 | $2,782.80 | $6,200.00 | $6,525.06 | $2,754.00 | $3,800.00 | $5,725.60 |
| 0082 | Convert existing drop inlet to junction box (2905000000-N) | EACH | 1 | $2,782.80 | $6,200.00 | $6,525.06 | $2,754.00 | $3,800.00 | $5,254.53 |
| 0083 | Convert existing junction box to catch basin (2965000000-N) | EACH | 1 | $2,782.80 | $6,200.00 | $5,481.74 | $3,040.20 | $3,800.00 | $3,638.28 |
| 0084 | Steel beam guardrail (3030000000-E) | LF | 2,837.50 | $22.75 | $27.00 | $23.08 | $24.55 | $22.75 | $22.75 |
| 0085 | Steel beam guardrail, shop curved (3045000000-E) | LF | 387.50 | $31.00 | $36.43 | $31.45 | $33.50 | $31.00 | $31.00 |
| 0086 | Additional guardrail posts (3150000000-N) | EACH | 10 | $1.00 | $1.20 | $1.01 | $1.10 | $1.00 | $1.00 |
| 0087 | Guardrail end units, type cat-1 (3210000000-N) | EACH | 7 | $925.00 | $1,100.00 | $938.43 | $999.00 | $925.00 | $925.00 |
| 0088 | Guardrail anchor units, type III (3215000000-N) | EACH | 3 | $2,300.00 | $2,730.00 | $2,465.28 | $2,624.40 | $2,300.00 | $2,300.00 |
| 0089 | Guardrail end units, type TL-3 (3287000000-N) | EACH | 4 | $3,200.00 | $3,700.00 | $3,246.45 | $3,456.00 | $3,200.00 | $3,200.00 |
| 0090 | Guardrail end units, type TL-2 (3288000000-N) | EACH | 2 | $3,100.00 | $3,642.64 | $3,145.00 | $3,348.00 | $3,100.00 | $3,100.00 |
| 0091 | Guardrail anchor units, type B-77 (3317000000-N) | EACH | 4 | $2,600.00 | $3,000.00 | $2,739.20 | $2,916.00 | $2,600.00 | $2,600.00 |
| 0092 | Remove existing guardrail (3360000000-E) | LF | 2,053 | $0.75 | $1.00 | $0.76 | $0.80 | $0.75 | $0.75 |
| 0093 | Temp GDRL end units ***** - (TL-3) (3389150000-N) | EACH | 2 | $2,600.00 | $3,000.00 | $2,637.74 | $2,808.00 | $2,600.00 | $2,600.00 |
| 0094 | Woven wire fence **" fab - (48") (3500000000-E) | LF | 230 | $14.00 | $16.50 | $15.22 | $15.10 | $14.36 | $14.36 |
| 0095 | 4" timber fence posts, 7'-6" long (3509000000-E) | EACH | 6 | $60.00 | $74.50 | $50.73 | $64.80 | $61.56 | $61.56 |
| 0096 | 5" timber fence posts, 8'-0" long (3515000000-E) | EACH | 19 | $55.00 | $66.00 | $50.73 | $59.40 | $56.43 | $56.43 |
| 0097 | CHN LK fence **" fabric - (72") (3533000000-E) | LF | 688 | $20.00 | $25.00 | $21.81 | $21.60 | $20.52 | $20.52 |
| 0098 | Met line PST **" CL fen - (72") (3539000000-E) | EACH | 59 | $80.00 | $100.00 | $89.28 | $86.40 | $82.08 | $82.08 |
| 0099 | Met term PST **" CL fen - (72") (3545000000-E) | EACH | 12 | $300.00 | $365.00 | $158.26 | $324.00 | $307.81 | $307.81 |
| 0100 | Chain link fence reset (3572000000-E) | LF | 1,255 | $17.00 | $21.00 | $32.97 | $18.35 | $17.44 | $17.44 |
| 0101 | Rip rap, class I (3628000000-E) | TON | 26 | $87.15 | $150.00 | $91.64 | $83.20 | $135.00 | $124.79 |
| 0102 | Rip rap, class II (3635000000-E) | TON | 105 | $91.25 | $160.00 | $92.94 | $88.90 | $135.00 | $117.54 |
| 0103 | Rip rap, class B (3649000000-E) | TON | 15 | $95.50 | $115.00 | $88.71 | $73.00 | $120.00 | $124.80 |
| 0104 | Geotextile for drainage (3656000000-E) | SY | 985 | $5.40 | $5.00 | $4.79 | $3.10 | $4.15 | $5.69 |
| 0105 | Plain concrete sign foundations (4054000000-E) | CY | 1 | $5.00 | $5.94 | $5.17 | $5.40 | $5.00 | $5.00 |
| 0106 | Supports, breakaway steel beam (4060000000-E) | LB | 1,103 | $9.00 | $10.70 | $9.31 | $9.70 | $9.00 | $9.00 |
| 0107 | Supports, 3-LB steel U-channel (4072000000-E) | LF | 631 | $8.00 | $9.51 | $8.28 | $8.65 | $8.00 | $8.00 |
| 0108 | Sign erection, type D (4096000000-N) | EACH | 10 | $100.00 | $118.84 | $103.45 | $108.00 | $100.00 | $100.00 |
| 0109 | Sign erection, type E (4102000000-N) | EACH | 35 | $75.00 | $89.13 | $77.59 | $81.00 | $75.00 | $75.00 |
| 0110 | Sign erection, type F (4108000000-N) | EACH | 10 | $100.00 | $118.84 | $103.45 | $108.00 | $100.00 | $100.00 |
| 0111 | Sign erection, type *** (GRD MTD) - (A) (4110000000-N) | EACH | 6 | $700.00 | $831.86 | $724.18 | $756.00 | $700.00 | $700.00 |
| 0112 | Disposal of support, steel beam (4138000000-N) | EACH | 6 | $400.00 | $475.35 | $413.82 | $432.00 | $400.00 | $400.00 |
| 0113 | Disposal of sign system, U-channel (4155000000-N) | EACH | 43 | $2.00 | $2.38 | $2.07 | $2.15 | $2.00 | $2.00 |
| 0114 | Disposal of sign, D, E or F (4238000000-N) | EACH | 6 | $2.00 | $2.38 | $2.07 | $2.15 | $2.00 | $2.00 |
| 0115 | Generic signing item (EA) - supports, omni-directional breakaway (4360000000-N) | EACH | 4 | $200.00 | $237.68 | $206.91 | $216.00 | $200.00 | $200.00 |
| 0116 | Work zone signs (stationary) (4400000000-E) | SF | 852 | $8.00 | $9.51 | $6.40 | $8.65 | $7.50 | $6.25 |
| 0117 | Work zone signs (portable) (4405000000-E) | SF | 288 | $23.50 | $10.70 | $10.95 | $23.65 | $11.00 | $8.25 |
| 0118 | Work zone signs (barricade mounted) (4410000000-E) | SF | 118 | $9.00 | $10.70 | $9.63 | $9.70 | $8.00 | $7.25 |
| 0119 | Flashing arrow board (4415000000-N) | EACH | 2 | $6,600.00 | $2,733.27 | $2,854.87 | $1,853.45 | $2,500.00 | $3,100.00 |
| 0120 | Portable changeable message sign (4420000000-N) | EACH | 2 | $10,155 | $13,072 | $11,552 | $18,149 | $10,500 | $9,200.00 |
| 0121 | Portable changeable message sign (short term) (4422000000-N) | DAY | 60 | $132.50 | $89.13 | $159.34 | $1,803.80 | $45.00 | $70.00 |
| 0122 | Drums (4430000000-N) | EACH | 275 | $66.15 | $85.00 | $72.37 | $74.00 | $44.00 | $45.00 |
| 0123 | Barricades (type III) (4445000000-E) | LF | 144 | $20.00 | $24.00 | $23.90 | $21.60 | $30.00 | $25.00 |
| 0124 | Pedestrian channelizing devices (4447000000-E) | LF | 72 | $75.00 | $90.00 | $42.48 | $81.00 | $30.00 | $55.00 |
| 0125 | Flagger (4455000000-N) | DAY | 180 | $620.00 | $400.00 | $408.06 | $442.50 | $353.96 | $1,275.00 |
| 0126 | Temporary crash cushions (4465000000-N) | EACH | 2 | $8,175.00 | $13,500 | $15,602 | $12,690 | $9,000.00 | $11,750 |
| 0127 | TMA (4480000000-N) | EACH | 4 | $1.00 | $34,500 | $35,852 | $9,948.90 | $40,500 | $3,200.00 |
| 0128 | Portable concrete barrier (anchored) (4490000000-E) | LF | 705 | $61.70 | $87.50 | $98.61 | $80.20 | $55.00 | $74.26 |
| 0129 | Law enforcement (4510000000-N) | HR | 720 | $91.65 | $80.00 | $104.15 | $108.00 | $65.00 | $80.00 |
| 0130 | Skinny drum (4516000000-N) | EACH | 45 | $77.35 | $85.00 | $42.48 | $52.00 | $34.00 | $32.00 |
| 0131 | Generic traffic control item (EA) - audible warning devices (4600000000-N) | EACH | 12 | $565.00 | $576.36 | $691.61 | $594.00 | $325.00 | $490.00 |
| 0132 | Temporary raised pavement markers (4650000000-N) | EACH | 13 | $8.00 | $152.14 | $132.13 | $140.40 | $130.00 | $130.88 |
| 0133 | 8" cold appl plstic lines type ** - (II) (4780000000-E) | LF | 1,318 | $6.00 | $15.80 | $13.72 | $14.58 | $13.50 | $13.59 |
| 0134 | 24" cold appl plstic line type ** - (II) (4795000000-E) | LF | 628 | $20.00 | $46.81 | $40.65 | $43.20 | $40.00 | $40.27 |
| 0135 | Cold app plas char type * - (II) (4800000000-N) | EACH | 14 | $200.00 | $146.29 | $127.05 | $135.00 | $125.00 | $125.84 |
| 0136 | Cold appl plastic sym type ** - (II) (4805000000-N) | EACH | 66 | $350.00 | $351.08 | $304.91 | $324.00 | $300.00 | $302.02 |
| 0137 | Paint pavement marking lines (4") (4810000000-E) | LF | 49,549 | $0.55 | $0.42 | $0.37 | $0.39 | $0.36 | $0.36 |
| 0138 | Paint pavement marking lines (6") (4815000000-E) | LF | 3,366 | $0.75 | $0.63 | $0.55 | $0.58 | $0.54 | $0.54 |
| 0139 | Paint pavement marking lines (8") (4820000000-E) | LF | 2,760 | $1.00 | $0.84 | $0.73 | $0.78 | $0.72 | $0.72 |
| 0140 | Paint pavement marking lines (24") (4835000000-E) | LF | 1,317 | $8.00 | $2.57 | $2.24 | $2.38 | $2.20 | $2.21 |
| 0141 | Paint pavement marking character (4840000000-N) | EACH | 16 | $65.00 | $17.55 | $15.25 | $16.20 | $15.00 | $15.10 |
| 0142 | Paint pavement marking symbol (4845000000-N) | EACH | 88 | $65.00 | $23.41 | $20.33 | $21.60 | $20.00 | $20.13 |
| 0143 | Polyurea lines (**", *** mils) - (4", 30 mils) (4846000000-E) | LF | 9,203 | $2.25 | $1.81 | $1.58 | $1.67 | $1.55 | $1.56 |
| 0144 | Polyurea lines (**", *** mils) - (6", 30 mils) (4846000000-E) | LF | 8,012 | $2.50 | $2.69 | $2.34 | $2.48 | $2.30 | $2.32 |
| 0145 | Polyurea lines (**", *** mils) - (8", 30 mils) (4846000000-E) | LF | 1,773 | $3.00 | $3.63 | $3.15 | $3.35 | $3.10 | $3.12 |
| 0146 | Removal of pavement marking lines (4") (4850000000-E) | LF | 18,174 | $1.00 | $0.73 | $0.63 | $0.67 | $0.62 | $0.62 |
| 0147 | Removal of pavement marking lines (6") (4855000000-E) | LF | 2,054 | $1.75 | $1.09 | $0.95 | $1.00 | $0.93 | $0.94 |
| 0148 | Removal of pavement marking lines (8") (4860000000-E) | LF | 435 | $4.00 | $1.46 | $1.27 | $1.35 | $1.25 | $1.26 |
| 0149 | Removal of pavement marking lines (24") (4870000000-E) | LF | 461 | $8.00 | $4.39 | $3.81 | $4.05 | $3.75 | $3.78 |
| 0150 | Removal of pavement marking symbols & characters (4875000000-N) | EACH | 31 | $100.00 | $34.82 | $30.24 | $32.13 | $29.75 | $29.95 |
| 0151 | Generic pavement marking item (EA) - polycarbonate H-shaped markers (4895000000-N) | EACH | 336 | $75.00 | $65.54 | $56.92 | $60.48 | $56.00 | $56.38 |
| 0152 | **" water line - (18") (5325000000-E) | LF | 778 | $294.07 | $425.62 | $368.86 | $783.00 | $725.00 | $757.74 |
| 0153 | 8" water line (5325800000-E) | LF | 40 | $405.78 | $260.10 | $225.41 | $729.00 | $675.00 | $705.48 |
| 0154 | 12" water line (5326200000-E) | LF | 368 | $323.42 | $307.39 | $266.40 | $961.20 | $890.00 | $930.19 |
| 0155 | 16" water line (5326600000-E) | LF | 917 | $254.10 | $354.68 | $307.38 | $1,036.80 | $960.00 | $1,003.35 |
| 0156 | DI H2O pipe fittings (5329000000-E) | LB | 8,555 | $20.64 | $16.55 | $14.34 | $20.50 | $19.00 | $19.86 |
| 0157 | **" valve - (18") (5534000000-E) | EACH | 2 | $24,316 | $40,198 | $34,837 | $43,740 | $40,500 | $42,329 |
| 0158 | 6" valve (5540000000-E) | EACH | 3 | $3,308.62 | $4,019.75 | $3,483.67 | $5,346.00 | $4,950.00 | $5,173.53 |
| 0159 | 8" valve (5546000000-E) | EACH | 1 | $4,831.66 | $4,965.57 | $4,303.36 | $7,020.00 | $6,500.00 | $6,793.52 |
| 0160 | 12" valve (5558000000-E) | EACH | 3 | $7,668.41 | $8,275.96 | $7,172.27 | $10,260 | $9,500.00 | $9,928.99 |
| 0161 | 16" valve (5558600000-E) | EACH | 1 | $16,914 | $26,010 | $22,541 | $29,700 | $27,500 | $29,467 |
| 0162 | **" insertion valve - (16") (5562000000-E) | EACH | 1 | $54,413 | $40,198 | $34,837 | $59,400 | $55,000 | $57,484 |
| 0163 | **" insertion valve - (18") (5562000000-E) | EACH | 1 | $71,610 | $99,903 | $86,580 | $140,400 | $130,000 | $135,870 |
| 0164 | **" insertion valve - (6") (5562000000-E) | EACH | 2 | $14,717 | $13,005 | $11,271 | $19,440 | $18,000 | $18,813 |
| 0165 | **" tapping sleeve & valve - (18") (5571000000-E) | EACH | 1 | $43,954 | $65,617 | $56,866 | $75,600 | $70,000 | $73,161 |
| 0166 | 6" tapping sleeve & valve (5571600000-E) | EACH | 2 | $14,803 | $9,458.25 | $8,196.88 | $12,960 | $12,000 | $12,542 |
| 0167 | 16" tapping sleeve & valve (5572600000-E) | EACH | 2 | $31,653 | $44,040 | $38,167 | $54,000 | $50,000 | $52,258 |
| 0168 | 2" air release valve (5589200000-E) | EACH | 2 | $9,810.17 | $10,641 | $9,221.49 | $20,520 | $19,000 | $19,858 |
| 0169 | Reconnect water meter (5649000000-N) | EACH | 4 | $2,967.30 | $2,601.02 | $2,254.14 | $3,024.00 | $2,800.00 | $2,926.44 |
| 0170 | Fire hydrant (5666000000-N) | EACH | 3 | $9,138.15 | $9,576.47 | $8,299.34 | $10,584 | $9,800.00 | $10,243 |
| 0171 | Fire hydrant leg (5673000000-E) | LF | 37 | $114.87 | $165.52 | $143.45 | $486.00 | $450.00 | $470.32 |
| 0172 | Water service line (<2") (5686500000-E) | LF | 430 | $66.90 | $118.23 | $102.46 | $178.20 | $165.00 | $172.45 |
| 0173 | **" force main sewer - (10") (5709000000-E) | LF | 1,149 | $135.40 | $289.66 | $251.03 | $405.00 | $375.00 | $391.93 |
| 0174 | 12" force main sewer (5709600000-E) | LF | 605 | $49.12 | $70.94 | $61.48 | $129.60 | $120.00 | $125.42 |
| 0175 | Ductile iron sewer pipe fittings (5769000000-E) | LB | 2,415 | $13.00 | $21.28 | $18.44 | $27.00 | $25.00 | $26.13 |
| 0176 | 4' dia utility manhole (5775000000-E) | EACH | 2 | $5,531.38 | $10,641 | $9,221.49 | $18,900 | $17,500 | $18,290 |
| 0177 | Abandon **" utility pipe - (18") (5798000000-E) | LF | 1,020 | $43.89 | $47.29 | $40.98 | $41.00 | $38.00 | $39.72 |
| 0178 | Abandon 6" utility pipe (5800000000-E) | LF | 1,865 | $22.94 | $17.73 | $15.37 | $12.95 | $12.00 | $12.54 |
| 0179 | Abandon 8" utility pipe (5801000000-E) | LF | 100 | $66.21 | $28.37 | $24.59 | $24.85 | $23.00 | $24.04 |
| 0180 | Abandon 12" utility pipe (5804000000-E) | LF | 290 | $46.45 | $30.74 | $26.64 | $27.00 | $25.00 | $26.13 |
| 0181 | Abandon 16" utility pipe (5810000000-E) | LF | 870 | $30.52 | $35.47 | $30.74 | $38.90 | $36.00 | $37.63 |
| 0182 | Remove fire hydrant (5815500000-N) | EACH | 3 | $2,132.22 | $2,482.79 | $2,151.68 | $7,074.00 | $6,550.00 | $6,845.78 |
| 0183 | 24" encasement pipe (5836000000-E) | LF | 110 | $251.32 | $354.68 | $307.38 | $448.20 | $230.00 | $433.74 |
| 0184 | Bore & jack **" - (24") (5872500000-E) | LF | 110 | $3,150.04 | $1,513.32 | $1,311.50 | $3,240.00 | $2,109.89 | $3,135.47 |
| 0185 | Direct drill **" - (12") (5872600000-E) | LF | 605 | $723.19 | $851.24 | $737.72 | $772.20 | $715.00 | $747.29 |
| 0186 | Temporary silt fence (6000000000-E) | LF | 11,940 | $2.05 | $3.23 | $2.82 | $2.25 | $2.75 | $2.12 |
| 0187 | Stone for erosion control, class A (6006000000-E) | TON | 860 | $0.01 | $115.00 | $86.98 | $71.60 | $100.00 | $121.11 |
| 0188 | Stone for erosion control, class B (6009000000-E) | TON | 2,190 | $0.01 | $105.00 | $88.29 | $71.60 | $100.00 | $112.37 |
| 0189 | Sediment control stone (6012000000-E) | TON | 2,050 | $0.01 | $95.00 | $67.89 | $61.80 | $75.00 | $87.25 |
| 0190 | Temporary mulching (6015000000-E) | ACRE | 24 | $600.00 | $2,150.00 | $1,741.84 | $1,188.00 | $1,700.00 | $1,116.75 |
| 0191 | Seed for temporary seeding (6018000000-E) | LB | 1,200 | $1.00 | $2.55 | $2.05 | $3.25 | $2.00 | $3.05 |
| 0192 | Fertilizer for temporary seeding (6021000000-E) | TON | 7 | $1,000.00 | $1,100.00 | $870.92 | $1,080.00 | $850.00 | $1,015.23 |
| 0193 | Temporary slope drains (6024000000-E) | LF | 310 | $34.98 | $25.00 | $27.90 | $14.60 | $22.00 | $59.39 |
| 0194 | Safety fence (6029000000-E) | LF | 1,520 | $2.36 | $3.50 | $3.07 | $2.55 | $3.00 | $2.40 |
| 0195 | Silt excavation (6030000000-E) | CY | 4,700 | $0.01 | $9.50 | $12.74 | $0.01 | $22.19 | $82.57 |
| 0196 | Matting for erosion control (6036000000-E) | SY | 19,600 | $1.45 | $1.88 | $1.64 | $1.60 | $1.60 | $1.50 |
| 0197 | Coir fiber mat (6037000000-E) | SY | 100 | $15.00 | $7.66 | $6.15 | $16.20 | $6.00 | $15.23 |
| 0198 | 1/4" hardware cloth (6042000000-E) | LF | 5,520 | $3.85 | $5.88 | $5.12 | $4.15 | $5.00 | $3.91 |
| 0199 | Low permeability geotextile (6043000000-E) | SY | 1,000 | $6.25 | $7.06 | $6.15 | $4.50 | $6.00 | $6.24 |
| 0200 | **" temporary pipe - (15") (6045000000-E) | LF | 50 | $80.40 | $139.34 | $64.00 | $77.65 | $51.48 | $151.94 |
| 0201 | Flocculant (6071002000-E) | LB | 1,060 | $1.00 | $0.01 | $0.01 | $1.10 | $0.01 | $1.02 |
| 0202 | Coir fiber wattle (6071012000-E) | LF | 1,120 | $9.00 | $11.50 | $9.22 | $9.70 | $9.00 | $9.14 |
| 0203 | Coir fiber baffle (6071030000-E) | LF | 215 | $7.00 | $9.41 | $8.20 | $7.55 | $8.00 | $7.11 |
| 0204 | **" skimmer - (1-1/2") (6071050000-E) | EACH | 1 | $1,435.00 | $1,352.69 | $2,021.55 | $1,524.35 | $796.86 | $3,284.83 |
| 0205 | Seeding and mulching (6084000000-E) | ACRE | 21 | $2,600.00 | $3,321.03 | $2,663.99 | $2,910.60 | $2,600.00 | $2,736.04 |
| 0206 | Mowing (6087000000-E) | ACRE | 18 | $200.00 | $319.33 | $256.15 | $216.00 | $250.00 | $203.05 |
| 0207 | Seed for repair seeding (6090000000-E) | LB | 250 | $5.00 | $5.75 | $4.61 | $5.40 | $4.50 | $5.08 |
| 0208 | Fertilizer for repair seeding (6093000000-E) | TON | 1 | $1,000.00 | $1,788.24 | $1,434.45 | $1,080.00 | $1,400.00 | $1,015.23 |
| 0209 | Seed for supplemental seeding (6096000000-E) | LB | 475 | $3.00 | $5.75 | $4.61 | $3.25 | $4.50 | $3.05 |
| 0210 | Fertilizer topdressing (6108000000-E) | TON | 14.25 | $925.00 | $1,181.52 | $947.76 | $999.00 | $925.00 | $939.09 |
| 0211 | Specialized hand mowing (6114500000-N) | MHR | 10 | $250.00 | $223.53 | $179.31 | $270.00 | $175.00 | $253.81 |
| 0212 | Manual litter removal (6114800000-N) | MHR | 10 | $124.00 | $223.53 | $179.31 | $240.30 | $175.00 | $177.67 |
| 0213 | Litter disposal (6114900000-E) | TON | 1 | $655.00 | $255.47 | $204.92 | $2,038.20 | $200.00 | $203.05 |
| 0214 | Response for erosion control (6117000000-N) | EACH | 100 | $1.00 | $63.87 | $51.23 | $1.10 | $50.00 | $1.02 |
| 0215 | Concrete washout structure (6117500000-N) | EACH | 2 | $1,945.00 | $3,526.67 | $1,165.10 | $3,193.30 | $1,500.00 | $550.00 |
| 0216 | Generic erosion control item (EA) - prefabricated concrete washout (6132000000-N) | EACH | 9 | $650.00 | $305.47 | $2,412.49 | $298.00 | $350.00 | $750.00 |
| 0217 | Pedestrian signal head (16", 1 section W/countdown) (7048500000-E) | EACH | 8 | $1,775.00 | $2,071.98 | $1,804.69 | $1,917.00 | $1,796.57 | $1,147.56 |
| 0218 | Signal cable (7060000000-E) | LF | 20,875 | $5.00 | $5.84 | $5.08 | $5.40 | $5.06 | $5.77 |
| 0219 | Vehicle signal head (12", 3 section) (7120000000-E) | EACH | 91 | $1,430.00 | $1,669.26 | $1,453.92 | $1,544.40 | $1,447.38 | $1,470.48 |
| 0220 | Vehicle signal head (12", 4 section) (7132000000-E) | EACH | 15 | $1,855.00 | $2,165.37 | $1,886.03 | $2,003.40 | $1,877.55 | $1,643.48 |
| 0221 | Vehicle signal head (12", 5 section) (7144000000-E) | EACH | 4 | $2,365.00 | $2,760.70 | $2,404.56 | $2,554.20 | $2,393.75 | $1,845.31 |
| 0222 | Messenger cable (3/8") (7264000000-E) | LF | 4,050 | $10.00 | $11.67 | $10.17 | $10.80 | $10.12 | $5.77 |
| 0223 | Paved trench (***********) - (1, 2") (7288000000-E) | LF | 25 | $60.00 | $70.04 | $61.00 | $64.80 | $60.73 | $86.50 |
| 0224 | Unpaved trench (***********) - (1, 2") (7300000000-E) | LF | 2,550 | $15.50 | $18.09 | $15.76 | $16.75 | $15.69 | $20.76 |
| 0225 | Unpaved trench (***********) - (2, 2") (7300000000-E) | LF | 500 | $18.75 | $21.89 | $19.06 | $20.25 | $18.98 | $23.07 |
| 0226 | Junction box (standard size) (7324000000-N) | EACH | 57 | $875.00 | $1,021.40 | $889.64 | $945.00 | $885.63 | $749.66 |
| 0227 | Wood pole (7360000000-N) | EACH | 19 | $1,600.00 | $1,867.70 | $1,626.77 | $1,728.00 | $1,619.45 | $2,537.31 |
| 0228 | Guy assembly (7372000000-N) | EACH | 40 | $575.00 | $671.21 | $584.62 | $621.00 | $581.99 | $1,095.66 |
| 0229 | 1" riser with weatherhead (7408000000-E) | EACH | 5 | $675.00 | $787.94 | $686.29 | $729.00 | $683.20 | $1,066.82 |
| 0230 | 2" riser with weatherhead (7420000000-E) | EACH | 10 | $950.00 | $1,108.95 | $965.89 | $1,026.00 | $961.55 | $1,124.49 |
| 0231 | Inductive loop sawcut (7444000000-E) | LF | 2,825 | $21.00 | $24.51 | $21.35 | $22.70 | $21.26 | $11.53 |
| 0232 | Lead-in cable (14-2) (7456100000-E) | LF | 7,650 | $2.90 | $3.40 | $2.95 | $3.15 | $2.94 | $4.61 |
| 0233 | Site survey (7481000000-N) | EACH | 4 | $1,100.00 | $1,200.00 | $1,118.40 | $1,188.00 | $1,113.37 | $2,075.98 |
| 0234 | Luminaire arm for video system (7481200000-N) | EACH | 12 | $1,450.00 | $1,692.61 | $1,474.26 | $1,566.00 | $1,467.62 | $1,383.99 |
| 0235 | Camera without internal loop emulator processing unit (7481240000-N) | EACH | 12 | $2,775.00 | $3,239.30 | $2,821.42 | $2,997.00 | $2,808.73 | $12,860 |
| 0236 | External loop emulator processing unit (7481260000-N) | EACH | 4 | $3,200.00 | $3,735.41 | $3,253.53 | $3,456.00 | $3,238.89 | $5,189.95 |
| 0237 | Metal strain signal pole (7576000000-N) | EACH | 16 | $14,000 | $16,342 | $14,234 | $15,120 | $14,170 | $13,033 |
| 0238 | Soil test (7613000000-N) | EACH | 16 | $1,800.00 | $2,101.17 | $1,830.11 | $1,944.00 | $1,821.88 | $2,537.31 |
| 0239 | Drilled pier foundation (7614100000-E) | CY | 96 | $1,450.00 | $1,692.61 | $1,474.26 | $1,566.00 | $1,467.62 | $2,670.85 |
| 0240 | Sign for signals (7636000000-N) | EACH | 24 | $750.00 | $875.49 | $762.55 | $810.00 | $759.12 | $576.66 |
| 0241 | Type I post with foundation (7642100000-N) | EACH | 1 | $2,500.00 | $2,918.29 | $2,541.82 | $2,700.00 | $2,530.38 | $4,382.62 |
| 0242 | Type II pedestal with foundation (7642200000-N) | EACH | 7 | $3,900.00 | $4,552.53 | $3,965.24 | $4,212.00 | $3,947.40 | $6,689.26 |
| 0243 | Contlrs with CBNT (**************) - (2070LX base mounted) (7696000000-N) | EACH | 4 | $23,450 | $27,374 | $23,842 | $25,326 | $23,735 | $32,235 |
| 0244 | Detector card (type 170) (7744000000-N) | EACH | 30 | $240.00 | $280.16 | $244.01 | $259.20 | $242.92 | $461.33 |
| 0245 | Cabinet base extender (7901000000-N) | EACH | 4 | $880.00 | $1,027.24 | $894.72 | $950.40 | $890.70 | $922.66 |
| 0246 | Generic signal item (EA) - modify existing vehicle signal head (7980000000-N) | EACH | 2 | $700.00 | $820.00 | $711.71 | $756.00 | $708.51 | $519.00 |
| 0247 | MSE retain wall no ** - (1) (8801000000-E) | SF | 3,221 | $157.08 | $285.00 | $250.00 | $178.00 | $165.00 | $350.00 |
| 0248 | MSE retain wall no ** - (2) (8801000000-E) | SF | 2,915 | $155.76 | $287.50 | $250.00 | $178.00 | $165.00 | $350.00 |
| 0249 | Remv exist STR ****** BRG (402) - (119+69.55 -Y-) (8035000000-N) | LS | 1 | $149,343 | $228,500 | $25,000 | $604,000 | $300,000 | $275,000 |
| 0250 | Asbestos assessment (8065000000-N) | LS | 1 | $1,559.99 | $2,800.00 | $911.25 | $1,944.00 | $2,000.00 | $1,850.00 |
| 0251 | Pile excavation in soil (8096000000-E) | LF | 10 | $482.14 | $487.00 | $509.55 | $600.00 | $2,000.00 | $338.54 |
| 0252 | Pile excavation not in soil (8097000000-E) | LF | 190 | $516.24 | $530.00 | $478.63 | $485.00 | $1,000.00 | $338.54 |
| 0253 | 3'-6" dia drilled piers in soil (8105540000-E) | LF | 8 | $2,184.13 | $2,100.00 | $2,507.48 | $1,740.00 | $1,800.00 | $1,504.63 |
| 0254 | 3'-6" dia drilled piers not in soil (8105640000-E) | LF | 60 | $2,184.13 | $1,825.00 | $2,268.82 | $1,740.00 | $2,000.00 | $2,200.00 |
| 0255 | Sid inspections (8113000000-N) | EACH | 1 | $2,290.00 | $1,200.00 | $1,353.87 | $1,125.00 | $1,000.00 | $1,041.67 |
| 0256 | CSL testing (8115000000-N) | EACH | 1 | $1,125.00 | $2,000.00 | $1,353.87 | $1,125.00 | $1,000.00 | $20,089 |
| 0257 | Uncl STR excav sta ***** - (119+69.55 -Y-) (8121000000-N) | LS | 1 | $9,300.00 | $55,000 | $9,260.71 | $16,000 | $30,000 | $42,206 |
| 0258 | Reinforced concrete deck slab (8147000000-E) | SF | 13,421 | $56.92 | $65.00 | $58.21 | $45.00 | $55.00 | $75.14 |
| 0259 | Grooving bridge floors (8161000000-E) | SF | 13,262 | $0.79 | $1.00 | $0.66 | $0.75 | $1.00 | $0.61 |
| 0260 | Class A concrete (bridge) (8182000000-E) | CY | 239.40 | $1,010.81 | $1,850.00 | $1,623.96 | $1,750.00 | $1,200.00 | $2,064.53 |
| 0261 | BRG appr slab *********** - (119+69.55 -Y-) (8210000000-N) | LS | 1 | $141,475 | $125,000 | $165,000 | $150,000 | $130,000 | $193,000 |
| 0262 | Reinforcing steel (bridge) (8217000000-E) | LB | 41,238 | $1.70 | $1.75 | $1.69 | $1.35 | $2.00 | $2.30 |
| 0263 | Spiral column reinforcing steel (bridge) (8238000000-E) | LB | 2,972 | $3.71 | $3.15 | $3.03 | $2.51 | $5.00 | $5.00 |
| 0264 | 54" prestressed concrete girders (8265000000-E) | LF | 1,406 | $384.11 | $475.00 | $403.40 | $350.00 | $500.00 | $775.00 |
| 0265 | Pile DRV equip setup ** steel piles - (HP 12 X 53) (8328200000-E) | EACH | 20 | $1.00 | $940.00 | $4,250.00 | $1,000.00 | $1,000.00 | $3,730.79 |
| 0266 | HP 12 X 53 steel piles (8364000000-E) | LF | 600 | $51.69 | $100.00 | $139.45 | $80.00 | $75.00 | $168.21 |
| 0267 | Steel pile points (8391000000-N) | EACH | 20 | $1.00 | $190.00 | $168.54 | $180.00 | $200.00 | $250.27 |
| 0268 | Dynamic pile testing (8394000000-N) | EACH | 2 | $1.00 | $1,440.00 | $2,733.79 | $2,300.00 | $2,100.00 | $8,500.00 |
| 0269 | Two bar metal rail (8475000000-E) | LF | 338.48 | $224.75 | $280.00 | $236.52 | $215.00 | $200.00 | $283.75 |
| 0270 | 1'-**"X*****"conc parapet - (1'-2" X 3'-3") (8517000000-E) | LF | 355.14 | $227.21 | $240.00 | $225.40 | $192.00 | $210.00 | $220.00 |
| 0271 | 4" slope protection (8531000000-E) | SY | 54 | $407.80 | $480.00 | $199.18 | $200.00 | $250.00 | $193.85 |
| 0272 | Elastomeric bearings (8657000000-N) | LS | 1 | $8,875.00 | $56,800 | $28,000 | $35,000 | $10,000 | $56,981 |
| 0273 | Generic structure item (LS) - strip seal expansion joints (8860000000-N) | LS | 1 | $130,765 | $125,000 | $50,000 | $104,000 | $110,000 | $196,922 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
Every contract let that day: NCDOT letting of December 16, 2025. Compiled by Mirage Metrics.