GRADING, DRAINAGE, PAVING, AND WALLS. GREAT WAGON ROAD FROM SR-1001 (SHALLOWFORD ROAD) TO SR-1308 (LEWISVILLE-VIENNA ROAD). Let by North Carolina DOT on February 18, 2025, Forsyth. 7 bids received; low bid $19,785,000 by Branch Civil Inc.
- Owner
- North Carolina DOT
- Letting
- 18 FEB 2025
- Pay items
- 171
- Data through
- 20 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Branch Civil Inc | $19,785,000 | Low |
| 2 | Smith-Rowe, LLC | $21,177,562 | +7.0% |
| 3 | Triangle Grading & Paving Inc | $22,483,629 | +14% |
| 4 | Apac - Atlantic, Inc. Thompson Arthur Division | $22,628,000 | +14% |
| 5 | Blythe Construction Inc | $24,206,916 | +22% |
| 6 | Caton Construction Group Inc | $25,369,934 | +28% |
| 7 | Conti Civil LLC | $25,625,442 | +30% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Branch Civil Inc | 2. Smith-Rowe, LLC | 3. Triangle Grading & Paving Inc | 4. Apac - Atlantic, Inc. Thompson Arthur Division | 5. Blythe Construction Inc | 6. Caton Construction Group Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Mobilization (0000100000-N) | LS | 1 | $990,000 | $1,058,850 | $1,124,000 | $1,100,000 | $1,200,000 | $1,268,497 |
| 0002 | Construction surveying (0000400000-N) | LS | 1 | $300,000 | $223,120 | $373,000 | $354,000 | $600,000 | $207,220 |
| 0003 | Supplementary clearing & grubbing (0050000000-E) | ACRE | 1 | $14,600 | $7,050.41 | $8,800.00 | $13,048 | $15,000 | $7,000.00 |
| 0004 | Undercut excavation (0057000000-E) | CY | 5,750 | $10.50 | $14.55 | $21.00 | $28.00 | $25.00 | $48.45 |
| 0005 | Grading (0063000000-N) | LS | 1 | $1,349,019 | $4,598,500 | $7,432,104 | $3,600,000 | $4,328,000 | $2,277,000 |
| 0006 | Borrow excavation (0106000000-E) | CY | 96,000 | $14.00 | $0.01 | $1.00 | $24.50 | $25.00 | $30.00 |
| 0007 | Drainage ditch excavation (0134000000-E) | CY | 520 | $13.00 | $14.00 | $14.00 | $45.00 | $20.00 | $28.00 |
| 0008 | Select granular material (0195000000-E) | CY | 5,500 | $14.00 | $0.01 | $25.00 | $44.00 | $70.00 | $80.00 |
| 0009 | Geotextile for soil stabilization (0196000000-E) | SY | 7,950 | $4.10 | $5.20 | $3.50 | $4.16 | $6.00 | $5.00 |
| 0010 | Generic grading item (TON) - hauling and disposal of petroleum contaminated soil (0255000000-E) | TON | 100 | $70.00 | $70.15 | $125.00 | $143.00 | $200.00 | $400.00 |
| 0011 | Foundation conditioning material, minor structures (0318000000-E) | TON | 890 | $66.00 | $58.60 | $60.00 | $68.00 | $55.00 | $65.00 |
| 0012 | FND condit geotextile (4A) (0321000000-E) | SY | 2,800 | $2.65 | $5.80 | $3.50 | $3.00 | $5.00 | $5.00 |
| 0013 | 15" drainage pipe (0335200000-E) | LF | 656 | $85.00 | $113.15 | $72.00 | $72.00 | $100.00 | $73.00 |
| 0014 | 18" drainage pipe (0335300000-E) | LF | 532 | $94.00 | $114.15 | $75.00 | $80.00 | $80.00 | $83.00 |
| 0015 | 24" drainage pipe (0335400000-E) | LF | 140 | $117.00 | $142.04 | $85.00 | $98.00 | $120.00 | $106.00 |
| 0016 | 30" drainage pipe (0335500000-E) | LF | 96 | $182.00 | $144.98 | $125.00 | $165.00 | $110.00 | $109.00 |
| 0017 | 36" drainage pipe (0335600000-E) | LF | 92 | $225.00 | $146.65 | $150.00 | $180.00 | $140.00 | $132.00 |
| 0018 | **" drainage pipe elbow - (15") (0335850000-E) | EACH | 4 | $453.00 | $937.51 | $575.00 | $525.00 | $300.00 | $1,200.00 |
| 0019 | 15" RC pipe culverts, class III (0366000000-E) | LF | 1,496 | $82.00 | $128.60 | $78.00 | $72.00 | $80.00 | $78.00 |
| 0020 | 18" RC pipe culverts, class III (0372000000-E) | LF | 548 | $93.00 | $116.67 | $87.00 | $78.00 | $80.00 | $88.00 |
| 0021 | 30" RC pipe culverts, class III (0384000000-E) | LF | 468 | $170.00 | $161.88 | $160.00 | $165.00 | $125.00 | $200.00 |
| 0022 | 36" RC pipe culverts, class III (0390000000-E) | LF | 32 | $246.00 | $220.23 | $200.00 | $220.00 | $190.00 | $270.00 |
| 0023 | 15" RC pipe culverts, class IV (0448200000-E) | LF | 2,760 | $109.00 | $111.44 | $85.00 | $81.00 | $80.00 | $90.00 |
| 0024 | 18" RC pipe culverts, class IV (0448300000-E) | LF | 472 | $105.00 | $104.43 | $97.00 | $94.00 | $90.00 | $110.00 |
| 0025 | 24" RC pipe culverts, class IV (0448400000-E) | LF | 356 | $149.00 | $142.25 | $128.00 | $140.00 | $115.00 | $150.00 |
| 0026 | 30" RC pipe culverts, class IV (0448500000-E) | LF | 60 | $265.00 | $204.29 | $172.00 | $220.00 | $190.00 | $200.00 |
| 0027 | 36" RC pipe culverts, class IV (0448600000-E) | LF | 44 | $275.00 | $389.08 | $230.00 | $250.00 | $350.00 | $300.00 |
| 0028 | **" RC pipe culv class V - (15") (0449000000-E) | LF | 644 | $110.00 | $154.63 | $88.00 | $150.00 | $100.00 | $120.00 |
| 0029 | Pipe removal (0995000000-E) | LF | 2,035 | $41.00 | $51.24 | $20.00 | $48.00 | $60.00 | $42.00 |
| 0030 | Pipe clean out (0996000000-N) | EACH | 1 | $4,900.00 | $4,163.13 | $3,000.00 | $4,000.00 | $2,000.00 | $10,000 |
| 0031 | Shallow undercut (1099500000-E) | CY | 500 | $12.50 | $20.35 | $28.00 | $41.00 | $20.00 | $50.00 |
| 0032 | Class IV subgrade stabilization (1099700000-E) | TON | 1,000 | $54.00 | $44.00 | $55.00 | $49.00 | $40.00 | $60.00 |
| 0033 | Incidental stone base (1220000000-E) | TON | 81 | $76.00 | $102.50 | $75.00 | $120.00 | $50.00 | $220.00 |
| 0034 | Incidental milling (1330000000-E) | SY | 1,420 | $10.00 | $31.25 | $17.00 | $16.00 | $12.00 | $30.00 |
| 0035 | Asphalt conc base course, type B25.0C (1491000000-E) | TON | 10,560 | $89.00 | $82.00 | $93.00 | $82.00 | $82.00 | $82.00 |
| 0036 | Asphalt conc intermediate course, type I19.0C (1503000000-E) | TON | 8,810 | $92.00 | $85.00 | $90.00 | $85.00 | $85.00 | $85.00 |
| 0037 | Asphalt conc surface course, type S9.5B (1519000000-E) | TON | 6,110 | $98.00 | $90.00 | $88.00 | $90.00 | $90.00 | $90.00 |
| 0038 | Asphalt binder for plant mix (1575000000-E) | TON | 1,300 | $725.00 | $675.00 | $660.00 | $675.00 | $675.00 | $675.00 |
| 0039 | Asphalt plant mix, pavement repair (1693000000-E) | TON | 1,109 | $207.00 | $270.00 | $225.00 | $250.00 | $248.78 | $225.00 |
| 0040 | ******"PCC PVMT misc - (12") (1869000000-E) | SY | 168 | $240.00 | $141.20 | $145.00 | $141.20 | $141.20 | $244.57 |
| 0041 | Generic paving item (SY) - 8" stamped concrete truck apron (1891000000-E) | SY | 1,792 | $135.00 | $151.55 | $155.00 | $151.55 | $151.55 | $195.00 |
| 0042 | Right-of-way markers (2000000000-N) | EACH | 170 | $323.00 | $250.00 | $350.00 | $250.00 | $250.00 | $250.00 |
| 0043 | Subdrain excavation (2022000000-E) | CY | 120 | $38.00 | $19.00 | $35.00 | $35.00 | $30.00 | $35.00 |
| 0044 | Geotextile for subsurface drains (2026000000-E) | SY | 500 | $13.00 | $5.85 | $12.00 | $8.00 | $10.00 | $12.00 |
| 0045 | Subdrain coarse aggregate (2036000000-E) | CY | 90 | $87.00 | $92.50 | $80.00 | $85.00 | $125.00 | $80.00 |
| 0046 | 6" perforated subdrain pipe (2044000000-E) | LF | 500 | $17.50 | $9.20 | $16.00 | $17.50 | $30.00 | $16.00 |
| 0047 | Subdrain pipe outlet (2070000000-N) | EACH | 1 | $436.00 | $538.10 | $400.00 | $800.00 | $700.00 | $400.00 |
| 0048 | 6" outlet pipe (2077000000-E) | LF | 6 | $44.00 | $69.86 | $40.00 | $50.00 | $60.00 | $40.00 |
| 0049 | Pipe collars (2253000000-E) | CY | 1.29 | $2,500.00 | $5,176.77 | $1,500.00 | $1,497.68 | $2,500.00 | $3,000.00 |
| 0050 | Flowable fill (2275000000-E) | CY | 43 | $825.00 | $855.60 | $775.00 | $315.00 | $450.00 | $375.00 |
| 0051 | Masonry drainage structures (2286000000-N) | EACH | 147 | $3,800.00 | $3,648.51 | $2,950.00 | $4,500.00 | $3,000.00 | $6,500.00 |
| 0052 | Masonry drainage structures (2308000000-E) | LF | 83 | $378.00 | $579.10 | $725.00 | $500.00 | $800.00 | $500.00 |
| 0053 | Frame with two grates, STD 840.16 (2364000000-N) | EACH | 17 | $1,400.00 | $2,281.65 | $1,100.00 | $1,600.00 | $1,500.00 | $1,200.00 |
| 0054 | Frame-GRT-HD 840.03 ** - (E) (2374000000-N) | EACH | 33 | $1,500.00 | $1,249.53 | $1,200.00 | $1,150.00 | $1,500.00 | $1,550.00 |
| 0055 | Frame-GRT-HD 840.03 ** - (F) (2374000000-N) | EACH | 41 | $1,600.00 | $1,303.31 | $1,200.00 | $1,150.00 | $1,500.00 | $1,550.00 |
| 0056 | Frame-GRT-HD 840.03 ** - (G) (2374000000-N) | EACH | 49 | $1,600.00 | $1,303.31 | $1,200.00 | $1,150.00 | $1,500.00 | $1,550.00 |
| 0057 | Frame with cover, STD 840.54 (2396000000-N) | EACH | 8 | $1,100.00 | $1,010.71 | $1,200.00 | $1,000.00 | $1,200.00 | $1,450.00 |
| 0058 | Concrete transitional section for drop inlet (2451000000-N) | EACH | 2 | $2,400.00 | $1,100.00 | $1,200.00 | $1,100.00 | $1,100.00 | $2,800.00 |
| 0059 | **"X**" concrete curb - (8" X 18") (2535000000-E) | LF | 890 | $39.00 | $32.30 | $34.00 | $32.30 | $32.30 | $30.00 |
| 0060 | 1'-6" concrete curb & gutter (2542000000-E) | LF | 2,050 | $24.50 | $32.25 | $34.00 | $32.25 | $32.25 | $30.00 |
| 0061 | 2'-6" concrete curb & gutter (2549000000-E) | LF | 18,500 | $30.00 | $36.40 | $38.00 | $36.40 | $36.40 | $34.00 |
| 0062 | 4" concrete sidewalk (2591000000-E) | SY | 12,990 | $72.00 | $97.65 | $62.00 | $60.25 | $60.25 | $70.00 |
| 0063 | Concrete curb ramps (2605000000-N) | EACH | 110 | $2,300.00 | $4,875.00 | $2,900.00 | $2,750.00 | $2,750.00 | $3,400.00 |
| 0064 | 6" concrete driveway (2612000000-E) | SY | 1,330 | $97.00 | $131.50 | $108.00 | $103.10 | $103.10 | $90.00 |
| 0065 | 5" monolithic concrete islands (keyed in) (2655000000-E) | SY | 1,970 | $87.00 | $99.20 | $105.00 | $99.20 | $99.20 | $90.00 |
| 0066 | **" mono conc median (*****) - (7", mountable) (2657000000-E) | SY | 80 | $197.00 | $108.20 | $115.00 | $108.20 | $1,108.20 | $200.00 |
| 0067 | Adjustment of catch basins (2800000000-N) | EACH | 2 | $1,400.00 | $2,054.63 | $650.00 | $1,800.00 | $1,000.00 | $2,000.00 |
| 0068 | Generic fencing item (LF) - aluminum picket fence (3575000000-E) | LF | 330 | $71.00 | $65.00 | $65.00 | $65.00 | $65.00 | $65.00 |
| 0069 | Rip rap, class I (3628000000-E) | TON | 420 | $94.00 | $68.50 | $58.00 | $122.00 | $60.00 | $80.00 |
| 0070 | Rip rap, class B (3649000000-E) | TON | 580 | $83.00 | $66.75 | $56.00 | $115.00 | $60.00 | $80.00 |
| 0071 | Geotextile for drainage (3656000000-E) | SY | 4,105 | $2.80 | $4.70 | $5.00 | $3.85 | $5.00 | $5.00 |
| 0072 | Supports, 3-LB steel U-channel (4072000000-E) | LF | 2,930 | $9.50 | $9.00 | $9.00 | $9.00 | $6.50 | $9.00 |
| 0073 | Sign erection, type E (4102000000-N) | EACH | 163 | $98.00 | $90.00 | $175.00 | $90.00 | $65.00 | $90.00 |
| 0074 | Sign erect, reloc ** GRD MTD - (D) (4116100000-N) | EACH | 6 | $136.00 | $125.00 | $225.00 | $125.00 | $120.00 | $125.00 |
| 0075 | Sign erect, reloc ** GRD MTD - (E) (4116100000-N) | EACH | 9 | $136.00 | $125.00 | $225.00 | $125.00 | $65.00 | $125.00 |
| 0076 | Disposal of sign system, U-channel (4155000000-N) | EACH | 29 | $2.00 | $2.00 | $10.00 | $2.00 | $20.00 | $2.00 |
| 0077 | Work zone signs (stationary) (4400000000-E) | SF | 963 | $15.50 | $10.00 | $15.00 | $10.00 | $6.00 | $10.00 |
| 0078 | Work zone signs (portable) (4405000000-E) | SF | 543 | $14.50 | $17.30 | $25.00 | $9.75 | $13.00 | $18.00 |
| 0079 | Work zone signs (barricade mounted) (4410000000-E) | SF | 302 | $13.25 | $8.50 | $10.00 | $8.50 | $6.50 | $8.50 |
| 0080 | Portable changeable message sign (4420000000-N) | EACH | 2 | $19,500 | $7,100.00 | $12,000 | $12,500 | $12,000 | $25,000 |
| 0081 | Drums (4430000000-N) | EACH | 170 | $72.00 | $75.00 | $85.00 | $100.00 | $50.00 | $60.00 |
| 0082 | Cones (4435000000-N) | EACH | 360 | $31.00 | $0.01 | $55.00 | $25.00 | $25.00 | $35.00 |
| 0083 | Barricades (type III) (4445000000-E) | LF | 176 | $39.00 | $25.00 | $30.00 | $25.00 | $14.00 | $25.00 |
| 0084 | Pedestrian channelizing devices (4447000000-E) | LF | 180 | $39.00 | $75.00 | $25.00 | $75.00 | $8.00 | $30.00 |
| 0085 | Flagger (4455000000-N) | DAY | 302 | $593.00 | $466.35 | $450.00 | $375.00 | $350.00 | $1,000.00 |
| 0086 | Law enforcement (4510000000-N) | HR | 80 | $93.00 | $78.35 | $85.00 | $80.00 | $65.00 | $90.00 |
| 0087 | Thermoplastic pavement marking lines (4", 90 mils) (4685000000-E) | LF | 36,653 | $0.60 | $1.45 | $1.45 | $0.55 | $1.45 | $0.55 |
| 0088 | Thermoplastic pavement marking lines (8", 90 mils) (4695000000-E) | LF | 4,204 | $2.75 | $2.60 | $2.60 | $2.50 | $2.60 | $2.50 |
| 0089 | Thermoplastic pavement marking lines (24", 90 mils) (4709000000-E) | LF | 2,583 | $12.50 | $12.00 | $12.00 | $11.50 | $12.00 | $11.50 |
| 0090 | Thermoplastic pavement marking symbol (90 mils) (4725000000-E) | EACH | 157 | $136.00 | $230.00 | $230.00 | $125.00 | $230.00 | $125.00 |
| 0091 | Heated-in-place thermoplastic pavement marking symbol (90 mils) (4726110000-E) | EACH | 56 | $180.00 | $255.00 | $255.00 | $165.00 | $255.00 | $165.00 |
| 0092 | Paint pavement marking lines (4") (4810000000-E) | LF | 36,653 | $0.35 | $0.50 | $0.50 | $0.32 | $0.50 | $0.32 |
| 0093 | Paint pavement marking lines (8") (4820000000-E) | LF | 4,204 | $0.70 | $1.00 | $1.00 | $0.65 | $1.00 | $0.65 |
| 0094 | Paint pavement marking lines (24") (4835000000-E) | LF | 2,583 | $3.25 | $4.00 | $4.00 | $3.00 | $4.00 | $3.00 |
| 0095 | Paint pavement marking symbol (4845000000-N) | EACH | 157 | $44.00 | $55.00 | $55.00 | $40.00 | $55.00 | $40.00 |
| 0096 | Elect duct **, size ***** - (TL, 2") (5150000000-E) | LF | 1,250 | $39.00 | $35.00 | $35.00 | $35.00 | $35.00 | $25.25 |
| 0097 | Elect duct BD, size ***** - (2") (5155000000-E) | LF | 14,910 | $12.25 | $11.00 | $11.00 | $11.00 | $11.00 | $22.22 |
| 0098 | 4" water line (5325400000-E) | LF | 76 | $120.00 | $252.40 | $120.00 | $150.00 | $150.00 | $158.00 |
| 0099 | 6" water line (5325600000-E) | LF | 675 | $125.00 | $151.32 | $78.00 | $120.00 | $120.00 | $124.00 |
| 0100 | 8" water line (5325800000-E) | LF | 8,159 | $131.00 | $107.27 | $89.00 | $130.00 | $130.00 | $154.00 |
| 0101 | 12" water line (5326200000-E) | LF | 1,990 | $158.00 | $184.82 | $130.00 | $170.00 | $170.00 | $218.00 |
| 0102 | DI H2O pipe fittings (5329000000-E) | LB | 31,117 | $14.00 | $20.34 | $12.00 | $14.00 | $14.00 | $20.00 |
| 0103 | 4" valve (5538000000-E) | EACH | 1 | $2,300.00 | $2,917.05 | $2,100.00 | $3,000.00 | $3,000.00 | $3,448.00 |
| 0104 | 6" valve (5540000000-E) | EACH | 22 | $2,800.00 | $2,966.37 | $2,650.00 | $3,000.00 | $3,000.00 | $3,913.00 |
| 0105 | 8" valve (5546000000-E) | EACH | 29 | $3,800.00 | $4,470.52 | $3,450.00 | $4,400.00 | $4,400.00 | $5,330.00 |
| 0106 | 12" valve (5558000000-E) | EACH | 6 | $6,800.00 | $7,502.77 | $7,200.00 | $7,600.00 | $7,600.00 | $8,612.00 |
| 0107 | **" plug valve - (8") (5563000000-E) | EACH | 1 | $7,600.00 | $7,190.07 | $6,900.00 | $7,200.00 | $7,200.00 | $7,355.00 |
| 0108 | 6" tapping sleeve & valve (5571600000-E) | EACH | 1 | $13,900 | $14,159 | $8,800.00 | $8,600.00 | $8,600.00 | $10,805 |
| 0109 | 12" tapping sleeve & valve (5572200000-E) | EACH | 1 | $19,600 | $15,901 | $18,028 | $18,000 | $18,000 | $22,786 |
| 0110 | **" comb air valve - (2") (5590000000-E) | EACH | 4 | $13,900 | $11,526 | $7,100.00 | $16,000 | $16,000 | $18,493 |
| 0111 | **" water meter - (1") (5643000000-E) | EACH | 1 | $3,100.00 | $3,121.16 | $2,100.00 | $3,200.00 | $3,200.00 | $2,913.00 |
| 0112 | **" water meter - (5/8") (5643000000-E) | EACH | 23 | $2,900.00 | $3,763.73 | $1,300.00 | $3,000.00 | $3,000.00 | $2,882.00 |
| 0113 | 3" water meter (5643300000-E) | EACH | 1 | $34,200 | $26,946 | $12,500 | $22,000 | $24,000 | $23,742 |
| 0114 | **" DCV backflow prevnt asmbly - (1") (5653000000-E) | EACH | 1 | $4,600.00 | $6,240.91 | $2,400.00 | $3,000.00 | $3,000.00 | $4,596.00 |
| 0115 | Relc **" DCV backflow prevnt A - (1") (5653100000-E) | EACH | 1 | $3,800.00 | $5,312.26 | $1,450.00 | $2,600.00 | $2,600.00 | $10,683 |
| 0116 | Relocate 3" DCV backflow prevention assembly (5653310000-E) | EACH | 1 | $10,600 | $18,739 | $4,800.00 | $7,000.00 | $7,000.00 | $10,683 |
| 0117 | Relocate 8" DCV backflow prevention assembly (5653810000-E) | EACH | 1 | $18,800 | $20,313 | $16,500 | $12,000 | $12,000 | $14,156 |
| 0118 | Fire hydrant (5666000000-N) | EACH | 18 | $7,300.00 | $8,441.20 | $8,900.00 | $9,400.00 | $9,400.00 | $12,070 |
| 0119 | Fire hydrant leg (5673000000-E) | LF | 211 | $120.00 | $109.28 | $165.00 | $120.00 | $120.00 | $110.00 |
| 0120 | Water service line (<2") (5686500000-E) | LF | 585 | $60.00 | $83.67 | $37.00 | $90.00 | $90.00 | $52.00 |
| 0121 | 8" sanitary gravity sewer (5691300000-E) | LF | 6,462 | $202.00 | $156.37 | $73.00 | $150.00 | $150.00 | $155.00 |
| 0122 | **" force main sewer - (3") (5709000000-E) | LF | 26 | $540.00 | $353.96 | $295.00 | $120.00 | $120.00 | $233.00 |
| 0123 | 8" force main sewer (5709400000-E) | LF | 3,458 | $164.00 | $99.60 | $95.00 | $130.00 | $130.00 | $164.00 |
| 0124 | Sanitary sewer clean-out (5768000000-N) | EACH | 13 | $1,500.00 | $1,918.27 | $750.00 | $2,600.00 | $2,600.00 | $5,216.00 |
| 0125 | Sewer service line (5768500000-E) | LF | 493 | $71.00 | $175.03 | $58.00 | $120.00 | $120.00 | $172.00 |
| 0126 | Ductile iron sewer pipe fittings (5769000000-E) | LB | 4,452 | $16.25 | $23.30 | $12.00 | $21.00 | $21.00 | $27.00 |
| 0127 | 4' dia utility manhole (5775000000-E) | EACH | 47 | $8,100.00 | $8,471.27 | $4,800.00 | $14,600 | $14,600 | $10,393 |
| 0128 | Abandon **" utility pipe - (3") (5798000000-E) | LF | 253 | $6.50 | $23.01 | $20.00 | $30.00 | $30.00 | $26.00 |
| 0129 | Abandon 6" utility pipe (5800000000-E) | LF | 2,159 | $8.75 | $22.08 | $16.00 | $20.00 | $20.00 | $37.00 |
| 0130 | Abandon 8" utility pipe (5801000000-E) | LF | 1,256 | $15.25 | $12.59 | $18.00 | $25.00 | $25.00 | $39.00 |
| 0131 | Abandon 12" utility pipe (5804000000-E) | LF | 1,480 | $19.75 | $22.58 | $24.00 | $40.00 | $40.00 | $45.00 |
| 0132 | Temporary silt fence (6000000000-E) | LF | 30,355 | $3.10 | $1.99 | $2.75 | $1.99 | $1.99 | $1.99 |
| 0133 | Stone for erosion control, class A (6006000000-E) | TON | 680 | $69.00 | $69.00 | $60.00 | $38.00 | $60.00 | $80.00 |
| 0134 | Stone for erosion control, class B (6009000000-E) | TON | 2,550 | $84.00 | $0.01 | $57.00 | $39.00 | $65.00 | $80.00 |
| 0135 | Sediment control stone (6012000000-E) | TON | 2,825 | $62.00 | $0.01 | $50.00 | $35.00 | $60.00 | $76.00 |
| 0136 | Temporary mulching (6015000000-E) | ACRE | 23.50 | $2,000.00 | $985.00 | $1,400.00 | $985.00 | $985.00 | $985.00 |
| 0137 | Seed for temporary seeding (6018000000-E) | LB | 1,200 | $2.25 | $1.00 | $3.00 | $1.00 | $1.00 | $1.00 |
| 0138 | Fertilizer for temporary seeding (6021000000-E) | TON | 7.50 | $1,000.00 | $1,000.00 | $1,500.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 0139 | Temporary slope drains (6024000000-E) | LF | 1,275 | $30.00 | $20.85 | $25.00 | $38.00 | $15.40 | $45.00 |
| 0140 | Safety fence (6029000000-E) | LF | 2,000 | $2.80 | $3.15 | $2.00 | $2.15 | $2.15 | $2.15 |
| 0141 | Silt excavation (6030000000-E) | CY | 8,230 | $16.00 | $0.01 | $2.00 | $0.01 | $30.00 | $67.00 |
| 0142 | Matting for erosion control (6036000000-E) | SY | 37,275 | $1.75 | $1.45 | $1.75 | $1.45 | $1.45 | $1.45 |
| 0143 | Coir fiber mat (6037000000-E) | SY | 100 | $9.00 | $18.00 | $12.00 | $18.00 | $18.00 | $18.00 |
| 0144 | 1/4" hardware cloth (6042000000-E) | LF | 10,065 | $5.50 | $0.01 | $5.00 | $4.00 | $4.00 | $9.00 |
| 0145 | Low permeability geotextile (6043000000-E) | SY | 1,700 | $4.80 | $6.97 | $5.50 | $1.78 | $5.00 | $9.00 |
| 0146 | **" temporary pipe - (15") (6045000000-E) | LF | 185 | $88.00 | $89.50 | $85.00 | $70.00 | $100.00 | $68.00 |
| 0147 | **" temporary pipe - (18") (6045000000-E) | LF | 135 | $93.00 | $81.05 | $90.00 | $76.00 | $105.00 | $78.00 |
| 0148 | **" temporary pipe - (24") (6045000000-E) | LF | 130 | $109.00 | $118.65 | $125.00 | $88.00 | $110.00 | $130.00 |
| 0149 | Special stilling basins (6070000000-N) | EACH | 3 | $1,200.00 | $990.00 | $750.00 | $2,000.00 | $320.00 | $6,800.00 |
| 0150 | Flocculant (6071002000-E) | LB | 1,460 | $4.45 | $1.00 | $5.50 | $1.00 | $1.00 | $1.00 |
| 0151 | Coir fiber wattle (6071012000-E) | LF | 2,120 | $10.00 | $9.00 | $10.00 | $9.00 | $9.00 | $9.00 |
| 0152 | Coir fiber wattle barrier (6071014000-E) | LF | 480 | $15.50 | $9.00 | $12.00 | $9.00 | $9.00 | $9.00 |
| 0153 | Coir fiber baffle (6071030000-E) | LF | 1,580 | $9.00 | $7.00 | $9.00 | $7.00 | $7.00 | $7.00 |
| 0154 | **" skimmer - (1-1/2") (6071050000-E) | EACH | 13 | $1,100.00 | $1,600.00 | $2,800.00 | $1,050.00 | $1,395.66 | $2,350.00 |
| 0155 | Seeding and mulching (6084000000-E) | ACRE | 24 | $3,100.00 | $2,600.00 | $3,000.00 | $2,600.00 | $2,600.00 | $2,600.00 |
| 0156 | Mowing (6087000000-E) | ACRE | 21 | $223.00 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 |
| 0157 | Seed for repair seeding (6090000000-E) | LB | 250 | $4.45 | $5.00 | $4.00 | $5.00 | $5.00 | $5.00 |
| 0158 | Fertilizer for repair seeding (6093000000-E) | TON | 1 | $1,300.00 | $800.00 | $1,500.00 | $800.00 | $800.00 | $800.00 |
| 0159 | Seed for supplemental seeding (6096000000-E) | LB | 550 | $3.35 | $3.00 | $4.00 | $3.00 | $3.00 | $3.00 |
| 0160 | Fertilizer topdressing (6108000000-E) | TON | 16.25 | $1,000.00 | $925.00 | $1,500.00 | $925.00 | $925.00 | $925.00 |
| 0161 | Impervious dike (6111000000-E) | LF | 100 | $10.50 | $142.00 | $145.00 | $111.00 | $197.92 | $214.00 |
| 0162 | Specialized hand mowing (6114500000-N) | MHR | 10 | $195.00 | $100.00 | $50.00 | $100.00 | $100.00 | $100.00 |
| 0163 | Response for erosion control (6117000000-N) | EACH | 100 | $111.00 | $100.00 | $150.00 | $100.00 | $100.00 | $100.00 |
| 0164 | Concrete washout structure (6117500000-N) | EACH | 10 | $1,800.00 | $650.00 | $1,300.00 | $750.00 | $3,470.84 | $4,975.00 |
| 0165 | Generic erosion control item (EA) - fabric insert inlet protection cleanout (6132000000-N) | EACH | 1,086 | $153.00 | $0.01 | $90.00 | $62.00 | $100.00 | $480.00 |
| 0166 | Generic erosion control item (EA) - fabric insert inlet protection, type 2 (6132000000-N) | EACH | 362 | $215.00 | $0.01 | $150.00 | $85.00 | $150.00 | $720.00 |
| 0167 | Traffic signal removal (7948000000-N) | EACH | 1 | $3,200.00 | $2,900.00 | $2,900.00 | $2,900.00 | $2,900.00 | $4,040.40 |
| 0168 | MSE retain wall no ** - (3) (8801000000-E) | SF | 321 | $213.00 | $194.88 | $155.00 | $178.00 | $177.16 | $63.16 |
| 0169 | MSE retain wall no ** - (5) (8801000000-E) | SF | 695 | $213.00 | $195.23 | $155.00 | $214.00 | $177.48 | $63.16 |
| 0170 | Segmental gravity retaining walls (8802030000-E) | SF | 1,432 | $71.00 | $65.19 | $85.00 | $60.00 | $59.26 | $63.16 |
| 0171 | Generic ret wall item (LS) - masonry wall termination (8832000000-N) | LS | 1 | $11,300 | $8,355.00 | $20,000 | $10,000 | $10,000 | $40,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
Every contract let that day: NCDOT letting of February 18, 2025. Compiled by Mirage Metrics.