Kemp Sigmon Construction Co Inc: NCDOT bid record

Kemp Sigmon Construction Co Inc submitted 41 bids on North Carolina DOT contracts in the data, from 20 JUL 2021 to 15 SEP 2026, and was the low bidder on 10 of them (24%). When it was not low, its total sat a median +14% above the low bid.

Owner
North Carolina DOT
Low bid volume
$76,860,455
Latest bid
15 SEP 2026
Data through
20 OCT 2026
41Bids
10Low bids
24Win rate, percent
+14%Median gap to the low bid when not low, 31 bids

By year

YearBidsLow bidsWin rate
2021100%
20222150%
202322100%
20241119%
202513431%
202612217%
Kemp Sigmon Construction Co Inc, NCDOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
Rutherford6117%
Mecklenburg400%
Mcdowell3267%
Madison33100%
Cleveland3133%
Rockingham200%
Davidson22100%
Catawba200%
Stanly100%
Jackson100%
Johnston100%
Haywood100%
Kemp Sigmon Construction Co Inc, NCDOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Supplementary clearing & grubbing0050000000-EACRE2625 (96%)$100.00$150.00
Stone for erosion control, class B6009000000-ETON3124 (77%)$40.00$49.00
Stone for erosion control, class A6006000000-ETON3124 (77%)$40.00$48.00
Sediment control stone6012000000-ETON3123 (74%)$40.00$42.00
FND condit geotextile (4A)0321000000-ESY2723 (85%)$1.00$4.50
Additional guardrail posts3150000000-NEACH2922 (76%)$11.00$13.00
Steel beam guardrail3030000000-ELF2922 (76%)$23.80$24.00
Safety fence6029000000-ELF3120 (65%)$2.00$2.20
Geotextile for subsurface drains2026000000-ESY3120 (65%)$2.00$4.10
Class IV subgrade stabilization1099700000-ETON3020 (67%)$32.50$33.27
Foundation conditioning material, minor structures0318000000-ETON2120 (95%)$10.00$42.00
Temporary slope drains6024000000-ELF3118 (58%)$10.00$14.20
Kemp Sigmon Construction Co Inc, NCDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Kemp Sigmon Construction Co Inc, NCDOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
15 SEP 2026C205214WilkesGRADING, DRAINAGE, PAVING, AND STRUCTURE., GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURE. BRIDGE #960029 OVER CUB CREEK ON SR-1001 (OAKW2 of 5$6,801,641+5.0%
18 AUG 2026C205195CatawbaGRADING, DRAINAGE, PAVING, AND SIGNALS. INTERCHANGE AT I-40 AND SR-1007 (LENOIR RHYNE BOULEVARD)4 of 4$17,474,191+27%
18 AUG 2026C204877RutherfordGRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #800145 OVER FLOYDS CREEK ON SR-2125 (HARRIS HENRIETTA ROAD)2 of 8$1,998,056+7.0%
18 AUG 2026C205070RutherfordGRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #800012 OVER US-74 BYPASS ON NC-1203 of 9$7,694,884+9.0%
18 AUG 2026C205224RutherfordBRIDGE REPLACEMENT (EXPRESS DESIGN-BUILD). BRIDGE #800239 OVER CATHEYS CREEK ON SR-1325 (NANNEYTOWN RD)2 of 4$1,672,000+13%
18 AUG 2026C205228McdowellROADWAY AND BRIDGE CONSTRUCTION. (EXPRESS DESIGN BUILD). BRIDGE #580023 OVER LAKE TAHOMA ON NC-80 (LAKE TAHOMA RD)1 of 3$3,629,400Low, 37% under the second
19 MAY 2026C204733YadkinGRADING, DRAINAGE, PAVING, AND STRUCTURES. BRIDGE #980029 OVER I-77 ON US-21 BUS4 of 4$23,067,861+40%
19 MAY 2026C205196Buncombe, Mitchell, YanceyROADWAY AND BRIDGE CONSTRUCTION. (EXPRESS DESIGN BUILD), ROADWAY AND CULVERT CONSTRUCTION. (EXPRESS DESIGN BUILD). BRIDGE #100678, CULVERT B3 of 3$11,120,000+33%
17 MAR 2026C205013MecklenburgGRADING, DRAINAGE, PAVING, AND SIGNALS. GREYLOCK RIDGE RD FROM EAST JOHN ST TO TANK TOWN RD4 of 9$4,915,484+17%
17 FEB 2026C204936AlamanceGRADING, DRAINAGE, PAVING, AND STRUCTURES., GRADING, DRAINAGE, PAVING, AND STURCTURES. BRIDGE #000014 OVER CANE CREEK ON NC-871 of 7$7,695,971Low, 1.0% under the second
17 FEB 2026C205095MecklenburgGRADING, DRAINAGE, PAVING, SIGNALS, AND CULVERTS. SR-2415 (BAILEY RD) FROM POOLE PLACE DR TO US-21 (STATESVILLE RD)4 of 10$8,680,972+11%
20 JAN 2026C205132ClevelandGRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #220075 ON NC-226 (POLKVILLE ROAD) OVER HINTON CREEK2 of 6$6,385,066+18%
16 DEC 2025C205135RutherfordGRADING, DRAINAGE, AND PAVING. (EXPRESS DESIGN BUILD). INTERSECTION OF US-64/US-74A (WEST MOUNTAIN ST) AND NORTH WASHINGTON ST3 of 4$5,150,000+14%
16 DEC 2025C205141RutherfordBRIDGE REPLACEMENT. (EXPRESS DESIGN BUILD). BRIDGE #800036 OVER SECOND BROAD RIVER ON US-74 BUSINESS2 of 5$6,680,000+25%
21 OCT 2025C204840CaldwellGRADING, DRAINAGE, PAVING, AND SIGNALS. INTERSECTION AT US-321 AND SR-1108 (MISSION RD)2 of 4$13,629,385+2.0%
21 OCT 2025C205124Mcdowell, RutherfordROADWAY AND BRIDGE CONSTRUCTION (EXPRESS DESIGN BUILD)., ROADWAY AND CULVERT CONSTRUCTION. (EXPRESS DESIGN BUILD). CULVERT #580382 ON SR-1443 of 3$10,193,000+41%
19 AUG 2025C204991MecklenburgBRIDGE #590165 OVER COFFEY CREEK ON SHOPTON RD., BRIDGE #590165 OVER COFFEY CREEK ON SR 5469 (SHOPTON RD)., BRIDGE #590165 OVER COFFEY CREEK4 of 6$8,781,551+29%
20 MAY 2025C205043CatawbaGRADING, DRAINAGE, PAVING, AND SIGNALS. NC-127 FROM 1ST AVENUE SOUTHEAST TO 2ND AVENUE SOUTHEAST2 of 3$8,941,878+5.0%
18 MAR 2025C204938ClevelandGRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #220025 OVER BUFFALO CREEK ON SR-2033 (OAK GROVE ROAD)2 of 6$5,652,405+9.0%
18 MAR 2025C204766MadisonGRADING, DRAINAGE, PAVING, AND STRUCTURES., GRADING, DRAINAGE, PAVING, RETAINING WALL, AND STRUCTURE. BRIDGE #560067 OVER THE FRENCH BROAD R1 of 8$16,777,527Low, 5.0% under the second
18 MAR 2025C205064McdowellROADWAY AND BRIDGE CONSTRUCTION (EXPRESS DESIGN BUILD). BRIDGE #580058 OVER MACKEY CREEK ON US-701 of 3$5,400,000Low, 9.0% under the second
18 FEB 2025C204979DavieGRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #290076 OVER I-40 ON SR-1436 (PINEBROOK SCHOOL RD)6 of 10$5,442,911+29%
18 FEB 2025C204883RutherfordGRADING, DRAINAGE, PAVING, AND STRUCTURES. BRIDGE #800040 OVER NORTH FORK FIRST BROAD CREEK ON NC-2261 of 6$5,593,808Low, 20% under the second
18 FEB 2025C205029MadisonROADWAY AND BRIDGE CONSTRUCTION (EXPRESS DESIGN BUILD). BRIDGE #560042 OVER IVY CREEK ON SR-1576 (BEND OF IVY RD) AND BRIDGE #560304 OVER SR1 of 2$5,900,000Low, 17% under the second
09 JAN 2025C205020McdowellROADWAY AND BRIDGE CONSTRUCTION (EXPRESS DESIGN BUILD). BRG #580119 ON US-221 AND BRG #580285 ON SR-1571: BOTH OVER NORTH FORK CATAWBA RIVER2 of 3$5,540,000+15%
Kemp Sigmon Construction Co Inc: latest NCDOT bids in the data

How this record was read

NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; NCDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.