NCDOT contract C205095 bid tabulation
GRADING, DRAINAGE, PAVING, SIGNALS, AND CULVERTS. SR-2415 (BAILEY RD) FROM POOLE PLACE DR TO US-21 (STATESVILLE RD). Let by North Carolina DOT on February 17, 2026, Mecklenburg. 10 bids received; low bid $7,809,039 by Blythe Development Co..
- Owner
- North Carolina DOT
- Letting
- 17 FEB 2026
- Pay items
- 171
- Data through
- 20 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Blythe Development Co. | $7,809,039 | Low |
| 2 | K West Group LLC DBA Kwest Group LLC | $8,531,334 | +9.0% |
| 3 | Blythe Construction Inc | $8,656,255 | +11% |
| 4 | Kemp Sigmon Construction Co Inc | $8,680,972 | +11% |
| 5 | Sealand Contractors Corp | $8,760,000 | +12% |
| 6 | King Asphalt Inc | $8,991,316 | +15% |
| 7 | NJR Group Inc | $9,021,092 | +16% |
| 8 | Mountaineer Contractors Inc and Subsidiaries | $9,585,362 | +23% |
| 9 | Eagle-Wood Inc | $9,689,835 | +24% |
| 10 | Chatham Civil Contracting LLC | $10,597,000 | +36% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Blythe Development Co. | 2. K West Group LLC DBA Kwest Group LLC | 3. Blythe Construction Inc | 4. Kemp Sigmon Construction Co Inc | 5. Sealand Contractors Corp | 6. King Asphalt Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Mobilization (0000100000-N) | LS | 1 | $390,000 | $397,806 | $420,000 | $430,000 | $438,000 | $449,000 |
| 0002 | Construction surveying (0000400000-N) | LS | 1 | $72,000 | $150,000 | $160,000 | $99,614 | $150,000 | $165,000 |
| 0003 | Clearing & grubbing (0001000000-E) | LS | 1 | $820,700 | $800,000 | $1,585,000 | $575,000 | $300,000 | $632,000 |
| 0004 | Supplementary clearing & grubbing (0008000000-E) | ACRE | 1 | $10,000 | $8,500.00 | $3,000.00 | $100.00 | $15,000 | $10,000 |
| 0005 | Unclassified excavation (0022000000-E) | CY | 3,600 | $16.50 | $25.00 | $18.00 | $20.00 | $36.00 | $23.00 |
| 0006 | Undercut excavation (0036000000-E) | CY | 4,050 | $33.00 | $15.00 | $29.00 | $20.00 | $40.00 | $37.00 |
| 0007 | Borrow excavation (0106000000-E) | CY | 74,400 | $22.00 | $30.00 | $20.00 | $25.00 | $26.00 | $30.00 |
| 0008 | Drainage ditch excavation (0134000000-E) | CY | 980 | $12.00 | $25.00 | $15.00 | $17.00 | $22.00 | $53.25 |
| 0009 | Removal of existing asphalt pavement (0156000000-E) | SY | 630 | $9.00 | $10.00 | $9.00 | $62.00 | $12.00 | $8.25 |
| 0010 | Removal of existing concrete pavement (0163000000-E) | SY | 120 | $23.00 | $25.00 | $26.00 | $62.00 | $11.00 | $91.50 |
| 0011 | Proof rolling (0192000000-N) | HR | 10 | $375.00 | $150.00 | $300.00 | $200.00 | $300.00 | $271.50 |
| 0012 | Select granular material (0195000000-E) | CY | 500 | $70.00 | $20.00 | $70.00 | $40.00 | $72.00 | $95.00 |
| 0013 | Geotextile for soil stabilization (0196000000-E) | SY | 7,600 | $4.00 | $2.00 | $5.00 | $5.00 | $4.00 | $5.30 |
| 0014 | Foundation conditioning material, minor structures (0318000000-E) | TON | 120 | $46.00 | $40.00 | $60.00 | $1.00 | $75.00 | $83.50 |
| 0015 | FND condit geotextile (4A) (0321000000-E) | SY | 380 | $2.90 | $2.00 | $5.00 | $1.00 | $2.00 | $4.90 |
| 0016 | 15" drainage pipe (0335200000-E) | LF | 192 | $83.00 | $125.00 | $90.00 | $150.00 | $110.00 | $84.00 |
| 0017 | 18" drainage pipe (0335300000-E) | LF | 24 | $94.00 | $135.00 | $100.00 | $170.00 | $145.00 | $151.00 |
| 0018 | 36" drainage pipe (0335600000-E) | LF | 16 | $278.00 | $250.00 | $170.00 | $260.00 | $265.00 | $299.00 |
| 0019 | **" drainage pipe elbow - (15") (0335850000-E) | EACH | 4 | $461.00 | $1,500.00 | $400.00 | $1,250.00 | $725.00 | $1,165.00 |
| 0020 | 15" side drain pipe (0343000000-E) | LF | 48 | $81.00 | $85.00 | $100.00 | $110.00 | $120.00 | $96.50 |
| 0021 | ***" RCP culv class IV - (60") (0448000000-E) | LF | 140 | $606.00 | $1,000.00 | $520.00 | $1,400.00 | $715.00 | $587.00 |
| 0022 | 15" RC pipe culverts, class IV (0448200000-E) | LF | 524 | $110.00 | $125.00 | $90.00 | $200.00 | $115.00 | $115.50 |
| 0023 | 18" RC pipe culverts, class IV (0448300000-E) | LF | 44 | $105.00 | $130.00 | $110.00 | $275.00 | $125.00 | $118.75 |
| 0024 | 30" RC pipe culverts, class IV (0448500000-E) | LF | 124 | $185.00 | $200.00 | $160.00 | $430.00 | $225.00 | $191.75 |
| 0025 | Pipe removal (0995000000-E) | LF | 108 | $29.00 | $10.00 | $40.00 | $20.00 | $35.00 | $66.50 |
| 0026 | Fine grading (1011000000-N) | LS | 1 | $30,000 | $500,000 | $250,000 | $300,000 | $941,271 | $232,000 |
| 0027 | Shallow undercut (1099500000-E) | CY | 1,230 | $34.00 | $10.00 | $8.00 | $20.00 | $40.00 | $57.25 |
| 0028 | Class IV subgrade stabilization (1099700000-E) | TON | 2,460 | $42.00 | $20.00 | $45.00 | $50.00 | $38.00 | $45.20 |
| 0029 | Stabilizer aggregate (1110000000-E) | TON | 500 | $49.00 | $20.00 | $45.00 | $75.00 | $68.00 | $59.00 |
| 0030 | Geotextile for subgrade stabilization (1112000000-E) | SY | 11,933 | $5.00 | $2.00 | $5.00 | $5.00 | $3.50 | $4.00 |
| 0031 | Aggregate base course (1121000000-E) | TON | 2,573 | $44.00 | $50.00 | $45.00 | $70.00 | $60.00 | $54.50 |
| 0032 | Mill asp PVMT *****" DTH - (1-1/2") (1297000000-E) | SY | 1,800 | $12.00 | $12.00 | $7.00 | $12.00 | $17.00 | $11.00 |
| 0033 | Incidental milling (1330000000-E) | SY | 350 | $12.00 | $26.00 | $26.00 | $25.00 | $17.00 | $25.00 |
| 0034 | Asphalt conc base course, type B25.0C (1491000000-E) | TON | 1,310 | $102.00 | $104.50 | $113.00 | $82.12 | $104.00 | $96.75 |
| 0035 | Asphalt conc intermediate course, type I19.0C (1503000000-E) | TON | 2,360 | $100.00 | $87.20 | $93.00 | $83.14 | $98.00 | $80.50 |
| 0036 | Asphalt conc surface course, type S9.5B (1519000000-E) | TON | 1,990 | $100.00 | $85.00 | $114.00 | $82.90 | $102.00 | $78.45 |
| 0037 | Asphalt binder for plant mix (1575000000-E) | TON | 305 | $570.00 | $653.00 | $650.00 | $665.00 | $625.00 | $606.00 |
| 0038 | Generic paving item (SY) - 12" concrete truck apron, class AA concrete (1891000000-E) | SY | 500 | $138.00 | $164.75 | $180.00 | $180.00 | $192.00 | $193.64 |
| 0039 | Generic paving item (SY) - 12" concrete truck apron, class AA concrete with black tint (1891000000-E) | SY | 340 | $209.00 | $180.34 | $194.00 | $194.00 | $242.00 | $208.70 |
| 0040 | Subdrain excavation (2022000000-E) | CY | 360 | $22.00 | $25.00 | $36.00 | $25.00 | $35.00 | $43.30 |
| 0041 | Geotextile for subsurface drains (2026000000-E) | SY | 1,051 | $2.50 | $1.50 | $12.00 | $5.00 | $1.50 | $2.00 |
| 0042 | Subdrain coarse aggregate (2036000000-E) | CY | 177 | $110.00 | $90.00 | $50.00 | $75.00 | $110.00 | $116.00 |
| 0043 | 6" perforated subdrain pipe (2044000000-E) | LF | 1,051 | $32.00 | $20.00 | $15.00 | $10.00 | $20.00 | $29.00 |
| 0044 | Subdrain pipe outlet (2070000000-N) | EACH | 3 | $760.00 | $979.72 | $200.00 | $250.00 | $350.00 | $782.00 |
| 0045 | 6" outlet pipe (2077000000-E) | LF | 61 | $35.00 | $50.00 | $20.00 | $50.00 | $45.00 | $54.25 |
| 0046 | Reinforced endwalls (2220000000-E) | CY | 11.20 | $2,450.00 | $2,000.00 | $2,200.00 | $3,500.00 | $2,300.00 | $3,000.00 |
| 0047 | Masonry drainage structures (2286000000-N) | EACH | 20 | $3,470.00 | $3,000.00 | $3,200.00 | $3,500.00 | $3,000.00 | $4,250.00 |
| 0048 | Masonry drainage structures (2308000000-E) | LF | 17.90 | $600.00 | $500.00 | $400.00 | $550.00 | $685.00 | $775.00 |
| 0049 | Frame with two grates, STD 840.29 (2367000000-N) | EACH | 6 | $1,110.00 | $1,250.00 | $2,000.00 | $1,300.00 | $1,300.00 | $1,650.00 |
| 0050 | Frame-GRT-HD 840.03 ** - (E) (2374000000-N) | EACH | 2 | $1,180.00 | $1,500.00 | $2,000.00 | $1,300.00 | $1,750.00 | $1,650.00 |
| 0051 | Frame-GRT-HD 840.03 ** - (F) (2374000000-N) | EACH | 4 | $1,200.00 | $1,500.00 | $2,000.00 | $1,300.00 | $1,800.00 | $1,650.00 |
| 0052 | Frame-GRT-HD 840.03 ** - (G) (2374000000-N) | EACH | 5 | $1,200.00 | $1,500.00 | $2,000.00 | $1,300.00 | $1,800.00 | $1,650.00 |
| 0053 | Frame with cover, STD 840.54 (2396000000-N) | EACH | 3 | $830.00 | $1,000.00 | $1,500.00 | $1,300.00 | $950.00 | $1,650.00 |
| 0054 | **"X**" concrete curb - (8" X 18") (2535000000-E) | LF | 160 | $38.50 | $44.00 | $45.90 | $45.90 | $45.00 | $46.60 |
| 0055 | 2'-6" concrete curb & gutter (2549000000-E) | LF | 1,980 | $42.50 | $29.77 | $35.20 | $35.20 | $35.00 | $35.75 |
| 0056 | Shoulder berm gutter (2556000000-E) | LF | 600 | $57.00 | $46.00 | $41.00 | $41.00 | $55.00 | $41.60 |
| 0057 | 4" concrete sidewalk (2591000000-E) | SY | 1,900 | $68.00 | $60.85 | $72.25 | $72.25 | $52.00 | $73.35 |
| 0058 | Concrete curb ramps (2605000000-N) | EACH | 4 | $2,050.00 | $1,400.00 | $3,000.00 | $3,000.00 | $3,000.00 | $3,045.00 |
| 0059 | 6" concrete driveway (2612000000-E) | SY | 70 | $115.00 | $110.40 | $180.00 | $180.00 | $110.00 | $182.75 |
| 0060 | 5" monolithic concrete islands (surface mounted) (2647000000-E) | SY | 330 | $110.00 | $103.44 | $88.50 | $88.50 | $90.00 | $90.00 |
| 0061 | Generic paving item (LF) - 1'-6" concrete curb & gutter, class AA concrete (2752000000-E) | LF | 860 | $33.00 | $30.55 | $30.00 | $30.00 | $32.00 | $30.45 |
| 0062 | Generic paving item 846 (LF) - 2'-6" concrete curb & gutter (modified spill) (2753000000-E) | LF | 690 | $39.50 | $42.36 | $37.35 | $37.35 | $36.00 | $37.90 |
| 0063 | Steel beam guardrail (3030000000-E) | LF | 1,975 | $24.00 | $23.00 | $23.00 | $23.00 | $24.50 | $23.00 |
| 0064 | Steel beam guardrail, shop curved (3045000000-E) | LF | 125 | $32.00 | $31.50 | $31.50 | $26.00 | $33.50 | $31.50 |
| 0065 | Additional guardrail posts (3150000000-N) | EACH | 10 | $21.00 | $20.00 | $20.00 | $11.00 | $21.00 | $20.00 |
| 0066 | Guardrail end units, type cat-1 (3210000000-N) | EACH | 1 | $1,025.00 | $1,000.00 | $1,000.00 | $990.00 | $1,050.00 | $1,000.00 |
| 0067 | Guardrail end units, type TL-3 (3287000000-N) | EACH | 2 | $3,240.00 | $3,200.00 | $3,200.00 | $3,300.00 | $3,400.00 | $3,200.00 |
| 0068 | Guardrail end units, type TL-2 (3288000000-N) | EACH | 5 | $2,950.00 | $2,900.00 | $2,900.00 | $3,250.00 | $3,100.00 | $2,900.00 |
| 0069 | Remove existing guardrail (3360000000-E) | LF | 275 | $3.50 | $3.00 | $3.00 | $1.00 | $3.25 | $3.00 |
| 0070 | Generic fencing item (LF) - bicycle/pedestrian safety rail (3575000000-E) | LF | 660 | $172.00 | $170.00 | $170.00 | $262.00 | $182.00 | $170.00 |
| 0071 | Rip rap, class I (3628000000-E) | TON | 40 | $74.00 | $125.00 | $70.00 | $100.00 | $100.00 | $101.60 |
| 0072 | Rip rap, class II (3635000000-E) | TON | 230 | $61.00 | $110.00 | $75.00 | $100.00 | $105.00 | $88.60 |
| 0073 | Rip rap, class B (3649000000-E) | TON | 20 | $76.00 | $125.00 | $70.00 | $100.00 | $100.00 | $145.20 |
| 0074 | Geotextile for drainage (3656000000-E) | SY | 1,565 | $3.00 | $2.00 | $5.00 | $5.00 | $2.00 | $6.00 |
| 0075 | Contr furn, type ***sign - (D) (4025000000-E) | SF | 13 | $29.00 | $38.00 | $21.00 | $36.00 | $16.00 | $28.00 |
| 0076 | Contr furn, type ***sign - (E) (4025000000-E) | SF | 147 | $25.00 | $28.00 | $21.00 | $28.00 | $15.00 | $24.00 |
| 0077 | Supports, 3-LB steel U-channel (4072000000-E) | LF | 458 | $8.00 | $8.00 | $11.00 | $10.00 | $9.50 | $7.55 |
| 0078 | Sign erection, type E (4102000000-N) | EACH | 28 | $227.50 | $100.00 | $85.00 | $90.00 | $135.00 | $225.00 |
| 0079 | Sign erect, reloc ** GRD MTD - (E) (4116100000-N) | EACH | 2 | $253.00 | $100.00 | $125.00 | $250.00 | $160.00 | $250.00 |
| 0080 | Disposal of sign system, U-channel (4155000000-N) | EACH | 7 | $15.25 | $25.00 | $20.00 | $5.00 | $27.50 | $15.00 |
| 0081 | Disposal of support, U-channel (4192000000-N) | EACH | 2 | $15.25 | $25.00 | $20.00 | $5.00 | $27.50 | $15.00 |
| 0082 | Work zone signs (stationary) (4400000000-E) | SF | 449 | $7.00 | $7.00 | $6.75 | $12.00 | $8.75 | $6.85 |
| 0083 | Work zone signs (barricade mounted) (4410000000-E) | SF | 229 | $9.00 | $7.00 | $6.95 | $8.50 | $8.75 | $8.85 |
| 0084 | Drums (4430000000-N) | EACH | 203 | $49.25 | $125.00 | $25.00 | $100.00 | $40.00 | $45.00 |
| 0085 | Barricades (type III) (4445000000-E) | LF | 344 | $26.50 | $22.00 | $25.00 | $28.00 | $30.00 | $24.00 |
| 0086 | Pedestrian channelizing devices (4447000000-E) | LF | 292 | $38.50 | $40.00 | $25.00 | $95.00 | $33.00 | $35.00 |
| 0087 | Flagger (4455000000-N) | DAY | 70 | $435.00 | $500.00 | $400.00 | $475.00 | $435.00 | $1,425.00 |
| 0088 | Water filled barrier (4507000000-E) | LF | 292 | $100.00 | $100.00 | $110.00 | $68.00 | $75.00 | $85.00 |
| 0089 | Generic traffic control item (EA) - temporary curb ramps (4600000000-N) | EACH | 1 | $2,625.00 | $2,000.00 | $510.00 | $3,000.00 | $650.00 | $495.00 |
| 0090 | Thermoplastic pavement marking lines (4", 90 mils) (4685000000-E) | LF | 16,035 | $0.63 | $0.55 | $0.62 | $0.62 | $0.60 | $0.62 |
| 0091 | Thermoplastic pavement marking lines (8", 90 mils) (4695000000-E) | LF | 533 | $3.03 | $3.00 | $3.36 | $3.00 | $3.20 | $3.00 |
| 0092 | Thermoplastic pavement marking lines (12", 90 mils) (4700000000-E) | LF | 35 | $5.05 | $4.50 | $5.04 | $5.00 | $4.80 | $5.00 |
| 0093 | Thermoplastic pavement marking lines (24", 90 mils) (4709000000-E) | LF | 125 | $13.14 | $8.90 | $9.98 | $13.00 | $9.55 | $13.00 |
| 0094 | Thermoplastic pavement marking symbol (90 mils) (4725000000-E) | EACH | 16 | $151.58 | $71.25 | $79.86 | $150.00 | $76.50 | $150.00 |
| 0095 | Paint pavement marking lines (4") (4810000000-E) | LF | 4,579 | $0.42 | $0.80 | $0.90 | $0.41 | $0.85 | $0.41 |
| 0096 | Paint pavement marking lines (8") (4820000000-E) | LF | 152 | $0.83 | $1.60 | $1.79 | $0.82 | $1.70 | $0.82 |
| 0097 | Removal of pavement marking lines (4") (4850000000-E) | LF | 2,501 | $1.01 | $1.30 | $1.46 | $1.00 | $1.40 | $1.00 |
| 0098 | Removal of pavement marking lines (8") (4860000000-E) | LF | 135 | $2.02 | $2.60 | $2.91 | $2.00 | $2.75 | $2.00 |
| 0099 | Removal of pavement marking symbols & characters (4875000000-N) | EACH | 4 | $65.50 | $62.75 | $70.33 | $65.00 | $67.50 | $65.00 |
| 0100 | Generic pavement marking item (LF) - yield line paint pavement marking (24") (4890000000-E) | LF | 27 | $4.55 | $4.80 | $5.38 | $4.50 | $5.15 | $4.50 |
| 0101 | Generic pavement marking item (LF) - yield line thermoplastic pavement marking (24", 90 mils) (4890000000-E) | LF | 66 | $11.10 | $8.90 | $9.98 | $11.00 | $9.55 | $11.00 |
| 0102 | Generic pavement marking item (EA) - polycarbonate H-shaped markers (4895000000-N) | EACH | 124 | $68.50 | $78.50 | $87.98 | $68.00 | $84.00 | $68.00 |
| 0103 | 8" water line (5325800000-E) | LF | 816 | $136.00 | $200.00 | $195.00 | $300.00 | $185.00 | $199.00 |
| 0104 | DI H2O pipe fittings (5329000000-E) | LB | 3,106 | $8.00 | $20.00 | $10.00 | $20.00 | $8.25 | $10.25 |
| 0105 | 8" valve (5546000000-E) | EACH | 5 | $4,000.00 | $3,500.00 | $4,075.00 | $4,000.00 | $4,000.00 | $4,158.00 |
| 0106 | Fire hydrant (5666000000-N) | EACH | 1 | $8,800.00 | $7,500.00 | $9,795.00 | $11,000 | $8,000.00 | $9,995.00 |
| 0107 | Fire hydrant leg (5673000000-E) | LF | 11 | $138.00 | $150.00 | $185.00 | $260.00 | $210.00 | $188.75 |
| 0108 | 8" line stop (5678600000-E) | EACH | 3 | $12,000 | $15,000 | $11,125 | $6,000.00 | $11,000 | $11,352 |
| 0109 | 12" sanitary gravity sewer (5691500000-E) | LF | 184 | $230.00 | $450.00 | $380.00 | $500.00 | $150.00 | $387.75 |
| 0110 | 4' dia utility manhole (5775000000-E) | EACH | 2 | $8,700.00 | $7,500.00 | $10,625 | $15,000 | $10,000 | $10,840 |
| 0111 | Abandon 8" utility pipe (5801000000-E) | LF | 438 | $7.75 | $20.00 | $45.00 | $27.00 | $12.00 | $46.00 |
| 0112 | Abandon 12" utility pipe (5804000000-E) | LF | 184 | $15.80 | $25.00 | $50.00 | $30.00 | $12.00 | $51.00 |
| 0113 | 16" encasement pipe (5835700000-E) | LF | 48 | $211.45 | $165.00 | $175.00 | $300.00 | $180.00 | $178.60 |
| 0114 | 24" encasement pipe (5836000000-E) | LF | 169 | $312.59 | $425.00 | $325.00 | $550.00 | $300.00 | $331.60 |
| 0115 | Bore & jack **" - (16") (5872500000-E) | LF | 48 | $1,655.73 | $675.00 | $1,500.00 | $700.00 | $975.00 | $1,530.00 |
| 0116 | Generic utility item (LF) - 4" PVC water pipe, SCH 40 (5888000000-E) | LF | 173 | $42.00 | $15.00 | $130.00 | $100.00 | $22.00 | $132.65 |
| 0117 | Temporary silt fence (6000000000-E) | LF | 14,325 | $4.50 | $2.90 | $2.99 | $2.50 | $3.15 | $3.90 |
| 0118 | Stone for erosion control, class A (6006000000-E) | TON | 380 | $79.00 | $40.00 | $70.00 | $30.00 | $92.00 | $99.00 |
| 0119 | Stone for erosion control, class B (6009000000-E) | TON | 1,525 | $79.00 | $40.00 | $70.00 | $30.00 | $92.00 | $97.25 |
| 0120 | Sediment control stone (6012000000-E) | TON | 875 | $61.00 | $40.00 | $60.00 | $30.00 | $70.00 | $67.40 |
| 0121 | Temporary mulching (6015000000-E) | ACRE | 15 | $1,450.00 | $1,075.00 | $1,429.00 | $1,200.00 | $1,135.00 | $1,075.00 |
| 0122 | Seed for temporary seeding (6018000000-E) | LB | 900 | $0.55 | $2.50 | $0.50 | $5.00 | $2.65 | $2.50 |
| 0123 | Fertilizer for temporary seeding (6021000000-E) | TON | 5 | $835.00 | $1,100.00 | $829.00 | $1,200.00 | $1,160.00 | $1,100.00 |
| 0124 | Temporary slope drains (6024000000-E) | LF | 2,335 | $33.00 | $10.00 | $16.86 | $20.00 | $24.00 | $15.00 |
| 0125 | Safety fence (6029000000-E) | LF | 320 | $3.00 | $2.00 | $1.49 | $1.85 | $2.25 | $2.00 |
| 0126 | Silt excavation (6030000000-E) | CY | 3,160 | $27.00 | $1.00 | $22.00 | $15.00 | $21.00 | $33.00 |
| 0127 | Matting for erosion control (6036000000-E) | SY | 22,100 | $1.60 | $1.50 | $1.55 | $1.75 | $1.65 | $1.50 |
| 0128 | Coir fiber mat (6037000000-E) | SY | 100 | $4.65 | $4.75 | $4.60 | $6.00 | $5.15 | $4.75 |
| 0129 | 1/4" hardware cloth (6042000000-E) | LF | 1,880 | $6.05 | $5.00 | $5.99 | $10.00 | $5.35 | $5.00 |
| 0130 | Low permeability geotextile (6043000000-E) | SY | 500 | $4.00 | $10.00 | $3.95 | $5.00 | $3.50 | $4.87 |
| 0131 | **" temporary pipe - (36") (6045000000-E) | LF | 120 | $115.00 | $100.00 | $115.00 | $150.00 | $105.00 | $153.10 |
| 0132 | Temporary pipe for stream crossing (6046000000-E) | LF | 25 | $155.00 | $150.00 | $95.00 | $350.00 | $155.00 | $144.00 |
| 0133 | Floating turbidity curtain (6048000000-E) | SY | 15 | $23.50 | $68.00 | $25.00 | $100.00 | $72.00 | $146.00 |
| 0134 | Special stilling basins (6070000000-N) | EACH | 4 | $750.00 | $750.00 | $325.00 | $1,500.00 | $950.00 | $1,530.00 |
| 0135 | Flocculant (6071002000-E) | LB | 225 | $13.40 | $10.00 | $13.25 | $10.00 | $10.50 | $10.00 |
| 0136 | Coir fiber wattle (6071012000-E) | LF | 280 | $9.90 | $10.00 | $9.80 | $9.00 | $10.50 | $10.00 |
| 0137 | Coir fiber baffle (6071030000-E) | LF | 220 | $8.40 | $7.00 | $7.29 | $7.00 | $7.50 | $7.00 |
| 0138 | **" skimmer - (1-1/2") (6071050000-E) | EACH | 1 | $1,050.00 | $2,500.00 | $650.00 | $2,500.00 | $1,100.00 | $2,500.00 |
| 0139 | **" skimmer - (2") (6071050000-E) | EACH | 1 | $1,200.00 | $3,500.00 | $750.00 | $4,000.00 | $1,300.00 | $2,600.00 |
| 0140 | Seeding and mulching (6084000000-E) | ACRE | 18 | $2,400.00 | $2,250.00 | $2,395.00 | $2,100.00 | $2,400.00 | $2,250.00 |
| 0141 | Mowing (6087000000-E) | ACRE | 15 | $250.00 | $185.00 | $249.00 | $200.00 | $195.00 | $185.00 |
| 0142 | Seed for repair seeding (6090000000-E) | LB | 150 | $9.00 | $8.00 | $8.95 | $5.00 | $8.50 | $8.00 |
| 0143 | Fertilizer for repair seeding (6093000000-E) | TON | 0.75 | $1,130.00 | $1,400.00 | $1,125.00 | $1,800.00 | $1,475.00 | $1,400.00 |
| 0144 | Seed for supplemental seeding (6096000000-E) | LB | 400 | $9.00 | $7.00 | $8.95 | $5.00 | $7.50 | $7.00 |
| 0145 | Fertilizer topdressing (6108000000-E) | TON | 12 | $1,700.00 | $1,300.00 | $1,689.00 | $180.00 | $1,375.00 | $1,300.00 |
| 0146 | Impervious dike (6111000000-E) | LF | 38 | $140.00 | $150.00 | $125.00 | $75.00 | $132.00 | $75.00 |
| 0147 | Specialized hand mowing (6114500000-N) | MHR | 10 | $96.00 | $95.00 | $95.00 | $75.00 | $100.00 | $95.00 |
| 0148 | Response for erosion control (6117000000-N) | EACH | 75 | $110.00 | $250.00 | $95.00 | $300.00 | $262.50 | $250.00 |
| 0149 | Concrete washout structure (6117500000-N) | EACH | 2 | $560.00 | $1,500.00 | $915.26 | $1,500.00 | $650.00 | $375.00 |
| 0150 | Culvert diversion channel (6120000000-E) | CY | 136 | $55.00 | $50.00 | $50.00 | $70.00 | $54.00 | $76.00 |
| 0151 | Generic erosion control item (EA) - fabric insert inlet protection cleanout (6132000000-N) | EACH | 126 | $60.00 | $200.00 | $55.00 | $75.00 | $90.00 | $277.00 |
| 0152 | Generic erosion control item (EA) - fabric insert inlet protection, type 2 (6132000000-N) | EACH | 42 | $175.00 | $300.00 | $169.00 | $140.00 | $250.00 | $219.00 |
| 0153 | Generic erosion control item (EA) - prefabricated concrete washout (6132000000-N) | EACH | 11 | $1,100.00 | $1,000.00 | $567.48 | $100.00 | $650.00 | $375.00 |
| 0154 | Signal cable (7060000000-E) | LF | 1,160 | $6.05 | $6.00 | $6.00 | $6.00 | $6.40 | $6.00 |
| 0155 | Vehicle signal head (12", 3 section) (7120000000-E) | EACH | 5 | $1,310.00 | $1,300.00 | $1,300.00 | $1,300.00 | $1,375.00 | $1,300.00 |
| 0156 | Vehicle signal head (12", 4 section) (7132000000-E) | EACH | 3 | $1,515.00 | $1,500.00 | $1,500.00 | $1,500.00 | $1,600.00 | $1,500.00 |
| 0157 | APS detector station (7229000000-N) | EACH | 2 | $2,020.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,125.00 | $2,000.00 |
| 0158 | Central control unit APS detector station (7230000000-N) | EACH | 1 | $3,030.00 | $3,000.00 | $3,000.00 | $3,000.00 | $3,200.00 | $3,000.00 |
| 0159 | Messenger cable (3/8") (7264000000-E) | LF | 150 | $7.10 | $7.00 | $7.00 | $7.00 | $7.50 | $7.00 |
| 0160 | Unpaved trench (***********) - (2, 2") (7300000000-E) | LF | 435 | $25.25 | $25.00 | $25.00 | $25.00 | $26.50 | $25.00 |
| 0161 | Junction box (standard size) (7324000000-N) | EACH | 4 | $858.00 | $850.00 | $850.00 | $850.00 | $925.00 | $850.00 |
| 0162 | Junction box (over-sized, heavy duty) (7348000000-N) | EACH | 2 | $960.00 | $950.00 | $950.00 | $950.00 | $1,025.00 | $950.00 |
| 0163 | Guy assembly (7372000000-N) | EACH | 2 | $805.00 | $800.00 | $800.00 | $800.00 | $850.00 | $800.00 |
| 0164 | Inductive loop sawcut (7444000000-E) | LF | 800 | $18.75 | $18.50 | $18.50 | $18.50 | $19.75 | $18.50 |
| 0165 | Lead-in cable (14-2) (7456100000-E) | LF | 1,760 | $4.55 | $4.50 | $4.50 | $4.50 | $4.75 | $4.50 |
| 0166 | Detector card (***********) - (2070LX) (7708000000-N) | EACH | 7 | $304.00 | $300.00 | $300.00 | $300.00 | $325.00 | $300.00 |
| 0167 | Box culv excav @ ******** - (21+05.48 -L-) (8130000000-N) | LS | 1 | $38,000 | $6,245.84 | $35,000 | $125,000 | $38,000 | $40,000 |
| 0168 | Box culv excav @ ******** - (22+01.71 -L-) (8130000000-N) | LS | 1 | $80,000 | $18,753 | $75,000 | $255,000 | $81,500 | $90,000 |
| 0169 | Foundation conditioning material, box culvert (8133000000-E) | TON | 432 | $95.00 | $66.14 | $85.00 | $60.00 | $90.00 | $61.20 |
| 0170 | Class A concrete (culvert) (8196000000-E) | CY | 891.10 | $720.00 | $681.78 | $675.00 | $750.00 | $715.00 | $796.00 |
| 0171 | Reinforcing steel (culvert) (8245000000-E) | LB | 106,269 | $2.30 | $2.74 | $2.00 | $2.00 | $2.10 | $2.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
Every contract let that day: NCDOT letting of February 17, 2026. Compiled by Mirage Metrics.