NCDOT contract C205064 bid tabulation
ROADWAY AND BRIDGE CONSTRUCTION (EXPRESS DESIGN BUILD). BRIDGE #580058 OVER MACKEY CREEK ON US-70. Let by North Carolina DOT on March 18, 2025, Mcdowell. 3 bids received; low bid $5,400,000 by Kemp Sigmon Construction Co Inc.
- Owner
- North Carolina DOT
- Letting
- 18 MAR 2025
- Pay items
- 7
- Data through
- 20 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Kemp Sigmon Construction Co Inc | $5,400,000 | Low |
| 2 | Blythe Development Co. | $5,879,172 | +9.0% |
| 3 | Reeves Construction Company | $7,232,700 | +34% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Kemp Sigmon Construction Co Inc | 2. Blythe Development Co. | 3. Reeves Construction Company |
|---|---|---|---|---|---|---|
| 0001 | Mobilization (0000100000-N) | LS | 1 | $275,000 | $291,602 | $720,000 |
| 0002 | Generic miscellaneous item (LS) - design & construction of bridge #580058 (0000900000-N) | LS | 1 | $2,208,500 | $4,392,470 | $5,200,000 |
| 0003 | Generic miscellaneous item (EA) - end bents structure #580058 (0000915000-N) | EACH | 2 | $100,000 | $155,000 | $105,000 |
| 0004 | Generic miscellaneous item (EA) - right of way aquisition structure #580058 (0000915000-N) | EACH | 3 | $11,500 | $13,000 | $13,000 |
| 0005 | Generic miscellaneous item (LF) - bridge length structure #580058 (0000930000-E) | LF | 100 | $25,000 | $7,000.00 | $10,000 |
| 0006 | Generic miscellaneous item (LF) - foundation length at end bent #1 structure #580058 (0000930000-E) | LF | 45 | $2,000.00 | $1,100.00 | $700.00 |
| 0007 | Generic miscellaneous item (LF) - foundation length at end bent #2 structure #580058 (0000930000-E) | LF | 46 | $2,000.00 | $2,100.00 | $700.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
Every contract let that day: NCDOT letting of March 18, 2025. Compiled by Mirage Metrics.