NCDOT contract C204991 bid tabulation
BRIDGE #590165 OVER COFFEY CREEK ON SHOPTON RD., BRIDGE #590165 OVER COFFEY CREEK ON SR 5469 (SHOPTON RD)., BRIDGE #590165 OVER COFFEY CREEK ON SR-5469 (SHOPTON RD)., GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #590165 OVER COFFEY CREEK ON SR-5469 (SHOPTON RD). Let by North Carolina DOT on August 19, 2025, Mecklenburg. 6 bids received; low bid $6,807,682 by Blythe Development Co..
- Owner
- North Carolina DOT
- Letting
- 19 AUG 2025
- Pay items
- 151
- Data through
- 20 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Blythe Development Co. | $6,807,682 | Low |
| 2 | Smith-Rowe, LLC | $7,952,085 | +17% |
| 3 | Blythe Construction Inc | $8,582,199 | +26% |
| 4 | Kemp Sigmon Construction Co Inc | $8,781,551 | +29% |
| 5 | Caton Construction Group Inc | $8,864,872 | +30% |
| 6 | NJR Group Inc | $9,185,400 | +35% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Blythe Development Co. | 2. Smith-Rowe, LLC | 3. Blythe Construction Inc | 4. Kemp Sigmon Construction Co Inc | 5. Caton Construction Group Inc | 6. NJR Group Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Mobilization (0000100000-N) | LS | 1 | $340,500 | $397,600 | $428,000 | $438,000 | $443,244 | $459,000 |
| 0002 | Construction surveying (0000400000-N) | LS | 1 | $60,000 | $42,500 | $90,000 | $60,000 | $39,917 | $140,000 |
| 0003 | Grading (0043000000-N) | LS | 1 | $983,600 | $1,133,000 | $1,870,000 | $2,300,000 | $1,415,000 | $1,666,920 |
| 0004 | Supplementary clearing & grubbing (0050000000-E) | ACRE | 1 | $16,000 | $1.00 | $10,000 | $100.00 | $20,000 | $1,000.00 |
| 0005 | Undercut excavation (0057000000-E) | CY | 1,600 | $20.00 | $4.00 | $22.00 | $10.00 | $42.00 | $10.00 |
| 0006 | Drainage ditch excavation (0134000000-E) | CY | 60 | $21.00 | $7.00 | $25.00 | $25.00 | $26.15 | $1.00 |
| 0007 | Select granular material (0195000000-E) | CY | 3,500 | $68.00 | $1.00 | $77.00 | $10.00 | $114.80 | $15.00 |
| 0008 | Geotextile for soil stabilization (0196000000-E) | SY | 13,500 | $2.00 | $1.00 | $3.00 | $1.00 | $5.50 | $1.00 |
| 0009 | Generic grading item (LS) - type 1 bridge approach fill, station 21+59.00 -L- (0248000000-N) | LS | 1 | $60,000 | $35,000 | $65,000 | $50,000 | $110,475 | $68,000 |
| 0010 | Foundation conditioning material, minor structures (0318000000-E) | TON | 170 | $48.00 | $1.00 | $50.00 | $50.00 | $77.00 | $1.00 |
| 0011 | FND condit geotextile (4A) (0321000000-E) | SY | 510 | $3.20 | $1.00 | $5.20 | $3.00 | $5.00 | $1.00 |
| 0012 | 18" drainage pipe (0335300000-E) | LF | 112 | $72.00 | $87.00 | $52.00 | $95.00 | $75.50 | $90.00 |
| 0013 | 24" drainage pipe (0335400000-E) | LF | 60 | $81.00 | $94.00 | $82.00 | $110.00 | $88.50 | $115.00 |
| 0014 | **" drainage pipe elbow - (18") (0335850000-E) | EACH | 2 | $755.00 | $1.00 | $300.00 | $500.00 | $1,460.00 | $800.00 |
| 0015 | **" drainage pipe elbow - (24") (0335850000-E) | EACH | 2 | $910.00 | $1.00 | $450.00 | $750.00 | $1,459.50 | $1,000.00 |
| 0016 | 15" RC pipe culverts, class IV (0448200000-E) | LF | 444 | $109.00 | $83.00 | $60.00 | $95.00 | $135.50 | $95.00 |
| 0017 | 18" RC pipe culverts, class IV (0448300000-E) | LF | 824 | $165.00 | $105.00 | $80.00 | $110.00 | $138.00 | $125.00 |
| 0018 | 24" RC pipe culverts, class IV (0448400000-E) | LF | 84 | $168.00 | $138.00 | $112.00 | $135.00 | $239.00 | $138.00 |
| 0019 | Pipe removal (0995000000-E) | LF | 472 | $46.00 | $11.00 | $12.00 | $10.00 | $73.00 | $38.00 |
| 0020 | Shallow undercut (1099500000-E) | CY | 100 | $21.00 | $9.00 | $18.00 | $30.00 | $45.50 | $1.00 |
| 0021 | Class IV subgrade stabilization (1099700000-E) | TON | 6,512 | $46.00 | $41.00 | $44.00 | $35.00 | $72.00 | $45.00 |
| 0022 | Geotextile for subgrade stabilization (1112000000-E) | SY | 300 | $3.30 | $1.50 | $6.00 | $3.00 | $5.00 | $5.00 |
| 0023 | Incidental milling (1330000000-E) | SY | 1,270 | $18.00 | $8.50 | $7.70 | $18.00 | $21.00 | $28.00 |
| 0024 | Asphalt conc base course, type B25.0C (1491000000-E) | TON | 1,140 | $121.00 | $90.00 | $143.00 | $100.00 | $101.01 | $95.55 |
| 0025 | Asphalt conc intermediate course, type I19.0C (1503000000-E) | TON | 1,070 | $120.00 | $90.00 | $140.00 | $100.00 | $111.11 | $90.89 |
| 0026 | Asphalt conc surface course, type S9.5C (1523000000-E) | TON | 1,150 | $114.00 | $93.00 | $133.00 | $100.00 | $111.11 | $98.19 |
| 0027 | Asphalt binder for plant mix (1575000000-E) | TON | 175 | $572.00 | $625.00 | $610.00 | $780.00 | $788.00 | $700.00 |
| 0028 | Subdrain excavation (2022000000-E) | CY | 84 | $14.50 | $1.00 | $35.00 | $25.00 | $68.50 | $1.00 |
| 0029 | Geotextile for subsurface drains (2026000000-E) | SY | 250 | $3.00 | $1.00 | $12.00 | $2.50 | $9.00 | $1.00 |
| 0030 | Subdrain coarse aggregate (2036000000-E) | CY | 42 | $120.00 | $1.00 | $85.00 | $100.00 | $179.50 | $1.00 |
| 0031 | 6" perforated subdrain pipe (2044000000-E) | LF | 250 | $11.00 | $1.00 | $18.00 | $15.00 | $34.00 | $1.00 |
| 0032 | Subdrain pipe outlet (2070000000-N) | EACH | 1 | $310.00 | $1.00 | $400.00 | $500.00 | $2,981.50 | $1.00 |
| 0033 | 6" outlet pipe (2077000000-E) | LF | 6 | $40.00 | $1.00 | $25.00 | $50.00 | $86.00 | $1.00 |
| 0034 | Pipe collars (2253000000-E) | CY | 1.29 | $1,000.00 | $1,200.00 | $2,200.00 | $3,000.00 | $4,752.00 | $1,500.00 |
| 0035 | Masonry drainage structures (2286000000-N) | EACH | 19 | $5,200.00 | $2,400.00 | $2,300.00 | $2,500.00 | $6,549.00 | $4,500.00 |
| 0036 | Masonry drainage structures (2308000000-E) | LF | 8.40 | $780.00 | $1,000.00 | $450.00 | $250.00 | $745.50 | $800.00 |
| 0037 | Frame-GRT-HD 840.03 ** - (E) (2374000000-N) | EACH | 2 | $950.00 | $708.00 | $1,500.00 | $1,200.00 | $1,184.00 | $1,000.00 |
| 0038 | Frame-GRT-HD 840.03 ** - (F) (2374000000-N) | EACH | 9 | $950.00 | $743.00 | $1,500.00 | $1,200.00 | $1,237.50 | $1,000.00 |
| 0039 | Frame-GRT-HD 840.03 ** - (G) (2374000000-N) | EACH | 8 | $950.00 | $743.00 | $1,500.00 | $1,200.00 | $1,273.00 | $1,000.00 |
| 0040 | Frame with cover, STD 840.54 (2396000000-N) | EACH | 1 | $600.00 | $446.00 | $1,200.00 | $750.00 | $807.00 | $850.00 |
| 0041 | 2'-6" concrete curb & gutter (2549000000-E) | LF | 2,650 | $44.50 | $36.00 | $31.00 | $31.00 | $30.00 | $35.65 |
| 0042 | 4" concrete sidewalk (2591000000-E) | SY | 1,450 | $78.00 | $70.00 | $52.00 | $52.00 | $72.00 | $59.80 |
| 0043 | Concrete curb ramps (2605000000-N) | EACH | 2 | $3,445.00 | $3,700.00 | $2,650.00 | $2,650.00 | $3,000.00 | $3,047.50 |
| 0044 | Adjustment of manholes (2830000000-N) | EACH | 1 | $200.00 | $1,500.00 | $1,100.00 | $2,000.00 | $809.00 | $1,650.00 |
| 0045 | Convert existing drop inlet to junction box (2905000000-N) | EACH | 1 | $1,200.00 | $1,700.00 | $1,100.00 | $3,000.00 | $1,694.50 | $2,750.00 |
| 0046 | Steel beam guardrail (3030000000-E) | LF | 50 | $31.00 | $24.00 | $24.00 | $24.00 | $24.00 | $30.24 |
| 0047 | Additional guardrail posts (3150000000-N) | EACH | 5 | $58.00 | $0.01 | $11.00 | $11.00 | $11.00 | $56.00 |
| 0048 | Guardrail anchor units, type III (3215000000-N) | EACH | 4 | $2,875.00 | $2,250.00 | $2,250.00 | $2,250.00 | $2,250.00 | $2,800.00 |
| 0049 | Guardrail end units, type TL-3 (3287000000-N) | EACH | 4 | $4,015.00 | $3,250.00 | $3,250.00 | $3,250.00 | $3,250.00 | $3,920.00 |
| 0050 | Woven wire fence, 47" fabric (3503000000-E) | LF | 70 | $17.20 | $20.00 | $20.00 | $20.00 | $20.00 | $16.80 |
| 0051 | 4" timber fence posts, 7'-6" long (3509000000-E) | EACH | 3 | $63.00 | $90.00 | $90.00 | $90.00 | $90.00 | $61.60 |
| 0052 | 5" timber fence posts, 8'-0" long (3515000000-E) | EACH | 4 | $80.00 | $100.00 | $100.00 | $100.00 | $100.00 | $78.40 |
| 0053 | Chain link fence, 48" fabric (3536000000-E) | LF | 153 | $13.75 | $20.00 | $20.00 | $20.00 | $20.00 | $13.44 |
| 0054 | Metal line posts for 48" chain link fence (3542000000-E) | EACH | 13 | $138.00 | $150.00 | $150.00 | $150.00 | $150.00 | $134.40 |
| 0055 | Metal terminal posts for 48" chain link fence (3548000000-E) | EACH | 2 | $459.00 | $250.00 | $250.00 | $250.00 | $250.00 | $448.00 |
| 0056 | Rip rap, class I (3628000000-E) | TON | 405 | $69.00 | $66.00 | $57.00 | $85.00 | $104.50 | $45.00 |
| 0057 | Rip rap, class II (3635000000-E) | TON | 300 | $72.00 | $68.00 | $61.00 | $85.00 | $111.00 | $45.00 |
| 0058 | Rip rap, class B (3649000000-E) | TON | 10 | $65.00 | $66.00 | $57.00 | $85.00 | $93.50 | $45.00 |
| 0059 | Geotextile for drainage (3656000000-E) | SY | 1,425 | $2.50 | $1.00 | $3.00 | $4.00 | $5.00 | $5.00 |
| 0060 | Preformed scour holes with level spreader apron (3659000000-N) | EACH | 1 | $2,200.00 | $1,500.00 | $2,500.00 | $2,000.00 | $3,389.00 | $5,000.00 |
| 0061 | Contr furn, type ***sign - (E) (4025000000-E) | SF | 7.50 | $30.00 | $35.00 | $26.00 | $26.00 | $26.00 | $29.12 |
| 0062 | Supports, 3-LB steel U-channel (4072000000-E) | LF | 140 | $9.00 | $18.00 | $7.65 | $7.65 | $7.65 | $8.57 |
| 0063 | Sign erect, reloc ** GRD MTD - (E) (4116100000-N) | EACH | 13 | $200.00 | $250.00 | $175.00 | $175.00 | $175.00 | $196.00 |
| 0064 | Work zone signs (stationary) (4400000000-E) | SF | 618 | $8.00 | $14.00 | $6.25 | $6.25 | $6.31 | $7.00 |
| 0065 | Work zone signs (barricade mounted) (4410000000-E) | SF | 95 | $8.00 | $8.75 | $8.40 | $8.40 | $8.50 | $9.41 |
| 0066 | Portable changeable message sign (4420000000-N) | EACH | 3 | $8,000.00 | $10,000 | $6,400.00 | $6,400.00 | $12,500 | $15,000 |
| 0067 | Barricades (type III) (4445000000-E) | LF | 64 | $29.00 | $30.00 | $25.00 | $25.00 | $25.00 | $28.00 |
| 0068 | Thermoplastic pavement marking lines (4", 90 mils) (4685000000-E) | LF | 11,575 | $1.10 | $1.25 | $1.25 | $0.93 | $1.25 | $1.40 |
| 0069 | Thermoplastic pavement marking lines (8", 90 mils) (4695000000-E) | LF | 235 | $2.30 | $3.00 | $3.00 | $2.00 | $3.00 | $3.36 |
| 0070 | Thermoplastic pavement marking lines (24", 90 mils) (4709000000-E) | LF | 340 | $13.20 | $12.00 | $12.00 | $11.50 | $12.00 | $13.44 |
| 0071 | Thermoplastic pavement marking character (90 mils) (4720000000-E) | EACH | 6 | $195.00 | $115.00 | $115.00 | $170.00 | $115.00 | $128.80 |
| 0072 | Thermoplastic pavement marking symbol (90 mils) (4725000000-E) | EACH | 10 | $200.00 | $125.00 | $125.00 | $175.00 | $125.00 | $140.00 |
| 0073 | Heated-in-place thermoplastic pavement marking symbol (90 mils) (4726110000-E) | EACH | 6 | $260.00 | $250.00 | $250.00 | $225.00 | $250.00 | $280.00 |
| 0074 | 4" cold appl plstic lines type ** - (I) (4770000000-E) | LF | 1,390 | $12.00 | $3.75 | $3.75 | $10.00 | $3.79 | $4.20 |
| 0075 | 12" water line (5326200000-E) | LF | 1,306.30 | $191.00 | $236.92 | $350.00 | $325.00 | $262.00 | $392.00 |
| 0076 | DI H2O pipe fittings (5329000000-E) | LB | 4,670 | $7.00 | $11.48 | $10.00 | $12.00 | $16.00 | $11.20 |
| 0077 | 8" valve (5546000000-E) | EACH | 2 | $3,110.00 | $5,652.58 | $3,500.00 | $4,000.00 | $6,939.50 | $3,920.00 |
| 0078 | 12" valve (5558000000-E) | EACH | 2 | $6,025.00 | $8,368.19 | $6,000.00 | $8,000.00 | $9,606.00 | $6,720.00 |
| 0079 | Fire hydrant (5666000000-N) | EACH | 2 | $8,750.00 | $12,139 | $11,000 | $7,500.00 | $19,524 | $12,320 |
| 0080 | Fire hydrant leg (5673000000-E) | LF | 20 | $88.00 | $128.29 | $80.00 | $100.00 | $176.50 | $89.60 |
| 0081 | 12" line stop (5679000000-E) | EACH | 2 | $22,750 | $25,314 | $22,000 | $18,000 | $20,204 | $24,640 |
| 0082 | **" sanitary gravity sewer - (36") (5691000000-E) | LF | 154.60 | $553.00 | $2,208.35 | $1,270.00 | $1,400.00 | $845.00 | $1,422.40 |
| 0083 | 8" sanitary gravity sewer (5691300000-E) | LF | 30 | $255.00 | $214.57 | $550.00 | $500.00 | $335.50 | $616.00 |
| 0084 | 4' dia utility manhole (5775000000-E) | EACH | 1 | $8,250.00 | $14,037 | $7,000.00 | $6,000.00 | $8,234.50 | $7,840.00 |
| 0085 | 5' dia utility manhole (5776000000-E) | EACH | 1 | $9,950.00 | $10,918 | $9,000.00 | $10,000 | $10,242 | $10,080 |
| 0086 | 6' dia utility manhole (5777000000-E) | EACH | 3 | $12,700 | $18,523 | $14,000 | $16,000 | $12,651 | $15,680 |
| 0087 | Utility manhole wall 4' dia (5781000000-E) | LF | 4.60 | $810.00 | $686.37 | $500.00 | $600.00 | $1,327.00 | $560.00 |
| 0088 | Utility manhole wall 5' dia (5782000000-E) | LF | 6.60 | $1,020.00 | $822.96 | $700.00 | $800.00 | $1,327.00 | $784.00 |
| 0089 | Utility manhole wall 6' dia (5783000000-E) | LF | 19.70 | $1,350.00 | $1,239.54 | $1,000.00 | $1,200.00 | $1,327.00 | $1,120.00 |
| 0090 | Abandon **" utility pipe - (36") (5798000000-E) | LF | 131.90 | $108.00 | $313.07 | $290.00 | $275.00 | $42.00 | $324.80 |
| 0091 | Abandon 8" utility pipe (5801000000-E) | LF | 51 | $58.00 | $119.95 | $15.00 | $20.00 | $19.50 | $16.80 |
| 0092 | Abandon 12" utility pipe (5804000000-E) | LF | 1,259.60 | $38.00 | $22.02 | $5.00 | $25.00 | $19.50 | $5.60 |
| 0093 | Remove fire hydrant (5815500000-N) | EACH | 1 | $1,825.00 | $799.19 | $1,500.00 | $2,000.00 | $1,905.00 | $1,680.00 |
| 0094 | Remove utility manhole (5828000000-N) | EACH | 2 | $1,560.00 | $4,381.36 | $6,000.00 | $6,500.00 | $4,151.00 | $6,720.00 |
| 0095 | Generic utility item (LF) - 72" tunnel liner plates (5888000000-E) | LF | 100 | $765.00 | $6,865.88 | $7,500.00 | $6,000.00 | $1,466.50 | $8,400.00 |
| 0096 | Generic utility item (LF) - sewer lining cured-in-place pipe (5888000000-E) | LF | 204.60 | $391.00 | $544.83 | $700.00 | $694.00 | $434.00 | $825.44 |
| 0097 | Generic utility item (LS) - temporary sanitary sewer bypass pumping (5912000000-N) | LS | 1 | $57,500 | $927,921 | $700,000 | $600,000 | $145,000 | $784,000 |
| 0098 | Temporary silt fence (6000000000-E) | LF | 5,040 | $3.50 | $2.60 | $3.00 | $2.25 | $2.27 | $4.00 |
| 0099 | Stone for erosion control, class A (6006000000-E) | TON | 150 | $59.00 | $1.00 | $50.74 | $75.00 | $94.50 | $35.00 |
| 0100 | Stone for erosion control, class B (6009000000-E) | TON | 910 | $59.00 | $1.00 | $55.50 | $50.00 | $94.50 | $35.00 |
| 0101 | Sediment control stone (6012000000-E) | TON | 455 | $49.00 | $1.00 | $56.20 | $50.00 | $80.00 | $30.00 |
| 0102 | Temporary mulching (6015000000-E) | ACRE | 11.30 | $1,265.00 | $1.00 | $1,100.00 | $1,400.00 | $1,400.00 | $1,760.00 |
| 0103 | Seed for temporary seeding (6018000000-E) | LB | 700 | $3.50 | $1.00 | $3.00 | $1.00 | $1.00 | $6.60 |
| 0104 | Fertilizer for temporary seeding (6021000000-E) | TON | 4.50 | $1,405.00 | $1.00 | $1,225.00 | $600.00 | $600.00 | $2,090.00 |
| 0105 | Temporary slope drains (6024000000-E) | LF | 325 | $24.00 | $1.00 | $24.10 | $20.00 | $41.00 | $30.00 |
| 0106 | Safety fence (6029000000-E) | LF | 400 | $2.50 | $2.50 | $2.00 | $2.25 | $2.27 | $5.00 |
| 0107 | Silt excavation (6030000000-E) | CY | 1,750 | $23.00 | $2.00 | $14.41 | $5.00 | $72.50 | $5.00 |
| 0108 | Matting for erosion control (6036000000-E) | SY | 11,467 | $2.00 | $1.75 | $1.45 | $1.65 | $1.65 | $2.15 |
| 0109 | Coir fiber mat (6037000000-E) | SY | 550 | $5.25 | $4.00 | $4.50 | $8.00 | $8.00 | $4.40 |
| 0110 | 1/4" hardware cloth (6042000000-E) | LF | 780 | $5.75 | $3.50 | $5.00 | $3.95 | $8.00 | $15.00 |
| 0111 | Low permeability geotextile (6043000000-E) | SY | 100 | $10.75 | $9.25 | $5.62 | $10.00 | $6.00 | $15.00 |
| 0112 | Special stilling basins (6070000000-N) | EACH | 2 | $2,600.00 | $700.00 | $700.00 | $500.00 | $951.00 | $500.00 |
| 0113 | Flocculant (6071002000-E) | LB | 220 | $11.50 | $1.00 | $10.00 | $1.00 | $1.00 | $25.00 |
| 0114 | Coir fiber wattle (6071012000-E) | LF | 120 | $13.75 | $8.00 | $12.00 | $12.00 | $12.00 | $25.00 |
| 0115 | Wattle barrier (6071013000-E) | LF | 1,650 | $11.50 | $7.00 | $10.00 | $7.00 | $7.00 | $25.00 |
| 0116 | Coir fiber wattle barrier (6071014000-E) | LF | 110 | $25.25 | $22.00 | $22.00 | $12.00 | $12.00 | $40.00 |
| 0117 | Coir fiber baffle (6071030000-E) | LF | 60 | $9.25 | $9.00 | $8.00 | $20.00 | $20.00 | $10.00 |
| 0118 | **" skimmer - (1-1/2") (6071050000-E) | EACH | 3 | $2,350.00 | $1,200.00 | $1,200.00 | $1,250.00 | $2,678.50 | $2,000.00 |
| 0119 | Seeding and mulching (6084000000-E) | ACRE | 11.30 | $2,700.00 | $1.00 | $2,350.00 | $2,800.00 | $2,800.00 | $2,640.00 |
| 0120 | Mowing (6087000000-E) | ACRE | 5.65 | $230.00 | $1.00 | $200.00 | $200.00 | $200.00 | $330.00 |
| 0121 | Seed for repair seeding (6090000000-E) | LB | 100 | $9.20 | $1.00 | $8.00 | $6.00 | $6.00 | $8.80 |
| 0122 | Fertilizer for repair seeding (6093000000-E) | TON | 0.25 | $2,180.00 | $1.00 | $1,900.00 | $1,000.00 | $1,000.00 | $2,310.00 |
| 0123 | Seed for supplemental seeding (6096000000-E) | LB | 275 | $8.00 | $1.00 | $7.00 | $5.00 | $5.00 | $6.60 |
| 0124 | Fertilizer topdressing (6108000000-E) | TON | 8 | $1,605.00 | $1.00 | $1,400.00 | $1,100.00 | $1,100.00 | $2,200.00 |
| 0125 | Impervious dike (6111000000-E) | LF | 353.30 | $146.00 | $30.00 | $85.00 | $75.00 | $117.50 | $125.00 |
| 0126 | Specialized hand mowing (6114500000-N) | MHR | 10 | $105.00 | $1.00 | $90.00 | $250.00 | $250.00 | $50.00 |
| 0127 | Response for erosion control (6117000000-N) | EACH | 13 | $275.00 | $1.00 | $225.00 | $200.00 | $200.00 | $350.00 |
| 0128 | Concrete washout structure (6117500000-N) | EACH | 1 | $1,000.00 | $500.00 | $1,100.00 | $1,488.03 | $4,862.50 | $500.00 |
| 0129 | Generic erosion control item (EA) - fabric insert inlet protection cleanout (6132000000-N) | EACH | 12 | $265.00 | $230.00 | $185.00 | $350.00 | $173.00 | $500.00 |
| 0130 | Generic erosion control item (EA) - fabric insert inlet protection, type 1 (6132000000-N) | EACH | 4 | $230.00 | $188.00 | $161.00 | $250.00 | $535.00 | $1,000.00 |
| 0131 | Generic erosion control item (EA) - prefabricated concrete washout (6132000000-N) | EACH | 6 | $840.00 | $635.00 | $140.00 | $1,000.00 | $5,001.50 | $1,000.00 |
| 0132 | Remv exist STR ****** BRG (402) - (21+59.00 -L-) (8035000000-N) | LS | 1 | $98,350 | $373,780 | $50,000 | $200,000 | $150,000 | $102,000 |
| 0133 | Asbestos assessment (8065000000-N) | LS | 1 | $3,500.00 | $850.00 | $1,200.00 | $1,500.00 | $1,200.00 | $1,416.00 |
| 0134 | 3'-6" dia drilled piers in soil (8105540000-E) | LF | 57 | $1,400.00 | $1,021.90 | $1,506.67 | $1,500.00 | $2,133.00 | $1,163.99 |
| 0135 | 3'-6" dia drilled piers not in soil (8105640000-E) | LF | 48 | $2,000.00 | $1,077.45 | $1,722.55 | $1,500.00 | $986.50 | $1,163.99 |
| 0136 | Permanent steel casing for 3'-6" dia drilled pier (8111400000-E) | LF | 55 | $300.00 | $309.50 | $375.00 | $200.00 | $271.00 | $236.00 |
| 0137 | CSL testing (8115000000-N) | EACH | 1 | $16,360 | $3,334.98 | $7,220.00 | $2,500.00 | $32,000 | $2,950.00 |
| 0138 | Uncl STR excav sta ***** - (21+59.00 -L-) (8121000000-N) | LS | 1 | $20,000 | $125,000 | $37,000 | $15,000 | $150,000 | $45,000 |
| 0139 | Reinforced concrete deck slab (8147000000-E) | SF | 9,411 | $68.00 | $59.52 | $42.00 | $65.00 | $88.25 | $66.98 |
| 0140 | Grooving bridge floors (8161000000-E) | SF | 8,067 | $2.00 | $1.60 | $1.30 | $1.25 | $0.63 | $1.30 |
| 0141 | Class A concrete (bridge) (8182000000-E) | CY | 144 | $2,000.00 | $1,171.29 | $1,100.00 | $1,200.00 | $1,850.00 | $1,400.00 |
| 0142 | BRG appr slab *********** - (21+59.00 -L-) (8210000000-N) | LS | 1 | $100,000 | $93,974 | $61,000 | $85,000 | $86,800 | $87,338 |
| 0143 | Reinforcing steel (bridge) (8217000000-E) | LB | 35,282 | $2.00 | $1.72 | $2.00 | $2.00 | $2.00 | $1.95 |
| 0144 | Spiral column reinforcing steel (bridge) (8238000000-E) | LB | 3,643 | $3.25 | $3.94 | $3.00 | $3.00 | $4.00 | $4.20 |
| 0145 | 45" prestressed concrete girders (8262000000-E) | LF | 1,327.50 | $380.00 | $330.15 | $268.00 | $300.00 | $424.83 | $419.63 |
| 0146 | Pile DRV equip setup ** steel piles - (HP 12 X 53) (8328200000-E) | EACH | 20 | $1,200.00 | $999.84 | $500.00 | $1,500.00 | $803.50 | $1,000.00 |
| 0147 | HP 12 X 53 steel piles (8364000000-E) | LF | 525 | $83.00 | $55.42 | $50.00 | $50.00 | $193.50 | $85.00 |
| 0148 | Three bar metal rail (8482000000-E) | LF | 251.70 | $360.00 | $381.21 | $360.00 | $275.00 | $448.50 | $350.00 |
| 0149 | Rip rap class II (2'-0" thick) (8608000000-E) | TON | 1,134 | $87.00 | $65.00 | $52.00 | $75.00 | $110.00 | $85.00 |
| 0150 | Geotextile for drainage (8622000000-E) | SY | 1,260 | $4.00 | $1.50 | $4.00 | $3.00 | $16.00 | $5.00 |
| 0151 | Elastomeric bearings (8657000000-N) | LS | 1 | $20,000 | $8,665.10 | $10,000 | $10,000 | $35,000 | $16,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
Every contract let that day: NCDOT letting of August 19, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.