NCDOT contract C205195 bid tabulation

GRADING, DRAINAGE, PAVING, AND SIGNALS. INTERCHANGE AT I-40 AND SR-1007 (LENOIR RHYNE BOULEVARD). Let by North Carolina DOT on August 18, 2026, Catawba. 4 bids received; low bid $13,758,420 by Blythe Development Co..

Owner
North Carolina DOT
Letting
18 AUG 2026
Pay items
223
Data through
20 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Blythe Development Co.$13,758,420Low
2James R Vannoy & Sons Construction Company Inc$14,578,799+6.0%
3Branch Civil Inc$15,549,585+13%
4Kemp Sigmon Construction Co Inc$17,474,191+27%
NCDOT contract C205195: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Blythe Development Co.2. James R Vannoy & Sons Construction Company Inc3. Branch Civil Inc4. Kemp Sigmon Construction Co Inc
0001Mobilization (0000100000-N)LS1$650,000$675,000$731,347$825,000
0002Construction surveying (0000400000-N)LS1$180,000$300,000$190,360$179,000
0003Unclassified excavation (0022000000-E)CY47,200$12.00$20.00$50.25$25.00
0004Supplementary clearing & grubbing (0050000000-E)ACRE1$5,000.00$30,000$16,300$100.00
0005Undercut excavation (0057000000-E)CY550$19.00$30.00$56.50$5.50
0006Grading (0063000000-N)LS1$2,100,000$2,435,000$847,575$4,000,000
0007Drainage ditch excavation (0134000000-E)CY700$12.00$31.50$28.25$25.00
0008Berm ditch construction (0141000000-E)LF220$10.00$5.00$53.00$4.00
0009Proof rolling (0192000000-N)HR10$275.00$498.00$267.50$600.00
0010Select granular material, class III (0194000000-E)CY400$68.00$59.00$161.50$20.00
0011Geotextile for soil stabilization (0196000000-E)SY100$5.00$3.60$6.00$7.00
0012Foundation conditioning material, minor structures (0318000000-E)TON460$70.00$72.00$88.75$1.00
0013FND condit geotextile (4A) (0321000000-E)SY1,450$5.00$5.50$7.65$1.00
001415" side drain pipe (0343000000-E)LF448$70.00$63.00$156.00$175.00
001524" side drain pipe (0345000000-E)LF68$95.00$94.00$241.50$200.00
0016**" side drain pipe elbow - (15") (0348000000-E)EACH8$950.00$480.00$1,657.00$1,500.00
0017**" side drain pipe elbow - (24") (0348000000-E)EACH4$1,250.00$700.00$2,052.00$2,000.00
001815" RC pipe culverts, class III (0366000000-E)LF1,080$70.00$72.00$147.50$175.00
001918" RC pipe culverts, class III (0372000000-E)LF96$85.00$81.00$167.50$200.00
002024" RC pipe culverts, class III (0378000000-E)LF340$100.00$104.00$218.00$250.00
002130" RC pipe culverts, class III (0384000000-E)LF84$140.00$142.00$447.50$350.00
0022***" RCP culv class IV - (48") (0448000000-E)LF120$295.00$370.00$713.50$1,350.00
002315" RC pipe culverts, class IV (0448200000-E)LF552$90.00$80.00$163.00$225.00
002418" RC pipe culverts, class IV (0448300000-E)LF556$95.00$85.00$209.50$250.00
002524" RC pipe culverts, class IV (0448400000-E)LF824$120.00$116.00$322.00$350.00
002630" RC pipe culverts, class IV (0448500000-E)LF64$150.00$159.00$343.00$450.00
0027**" CS pipe culv *****" - (54", 0.079") (0576000000-E)LF24$250.00$325.00$716.50$1,800.00
0028Pipe removal (0995000000-E)LF1,089$25.00$49.00$62.00$30.00
0029Shallow undercut (1099500000-E)CY100$15.00$30.00$38.00$20.00
0030Class IV subgrade stabilization (1099700000-E)TON1,200$55.00$50.00$84.75$30.00
0031Stabilizer aggregate (1110000000-E)TON250$55.00$55.00$84.75$75.00
0032Geotextile for subgrade stabilization (1112000000-E)SY2,800$5.00$3.75$7.65$10.00
0033Aggregate base course (1121000000-E)TON1,901$60.00$54.00$116.00$75.00
0034Incidental stone base (1220000000-E)TON100$60.00$57.00$102.50$100.00
0035Mill asp PVMT *****" DTH - (1-1/2") (1297000000-E)SY9,110$10.00$9.50$4.30$8.25
0036Mill asp PVMT *****" DTH - (3") (1297000000-E)SY15,060$10.00$9.50$4.85$8.53
0037Incidental milling (1330000000-E)SY250$37.00$35.00$27.00$33.00
0038Asphalt conc base course, type B25.0C (1491000000-E)TON7,340$120.00$123.00$117.00$105.00
0039Asphalt conc intermediate course, type I19.0C (1503000000-E)TON6,130$120.00$123.00$117.00$105.00
0040Asphalt conc surface course, type S9.5C (1523000000-E)TON8,800$120.00$123.00$117.00$105.00
0041Asphalt binder for plant mix (1575000000-E)TON1,145$850.00$970.00$960.00$850.00
0042Asphalt plant mix, pavement repair (1693000000-E)TON25$400.00$228.00$467.00$584.80
0043Generic paving item (LF) 665 - milled rumple strips (asphalt concrete), (16") (1841000000-E)LF2,930$5.00$5.00$5.50$2.09
0044Subdrain excavation (2022000000-E)CY336$35.00$39.00$40.50$1.00
0045Geotextile for subsurface drains (2026000000-E)SY1,000$8.00$6.50$11.50$1.00
0046Subdrain coarse aggregate (2036000000-E)CY168$100.00$61.00$104.00$1.00
00476" perforated subdrain pipe (2044000000-E)LF1,000$15.00$18.50$17.25$1.00
0048Subdrain pipe outlet (2070000000-N)EACH2$350.00$374.00$694.00$1.00
00496" outlet pipe (2077000000-E)LF12$20.00$22.00$63.50$1.00
0050Endwalls (2209000000-E)CY6$1,200.00$2,100.00$2,975.00$2,500.00
0051Reinforced endwalls (2220000000-E)CY5.10$1,500.00$3,430.00$4,098.00$5,000.00
0052Masonry drainage structures (2286000000-N)EACH46$4,000.00$3,420.00$6,947.00$5,000.00
0053Masonry drainage structures (2297000000-E)CY4.87$750.00$2,760.00$5,791.00$4,000.00
0054Masonry drainage structures (2308000000-E)LF58.30$400.00$410.00$751.00$350.00
0055Frame with two grates, STD 840.16 (2364000000-N)EACH7$1,300.00$840.00$2,878.00$1,750.00
0056Frame with two grates, STD 840.22 (2365000000-N)EACH15$1,300.00$950.00$5,436.00$1,750.00
0057Frame-GRT-HD 840.03 ** - (E) (2374000000-N)EACH2$1,300.00$880.00$2,770.00$1,750.00
0058Frame-GRT-HD 840.03 ** - (F) (2374000000-N)EACH10$1,300.00$880.00$2,770.00$1,750.00
0059Frame-GRT-HD 840.03 ** - (G) (2374000000-N)EACH11$1,300.00$880.00$2,770.00$1,750.00
0060Frame with cover, STD 840.54 (2396000000-N)EACH4$1,100.00$720.00$2,055.00$1,750.00
0061Concrete transitional section for drop inlet (2451000000-N)EACH6$1,500.00$2,350.00$1,156.00$2,500.00
00622'-6" concrete curb & gutter (2549000000-E)LF3,470$44.00$41.00$43.75$30.00
00634" concrete sidewalk (2591000000-E)SY900$90.00$111.00$63.50$67.00
0064Concrete curb ramps (2605000000-N)EACH20$3,000.00$2,930.00$2,891.00$2,800.00
00654" concrete paved ditch (2619000000-E)SY42$210.00$111.00$162.00$205.00
00665" monolithic concrete islands (keyed in) (2655000000-E)SY1,760$120.00$94.00$98.75$115.00
0067Precast reinforced concrete barrier, single faced (2724000000-E)LF110$135.00$179.00$114.50$250.00
0068Adjustment of catch basins (2800000000-N)EACH1$600.00$1,370.00$497.00$3,000.00
0069Convert existing drop inlet to junction box (2905000000-N)EACH2$900.00$1,860.00$9,416.00$7,500.00
0070Steel beam guardrail (3030000000-E)LF2,375$28.49$29.00$29.00$25.00
0071Additional guardrail posts (3150000000-N)EACH10$62.67$63.00$63.75$55.00
0072Guardrail end units, type cat-1 (3210000000-N)EACH3$1,082.49$1,090.00$1,102.00$950.00
0073Guardrail end units, type TL-3 (3287000000-N)EACH4$3,646.27$3,680.00$3,713.00$3,200.00
0074Guardrail anchor units, type B-77 (3317000000-N)EACH3$2,791.68$2,820.00$2,843.00$2,450.00
0075Remove existing guardrail (3360000000-E)LF980$1.14$1.20$1.15$1.00
0076Chain link fence, 48" fabric (3536000000-E)LF1,118$12.82$13.00$13.00$11.25
0077Metal line posts for 48" chain link fence (3542000000-E)EACH106$62.67$63.00$63.50$55.00
0078Metal terminal posts for 48" chain link fence (3548000000-E)EACH5$250.68$253.00$254.50$220.00
0079Rip rap, class I (3628000000-E)TON422$85.00$87.00$162.50$100.00
0080Rip rap, class II (3635000000-E)TON446$85.00$109.00$186.50$100.00
0081Rip rap, class B (3649000000-E)TON187$85.00$84.00$181.50$100.00
0082Geotextile for drainage (3656000000-E)SY3,005$5.00$3.50$5.05$5.00
0083Supports, breakaway steel beam (4060000000-E)LB1,054$13.67$11.50$11.50$10.00
0084Supports, 3-LB steel U-channel (4072000000-E)LF800$8.55$11.00$8.65$9.50
0085Sign erection, type D (4096000000-N)EACH9$222.19$117.00$225.50$100.00
0086Sign erection, type E (4102000000-N)EACH27$222.19$88.00$225.50$75.00
0087Sign erection, type F (4108000000-N)EACH3$222.20$117.00$225.50$100.00
0088Sign erection, milemarkers (4114000000-N)EACH1$284.86$88.00$289.00$75.00
0089Sign erect, reloc ** GRD MTD - (A) (4116100000-N)EACH4$284.87$1,410.00$289.00$1,200.00
0090Sign erect, reloc ** GRD MTD - (B) (4116100000-N)EACH2$284.87$590.00$289.00$500.00
0091Sign erect, reloc ** GRD MTD - (D) (4116100000-N)EACH1$284.86$176.00$289.00$150.00
0092Sign erect, reloc ** GRD MTD - (E) (4116100000-N)EACH1$284.86$176.00$289.00$150.00
0093Disposal of sign system, U-channel (4155000000-N)EACH20$56.97$2.40$57.75$2.00
0094Work zone signs (stationary) (4400000000-E)SF312$10.26$9.00$17.25$9.00
0095High visibility stationary signs (4402000000-E)SF2,564$11.39$11.00$23.50$12.00
0096Work zone signs (portable) (4405000000-E)SF160$9.69$40.50$17.25$9.00
0097High visibility portable signs (4407000000-E)SF109$9.69$37.50$17.25$9.00
0098Work zone signs (barricade mounted) (4410000000-E)SF88$9.29$11.00$17.25$8.00
0099Flashing arrow board (4415000000-N)EACH2$5,697.30$3,490.00$3,564.00$5,200.00
0100Portable changeable message sign (4420000000-N)EACH4$12,819$12,200$8,909.00$18,300
0101Work zone presence lighting (4424000000-N)EACH14$2,278.92$2,450.00$4,454.00$8,000.00
0102Drums (4430000000-N)EACH104$51.28$55.00$102.50$100.00
0103High visibility drums (4432000000-N)EACH29$66.09$69.00$131.50$150.00
0104Sequential flashing warning lights (4434000000-N)EACH20$142.43$245.00$401.00$100.00
0105Barricades (type III) (4445000000-E)LF72$26.21$43.00$55.75$25.00
0106Pedestrian channelizing devices (4447000000-E)LF24$21.65$43.00$44.50$65.00
0107Flagger (4455000000-N)DAY14$400.00$207.00$691.00$2,000.00
0108Temporary crash cushions (4465000000-N)EACH8$8,261.08$10,700$9,871.00$7,250.00
0109Portable concrete barrier (4485000000-E)LF4,825$50.41$50.00$53.75$44.24
0110Portable concrete barrier (anchored) (4490000000-E)LF3,125$78.14$78.00$79.75$68.58
0111Law enforcement (4510000000-N)HR10,000$74.06$91.00$48.00$30.00
0112Skinny drum (4516000000-N)EACH6$246.12$41.50$165.00$100.00
0113Tubular markers (fixed) (4520000000-N)EACH411$200.00$117.00$205.00$78.00
0114Generic traffic control item (EA) - pedestrian transport service (4600000000-N)EACH470$28.49$100.00$57.75$100.00
0115Temporary raised pavement markers (4650000000-N)EACH425$11.39$11.50$12.25$10.00
0116Thermoplastic pavement marking lines (4", 90 mils) (4685000000-E)LF5,746$1.71$1.30$1.35$1.10
0117Thermoplastic pavement marking lines (6", 90 mils) (4688000000-E)LF16,465$1.88$1.10$1.10$0.90
0118Thermoplastic pavement marking lines (8", 90 mils) (4695000000-E)LF72$4.56$6.00$6.10$5.00
0119Thermoplastic pavement marking lines (12", 90 mils) (4700000000-E)LF964$4.56$9.50$9.75$8.00
0120Thermoplastic pavement marking lines (24", 90 mils) (4709000000-E)LF890$13.67$14.00$14.50$12.00
0121Thermoplastic pavement marking character (90 mils) (4720000000-E)EACH3$142.43$411.00$426.50$350.00
0122Thermoplastic pavement marking symbol (90 mils) (4725000000-E)EACH42$199.41$153.00$158.50$130.00
0123Paint pavement marking lines (6") (4815000000-E)LF11,104$1.14$0.45$0.50$0.40
0124Paint pavement marking lines (8") (4820000000-E)LF555$1.42$1.20$1.20$1.00
0125Paint pavement marking lines (24") (4835000000-E)LF144$5.70$2.40$2.45$2.00
0126Paint pavement marking symbol (4845000000-N)EACH21$51.28$53.00$54.75$45.00
0127Work zone performance pavement marking lines, 6" (4847500000-E)LF43,199$2.28$0.90$0.95$0.80
0128Work zone performance pavement marking lines, 12" (4847600000-E)LF637$7.98$6.00$6.10$5.00
0129Removal of pavement marking lines (6") (4855000000-E)LF15,959$0.85$0.50$0.55$0.45
0130Removal of pavement marking lines (24") (4870000000-E)LF24$10.26$4.70$4.85$4.00
0131Generic pavement marking item (EA) - polycarbonate H-shaped markers (4895000000-N)EACH274$79.76$62.00$64.50$53.00
0132120' high mount standard (5015000000-E)EACH1$79,762$79,900$81,787$69,500
0133Portable drive unit (5020000000-N)EACH1$13,104$10,300$10,591$9,000.00
0134High mount foundations (5025000000-E)CY9$2,164.97$2,760.00$2,824.00$2,400.00
0135HM luminaire ************ - (560W LED) (5030000000-N)EACH8$2,848.65$3,100.00$3,177.00$2,700.00
0136Elect duct **, size ***** - (TL, 3") (5150000000-E)LF100$34.18$46.00$47.00$40.00
0137Elect duct BD, size ***** - (1.5") (5155000000-E)LF50$17.09$17.50$23.50$20.00
0138Elect duct BD, size ***** - (3") (5155000000-E)LF30$25.07$29.00$29.50$25.00
0139**-#2 W/G feeder N *****" - (2, 1.5") (5220000000-E)LF1,050$37.60$30.00$30.50$26.00
0140Elec JB ************ - (HM18) (5240000000-N)EACH1$1,025.51$1,240.00$1,271.00$1,080.00
0141Elec JB ************ - (IG18) (5240000000-N)EACH3$1,025.51$1,380.00$1,412.00$1,200.00
0142Portable lighting (5255000000-N)LS1$300,000$36,700$113,360$2,000,000
0143Generic lighting item (LS) - smart node storage (5260000000-N)LS1$2,278.92$308.00$315.50$268.00
0144Generic lighting item (EA) - remove high mount foundation (5270000000-N)EACH1$7,976.22$5,700.00$5,884.00$5,000.00
0145Generic lighting item (EA) - remove high mount standard (5270000000-N)EACH1$10,939$13,200$13,533$11,500
0146Temporary silt fence (6000000000-E)LF9,115$2.96$3.00$3.05$2.50
0147Stone for erosion control, class A (6006000000-E)TON675$85.00$85.00$204.50$25.00
0148Stone for erosion control, class B (6009000000-E)TON1,940$85.00$85.00$204.50$25.00
0149Sediment control stone (6012000000-E)TON1,210$75.00$74.00$146.00$25.00
0150Temporary mulching (6015000000-E)ACRE30$1,595.24$1,590.00$1,652.00$1,200.00
0151Seed for temporary seeding (6018000000-E)LB1,800$2.28$2.30$2.35$5.00
0152Fertilizer for temporary seeding (6021000000-E)TON9.50$968.54$970.00$1,003.00$1,200.00
0153Temporary slope drains (6024000000-E)LF1,170$22.00$13.50$67.25$10.00
0154Safety fence (6029000000-E)LF380$3.19$3.20$3.30$1.85
0155Silt excavation (6030000000-E)CY4,650$28.00$23.00$5.00$5.00
0156Matting for erosion control (6036000000-E)SY35,000$1.82$1.80$1.90$1.75
0157Coir fiber mat (6037000000-E)SY100$5.13$5.00$5.30$6.00
01581/4" hardware cloth (6042000000-E)LF2,075$5.70$5.50$5.90$10.00
0159Low permeability geotextile (6043000000-E)SY100$5.70$9.50$5.30$10.00
0160Special stilling basins (6070000000-N)EACH2$384.36$1,400.00$1,882.00$1,500.00
0161Flocculant (6071002000-E)LB570$5.98$6.00$6.20$10.00
0162Coir fiber wattle (6071012000-E)LF620$9.12$9.00$9.45$9.00
0163Coir fiber wattle barrier (6071014000-E)LF3,230$18.23$18.00$19.00$10.00
0164Coir fiber baffle (6071030000-E)LF580$9.12$9.00$9.45$6.50
0165**" skimmer - (1-1/2") (6071050000-E)EACH3$2,000.00$1,060.00$1,357.00$4,033.86
0166Seeding and mulching (6084000000-E)ACRE30$2,962.60$2,960.00$3,068.00$2,000.00
0167Mowing (6087000000-E)ACRE15$284.86$510.00$295.00$250.00
0168Seed for repair seeding (6090000000-E)LB300$4.84$4.80$5.00$6.00
0169Fertilizer for repair seeding (6093000000-E)TON0.75$1,253.40$1,278.00$1,298.00$1,750.00
0170Seed for supplemental seeding (6096000000-E)LB625$4.84$4.80$5.00$6.00
0171Fertilizer topdressing (6108000000-E)TON18.50$1,082.49$1,080.00$1,121.00$1,300.00
0172Specialized hand mowing (6114500000-N)MHR10$159.52$159.00$165.00$75.00
0173Manual litter removal (6114800000-N)MHR10$160.00$61.00$165.00$75.00
0174Litter disposal (6114900000-E)TON1$320.00$1,220.00$236.00$500.00
0175Response for erosion control (6117000000-N)EACH25$85.46$85.00$88.50$200.00
0176Concrete washout structure (6117500000-N)EACH3$853.89$1,550.00$2,892.00$1,500.00
0177Reforestation (6123000000-E)ACRE0.25$11,395$11,618$11,799$6,000.00
0178Generic erosion control item (EA) - fabric insert inlet protection cleanout (6132000000-N)EACH90$180.00$245.00$413.00$125.00
0179Generic erosion control item (EA) - fabric insert inlet protection, type 1 (6132000000-N)EACH30$180.00$245.00$413.00$150.00
0180Generic erosion control item (EA) - prefabricated concrete washout (6132000000-N)EACH15$700.00$369.00$1,153.00$1,500.00
0181Pedestrian signal head (16", 1 section W/countdown) (7048500000-E)EACH18$1,367.35$1,150.00$1,177.00$1,000.00
0182Signal cable (7060000000-E)LF6,750$6.84$6.00$5.90$5.00
0183Vehicle signal head (12", 3 section) (7120000000-E)EACH42$1,595.24$1,610.00$1,648.00$1,400.00
0184Vehicle signal head (12", 4 section) (7132000000-E)EACH5$1,823.13$1,950.00$2,001.00$1,700.00
0185Backplate (7180000000-N)EACH47$284.86$201.00$206.00$175.00
0186Messenger cable (3/8") (7264000000-E)LF2,675$6.27$10.50$10.50$9.00
0187Tracer wire (7279000000-E)LF550$1.71$2.40$2.35$2.00
0188Unpaved trench (***********) - (1, 2") (7300000000-E)LF50$14.24$23.50$23.50$20.00
0189Unpaved trench (***********) - (2, 2") (7300000000-E)LF400$22.79$23.50$23.50$20.00
0190Direct drill (***********) - (2, 2") (7301000000-E)LF750$42.73$40.00$41.25$35.00
0191Junction box (***************) - (special oversized, heavy duty) (7312000000-N)EACH3$2,848.65$3,220.00$3,295.00$2,800.00
0192Junction box (over-sized, heavy duty) (7348000000-N)EACH6$1,994.06$1,950.00$2,001.00$1,700.00
0193Wood pole (7360000000-N)EACH5$1,595.24$2,640.00$2,707.00$2,300.00
0194Guy assembly (7372000000-N)EACH17$911.57$1,090.00$1,118.00$950.00
01951" riser with weatherhead (7408000000-E)EACH1$797.63$630.00$647.00$550.00
01962" riser with weatherhead (7420000000-E)EACH5$1,253.41$1,150.00$1,177.00$1,000.00
0197Heat shrink tubing retrofit kit (7430000000-N)EACH1$259.79$287.00$294.00$250.00
01982" riser with heat shrink tubing (7432000000-E)EACH5$1,424.32$1,440.00$1,471.00$1,250.00
0199Lead-in cable (14-2) (7456100000-E)LF3,000$5.70$3.50$3.55$3.00
0200Communications cable (** fiber) - (24) (7516000000-E)LF2,800$5.13$6.00$5.90$5.00
0201Splice enclosure (7540000000-N)EACH5$5,134.41$5,600.00$5,766.00$4,900.00
0202Modify splice enclosure (7541000000-N)EACH2$1,893.79$3,220.00$3,295.00$2,800.00
0203Interconnect center (7552000000-N)EACH3$2,652.66$2,930.00$3,001.00$2,550.00
0204Delineator marker (7566000000-N)EACH9$184.59$201.00$206.00$175.00
0205Remove existing communications cable (7575160000-E)LF2,000$1.85$2.40$2.35$2.00
0206Cable transfer (7575180000-N)EACH5$581.12$630.00$647.00$550.00
0207Metal strain signal pole (7576000000-N)EACH10$19,941$19,300$19,711$16,750
0208Soil test (7613000000-N)EACH10$2,734.70$2,130.00$2,177.00$1,850.00
0209Drilled pier foundation (7614100000-E)CY70$2,164.97$2,990.00$3,060.00$2,600.00
0210Sign for signals (7636000000-N)EACH18$1,025.51$860.00$882.50$750.00
0211Type I post with foundation (7642100000-N)EACH2$2,848.65$4,020.00$4,119.00$3,500.00
0212Type II pedestal with foundation (7642200000-N)EACH16$3,988.11$4,600.00$4,707.00$4,000.00
0213Signal cabinet foundation (7684000000-N)EACH3$3,133.52$3,450.00$3,530.00$3,000.00
0214Contlrs with CBNT (**************) - (2070LX, base mounted) (7696000000-N)EACH3$27,347$29,900$30,597$26,000
0215Cabinet base extender (7901000000-N)EACH3$911.57$830.00$853.00$725.00
0216Generic signal item (EA) - digital CCTV camera assembly (7980000000-N)EACH1$7,121.62$8,900.00$9,061.00$7,700.00
0217Generic signal item (EA) - microwave vehicle detector - multiple zones (7980000000-N)EACH13$18,516$10,900$11,180$9,500.00
0218Generic signal item (EA) - non-intrusive detection system processor (7980000000-N)EACH3$18,516$17,000$17,417$14,800
0219Generic signal item (EA) - site survey (7980000000-N)EACH3$1,709.19$2,990.00$3,060.00$2,600.00
0220Generic signal item (LS) - training for non-intrusive detection (7985000000-N)LS1$8,545.95$14,900$15,269$12,975
0221Generic signal item (LF) - mmfo communications cable (12-fiber) (7990000000-E)LF2,250$4.72$6.00$5.90$5.00
0222Generic paving item (LS) - concrete median (1891500000-N)LS1$30,000$21,600$17,171$58,462
0223Messenger cable (1/4") (7252000000-E)LF2,375$4.99$6.00$5.90$5.00
NCDOT contract C205195: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.

Every contract let that day: NCDOT letting of August 18, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy