NCDOT contract C204766 bid tabulation
GRADING, DRAINAGE, PAVING, AND STRUCTURES., GRADING, DRAINAGE, PAVING, RETAINING WALL, AND STRUCTURE. BRIDGE #560067 OVER THE FRENCH BROAD RIVER ON US-25/70. Let by North Carolina DOT on March 18, 2025, Madison. 8 bids received; low bid $16,777,527 by Kemp Sigmon Construction Co Inc.
- Owner
- North Carolina DOT
- Letting
- 18 MAR 2025
- Pay items
- 182
- Data through
- 20 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Kemp Sigmon Construction Co Inc | $16,777,527 | Low |
| 2 | Caton Construction Group Inc | $17,651,097 | +5.0% |
| 3 | Whaley Construction LLC | $17,869,963 | +7.0% |
| 4 | Zachry Construction Corporation | $18,752,931 | +12% |
| 5 | Wright Brothers Civil Construction LLC | $19,992,195 | +19% |
| 6 | Brayman Construction Corporation | $20,199,284 | +20% |
| 7 | NHM Constructors, LLC | $21,501,396 | +28% |
| 8 | Dane Construction, Inc. | $22,228,868 | +32% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Kemp Sigmon Construction Co Inc | 2. Caton Construction Group Inc | 3. Whaley Construction LLC | 4. Zachry Construction Corporation | 5. Wright Brothers Civil Construction LLC | 6. Brayman Construction Corporation |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Mobilization (0000100000-N) | LS | 1 | $835,000 | $882,555 | $1,742,193 | $931,000 | $995,000 | $917,000 |
| 0002 | Construction surveying (0000400000-N) | LS | 1 | $184,200 | $63,000 | $65,861 | $300,000 | $75,000 | $350,000 |
| 0003 | Undercut excavation (0036000000-E) | CY | 450 | $20.00 | $60.00 | $55.00 | $28.52 | $51.00 | $163.00 |
| 0004 | Supplementary clearing & grubbing (0050000000-E) | ACRE | 1 | $100.00 | $5,000.00 | $20,000 | $34,640 | $11,000 | $12,000 |
| 0005 | Grading (0063000000-N) | LS | 1 | $1,200,000 | $711,600 | $350,000 | $250,000 | $2,316,200 | $316,000 |
| 0006 | Borrow excavation (0106000000-E) | CY | 6,200 | $5.00 | $60.00 | $40.00 | $30.00 | $47.00 | $25.00 |
| 0007 | Drainage ditch excavation (0134000000-E) | CY | 110 | $15.00 | $80.00 | $100.00 | $10.49 | $51.00 | $140.00 |
| 0008 | Select granular material (0195000000-E) | CY | 400 | $20.00 | $150.00 | $80.00 | $96.51 | $120.00 | $125.00 |
| 0009 | Geotextile for soil stabilization (0196000000-E) | SY | 500 | $4.00 | $5.00 | $10.00 | $3.68 | $5.00 | $5.00 |
| 0010 | Temporary shoring (0199000000-E) | SF | 4,940 | $80.00 | $140.00 | $97.00 | $425.00 | $104.00 | $140.00 |
| 0011 | Generic grading item (LS) - type 2 bridge approach fill, station 20+38.87 -L- (0248000000-N) | LS | 1 | $50,000 | $120,000 | $106,600 | $135,606 | $150,000 | $106,000 |
| 0012 | Foundation conditioning material, minor structures (0318000000-E) | TON | 290 | $1.00 | $60.00 | $61.00 | $68.84 | $85.00 | $75.00 |
| 0013 | FND condit geotextile (4A) (0321000000-E) | SY | 910 | $1.00 | $5.00 | $10.00 | $5.09 | $6.50 | $10.00 |
| 0014 | 12" drainage pipe (0335100000-E) | LF | 76 | $75.00 | $95.00 | $110.00 | $130.85 | $141.00 | $185.00 |
| 0015 | 15" drainage pipe (0335200000-E) | LF | 44 | $150.00 | $100.00 | $125.00 | $137.29 | $163.00 | $185.00 |
| 0016 | 18" drainage pipe (0335300000-E) | LF | 16 | $165.00 | $105.00 | $180.00 | $148.04 | $172.00 | $185.00 |
| 0017 | 15" RC pipe culverts, class III (0366000000-E) | LF | 256 | $150.00 | $160.00 | $155.00 | $140.72 | $142.00 | $250.00 |
| 0018 | 15" RC pipe culverts, class IV (0448200000-E) | LF | 404 | $200.00 | $175.00 | $195.00 | $158.39 | $157.00 | $250.00 |
| 0019 | 15" CS pipe culverts, 0.064" thick (0582000000-E) | LF | 108 | $150.00 | $100.00 | $165.00 | $134.55 | $154.00 | $200.00 |
| 0020 | **" CS elbow *****" thick - (15", 0.064") (0636000000-E) | EACH | 2 | $1,500.00 | $2,000.00 | $1,200.00 | $1,167.48 | $1,300.00 | $1,200.00 |
| 0021 | Pipe removal (0995000000-E) | LF | 101 | $20.00 | $50.00 | $56.00 | $30.10 | $36.60 | $30.00 |
| 0022 | Shallow undercut (1099500000-E) | CY | 100 | $10.00 | $70.00 | $75.00 | $30.29 | $51.00 | $55.00 |
| 0023 | Class IV subgrade stabilization (1099700000-E) | TON | 200 | $30.00 | $120.00 | $60.00 | $62.92 | $72.00 | $65.00 |
| 0024 | Geotextile for subgrade stabilization (1112000000-E) | SY | 300 | $4.00 | $5.00 | $10.00 | $6.27 | $4.00 | $5.00 |
| 0025 | Incidental milling (1330000000-E) | SY | 200 | $30.00 | $27.00 | $29.70 | $54.11 | $63.00 | $27.00 |
| 0026 | Asphalt conc base course, type B25.0C (1491000000-E) | TON | 840 | $190.00 | $174.00 | $191.40 | $410.00 | $360.00 | $174.00 |
| 0027 | Asphalt conc intermediate course, type I19.0C (1503000000-E) | TON | 750 | $190.00 | $174.00 | $191.40 | $425.00 | $365.00 | $174.00 |
| 0028 | Asphalt conc surface course, type S9.5B (1519000000-E) | TON | 720 | $190.00 | $184.00 | $202.40 | $415.00 | $355.00 | $184.00 |
| 0029 | Asphalt binder for plant mix (1575000000-E) | TON | 125 | $600.00 | $760.00 | $836.00 | $1,047.88 | $870.00 | $760.00 |
| 0030 | Asphalt plant mix, pavement repair (1693000000-E) | TON | 20 | $500.00 | $240.00 | $264.00 | $477.79 | $380.00 | $240.00 |
| 0031 | Right-of-way markers (2000000000-N) | EACH | 10 | $500.00 | $475.00 | $1,000.00 | $431.66 | $580.00 | $1,600.00 |
| 0032 | Subdrain excavation (2022000000-E) | CY | 44.80 | $1.00 | $55.00 | $100.00 | $40.95 | $27.00 | $225.00 |
| 0033 | Geotextile for subsurface drains (2026000000-E) | SY | 200 | $1.00 | $9.00 | $10.00 | $9.55 | $5.80 | $8.00 |
| 0034 | Subdrain coarse aggregate (2036000000-E) | CY | 33.60 | $1.00 | $115.00 | $100.00 | $75.08 | $146.00 | $160.00 |
| 0035 | 6" perforated subdrain pipe (2044000000-E) | LF | 200 | $1.00 | $45.00 | $35.00 | $27.30 | $16.00 | $10.00 |
| 0036 | Subdrain pipe outlet (2070000000-N) | EACH | 1 | $1.00 | $3,000.00 | $1,500.00 | $477.79 | $1,100.00 | $1,600.00 |
| 0037 | 6" outlet pipe (2077000000-E) | LF | 6 | $1.00 | $70.00 | $45.00 | $54.61 | $107.00 | $150.00 |
| 0038 | Flowable fill (2275000000-E) | CY | 0.40 | $5,000.00 | $4,715.00 | $1,350.00 | $435.66 | $5,200.00 | $2,600.00 |
| 0039 | Masonry drainage structures (2286000000-N) | EACH | 11 | $3,500.00 | $6,500.00 | $7,850.00 | $5,161.03 | $5,800.00 | $5,500.00 |
| 0040 | Masonry drainage structures (2308000000-E) | LF | 7.20 | $500.00 | $550.00 | $2,500.00 | $826.94 | $319.00 | $1,500.00 |
| 0041 | Frame with two grates, STD 840.16 (2364000000-N) | EACH | 1 | $1,400.00 | $1,400.00 | $1,160.00 | $1,237.94 | $2,500.00 | $2,500.00 |
| 0042 | Frame with two grates, STD 840.24 (2366000000-N) | EACH | 1 | $1,200.00 | $1,400.00 | $1,051.00 | $1,119.63 | $2,300.00 | $2,500.00 |
| 0043 | Frame with two grates, STD 840.29 (2367000000-N) | EACH | 3 | $1,200.00 | $1,400.00 | $1,026.00 | $1,129.85 | $4,600.00 | $2,500.00 |
| 0044 | Frame-GRT-HD 840.03 ** - (E) (2374000000-N) | EACH | 1 | $1,500.00 | $1,500.00 | $1,315.00 | $1,500.84 | $2,300.00 | $2,500.00 |
| 0045 | Frame-GRT-HD 840.03 ** - (F) (2374000000-N) | EACH | 2 | $1,500.00 | $1,500.00 | $1,392.00 | $1,500.84 | $2,400.00 | $2,500.00 |
| 0046 | Frame-GRT-HD 840.03 ** - (G) (2374000000-N) | EACH | 3 | $1,500.00 | $1,500.00 | $1,392.00 | $1,500.84 | $2,400.00 | $2,500.00 |
| 0047 | 2'-6" concrete curb & gutter (2549000000-E) | LF | 1,070 | $55.00 | $55.00 | $75.00 | $47.72 | $51.50 | $120.00 |
| 0048 | 4" concrete sidewalk (2591000000-E) | SY | 450 | $103.50 | $103.50 | $163.90 | $82.97 | $73.25 | $220.00 |
| 0049 | 6" concrete driveway (2612000000-E) | SY | 40 | $222.00 | $222.00 | $298.10 | $133.16 | $115.00 | $300.00 |
| 0050 | 4" concrete paved ditch (2619000000-E) | SY | 50 | $775.00 | $775.00 | $247.50 | $140.09 | $458.00 | $1,500.00 |
| 0051 | Precast reinforced concrete barrier, single faced (2724000000-E) | LF | 20 | $250.00 | $200.00 | $197.60 | $282.07 | $580.00 | $200.00 |
| 0052 | Adjustment of drop inlets (2815000000-N) | EACH | 2 | $1,500.00 | $1,500.00 | $1,650.00 | $2,551.20 | $3,300.00 | $7,500.00 |
| 0053 | Steel beam guardrail (3030000000-E) | LF | 325 | $24.00 | $24.00 | $25.30 | $33.26 | $26.60 | $23.00 |
| 0054 | Steel beam guardrail, shop curved (3045000000-E) | LF | 100 | $24.50 | $24.50 | $33.00 | $33.95 | $34.71 | $30.00 |
| 0055 | Additional guardrail posts (3150000000-N) | EACH | 5 | $11.00 | $11.00 | $410.00 | $15.24 | $4.65 | $4.00 |
| 0056 | Guardrail end units, type at-1 (3195000000-N) | EACH | 2 | $900.00 | $900.00 | $990.00 | $1,247.05 | $1,000.00 | $900.00 |
| 0057 | Guardrail anchor units, type III (3215000000-N) | EACH | 3 | $2,200.00 | $2,200.00 | $26.40 | $3,048.33 | $2,800.00 | $2,400.00 |
| 0058 | Guardrail end units, type TL-2 (3288000000-N) | EACH | 3 | $3,200.00 | $3,200.00 | $3,630.00 | $4,433.94 | $3,800.00 | $3,300.00 |
| 0059 | Guardrail anchor units, type B-77 (3317000000-N) | EACH | 2 | $2,500.00 | $2,500.00 | $3,190.00 | $3,464.01 | $3,400.00 | $2,900.00 |
| 0060 | Remove existing guardrail (3360000000-E) | LF | 890 | $1.00 | $1.00 | $2.20 | $1.39 | $2.30 | $2.00 |
| 0061 | Temporary steel beam guardrail (3380000000-E) | LF | 25 | $9.00 | $9.00 | $12.10 | $12.47 | $12.70 | $11.00 |
| 0062 | Temporary steel beam guardrail, shop curved (3382000000-E) | LF | 25 | $10.00 | $10.00 | $19.80 | $13.86 | $20.80 | $18.00 |
| 0063 | Temporary steel beam guardrail terminal sections (3384000000-N) | EACH | 1 | $50.00 | $50.00 | $82.50 | $69.28 | $86.75 | $75.00 |
| 0064 | Temp GDRL anch units ****** - (thrie-beam) (3387000000-N) | EACH | 1 | $850.00 | $850.00 | $1,375.00 | $1,177.77 | $1,400.00 | $1,250.00 |
| 0065 | Temp GDRL end units ***** - (TL-2) (3389150000-N) | EACH | 1 | $2,000.00 | $2,000.00 | $2,420.00 | $2,771.21 | $2,500.00 | $2,200.00 |
| 0066 | Rip rap, class I (3628000000-E) | TON | 160 | $100.00 | $95.00 | $65.00 | $84.43 | $108.00 | $90.00 |
| 0067 | Rip rap, class B (3649000000-E) | TON | 30 | $100.00 | $95.00 | $65.00 | $85.12 | $96.50 | $120.00 |
| 0068 | Geotextile for drainage (3656000000-E) | SY | 2,375 | $5.00 | $5.00 | $10.00 | $4.55 | $5.00 | $6.00 |
| 0069 | Contr furn, type ***sign - (D) (4025000000-E) | SF | 53 | $24.00 | $12.50 | $13.75 | $34.29 | $14.30 | $24.75 |
| 0070 | Contr furn, type ***sign - (E) (4025000000-E) | SF | 85 | $22.00 | $12.50 | $13.75 | $23.92 | $14.30 | $17.26 |
| 0071 | Supports, 3-LB steel U-channel (4072000000-E) | LF | 320 | $7.10 | $8.00 | $8.80 | $12.47 | $9.15 | $9.00 |
| 0072 | Sign erection, type D (4096000000-N) | EACH | 5 | $285.00 | $65.00 | $71.50 | $207.84 | $74.50 | $150.00 |
| 0073 | Sign erection, type E (4102000000-N) | EACH | 15 | $225.00 | $50.00 | $55.00 | $131.63 | $57.26 | $95.00 |
| 0074 | Sign erect, reloc ** GRD MTD - (D) (4116100000-N) | EACH | 4 | $150.00 | $85.00 | $93.50 | $207.84 | $97.25 | $150.00 |
| 0075 | Sign erect, reloc ** GRD MTD - (E) (4116100000-N) | EACH | 1 | $150.00 | $75.00 | $82.50 | $131.63 | $86.00 | $95.00 |
| 0076 | Disposal of sign system, U-channel (4155000000-N) | EACH | 12 | $15.00 | $20.00 | $22.00 | $27.71 | $22.90 | $20.00 |
| 0077 | Disposal of support, U-channel (4192000000-N) | EACH | 2 | $15.00 | $20.00 | $22.00 | $27.71 | $22.90 | $20.00 |
| 0078 | Work zone signs (stationary) (4400000000-E) | SF | 234 | $6.50 | $6.50 | $7.15 | $9.01 | $7.95 | $7.45 |
| 0079 | Work zone signs (portable) (4405000000-E) | SF | 757 | $13.00 | $25.00 | $14.30 | $18.01 | $30.70 | $8.85 |
| 0080 | Work zone signs (barricade mounted) (4410000000-E) | SF | 54 | $6.75 | $6.75 | $7.45 | $9.35 | $8.25 | $7.75 |
| 0081 | Temporary portable traffic signal system (4424500000-N) | EACH | 1 | $82,000 | $35,000 | $121,000 | $3,810.42 | $180,000 | $85,172 |
| 0082 | Drums (4430000000-N) | EACH | 100 | $100.00 | $75.00 | $22.00 | $55.39 | $24.50 | $48.00 |
| 0083 | Barricades (type III) (4445000000-E) | LF | 200 | $19.00 | $19.00 | $20.90 | $52.65 | $23.30 | $30.00 |
| 0084 | Pedestrian channelizing devices (4447000000-E) | LF | 827 | $14.99 | $14.99 | $16.50 | $20.77 | $18.35 | $65.00 |
| 0085 | Flagger (4455000000-N) | DAY | 120 | $500.00 | $1,200.00 | $1,265.00 | $427.91 | $1,300.00 | $300.00 |
| 0086 | Temporary crash cushions (4465000000-N) | EACH | 3 | $8,500.00 | $7,500.00 | $10,588 | $10,392 | $9,700.00 | $8,500.00 |
| 0087 | Portable concrete barrier (4485000000-E) | LF | 467 | $59.33 | $70.00 | $54.30 | $68.18 | $56.50 | $55.73 |
| 0088 | Portable concrete barrier (anchored) (4490000000-E) | LF | 123 | $79.01 | $70.00 | $87.00 | $109.20 | $90.50 | $89.26 |
| 0089 | Generic traffic control item (LS) - watercraft safety (4589000000-N) | LS | 1 | $250,000 | $300,000 | $30,000 | $13,890 | $45,900 | $510,000 |
| 0090 | Generic traffic control item (EA) - temporary river traffic warning signs (4600000000-N) | EACH | 35 | $500.00 | $1,500.00 | $247.50 | $8.91 | $3,000.00 | $225.00 |
| 0091 | Temporary raised pavement markers (4650000000-N) | EACH | 35 | $17.00 | $17.00 | $18.70 | $23.55 | $19.25 | $17.00 |
| 0092 | Thermoplastic pavement marking lines (4", 90 mils) (4685000000-E) | LF | 3,750 | $1.00 | $1.00 | $1.10 | $1.39 | $1.15 | $1.00 |
| 0093 | Thermoplastic pavement marking lines (16", 90 mils) (4704000000-E) | LF | 45 | $5.00 | $5.00 | $5.50 | $6.93 | $5.65 | $5.00 |
| 0094 | Thermoplastic pavement marking lines (24", 90 mils) (4709000000-E) | LF | 60 | $12.00 | $12.00 | $13.20 | $16.62 | $13.61 | $12.00 |
| 0095 | Thermoplastic pavement marking character (90 mils) (4720000000-E) | EACH | 2 | $150.00 | $150.00 | $165.00 | $207.84 | $170.00 | $150.00 |
| 0096 | Heated-in-place thermoplastic pavement marking symbol (90 mils) (4726110000-E) | EACH | 8 | $300.00 | $300.00 | $330.00 | $415.69 | $340.00 | $300.00 |
| 0097 | 4" cold appl plstic lines type ** - (II) (4770000000-E) | LF | 2,450 | $6.00 | $6.00 | $6.60 | $8.32 | $6.80 | $6.00 |
| 0098 | 4" cold appl plstic lines type ** - (IV) (4770000000-E) | LF | 2,600 | $6.00 | $6.00 | $6.60 | $8.32 | $6.80 | $6.00 |
| 0099 | Paint pavement marking lines (4") (4810000000-E) | LF | 4,920 | $0.35 | $0.35 | $0.39 | $0.49 | $0.40 | $0.35 |
| 0100 | Paint pavement marking lines (24") (4835000000-E) | LF | 36 | $3.50 | $3.50 | $3.85 | $4.85 | $3.95 | $3.50 |
| 0101 | Removal of pavement marking lines (4") (4850000000-E) | LF | 2,130 | $1.00 | $1.00 | $1.10 | $1.39 | $1.15 | $1.00 |
| 0102 | Generic pavement marking item (EA) - inlaid raised pavement markers (4895000000-N) | EACH | 16 | $250.00 | $250.00 | $275.00 | $346.41 | $283.00 | $250.00 |
| 0103 | Permanent raised pavement markers (4900000000-N) | EACH | 8 | $20.00 | $20.00 | $22.00 | $27.71 | $22.70 | $20.00 |
| 0104 | 4" water line (5325400000-E) | LF | 180 | $250.00 | $120.00 | $187.00 | $236.92 | $197.00 | $125.00 |
| 0105 | 8" water line (5325800000-E) | LF | 97 | $300.00 | $140.00 | $178.00 | $321.43 | $267.00 | $145.00 |
| 0106 | DI H2O pipe fittings (5329000000-E) | LB | 1,500 | $25.00 | $22.00 | $15.00 | $30.48 | $25.30 | $12.00 |
| 0107 | 2" valve (5536000000-E) | EACH | 1 | $2,700.00 | $3,000.00 | $2,750.00 | $3,330.73 | $2,800.00 | $4,500.00 |
| 0108 | 4" valve (5538000000-E) | EACH | 1 | $2,800.00 | $3,975.00 | $3,240.00 | $3,078.57 | $2,600.00 | $9,000.00 |
| 0109 | 8" valve (5546000000-E) | EACH | 2 | $5,000.00 | $6,100.00 | $5,800.00 | $5,432.53 | $4,500.00 | $14,500 |
| 0110 | 8" sanitary gravity sewer (5691300000-E) | LF | 198 | $600.00 | $400.00 | $227.00 | $411.49 | $342.00 | $195.00 |
| 0111 | **" force main sewer - (3") (5709000000-E) | LF | 563 | $30.00 | $112.00 | $56.00 | $90.06 | $74.75 | $234.00 |
| 0112 | 2" force main sewer (5709100000-E) | LF | 528 | $150.00 | $95.00 | $54.00 | $120.54 | $100.00 | $225.00 |
| 0113 | Sanitary sewer clean-out (5768000000-N) | EACH | 2 | $2,500.00 | $2,000.00 | $675.00 | $4,444.67 | $3,700.00 | $145.00 |
| 0114 | Sewer service line (5768500000-E) | LF | 40 | $175.00 | $100.00 | $115.00 | $85.90 | $71.25 | $245.00 |
| 0115 | Ductile iron sewer pipe fittings (5769000000-E) | LB | 600 | $25.00 | $20.00 | $22.00 | $30.48 | $25.30 | $12.00 |
| 0116 | 4' dia utility manhole (5775000000-E) | EACH | 2 | $10,000 | $9,500.00 | $9,500.00 | $8,163.34 | $6,800.00 | $39,000 |
| 0117 | Utility manhole wall 4' dia (5781000000-E) | LF | 1 | $1,200.00 | $1,600.00 | $2,500.00 | $622.09 | $520.00 | $350.00 |
| 0118 | 16" encasement pipe (5835700000-E) | LF | 140 | $150.00 | $90.00 | $155.00 | $338.05 | $281.00 | $2,500.00 |
| 0119 | Bore & jack **" - (16") (5872500000-E) | LF | 140 | $750.00 | $2,000.00 | $2,200.00 | $800.21 | $2,500.00 | $1,800.00 |
| 0120 | Direct drill **" - (3") (5872600000-E) | LF | 563 | $100.00 | $175.00 | $192.50 | $223.88 | $244.00 | $135.00 |
| 0121 | Generic utility item (EA) - force sewer service connection box (5882000000-N) | EACH | 1 | $3,000.00 | $7,200.00 | $4,700.00 | $13,392 | $11,100 | $3,400.00 |
| 0122 | Temporary silt fence (6000000000-E) | LF | 4,200 | $3.50 | $3.50 | $3.70 | $4.73 | $6.00 | $3.44 |
| 0123 | Stone for erosion control, class A (6006000000-E) | TON | 350 | $50.00 | $95.00 | $65.00 | $82.63 | $92.00 | $200.00 |
| 0124 | Stone for erosion control, class B (6009000000-E) | TON | 200 | $50.00 | $95.00 | $65.00 | $84.67 | $92.00 | $120.00 |
| 0125 | Sediment control stone (6012000000-E) | TON | 700 | $50.00 | $90.00 | $65.00 | $67.71 | $92.00 | $95.00 |
| 0126 | Temporary mulching (6015000000-E) | ACRE | 5 | $2,000.00 | $2,000.00 | $2,100.00 | $3,063.35 | $2,800.00 | $1,850.00 |
| 0127 | Seed for temporary seeding (6018000000-E) | LB | 300 | $2.00 | $2.00 | $2.10 | $5.57 | $10.00 | $2.00 |
| 0128 | Fertilizer for temporary seeding (6021000000-E) | TON | 2.50 | $400.00 | $400.00 | $420.00 | $1,670.92 | $3,500.00 | $1,092.00 |
| 0129 | Temporary slope drains (6024000000-E) | LF | 200 | $1.00 | $35.00 | $50.00 | $33.30 | $35.00 | $90.00 |
| 0130 | Safety fence (6029000000-E) | LF | 500 | $2.00 | $2.00 | $2.10 | $4.18 | $3.00 | $2.85 |
| 0131 | Silt excavation (6030000000-E) | CY | 1,800 | $10.00 | $60.00 | $20.00 | $18.72 | $0.01 | $20.00 |
| 0132 | Matting for erosion control (6036000000-E) | SY | 9,300 | $2.00 | $2.00 | $2.10 | $2.51 | $1.90 | $1.99 |
| 0133 | Coir fiber mat (6037000000-E) | SY | 100 | $6.75 | $6.75 | $7.10 | $11.14 | $17.00 | $4.36 |
| 0134 | 1/4" hardware cloth (6042000000-E) | LF | 475 | $6.00 | $8.00 | $6.30 | $8.36 | $14.30 | $3.75 |
| 0135 | Low permeability geotextile (6043000000-E) | SY | 100 | $10.00 | $12.00 | $15.00 | $11.14 | $5.50 | $100.00 |
| 0136 | Special stilling basins (6070000000-N) | EACH | 18 | $2,500.00 | $2,500.00 | $5,000.00 | $1,162.59 | $1,500.00 | $2,500.00 |
| 0137 | Flocculant (6071002000-E) | LB | 40 | $8.00 | $8.00 | $8.40 | $8.36 | $37.00 | $24.00 |
| 0138 | Coir fiber wattle (6071012000-E) | LF | 160 | $13.50 | $13.50 | $14.20 | $11.14 | $15.00 | $14.50 |
| 0139 | Coir fiber baffle (6071030000-E) | LF | 350 | $6.75 | $7.00 | $7.10 | $11.14 | $15.00 | $8.55 |
| 0140 | **" skimmer - (1-1/2") (6071050000-E) | EACH | 1 | $2,700.00 | $3,200.00 | $4,000.00 | $1,965.12 | $7,800.00 | $4,500.00 |
| 0141 | **" skimmer - (2") (6071050000-E) | EACH | 1 | $3,000.00 | $3,500.00 | $4,500.00 | $2,172.54 | $8,000.00 | $4,500.00 |
| 0142 | Seeding and mulching (6084000000-E) | ACRE | 6 | $3,300.00 | $3,300.00 | $3,465.00 | $4,455.79 | $4,400.00 | $4,950.00 |
| 0143 | Mowing (6087000000-E) | ACRE | 3 | $175.00 | $175.00 | $183.75 | $417.74 | $690.00 | $295.00 |
| 0144 | Seed for repair seeding (6090000000-E) | LB | 50 | $6.00 | $6.00 | $6.30 | $6.97 | $11.55 | $4.15 |
| 0145 | Fertilizer for repair seeding (6093000000-E) | TON | 0.25 | $600.00 | $600.00 | $630.00 | $1,670.84 | $3,500.00 | $1,092.00 |
| 0146 | Seed for supplemental seeding (6096000000-E) | LB | 100 | $6.00 | $6.00 | $6.30 | $5.57 | $13.90 | $4.98 |
| 0147 | Fertilizer topdressing (6108000000-E) | TON | 2.75 | $600.00 | $600.00 | $630.00 | $1,322.81 | $3,500.00 | $1,092.00 |
| 0148 | Specialized hand mowing (6114500000-N) | MHR | 10 | $45.00 | $45.00 | $47.25 | $243.67 | $110.00 | $75.00 |
| 0149 | Manual litter removal (6114800000-N) | MHR | 2 | $45.00 | $100.00 | $47.25 | $243.67 | $145.00 | $80.00 |
| 0150 | Litter disposal (6114900000-E) | TON | 1 | $350.00 | $800.00 | $367.50 | $348.12 | $300.00 | $535.00 |
| 0151 | Response for erosion control (6117000000-N) | EACH | 75 | $500.00 | $500.00 | $525.00 | $208.86 | $325.00 | $475.00 |
| 0152 | Concrete washout structure (6117500000-N) | EACH | 5 | $2,500.00 | $3,500.00 | $1,500.00 | $1,133.20 | $1,800.00 | $15,000 |
| 0153 | Concrete steps (6890000000-E) | CY | 36.10 | $6,200.00 | $6,200.00 | $2,327.00 | $1,177.77 | $2,600.00 | $10,000 |
| 0154 | Handrail on steps (6895000000-E) | LF | 378.33 | $300.00 | $210.00 | $231.00 | $221.69 | $520.00 | $210.00 |
| 0155 | MSE retain wall no ** - (1) (8801000000-E) | SF | 8,003 | $150.00 | $190.00 | $122.00 | $225.00 | $227.00 | $275.00 |
| 0156 | CM&R temp access *********** - (20+38.87 -L-) (8017000000-N) | LS | 1 | $1,200,000 | $980,000 | $2,709,500 | $1,250,000 | $1,598,300 | $1,509,000 |
| 0157 | Remv exist STR ****** BRG (402) - (20+38.87 -L-) (8035000000-N) | LS | 1 | $900,000 | $700,000 | $1,080,558 | $690,000 | $750,000 | $900,000 |
| 0158 | Asbestos assessment (8065000000-N) | LS | 1 | $10,001 | $1,400.00 | $3,300.00 | $1,092.11 | $1,200.00 | $3,500.00 |
| 0159 | **'-**" dia drilld piers - (4'-6") (8108000000-E) | LF | 835.30 | $1,100.00 | $1,460.00 | $1,520.00 | $1,723.03 | $1,100.00 | $1,200.00 |
| 0160 | Perm STL casing for ** pier - (4'-6") (8111000000-E) | LF | 176.30 | $700.00 | $710.00 | $891.00 | $965.14 | $800.00 | $430.00 |
| 0161 | Sid inspections (8113000000-N) | EACH | 9 | $1,000.00 | $1,010.10 | $11,000 | $5,515.12 | $1,100.00 | $1,000.00 |
| 0162 | CSL testing (8115000000-N) | EACH | 9 | $4,000.00 | $14,000 | $3,675.00 | $1,378.79 | $8,200.00 | $3,000.00 |
| 0163 | Uncl STR excav sta ***** - (20+38.87 -L-) (8121000000-N) | LS | 1 | $15,000 | $55,500 | $50,000 | $22,838 | $138,500 | $120,000 |
| 0164 | Reinforced concrete deck slab (8147000000-E) | SF | 25,598 | $80.00 | $60.00 | $56.00 | $50.46 | $57.75 | $75.00 |
| 0165 | Grooving bridge floors (8161000000-E) | SF | 17,665 | $0.82 | $0.50 | $0.55 | $0.49 | $0.55 | $0.34 |
| 0166 | Class A concrete (bridge) (8182000000-E) | CY | 357.70 | $1,500.00 | $2,125.00 | $1,571.00 | $1,561.46 | $2,100.00 | $3,100.00 |
| 0167 | BRG appr slab *********** - (20+38.87 -L-) (8210000000-N) | LS | 1 | $200,000 | $110,000 | $140,200 | $118,465 | $121,300 | $160,000 |
| 0168 | Reinforcing steel (bridge) (8217000000-E) | LB | 137,240 | $2.30 | $2.00 | $2.20 | $1.59 | $1.55 | $2.00 |
| 0169 | Spiral column reinforcing steel (bridge) (8238000000-E) | LB | 28,969 | $4.00 | $3.00 | $3.45 | $2.47 | $2.85 | $4.50 |
| 0170 | Pile DRV equip setup ** steel piles - (HP 14 X 73) (8328200000-E) | EACH | 19 | $500.00 | $980.00 | $2,500.00 | $10,000 | $840.00 | $2,500.00 |
| 0171 | HP 14 X 73 steel piles (8384000000-E) | LF | 655 | $60.00 | $170.00 | $250.00 | $108.75 | $173.02 | $120.00 |
| 0172 | Predrilling for piles (8392500000-E) | LF | 441 | $350.00 | $360.00 | $500.00 | $482.57 | $425.00 | $275.00 |
| 0173 | Rip rap class II (2'-0" thick) (8608000000-E) | TON | 805 | $50.00 | $95.00 | $61.00 | $91.27 | $114.00 | $5.50 |
| 0174 | Geotextile for drainage (8622000000-E) | SY | 895 | $4.00 | $5.00 | $10.00 | $3.32 | $6.80 | $6.00 |
| 0175 | Elastomeric bearings (8657000000-N) | LS | 1 | $30,000 | $93,000 | $21,770 | $65,671 | $73,400 | $50,000 |
| 0176 | Generic structure item (LS) - strip seal expansion joints (8860000000-N) | LS | 1 | $125,000 | $115,000 | $138,420 | $71,603 | $120,000 | $150,000 |
| 0177 | Generic structure item (LF) - classic concrete bridge rail (8867000000-E) | LF | 1,223.58 | $500.00 | $750.00 | $544.00 | $650.00 | $650.00 | $700.00 |
| 0178 | Generic structure item (LF) - concrete parapet with moment slab (8867000000-E) | LF | 390.48 | $1,100.00 | $1,380.00 | $600.00 | $1,200.00 | $1,100.00 | $2,000.00 |
| 0179 | Generic structure item (LF) - modified 74" prestressed concrete girders (8867000000-E) | LF | 2,793.33 | $750.00 | $660.00 | $450.00 | $700.00 | $670.00 | $550.00 |
| 0180 | Generic structure item (EA) - drilled pier pilot boring (8897000000-N) | EACH | 6 | $14,000 | $9,565.00 | $19,820 | $18,372 | $9,100.00 | $10,500 |
| 0181 | Generic structure item (EA) - sonic caliper testing (8897000000-N) | EACH | 9 | $4,800.00 | $4,848.48 | $5,280.00 | $6,618.14 | $5,500.00 | $4,250.00 |
| 0182 | Generic structure item (EA) - thermal integrity profiler (8897000000-N) | EACH | 9 | $2,500.00 | $2,525.25 | $2,750.00 | $3,446.94 | $2,900.00 | $10,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
Every contract let that day: NCDOT letting of March 18, 2025. Compiled by Mirage Metrics.