NCDOT contract C205207 bid tabulation

GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #700037 OVER ANGOLA CREEK ON NC-53. Let by North Carolina DOT on October 20, 2026, Pender. 5 bids received; low bid $6,409,381 by S T Wooten Corporation.

Owner
North Carolina DOT
Letting
20 OCT 2026
Pay items
117
Data through
20 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1S T Wooten Corporation$6,409,381Low
2Smith-Rowe, LLC$6,997,361+9.0%
3Conti Civil LLC$7,842,442+22%
4S & C Construction LLC$7,891,812+23%
5Caton Construction Group Inc$11,463,280+79%
NCDOT contract C205207: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. S T Wooten Corporation2. Smith-Rowe, LLC3. Conti Civil LLC4. S & C Construction LLC5. Caton Construction Group Inc
0001Mobilization (0000100000-N)LS1$320,000$349,850$390,000$375,000$543,800
0002Construction surveying (0000400000-N)LS1$50,000$50,000$100,000$44,800$59,555
0003Supplementary clearing & grubbing (0050000000-E)ACRE1$1.00$530.00$20,000$1.00$27,200
0004Undercut excavation (0057000000-E)CY300$5.00$27.50$25.00$1.00$30.41
0005Grading (0063000000-N)LS1$927,000$522,685$582,606$840,000$675,038
0006Borrow excavation (0106000000-E)CY19,400$5.00$0.01$0.01$16.80$79.02
0007Select granular material (0195000000-E)CY300$10.00$44.50$45.00$1.00$196.49
0008Geotextile for soil stabilization (0196000000-E)SY300$1.00$3.00$4.25$1.00$7.40
0009Temporary shoring (0199000000-E)SF1,260$50.00$101.25$33.00$67.20$89.96
0010Rock plating (0223000000-E)SY2,445$137.00$115.00$170.00$103.04$154.32
0011Generic grading item (SY) - modified reinforced soil slopes (0241000000-E)SY2,520$31.00$18.85$3.75$84.00$43.66
0012Generic grading item (LS) - type 1 bridge approach fill, station 19+84.00 -L- (0248000000-N)LS1$62,000$64,900$50,000$67,200$91,313
0013Foundation conditioning material, minor structures (0318000000-E)TON10$75.00$82.25$100.00$1.00$168.76
0014FND condit geotextile (4A) (0321000000-E)SY30$2.00$3.00$5.00$1.00$10.92
001515" drainage pipe (0335200000-E)LF80$160.00$80.45$100.00$38.08$167.19
0016**" drainage pipe elbow - (15") (0335850000-E)EACH6$600.00$550.00$545.00$168.00$229.70
0017Aggregate base course (1121000000-E)TON1,678$76.00$61.15$81.00$63.84$92.90
0018Mill asp PVMT *****" DTH - (2-1/2") (1297000000-E)SY870$13.00$11.85$9.85$7.28$11.97
0019Asphalt conc base course, type B25.0C (1491000000-E)TON1,130$128.00$84.60$89.00$108.36$85.45
0020Asphalt conc intermediate course, type I19.0C (1503000000-E)TON1,250$120.00$84.60$89.00$108.36$85.45
0021Asphalt conc surface course, type S9.5C (1523000000-E)TON1,990$115.00$82.20$87.00$112.00$83.03
0022Asphalt binder for plant mix (1575000000-E)TON230$600.00$895.00$895.00$762.50$904.04
0023Generic paving item (LF) - sinusoidal milled rumble strips, (6") (1881000000-E)LF4,550$4.50$4.91$2.10$3.53$4.70
0024Right-of-way markers (2000000000-N)EACH4$500.00$300.00$315.00$280.00$410.69
0025Subdrain excavation (2022000000-E)CY44.80$4.00$8.00$70.00$1.00$96.46
0026Geotextile for subsurface drains (2026000000-E)SY200$1.00$3.00$1.50$1.00$14.23
0027Subdrain coarse aggregate (2036000000-E)CY33.60$10.00$106.00$135.00$1.00$268.53
00286" perforated subdrain pipe (2044000000-E)LF200$5.00$3.00$11.00$1.00$53.52
0029Subdrain pipe outlet (2070000000-N)EACH1$40.00$285.00$525.00$1.00$3,586.85
00306" outlet pipe (2077000000-E)LF6$5.00$4.50$39.00$1.00$131.67
0031Masonry drainage structures (2286000000-N)EACH3$5,200.00$3,265.00$3,225.00$2,688.00$9,469.07
0032Frame with two grates, STD 840.29 (2367000000-N)EACH3$1,150.00$1,180.00$1,820.00$1,120.00$1,498.44
0033Shoulder berm gutter (2556000000-E)LF300$65.00$55.00$46.00$56.00$68.00
0034Steel beam guardrail (3030000000-E)LF900$27.00$27.00$27.30$30.24$27.00
0035EX length GR post ** STL - (8') (3145000000-E)EACH150$33.00$33.00$105.00$36.96$33.00
0036Guardrail end units, type TL-3 (3287000000-N)EACH4$3,250.00$3,250.00$3,150.00$3,640.00$3,250.00
0037Guardrail anchor units, type B-77 (3317000000-N)EACH4$2,640.00$2,640.00$3,150.00$2,956.80$2,640.00
0038Temporary steel beam guardrail (3380000000-E)LF950$8.00$8.00$12.08$8.96$8.00
0039Temp GDRL anch units ****** - (III) (3387000000-N)EACH4$1,200.00$1,200.00$1,601.25$1,344.00$1,200.00
0040Temp GDRL end units ***** - (TL-3) (3389150000-N)EACH4$1,750.00$1,750.00$1,575.00$1,960.00$1,750.00
0041Temporary additional guardrail posts (3389160000-N)EACH5$1.00$1.00$21.57$1.00$1.00
0042Rip rap, class II (3635000000-E)TON270$135.00$124.10$115.00$95.20$161.68
0043Rip rap, class B (3649000000-E)TON5$190.00$126.00$135.00$112.00$339.09
0044Geotextile for drainage (3656000000-E)SY820$1.00$3.00$3.50$2.24$8.16
0045Disposal of sign system, U-channel (4155000000-N)EACH6$50.00$100.00$5.25$56.00$25.00
0046Work zone signs (stationary) (4400000000-E)SF152$8.25$15.00$9.00$9.24$8.50
0047Work zone signs (portable) (4405000000-E)SF96$60.00$25.68$28.00$11.20$16.00
0048Work zone signs (barricade mounted) (4410000000-E)SF36$8.25$7.00$10.50$9.24$10.00
0049Portable changeable message sign (short term) (4422000000-N)DAY40$175.00$123.15$110.00$67.20$75.67
0050Drums (4430000000-N)EACH70$100.00$61.00$65.00$51.52$45.40
0051Cones (4435000000-N)EACH40$53.00$0.01$38.00$29.12$26.23
0052Barricades (type III) (4445000000-E)LF32$20.00$25.00$33.60$22.40$32.29
0053Flagger (4455000000-N)DAY240$460.00$505.00$590.00$392.00$567.04
0054Temporary crash cushions (4465000000-N)EACH1$5,950.00$1.00$8,400.00$6,664.00$8,071.75
0055Tubular markers (fixed) (4520000000-N)EACH50$150.00$150.00$157.50$117.60$175.00
0056Temporary raised pavement markers (4650000000-N)EACH150$15.00$15.00$15.75$16.80$10.00
0057Thermoplastic pavement marking lines (6", 90 mils) (4688000000-E)LF9,950$1.25$1.25$1.31$1.40$1.80
0058Paint pavement marking lines (4") (4810000000-E)LF36,690$0.25$0.25$0.26$0.28$0.35
0059Removal of pavement marking lines (4") (4850000000-E)LF6,950$0.50$0.50$0.53$0.56$1.30
0060Generic PVMT marking item (LF) 1205 - integrated multipolymer pavement marking lines (6", 90 mils) (4891000000-E)LF505$3.00$3.00$3.15$3.36$8.00
0061Generic pavement marking item (EA) - polycarbonate H-shaped markers (4895000000-N)EACH22$150.00$150.00$157.50$168.00$375.00
0062Permanent raised pavement markers (4900000000-N)EACH2$15.00$15.00$15.75$16.80$10.00
0063Temporary silt fence (6000000000-E)LF5,585$3.35$2.25$4.00$3.08$2.85
0064Stone for erosion control, class A (6006000000-E)TON75$20.00$102.55$139.00$1.00$146.36
0065Stone for erosion control, class B (6009000000-E)TON440$25.00$94.10$146.00$1.00$157.60
0066Sediment control stone (6012000000-E)TON275$15.00$75.25$121.00$1.00$133.13
0067Temporary mulching (6015000000-E)ACRE4.80$850.00$1,000.00$1,680.00$1.00$2,500.00
0068Seed for temporary seeding (6018000000-E)LB300$4.00$6.00$2.10$4.48$3.00
0069Fertilizer for temporary seeding (6021000000-E)TON1.50$825.00$2,150.00$945.00$1.00$500.00
0070Temporary slope drains (6024000000-E)LF1,115$1.00$11.00$33.00$1.00$64.68
0071Safety fence (6029000000-E)LF3,860$2.75$1.80$3.50$2.35$1.85
0072Silt excavation (6030000000-E)CY740$10.00$12.50$24.00$1.00$42.04
0073Matting for erosion control (6036000000-E)SY11,700$3.00$1.90$1.79$2.74$1.90
0074Coir fiber mat (6037000000-E)SY1,000$7.40$8.00$6.30$7.84$5.75
00751/4" hardware cloth (6042000000-E)LF145$6.00$6.00$6.56$4.48$6.00
0076Floating turbidity curtain (6048000000-E)SY100$55.00$51.25$75.00$28.00$91.29
0077Special stilling basins (6070000000-N)EACH4$700.00$100.00$450.00$560.00$3,928.78
0078Flocculant (6071002000-E)LB95$1.00$21.00$5.78$1.12$9.00
0079Wattle (6071010000-E)LF560$9.25$5.00$8.40$6.72$12.00
0080Coir fiber wattle (6071012000-E)LF230$17.50$8.00$9.45$8.96$14.00
0081Seeding and mulching (6084000000-E)ACRE4.80$2,800.00$2,625.00$2,835.00$3,220.00$3,400.00
0082Mowing (6087000000-E)ACRE2.40$25.00$85.00$315.00$1.00$200.00
0083Seed for repair seeding (6090000000-E)LB50$1.00$9.00$4.99$10.64$5.00
0084Fertilizer for repair seeding (6093000000-E)TON0.25$500.00$2,560.00$1,155.00$2,408.00$500.00
0085Seed for supplemental seeding (6096000000-E)LB175$1.00$8.00$4.99$8.96$5.00
0086Fertilizer topdressing (6108000000-E)TON5$50.00$2,650.00$997.50$2,408.00$500.00
0087Specialized hand mowing (6114500000-N)MHR10$90.00$30.00$168.00$1.00$60.00
0088Manual litter removal (6114800000-N)MHR2$90.00$122.20$168.00$112.00$55.00
0089Litter disposal (6114900000-E)TON1$100.00$500.00$210.00$112.00$300.00
0090Response for erosion control (6117000000-N)EACH18$160.00$500.00$210.00$224.00$500.00
0091Concrete washout structure (6117500000-N)EACH1$1,500.00$1,000.00$1,400.00$1,120.00$550.00
0092Wetland reforestation (6129000000-E)ACRE0.33$2,500.00$3,150.00$3,675.00$5,600.00$5,000.00
0093Generic erosion control item (EA) - prefabricated concrete washout (6132000000-N)EACH2$1,500.00$1,650.00$1,800.00$1,120.00$700.00
0094Generic erosion control item (acr) - disking (6135000000-E)ACRE0.33$500.00$2,100.00$7,300.00$5,600.00$2,700.00
0095Generic erosion control item (acr) - ripping (6135000000-E)ACRE0.33$500.00$3,100.00$7,300.00$5,600.00$2,700.00
0096CM&R temp STR *********** - (19+84.00 -L-) (8007000000-N)LS1$1,000,000$2,651,898$2,400,000$2,800,000$3,210,974
0097CM&R temp access *********** - (19+84.00 -L-) (8017000000-N)LS1$25,000$52,190$500,000$168,000$966,338
0098Remv exist STR ****** BRG (402) - (19+84.00 -L-) (8035000000-N)LS1$200,000$104,673$300,000$140,000$257,000
0099Asbestos assessment (8065000000-N)LS1$2,000.00$1,670.86$1,365.00$3,360.00$1,300.00
0100Uncl STR excav sta ***** - (19+84.00 -L-) (8121000000-N)LS1$80,000$12,700$25,000$22,400$33,389
0101Reinforced concrete deck slab (8147000000-E)SF6,016$90.00$80.02$60.00$62.44$83.23
0102Grooving bridge floors (8161000000-E)SF6,708$1.00$1.83$2.72$1.23$1.11
0103Class A concrete (bridge) (8182000000-E)CY100$2,500.00$1,449.37$2,200.00$1,388.80$2,134.32
0104BRG appr slab *********** - (19+84.00 -L-) (8210000000-N)LS1$100,000$76,000$100,000$89,600$79,090
0105Reinforcing steel (bridge) (8217000000-E)LB12,890$2.00$1.94$2.00$1.51$2.02
0106Fib **" prestr conc girdr - (36") (8278000000-E)LF757.97$550.00$468.67$470.00$444.64$509.31
0107Pile DRV equip setup ** steel piles - (HP 12 X 53) (8328200000-E)EACH16$2,000.00$993.43$2,150.00$2,184.00$1,106.29
0108Pile DRV equip setup ** galv steel piles - (HP 14 X 73) (8328400000-E)EACH9$5,000.00$2,063.59$2,200.00$3,248.00$1,065.69
0109HP 12 X 53 steel piles (8364000000-E)LF640$100.00$71.30$118.00$67.20$183.94
0110HP 14 X 73 galvanized steel piles (8384200000-E)LF540$160.00$112.74$195.00$117.60$223.01
0111Predrilling for piles (8392500000-E)LF338.70$310.00$253.14$220.00$236.32$300.00
0112Pile redrives (8393000000-N)EACH12$50.00$1.00$880.00$1.00$3,668.64
0113Dynamic pile testing (8394000000-N)EACH2$5,000.00$1.00$1,995.00$3,360.00$8,014.41
0114Concrete barrier rail (8503000000-E)LF306.54$250.00$175.54$175.00$196.00$184.42
0115Rip rap class II (2'-0" thick) (8608000000-E)TON540$125.00$131.60$105.00$95.20$159.51
0116Geotextile for drainage (8622000000-E)SY600$1.00$5.20$3.50$2.24$17.18
0117Elastomeric bearings (8657000000-N)LS1$20,000$9,750.00$45,000$8,960.00$33,686
NCDOT contract C205207: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.

Every contract let that day: NCDOT letting of October 20, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy