NCDOT contract C204832 bid tabulation
GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #630036 OVER FISHING CREEK ON NC-561. Let by North Carolina DOT on August 19, 2025, Nash, Halifax. 7 bids received; low bid $4,253,880 by S T Wooten Corporation.
- Owner
- North Carolina DOT
- Letting
- 19 AUG 2025
- Pay items
- 115
- Data through
- 20 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | S T Wooten Corporation | $4,253,880 | Low |
| 2 | Sanford Contractors Inc | $4,263,300 | 0.0% |
| 3 | FSC II LLC DBA Fred Smith Company | $5,737,575 | +35% |
| 4 | Blythe Construction Inc | $5,984,735 | +41% |
| 5 | Conti Civil LLC | $5,993,442 | +41% |
| 6 | W C English Incorporated | $6,445,688 | +52% |
| 7 | Caton Construction Group Inc | $8,627,900 | +103% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. S T Wooten Corporation | 2. Sanford Contractors Inc | 3. FSC II LLC DBA Fred Smith Company | 4. Blythe Construction Inc | 5. Conti Civil LLC | 6. W C English Incorporated |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Mobilization (0000100000-N) | LS | 1 | $210,000 | $213,165 | $280,000 | $295,000 | $295,000 | $322,000 |
| 0002 | Construction surveying (0000400000-N) | LS | 1 | $30,000 | $44,000 | $32,500 | $200,000 | $82,000 | $93,320 |
| 0003 | Clearing & grubbing (0001000000-E) | LS | 1 | $165,000 | $385,000 | $200,000 | $45,000 | $894,174 | $171,500 |
| 0004 | Supplementary clearing & grubbing (0008000000-E) | ACRE | 1 | $1.00 | $0.01 | $1.00 | $10,000 | $500.00 | $300.00 |
| 0005 | Unclassified excavation (0022000000-E) | CY | 10,500 | $17.25 | $0.01 | $32.00 | $35.00 | $30.00 | $23.20 |
| 0006 | Undercut excavation (0036000000-E) | CY | 200 | $31.00 | $15.00 | $12.00 | $30.50 | $31.00 | $18.50 |
| 0007 | Borrow excavation (0106000000-E) | CY | 20,000 | $15.00 | $0.01 | $20.00 | $37.00 | $22.00 | $25.25 |
| 0008 | Drainage ditch excavation (0134000000-E) | CY | 900 | $25.00 | $10.78 | $7.00 | $17.00 | $10.00 | $35.30 |
| 0009 | Removal of existing asphalt pavement (0156000000-E) | SY | 2,630 | $7.55 | $16.90 | $15.00 | $7.00 | $15.00 | $14.50 |
| 0010 | Select granular material (0195000000-E) | CY | 200 | $61.00 | $32.74 | $35.00 | $83.50 | $18.50 | $69.00 |
| 0011 | Geotextile for soil stabilization (0196000000-E) | SY | 300 | $10.00 | $5.00 | $5.00 | $4.50 | $3.50 | $7.00 |
| 0012 | Temporary shoring (0199000000-E) | SF | 245 | $160.00 | $21.19 | $100.00 | $240.00 | $150.00 | $148.00 |
| 0013 | Generic grading item (LS) - type 1 bridge approach fill, station 16+54.00 -L- (0248000000-N) | LS | 1 | $75,000 | $60,000 | $50,000 | $40,750 | $28,000 | $28,140 |
| 0014 | Foundation conditioning material, minor structures (0318000000-E) | TON | 20 | $75.00 | $35.15 | $50.00 | $52.50 | $65.00 | $70.84 |
| 0015 | FND condit geotextile (4A) (0321000000-E) | SY | 60 | $5.00 | $3.75 | $4.00 | $4.50 | $2.20 | $7.00 |
| 0016 | 15" drainage pipe (0335200000-E) | LF | 104 | $170.00 | $47.18 | $56.00 | $70.00 | $78.00 | $75.00 |
| 0017 | **" drainage pipe elbow - (15") (0335850000-E) | EACH | 4 | $825.00 | $374.50 | $375.00 | $475.00 | $650.00 | $394.50 |
| 0018 | 15" RC pipe culverts, class IV (0448200000-E) | LF | 64 | $170.00 | $85.08 | $110.00 | $105.00 | $150.00 | $100.50 |
| 0019 | Fine grading (1011000000-N) | LS | 1 | $125,000 | $386,000 | $60,000 | $120,000 | $35,000 | $110,534 |
| 0020 | Shallow undercut (1099500000-E) | CY | 100 | $35.00 | $10.00 | $45.00 | $20.50 | $25.00 | $47.00 |
| 0021 | Class IV subgrade stabilization (1099700000-E) | TON | 200 | $37.00 | $23.65 | $38.00 | $37.25 | $40.00 | $41.00 |
| 0022 | Geotextile for subgrade stabilization (1112000000-E) | SY | 300 | $10.00 | $3.75 | $5.00 | $4.50 | $3.50 | $7.00 |
| 0023 | Incidental stone base (1220000000-E) | TON | 50 | $40.00 | $23.65 | $45.00 | $45.00 | $84.00 | $58.00 |
| 0024 | Mill asp PVMT *****" DTH - (1-1/2") (1297000000-E) | SY | 790 | $7.75 | $13.00 | $15.00 | $15.00 | $7.30 | $13.65 |
| 0025 | Incidental milling (1330000000-E) | SY | 300 | $13.75 | $18.00 | $25.00 | $25.25 | $13.60 | $18.90 |
| 0026 | Asphalt conc base course, type B25.0C (1491000000-E) | TON | 760 | $91.00 | $130.00 | $95.00 | $100.00 | $105.00 | $136.50 |
| 0027 | Asphalt conc intermediate course, type I19.0C (1503000000-E) | TON | 305 | $102.00 | $130.00 | $110.00 | $110.00 | $115.50 | $136.50 |
| 0028 | Asphalt conc surface course, type S9.5B (1519000000-E) | TON | 340 | $96.00 | $134.00 | $90.00 | $90.00 | $94.50 | $140.70 |
| 0029 | Asphalt conc surface course, type S9.5C (1523000000-E) | TON | 420 | $87.00 | $134.00 | $110.00 | $112.00 | $117.60 | $140.70 |
| 0030 | Asphalt binder for plant mix (1575000000-E) | TON | 100 | $500.00 | $520.00 | $675.00 | $680.00 | $714.00 | $546.00 |
| 0031 | Masonry drainage structures (2286000000-N) | EACH | 4 | $5,000.00 | $4,100.00 | $3,700.00 | $2,500.00 | $2,600.00 | $5,715.00 |
| 0032 | Frame with two grates, STD 840.29 (2367000000-N) | EACH | 4 | $1,175.00 | $600.00 | $1,000.00 | $1,200.00 | $1,500.00 | $2,341.00 |
| 0033 | Shoulder berm gutter (2556000000-E) | LF | 112 | $68.50 | $235.00 | $68.50 | $60.00 | $77.00 | $41.64 |
| 0034 | Steel beam guardrail (3030000000-E) | LF | 625 | $23.00 | $23.00 | $23.00 | $23.00 | $24.15 | $25.30 |
| 0035 | Additional guardrail posts (3150000000-N) | EACH | 10 | $11.00 | $11.00 | $11.00 | $11.00 | $11.55 | $12.10 |
| 0036 | Guardrail end units, type TL-3 (3287000000-N) | EACH | 4 | $3,250.00 | $3,250.00 | $3,250.00 | $3,250.00 | $3,412.50 | $3,575.00 |
| 0037 | Guardrail anchor units, type B-77 (3317000000-N) | EACH | 4 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 | $2,625.00 | $2,750.00 |
| 0038 | Remove existing guardrail (3360000000-E) | LF | 104 | $1.00 | $1.00 | $1.00 | $1.00 | $1.05 | $5.00 |
| 0039 | Temporary steel beam guardrail (3380000000-E) | LF | 1,150 | $8.00 | $8.00 | $8.00 | $8.00 | $8.40 | $8.80 |
| 0040 | Temp GDRL anch units ****** - (III) (3387000000-N) | EACH | 4 | $950.00 | $950.00 | $950.00 | $950.00 | $997.50 | $1,045.00 |
| 0041 | Temp GDRL end units ***** - (TL-3) (3389150000-N) | EACH | 6 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,100.00 | $2,200.00 |
| 0042 | Temporary additional guardrail posts (3389160000-N) | EACH | 5 | $1.00 | $1.00 | $1.00 | $1.00 | $1.05 | $1.10 |
| 0043 | Rip rap, class II (3635000000-E) | TON | 650 | $85.00 | $48.15 | $25.00 | $0.01 | $0.01 | $77.00 |
| 0044 | Rip rap, class B (3649000000-E) | TON | 4 | $160.00 | $40.15 | $140.00 | $60.00 | $150.00 | $231.50 |
| 0045 | Geotextile for drainage (3656000000-E) | SY | 1,635 | $4.00 | $3.75 | $1.00 | $4.50 | $2.82 | $5.50 |
| 0046 | Supports, 3-LB steel U-channel (4072000000-E) | LF | 68 | $12.00 | $12.00 | $8.00 | $6.90 | $8.03 | $8.42 |
| 0047 | Sign erection, type D (4096000000-N) | EACH | 2 | $200.00 | $200.00 | $321.00 | $300.00 | $304.50 | $319.00 |
| 0048 | Disposal of sign system, U-channel (4155000000-N) | EACH | 6 | $2.00 | $2.00 | $10.00 | $10.00 | $15.75 | $16.50 |
| 0049 | Work zone signs (stationary) (4400000000-E) | SF | 74 | $25.00 | $25.00 | $25.00 | $24.32 | $16.80 | $17.60 |
| 0050 | Work zone signs (portable) (4405000000-E) | SF | 96 | $53.94 | $15.00 | $25.00 | $8.45 | $15.40 | $9.52 |
| 0051 | Work zone signs (barricade mounted) (4410000000-E) | SF | 36 | $8.75 | $8.75 | $10.00 | $8.25 | $9.40 | $9.85 |
| 0052 | Drums (4430000000-N) | EACH | 50 | $60.00 | $47.00 | $20.00 | $50.00 | $60.00 | $58.00 |
| 0053 | Barricades (type III) (4445000000-E) | LF | 64 | $30.00 | $30.00 | $25.00 | $23.00 | $26.25 | $71.50 |
| 0054 | Flagger (4455000000-N) | DAY | 150 | $525.00 | $0.01 | $700.00 | $328.00 | $600.00 | $863.50 |
| 0055 | Temporary raised pavement markers (4650000000-N) | EACH | 57 | $7.50 | $7.50 | $20.00 | $20.00 | $7.88 | $22.00 |
| 0056 | Paint pavement marking lines (4") (4810000000-E) | LF | 11,805 | $0.45 | $0.45 | $0.85 | $0.85 | $0.47 | $0.94 |
| 0057 | Removal of pavement marking lines (4") (4850000000-E) | LF | 4,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.05 | $1.10 |
| 0058 | Generic pavement marking item (LF) - integrated multipolymer pavement marking lines, (6", 90 mils) (4890000000-E) | LF | 3,520 | $3.00 | $3.00 | $3.00 | $3.00 | $3.15 | $3.30 |
| 0059 | Generic pavement marking item (EA) - polycarbonate H-shaped markers (4895000000-N) | EACH | 6 | $65.00 | $65.00 | $350.00 | $350.00 | $68.25 | $385.00 |
| 0060 | Permanent raised pavement markers (4900000000-N) | EACH | 3 | $7.50 | $7.50 | $50.00 | $50.00 | $7.88 | $55.00 |
| 0061 | Temporary silt fence (6000000000-E) | LF | 3,900 | $2.90 | $3.50 | $2.50 | $2.90 | $3.50 | $3.20 |
| 0062 | Stone for erosion control, class A (6006000000-E) | TON | 150 | $55.00 | $0.01 | $50.00 | $60.00 | $72.00 | $73.00 |
| 0063 | Stone for erosion control, class B (6009000000-E) | TON | 370 | $75.00 | $0.01 | $40.00 | $60.00 | $80.00 | $79.00 |
| 0064 | Sediment control stone (6012000000-E) | TON | 455 | $35.00 | $0.01 | $35.00 | $55.00 | $74.00 | $76.00 |
| 0065 | Temporary mulching (6015000000-E) | ACRE | 7 | $1,700.00 | $0.01 | $1,000.00 | $1,700.00 | $1,785.00 | $1,870.00 |
| 0066 | Seed for temporary seeding (6018000000-E) | LB | 500 | $2.50 | $0.01 | $1.00 | $2.50 | $2.63 | $2.75 |
| 0067 | Fertilizer for temporary seeding (6021000000-E) | TON | 3 | $950.00 | $0.01 | $100.00 | $950.00 | $997.50 | $1,045.00 |
| 0068 | Temporary slope drains (6024000000-E) | LF | 1,125 | $20.00 | $0.01 | $10.00 | $18.50 | $27.00 | $20.00 |
| 0069 | Safety fence (6029000000-E) | LF | 460 | $3.00 | $3.00 | $2.00 | $3.00 | $3.57 | $3.30 |
| 0070 | Silt excavation (6030000000-E) | CY | 1,100 | $5.00 | $0.01 | $10.00 | $25.00 | $15.00 | $0.02 |
| 0071 | Matting for erosion control (6036000000-E) | SY | 16,000 | $1.70 | $0.01 | $1.50 | $1.70 | $1.79 | $1.87 |
| 0072 | Coir fiber mat (6037000000-E) | SY | 855 | $6.00 | $6.00 | $7.00 | $6.00 | $6.30 | $6.60 |
| 0073 | 1/4" hardware cloth (6042000000-E) | LF | 770 | $5.00 | $4.00 | $5.00 | $5.00 | $5.43 | $5.50 |
| 0074 | Low permeability geotextile (6043000000-E) | SY | 100 | $5.00 | $8.00 | $25.00 | $6.00 | $6.30 | $5.69 |
| 0075 | Special stilling basins (6070000000-N) | EACH | 8 | $650.00 | $1.00 | $150.00 | $650.00 | $350.00 | $2,868.79 |
| 0076 | Flocculant (6071002000-E) | LB | 120 | $4.50 | $25.00 | $4.00 | $4.50 | $4.73 | $4.95 |
| 0077 | Coir fiber wattle (6071012000-E) | LF | 360 | $9.00 | $15.00 | $15.00 | $9.00 | $9.45 | $9.90 |
| 0078 | Coir fiber baffle (6071030000-E) | LF | 225 | $8.00 | $15.00 | $7.00 | $8.00 | $8.40 | $8.80 |
| 0079 | **" skimmer - (1-1/2") (6071050000-E) | EACH | 3 | $4,500.00 | $800.00 | $3,000.00 | $2,000.00 | $2,000.00 | $1,265.00 |
| 0080 | Seeding and mulching (6084000000-E) | ACRE | 7 | $2,600.00 | $0.01 | $2,000.00 | $2,600.00 | $2,730.00 | $2,860.00 |
| 0081 | Mowing (6087000000-E) | ACRE | 3.50 | $225.00 | $300.00 | $175.00 | $225.00 | $236.25 | $247.50 |
| 0082 | Seed for repair seeding (6090000000-E) | LB | 100 | $4.00 | $5.00 | $4.00 | $4.00 | $4.20 | $4.40 |
| 0083 | Fertilizer for repair seeding (6093000000-E) | TON | 0.25 | $1,200.00 | $1,100.00 | $600.00 | $1,200.00 | $1,260.00 | $1,320.00 |
| 0084 | Seed for supplemental seeding (6096000000-E) | LB | 225 | $4.00 | $5.00 | $4.00 | $4.00 | $4.20 | $4.40 |
| 0085 | Fertilizer topdressing (6108000000-E) | TON | 6.25 | $950.00 | $1,100.00 | $400.00 | $950.00 | $997.50 | $1,045.00 |
| 0086 | Specialized hand mowing (6114500000-N) | MHR | 10 | $175.00 | $80.00 | $120.00 | $175.00 | $183.75 | $192.50 |
| 0087 | Manual litter removal (6114800000-N) | MHR | 2 | $175.00 | $200.00 | $55.00 | $97.00 | $183.75 | $192.50 |
| 0088 | Litter disposal (6114900000-E) | TON | 1 | $200.00 | $200.00 | $300.00 | $750.00 | $210.00 | $220.00 |
| 0089 | Response for erosion control (6117000000-N) | EACH | 18 | $450.00 | $0.01 | $100.00 | $450.00 | $472.50 | $495.00 |
| 0090 | Concrete washout structure (6117500000-N) | EACH | 1 | $1,500.00 | $321.00 | $750.00 | $675.00 | $950.00 | $3,866.50 |
| 0091 | Reforestation (6123000000-E) | ACRE | 1.50 | $2,500.00 | $4,000.00 | $1,500.00 | $2,500.00 | $2,625.00 | $2,750.00 |
| 0092 | Generic erosion control item (EA) - prefabricated concrete washout (6132000000-N) | EACH | 6 | $1,500.00 | $535.00 | $800.00 | $500.00 | $525.00 | $3,800.00 |
| 0093 | CM&R temp STR *********** - (16+53.50 -ldet-) (8007000000-N) | LS | 1 | $640,000 | $689,219 | $1,690,000 | $1,000,000 | $900,000 | $1,318,000 |
| 0094 | CM&R temp access *********** - (16+54.00 -L-) (8017000000-N) | LS | 1 | $20,000 | $75,000 | $100,000 | $210,000 | $150,000 | $100,000 |
| 0095 | Remv exist STR ****** BRG (402) - (16+54.00 -L-) (8035000000-N) | LS | 1 | $139,892 | $250,000 | $200,000 | $130,000 | $400,000 | $362,000 |
| 0096 | Asbestos assessment (8065000000-N) | LS | 1 | $1,000.00 | $2,500.00 | $1,295.55 | $800.00 | $1,365.00 | $1,430.00 |
| 0097 | 3'-6" dia drilled piers in soil (8105540000-E) | LF | 128 | $985.00 | $723.25 | $800.00 | $864.21 | $1,000.00 | $2,000.00 |
| 0098 | 3'-6" dia drilled piers not in soil (8105640000-E) | LF | 46 | $985.00 | $723.25 | $800.00 | $1,150.06 | $1,100.00 | $2,000.00 |
| 0099 | Permanent steel casing for 3'-6" dia drilled pier (8111400000-E) | LF | 75 | $200.00 | $200.00 | $250.00 | $200.00 | $210.00 | $430.00 |
| 0100 | Sid inspections (8113000000-N) | EACH | 2 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $2,625.00 | $573.00 |
| 0101 | CSL testing (8115000000-N) | EACH | 2 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 | $1,050.00 | $1,145.00 |
| 0102 | Uncl STR excav sta ***** - (16+54.00 -L-) (8121000000-N) | LS | 1 | $50,000 | $10,000 | $65,000 | $40,000 | $20,000 | $47,000 |
| 0103 | Reinforced concrete deck slab (8147000000-E) | SF | 8,177 | $51.00 | $56.00 | $65.00 | $60.00 | $55.00 | $67.00 |
| 0104 | Grooving bridge floors (8161000000-E) | SF | 7,788 | $0.52 | $1.08 | $1.00 | $1.50 | $0.84 | $1.25 |
| 0105 | Class A concrete (bridge) (8182000000-E) | CY | 105.40 | $1,350.00 | $2,100.00 | $1,500.00 | $1,550.00 | $1,850.00 | $2,910.00 |
| 0106 | BRG appr slab *********** - (16+54.00 -L-) (8210000000-N) | LS | 1 | $50,000 | $70,000 | $45,000 | $54,000 | $50,000 | $51,000 |
| 0107 | Reinforcing steel (bridge) (8217000000-E) | LB | 34,901 | $1.50 | $1.00 | $2.00 | $5.00 | $1.72 | $1.30 |
| 0108 | Spiral column reinforcing steel (bridge) (8238000000-E) | LB | 4,555 | $3.00 | $2.20 | $3.50 | $6.00 | $3.45 | $2.70 |
| 0109 | Fib **" prestr conc girdr - (45") (8278000000-E) | LF | 1,037.50 | $375.00 | $372.00 | $390.00 | $600.00 | $390.00 | $459.00 |
| 0110 | Pile DRV equip setup ** steel piles - (HP 12 X 53) (8328200000-E) | EACH | 12 | $1,500.00 | $4,000.00 | $1,200.00 | $1,600.00 | $2,000.00 | $580.00 |
| 0111 | HP 12 X 53 steel piles (8364000000-E) | LF | 540 | $53.00 | $0.01 | $42.00 | $150.00 | $75.00 | $116.00 |
| 0112 | Concrete barrier rail (8503000000-E) | LF | 416.67 | $150.00 | $191.00 | $160.00 | $162.00 | $150.00 | $151.00 |
| 0113 | Rip rap class II (2'-0" thick) (8608000000-E) | TON | 682 | $80.00 | $48.15 | $20.00 | $0.01 | $0.01 | $66.00 |
| 0114 | Geotextile for drainage (8622000000-E) | SY | 758 | $4.00 | $3.75 | $2.00 | $4.50 | $4.75 | $4.50 |
| 0115 | Elastomeric bearings (8657000000-N) | LS | 1 | $15,000 | $15,000 | $12,500 | $55,000 | $37,000 | $33,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
Every contract let that day: NCDOT letting of August 19, 2025. Compiled by Mirage Metrics.