NCDOT contract C205015 bid tabulation
GRADING, DRAINAGE, PAVING, AND STRUCTURES. BRIDGE #430236 OVER SR-1513 ON I-40. Let by North Carolina DOT on June 17, 2025, Haywood. 8 bids received; low bid $18,127,601 by Zachry Construction Corporation.
- Owner
- North Carolina DOT
- Letting
- 17 JUN 2025
- Pay items
- 148
- Data through
- 20 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Zachry Construction Corporation | $18,127,601 | Low |
| 2 | Branch Civil Inc | $19,455,885 | +7.0% |
| 3 | Whaley Construction LLC | $19,580,509 | +8.0% |
| 4 | Mountain Creek Contractors Inc | $19,985,015 | +10% |
| 5 | Wright Brothers Civil Construction LLC | $19,988,646 | +10% |
| 6 | NHM Constructors, LLC | $20,359,739 | +12% |
| 7 | Crowder Construction Company | $22,114,856 | +22% |
| 8 | Dane Construction, Inc. | $22,564,944 | +24% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Zachry Construction Corporation | 2. Branch Civil Inc | 3. Whaley Construction LLC | 4. Mountain Creek Contractors Inc | 5. Wright Brothers Civil Construction LLC | 6. NHM Constructors, LLC |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Mobilization (0000100000-N) | LS | 1 | $905,000 | $830,000 | $1,505,397 | $998,500 | $995,000 | $1,060,000 |
| 0002 | Construction surveying (0000400000-N) | LS | 1 | $350,000 | $158,000 | $175,000 | $108,360 | $133,800 | $130,000 |
| 0003 | Clearing & grubbing (0001000000-E) | LS | 1 | $1,500,000 | $328,000 | $125,000 | $4,160,000 | $2,240,000 | $690,450 |
| 0004 | Supplementary clearing & grubbing (0008000000-E) | ACRE | 1 | $5,000.00 | $22,000 | $30,000 | $100.00 | $16,500 | $3,800.00 |
| 0005 | Unclassified excavation (0022000000-E) | CY | 13,350 | $4.50 | $15.50 | $51.07 | $25.00 | $26.40 | $24.00 |
| 0006 | Undercut excavation (0036000000-E) | CY | 1,140 | $23.96 | $25.50 | $84.66 | $25.00 | $24.00 | $50.80 |
| 0007 | Borrow excavation (0106000000-E) | CY | 16,150 | $15.69 | $47.00 | $38.92 | $25.00 | $41.00 | $32.00 |
| 0008 | Drainage ditch excavation (0134000000-E) | CY | 641 | $8.22 | $3.00 | $34.69 | $15.00 | $35.00 | $23.40 |
| 0009 | Removal of existing asphalt pavement (0156000000-E) | SY | 8,425 | $12.07 | $12.00 | $17.90 | $20.00 | $13.25 | $11.10 |
| 0010 | Select granular material (0195000000-E) | CY | 940 | $14.42 | $109.00 | $82.50 | $20.00 | $85.00 | $85.20 |
| 0011 | Geotextile for soil stabilization (0196000000-E) | SY | 1,270 | $2.08 | $3.25 | $10.00 | $3.00 | $4.50 | $5.30 |
| 0012 | Temporary shoring (0199000000-E) | SF | 3,700 | $95.23 | $69.50 | $96.00 | $75.00 | $62.00 | $135.00 |
| 0013 | Rock plating (0223000000-E) | SY | 925 | $105.08 | $144.00 | $75.00 | $115.00 | $105.00 | $211.00 |
| 0014 | Generic grading item (LS) - type 1 bridge approach fill, station 29+59.54 -L- (0248000000-N) | LS | 1 | $80,320 | $195,474 | $145,500 | $75,000 | $93,000 | $154,000 |
| 0015 | Foundation conditioning material, minor structures (0318000000-E) | TON | 200 | $59.00 | $85.50 | $75.00 | $40.00 | $61.00 | $60.00 |
| 0016 | FND condit geotextile (4A) (0321000000-E) | SY | 630 | $3.39 | $3.00 | $10.00 | $2.00 | $6.10 | $6.40 |
| 0017 | 15" RC pipe culverts, class IV (0448200000-E) | LF | 1,300 | $126.89 | $179.00 | $208.63 | $125.00 | $115.00 | $96.20 |
| 0018 | 18" RC pipe culverts, class IV (0448300000-E) | LF | 212 | $154.43 | $227.00 | $228.97 | $150.00 | $133.00 | $134.80 |
| 0019 | 15" CS pipe culverts, 0.064" thick (0582000000-E) | LF | 160 | $101.40 | $88.50 | $165.98 | $125.00 | $115.00 | $114.00 |
| 0020 | 18" CS pipe culverts, 0.064" thick inlet used based on county (0588000000-E) | LF | 88 | $112.22 | $113.00 | $187.23 | $130.00 | $125.00 | $119.00 |
| 0021 | 24" CS pipe culverts, 0.064" thick (0594000000-E) | LF | 104 | $123.80 | $116.00 | $210.54 | $150.00 | $158.00 | $137.50 |
| 0022 | **" CS elbow *****" thick - (15", 0.064") (0636000000-E) | EACH | 6 | $1,046.27 | $568.00 | $850.00 | $750.00 | $1,575.00 | $1,367.40 |
| 0023 | **" CS elbow *****" thick - (18", 0.064") (0636000000-E) | EACH | 2 | $1,086.50 | $628.00 | $950.00 | $750.00 | $1,675.00 | $1,530.00 |
| 0024 | Pipe removal (0995000000-E) | LF | 200 | $36.18 | $37.00 | $110.52 | $10.00 | $39.00 | $25.40 |
| 0025 | 4" slope protection (0999000000-E) | SY | 700 | $30.81 | $122.00 | $190.00 | $150.00 | $200.00 | $196.00 |
| 0026 | Fine grading (1011000000-N) | LS | 1 | $120,410 | $91,000 | $105,000 | $250,000 | $138,700 | $666,545 |
| 0027 | Shallow undercut (1099500000-E) | CY | 285 | $25.30 | $25.50 | $100.00 | $25.00 | $50.00 | $32.00 |
| 0028 | Class IV subgrade stabilization (1099700000-E) | TON | 1,670 | $55.25 | $58.50 | $55.00 | $40.00 | $49.00 | $51.60 |
| 0029 | Stabilizer aggregate (1110000000-E) | TON | 350 | $63.26 | $56.00 | $65.00 | $20.00 | $62.00 | $51.60 |
| 0030 | Geotextile for subgrade stabilization (1112000000-E) | SY | 3,455 | $4.49 | $2.50 | $10.00 | $6.00 | $5.80 | $6.50 |
| 0031 | Mill asp PVMT *****" DTH - (2-1/4") (1297000000-E) | SY | 12,500 | $4.19 | $12.50 | $11.55 | $11.00 | $3.65 | $13.00 |
| 0032 | Incidental milling (1330000000-E) | SY | 1,175 | $16.15 | $30.50 | $28.40 | $27.00 | $9.70 | $31.00 |
| 0033 | Asphalt conc base course, type B25.0C (1491000000-E) | TON | 15,095 | $205.38 | $182.00 | $169.05 | $161.00 | $181.00 | $192.00 |
| 0034 | Asphalt conc intermediate course, type I19.0C (1503000000-E) | TON | 4,510 | $197.45 | $201.00 | $186.90 | $178.00 | $200.00 | $210.50 |
| 0035 | Asphalt conc surface course, type S9.5B (1519000000-E) | TON | 530 | $299.50 | $305.00 | $283.50 | $270.00 | $300.00 | $320.00 |
| 0036 | Asphalt conc surface course, type S9.5D (1524200000-E) | TON | 4,375 | $228.51 | $232.00 | $216.30 | $206.00 | $230.00 | $243.00 |
| 0037 | Asphalt binder for plant mix (1575000000-E) | TON | 935 | $975.87 | $863.00 | $803.25 | $765.00 | $850.00 | $905.00 |
| 0038 | Polymer modified asphalt binder for plant mix (1577000000-E) | TON | 255 | $1,190.79 | $1,032.00 | $960.75 | $915.00 | $1,000.00 | $1,082.00 |
| 0039 | Open-graded asphalt friction course, type FC-1 modified (1662000000-E) | TON | 1,260 | $439.87 | $381.00 | $354.90 | $338.00 | $375.00 | $400.00 |
| 0040 | Generic paving item (LF) 665 - milled rumble strips (asphalt concrete), (16") (1841000000-E) | LF | 10,760 | $2.28 | $2.25 | $1.05 | $1.50 | $1.05 | $2.25 |
| 0041 | Subdrain excavation (2022000000-E) | CY | 134.40 | $14.11 | $44.50 | $125.00 | $25.00 | $26.00 | $31.75 |
| 0042 | Geotextile for subsurface drains (2026000000-E) | SY | 400 | $2.38 | $6.25 | $10.00 | $3.00 | $5.30 | $4.25 |
| 0043 | Subdrain coarse aggregate (2036000000-E) | CY | 67.20 | $93.78 | $161.00 | $75.00 | $100.00 | $118.75 | $85.25 |
| 0044 | 6" perforated subdrain pipe (2044000000-E) | LF | 400 | $23.55 | $17.00 | $45.00 | $12.00 | $16.00 | $25.80 |
| 0045 | Subdrain pipe outlet (2070000000-N) | EACH | 1 | $1,139.72 | $1,297.00 | $4,500.00 | $350.00 | $900.00 | $1,030.70 |
| 0046 | 6" outlet pipe (2077000000-E) | LF | 6 | $217.97 | $203.00 | $500.00 | $50.00 | $97.00 | $48.40 |
| 0047 | Masonry drainage structures (2286000000-N) | EACH | 24 | $5,513.88 | $3,879.00 | $9,363.37 | $2,500.00 | $4,900.00 | $3,950.00 |
| 0048 | Masonry drainage structures (2308000000-E) | LF | 4.50 | $1,074.66 | $1,070.00 | $650.00 | $500.00 | $1,075.00 | $855.40 |
| 0049 | Frame with two grates, STD 840.20 (2364200000-N) | EACH | 24 | $1,207.48 | $1,243.00 | $1,400.00 | $750.00 | $1,750.00 | $1,084.00 |
| 0050 | Shoulder berm gutter (2556000000-E) | LF | 4,250 | $43.09 | $60.00 | $39.90 | $45.00 | $66.00 | $69.00 |
| 0051 | Concrete expressway gutter (2577000000-E) | LF | 370 | $50.49 | $82.50 | $44.10 | $75.00 | $68.00 | $70.00 |
| 0052 | 4" concrete paved ditch (2619000000-E) | SY | 100 | $390.78 | $278.00 | $131.25 | $195.00 | $142.00 | $147.00 |
| 0053 | Conc barrier type ****** - (T) (2703000000-E) | LF | 2,400 | $188.81 | $278.00 | $194.25 | $205.00 | $209.00 | $219.00 |
| 0054 | Steel beam guardrail (3030000000-E) | LF | 4,700 | $23.47 | $27.00 | $24.25 | $23.00 | $26.00 | $27.50 |
| 0055 | Additional guardrail posts (3150000000-N) | EACH | 10 | $56.13 | $53.50 | $57.75 | $55.00 | $60.00 | $65.00 |
| 0056 | Guardrail end units, type cat-1 (3210000000-N) | EACH | 2 | $969.55 | $1,060.00 | $997.50 | $950.00 | $1,075.00 | $1,125.00 |
| 0057 | Guardrail end units, type TL-3 (3287000000-N) | EACH | 3 | $3,316.89 | $3,794.00 | $3,415.00 | $3,250.00 | $3,675.00 | $3,844.00 |
| 0058 | Guardrail anchor units, type B-77 (3317000000-N) | EACH | 4 | $2,500.42 | $3,124.00 | $2,475.00 | $2,450.00 | $2,770.00 | $2,900.00 |
| 0059 | Remove & reset existing guardrail (3345000000-E) | LF | 450 | $4.59 | $15.50 | $4.75 | $4.50 | $5.00 | $5.35 |
| 0060 | Remove existing guardrail (3360000000-E) | LF | 2,600 | $1.02 | $1.00 | $1.05 | $1.00 | $1.00 | $2.45 |
| 0061 | Woven wire fence reset (3566000000-E) | LF | 450 | $12.57 | $22.50 | $13.25 | $12.50 | $14.00 | $15.00 |
| 0062 | Rip rap, class I (3628000000-E) | TON | 280 | $77.75 | $90.00 | $75.00 | $75.00 | $85.00 | $92.00 |
| 0063 | Rip rap, class II (3635000000-E) | TON | 200 | $73.26 | $107.00 | $75.00 | $75.00 | $93.00 | $85.70 |
| 0064 | Rip rap, class B (3649000000-E) | TON | 8 | $71.98 | $492.00 | $110.00 | $125.00 | $120.00 | $82.00 |
| 0065 | Geotextile for drainage (3656000000-E) | SY | 1,241 | $3.68 | $2.00 | $10.00 | $5.00 | $5.50 | $6.00 |
| 0066 | Contr furn, type ***sign - (A) (4025000000-E) | SF | 80 | $51.78 | $59.50 | $12.10 | $50.00 | $57.00 | $89.00 |
| 0067 | Reinforced concrete sign foundations (4048000000-E) | CY | 1 | $5.18 | $6.00 | $1,000.00 | $5.00 | $500.00 | $12,700 |
| 0068 | Supports, breakaway steel beam (4060000000-E) | LB | 833 | $18.64 | $21.50 | $10.75 | $18.00 | $20.00 | $6.00 |
| 0069 | Sign erection, type *** (GRD MTD) - (A) (4110000000-N) | EACH | 2 | $1,242.72 | $1,433.00 | $1,050.00 | $1,200.00 | $1,375.00 | $1,182.00 |
| 0070 | Work zone signs (stationary) (4400000000-E) | SF | 640 | $7.14 | $8.75 | $7.75 | $7.25 | $8.50 | $8.60 |
| 0071 | High visibility stationary signs (4402000000-E) | SF | 460 | $7.14 | $11.00 | $8.40 | $9.25 | $11.00 | $10.95 |
| 0072 | Work zone signs (portable) (4405000000-E) | SF | 300 | $10.05 | $10.25 | $11.85 | $8.55 | $31.00 | $10.15 |
| 0073 | High visibility portable signs (4407000000-E) | SF | 140 | $14.29 | $11.75 | $12.60 | $9.85 | $32.00 | $11.65 |
| 0074 | Work zone signs (barricade mounted) (4410000000-E) | SF | 170 | $6.89 | $10.75 | $7.65 | $8.95 | $10.70 | $10.60 |
| 0075 | Flashing arrow board (4415000000-N) | EACH | 1 | $3,253.53 | $4,537.00 | $25,200 | $3,800.00 | $4,500.00 | $4,500.00 |
| 0076 | Portable changeable message sign (4420000000-N) | EACH | 5 | $13,014 | $10,300 | $15,750 | $8,600.00 | $10,200 | $10,175 |
| 0077 | Drums (4430000000-N) | EACH | 50 | $52.06 | $99.00 | $50.00 | $125.00 | $66.00 | $65.00 |
| 0078 | High visibility drums (4432000000-N) | EACH | 110 | $74.17 | $102.00 | $70.00 | $150.00 | $82.00 | $88.75 |
| 0079 | Sequential flashing warning lights (4434000000-N) | EACH | 15 | $162.67 | $358.00 | $52.50 | $145.00 | $200.00 | $415.00 |
| 0080 | Barricades (type III) (4445000000-E) | LF | 88 | $31.23 | $76.00 | $19.50 | $25.00 | $27.50 | $30.00 |
| 0081 | Flagger (4455000000-N) | DAY | 90 | $455.49 | $516.00 | $630.00 | $400.00 | $875.00 | $414.00 |
| 0082 | Temporary crash cushions (4465000000-N) | EACH | 2 | $11,713 | $10,600 | $9,187.50 | $12,150 | $13,750 | $28,745 |
| 0083 | Remove & reset temporary crash cushion (4470000000-N) | EACH | 2 | $5,856.35 | $3,946.00 | $3,412.50 | $3,250.00 | $3,675.00 | $3,850.00 |
| 0084 | TMA (4480000000-N) | EACH | 2 | $52,057 | $15,800 | $57,750 | $65,000 | $135,000 | $47,500 |
| 0085 | Portable concrete barrier (anchored) (4490000000-E) | LF | 9,420 | $61.79 | $73.50 | $63.75 | $60.70 | $68.50 | $72.00 |
| 0086 | Remove & reset portable concrete barrier (anchored) (4505000000-E) | LF | 4,620 | $26.72 | $30.50 | $26.25 | $25.00 | $28.30 | $29.50 |
| 0087 | Generic traffic control item (LS) - dynamic zipper merge system deployment (4589000000-N) | LS | 1 | $13,665 | $9,596.00 | $75,000 | $8,600.00 | $10,250 | $10,175 |
| 0088 | Generic traffic control item (EA) - connected lane closure system (4600000000-N) | EACH | 2 | $1,301.42 | $2,865.00 | $36,600 | $2,400.00 | $2,850.00 | $2,875.00 |
| 0089 | Generic traffic control item (EA) - dynamic zipper merge system relocation (4600000000-N) | EACH | 2 | $11,713 | $3,224.00 | $7,350.00 | $2,700.00 | $3,200.00 | $3,200.00 |
| 0090 | Generic traffic control item (day) - dynamic zipper merge system (4609000000-N) | DAY | 9 | $2,765.50 | $2,018.00 | $5,230.00 | $1,690.00 | $2,000.00 | $4,000.00 |
| 0091 | Temporary raised pavement markers (4650000000-N) | EACH | 460 | $12.76 | $7.75 | $13.15 | $12.50 | $14.00 | $8.30 |
| 0092 | Thermoplastic pavement marking lines (4", 90 mils) (4685000000-E) | LF | 4,300 | $1.63 | $1.75 | $1.70 | $1.60 | $1.80 | $1.75 |
| 0093 | Thermoplastic pavement marking lines (6", 90 mils) (4688000000-E) | LF | 15,100 | $1.99 | $1.25 | $2.05 | $1.95 | $2.20 | $1.45 |
| 0094 | Thermoplastic pavement marking lines (24", 90 mils) (4709000000-E) | LF | 100 | $15.05 | $11.25 | $15.50 | $14.75 | $16.50 | $11.85 |
| 0095 | 6" cold appl plstic lines type ** - (I) (4775000000-E) | LF | 800 | $7.91 | $16.75 | $8.15 | $7.75 | $8.80 | $17.75 |
| 0096 | Paint pavement marking lines (4") (4810000000-E) | LF | 6,460 | $1.02 | $0.45 | $1.05 | $1.00 | $1.15 | $0.50 |
| 0097 | Paint pavement marking lines (24") (4835000000-E) | LF | 40 | $6.63 | $2.25 | $6.85 | $6.50 | $7.40 | $2.40 |
| 0098 | Work zone performance pavement marking lines, 6" (4847500000-E) | LF | 31,120 | $1.02 | $1.00 | $1.05 | $1.00 | $1.15 | $1.20 |
| 0099 | Removal of pavement marking lines (4") (4850000000-E) | LF | 10,230 | $0.66 | $0.55 | $0.70 | $0.65 | $0.75 | $0.60 |
| 0100 | Removal of pavement marking lines (6") (4855000000-E) | LF | 10,560 | $0.73 | $0.55 | $0.75 | $0.72 | $0.80 | $0.60 |
| 0101 | Generic pavement marking item (EA) - inlaid raised pavement markers (4895000000-N) | EACH | 76 | $0.00 | $83.50 | $250.00 | $150.00 | $151.00 | $88.75 |
| 0102 | Portable lighting (5255000000-N) | LS | 1 | $51,729 | $40,000 | $45,000 | $500,000 | $185,000 | $626,070 |
| 0103 | Temporary silt fence (6000000000-E) | LF | 5,155 | $3.18 | $4.50 | $3.50 | $3.25 | $4.50 | $4.75 |
| 0104 | Stone for erosion control, class A (6006000000-E) | TON | 260 | $71.24 | $89.50 | $75.00 | $75.00 | $85.25 | $75.00 |
| 0105 | Stone for erosion control, class B (6009000000-E) | TON | 2,770 | $71.56 | $62.50 | $78.00 | $50.00 | $76.00 | $86.00 |
| 0106 | Sediment control stone (6012000000-E) | TON | 1,080 | $58.86 | $64.00 | $75.00 | $50.00 | $65.50 | $63.75 |
| 0107 | Temporary mulching (6015000000-E) | ACRE | 7.50 | $1,999.81 | $2,008.00 | $2,425.00 | $2,100.00 | $2,000.00 | $2,128.00 |
| 0108 | Seed for temporary seeding (6018000000-E) | LB | 400 | $2.05 | $3.25 | $2.10 | $2.00 | $3.35 | $3.55 |
| 0109 | Fertilizer for temporary seeding (6021000000-E) | TON | 2 | $974.27 | $1,674.00 | $420.00 | $950.00 | $1,700.00 | $1,775.00 |
| 0110 | Temporary slope drains (6024000000-E) | LF | 810 | $40.13 | $25.50 | $75.00 | $25.00 | $31.60 | $43.00 |
| 0111 | Safety fence (6029000000-E) | LF | 260 | $3.08 | $3.25 | $2.10 | $3.00 | $3.35 | $3.55 |
| 0112 | Silt excavation (6030000000-E) | CY | 4,610 | $12.40 | $11.00 | $35.00 | $1.00 | $0.01 | $35.40 |
| 0113 | Matting for erosion control (6036000000-E) | SY | 20,000 | $1.69 | $2.00 | $2.00 | $1.70 | $1.95 | $2.05 |
| 0114 | Coir fiber mat (6037000000-E) | SY | 100 | $5.13 | $11.25 | $6.05 | $6.00 | $11.10 | $11.90 |
| 0115 | 1/4" hardware cloth (6042000000-E) | LF | 1,650 | $5.13 | $6.25 | $6.30 | $6.00 | $9.50 | $6.50 |
| 0116 | Flocculant (6071002000-E) | LB | 450 | $5.13 | $20.00 | $8.40 | $5.00 | $20.20 | $21.50 |
| 0117 | Coir fiber wattle barrier (6071014000-E) | LF | 2,836 | $14.36 | $13.50 | $14.70 | $18.00 | $13.45 | $14.50 |
| 0118 | Coir fiber baffle (6071030000-E) | LF | 65 | $8.20 | $9.00 | $7.10 | $8.00 | $8.95 | $9.45 |
| 0119 | Seeding and mulching (6084000000-E) | ACRE | 6 | $3,179.18 | $3,571.00 | $3,675.00 | $3,400.00 | $3,550.00 | $3,785.00 |
| 0120 | Mowing (6087000000-E) | ACRE | 6 | $307.66 | $112.00 | $160.00 | $300.00 | $110.00 | $120.00 |
| 0121 | Seed for repair seeding (6090000000-E) | LB | 100 | $6.15 | $11.25 | $5.25 | $6.00 | $11.10 | $12.00 |
| 0122 | Fertilizer for repair seeding (6093000000-E) | TON | 0.25 | $1,230.65 | $2,200.00 | $525.00 | $2,000.00 | $2,200.00 | $2,365.00 |
| 0123 | Seed for supplemental seeding (6096000000-E) | LB | 150 | $6.15 | $11.25 | $5.25 | $6.00 | $11.00 | $11.85 |
| 0124 | Fertilizer topdressing (6108000000-E) | TON | 4.25 | $1,025.54 | $1,674.00 | $525.00 | $1,000.00 | $1,670.00 | $1,775.00 |
| 0125 | Specialized hand mowing (6114500000-N) | MHR | 10 | $230.75 | $83.50 | $52.50 | $225.00 | $83.00 | $90.00 |
| 0126 | Manual litter removal (6114800000-N) | MHR | 2 | $294.26 | $112.00 | $52.50 | $225.00 | $110.00 | $119.00 |
| 0127 | Litter disposal (6114900000-E) | TON | 1 | $326.96 | $558.00 | $315.00 | $250.00 | $555.00 | $595.00 |
| 0128 | Response for erosion control (6117000000-N) | EACH | 100 | $228.87 | $0.01 | $525.00 | $200.00 | $275.00 | $354.00 |
| 0129 | Concrete washout structure (6117500000-N) | EACH | 1 | $1,056.07 | $1,333.00 | $2,500.00 | $2,500.00 | $2,200.00 | $1,773.00 |
| 0130 | Generic erosion control item (EA) - fabric insert inlet protection cleanout (6132000000-N) | EACH | 144 | $168.39 | $191.00 | $250.00 | $250.00 | $165.00 | $240.00 |
| 0131 | Generic erosion control item (EA) - fabric insert inlet protection, type 1 (6132000000-N) | EACH | 48 | $384.81 | $253.00 | $250.00 | $200.00 | $220.00 | $240.00 |
| 0132 | Generic erosion control item (EA) - prefabricated concrete washout (6132000000-N) | EACH | 6 | $961.63 | $927.00 | $2,500.00 | $1,000.00 | $1,465.00 | $375.00 |
| 0133 | MSE retain wall no ** - (1) (8801000000-E) | SF | 3,825 | $239.92 | $275.00 | $145.00 | $150.00 | $177.00 | $220.50 |
| 0134 | Remv exist STR ****** BRG (402) - (29+59.54 -L-) (8035000000-N) | LS | 1 | $322,364 | $400,000 | $985,000 | $500,000 | $430,300 | $330,000 |
| 0135 | Asbestos assessment (8065000000-N) | LS | 1 | $1,041.13 | $5,579.00 | $7,500.00 | $2,500.00 | $1,900.00 | $1,200.00 |
| 0136 | Reinforced concrete deck slab (8147000000-E) | SF | 12,849 | $47.80 | $90.00 | $54.00 | $50.00 | $73.00 | $70.60 |
| 0137 | Grooving bridge floors (8161000000-E) | SF | 17,033 | $0.65 | $1.00 | $0.55 | $1.50 | $0.65 | $2.35 |
| 0138 | Class A concrete (bridge) (8182000000-E) | CY | 262.20 | $1,588.83 | $2,400.00 | $1,793.00 | $1,250.00 | $1,570.00 | $2,070.00 |
| 0139 | BRG appr slab *********** - (29+59.54 -L-) (8210000000-N) | LS | 1 | $239,000 | $348,000 | $433,945 | $250,000 | $288,800 | $170,000 |
| 0140 | Reinforcing steel (bridge) (8217000000-E) | LB | 32,218 | $1.74 | $2.00 | $2.50 | $2.00 | $1.60 | $1.00 |
| 0141 | Fib **" prestr conc girdr - (54") (8278000000-E) | LF | 1,301.08 | $494.88 | $650.00 | $455.00 | $450.00 | $555.00 | $572.25 |
| 0142 | Pile DRV equip setup ** steel piles - (HP 12 X 53) (8328200000-E) | EACH | 32 | $2,553.82 | $3,698.00 | $1,850.00 | $1,500.00 | $695.00 | $4,700.00 |
| 0143 | HP 12 X 53 steel piles (8364000000-E) | LF | 2,550 | $78.78 | $222.00 | $185.00 | $45.00 | $74.00 | $50.25 |
| 0144 | Concrete barrier rail (8503000000-E) | LF | 247.12 | $266.90 | $230.00 | $197.00 | $175.00 | $235.00 | $325.00 |
| 0145 | Concrete median barrier (8510000000-E) | LF | 154.75 | $219.64 | $200.00 | $169.00 | $260.00 | $210.00 | $272.00 |
| 0146 | 4" slope protection (8531000000-E) | SY | 1,430 | $40.30 | $123.00 | $190.00 | $135.00 | $170.00 | $162.00 |
| 0147 | Elastomeric bearings (8657000000-N) | LS | 1 | $38,471 | $157,000 | $75,587 | $25,000 | $54,500 | $6,705.00 |
| 0148 | Expansion joint seals (8706000000-N) | LS | 1 | $226,138 | $282,000 | $310,804 | $175,000 | $289,000 | $235,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
Every contract let that day: NCDOT letting of June 17, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way