NCDOT contract C204760 bid tabulation
GRADING, DRAINAGE, PAVING, SIGNALS, AND RETAINING WALL. SR-1112 FROM WEST OF SR-1115 TO NC-59 & SR-1115 FROM SOUTH OF WALLACE ST TO NC-59. Let by North Carolina DOT on January 21, 2025, Cumberland. 5 bids received; low bid $21,620,000 by FSC II LLC DBA Fred Smith Company.
- Owner
- North Carolina DOT
- Letting
- 21 JAN 2025
- Pay items
- 223
- Data through
- 20 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | FSC II LLC DBA Fred Smith Company | $21,620,000 | Low |
| 2 | Highland Paving Co LLC | $23,534,776 | +9.0% |
| 3 | Branch Civil Inc | $23,540,085 | +9.0% |
| 4 | Barnhill Contracting Company | $24,976,150 | +16% |
| 5 | Caton Construction Group Inc | $31,377,521 | +45% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. FSC II LLC DBA Fred Smith Company | 2. Highland Paving Co LLC | 3. Branch Civil Inc | 4. Barnhill Contracting Company | 5. Caton Construction Group Inc |
|---|---|---|---|---|---|---|---|---|
| 0001 | Mobilization (0000100000-N) | LS | 1 | $1,050,000 | $1,182,118 | $700,000 | $1,248,000 | $1,568,876 |
| 0002 | Construction surveying (0000400000-N) | LS | 1 | $250,000 | $200,000 | $282,000 | $310,000 | $329,000 |
| 0003 | Grading (0043000000-N) | LS | 1 | $3,750,000 | $4,500,000 | $1,750,000 | $4,803,960 | $5,225,000 |
| 0004 | Supplementary clearing & grubbing (0050000000-E) | ACRE | 1 | $1.00 | $1.00 | $40,000 | $85,000 | $10,000 |
| 0005 | Undercut excavation (0057000000-E) | CY | 400 | $65.00 | $17.00 | $50.75 | $62.00 | $58.00 |
| 0006 | Drainage ditch excavation (0134000000-E) | CY | 723 | $18.00 | $21.00 | $23.75 | $57.00 | $45.00 |
| 0007 | Select granular material, class III (0194000000-E) | CY | 900 | $35.00 | $30.00 | $40.25 | $43.00 | $150.00 |
| 0008 | Geotextile for soil stabilization (0196000000-E) | SY | 400 | $4.70 | $4.00 | $4.61 | $9.50 | $8.00 |
| 0009 | Generic grading item (TON) - hauling and disposal of petroleum contaminated soil (0255000000-E) | TON | 50 | $195.00 | $120.00 | $853.00 | $180.00 | $155.00 |
| 0010 | Foundation conditioning material, minor structures (0318000000-E) | TON | 1,470 | $40.00 | $44.00 | $82.75 | $65.00 | $85.00 |
| 0011 | FND condit geotextile (4A) (0321000000-E) | SY | 4,600 | $3.00 | $4.00 | $3.90 | $9.50 | $8.00 |
| 0012 | 15" drainage pipe (0335200000-E) | LF | 304 | $75.00 | $129.00 | $87.25 | $110.00 | $180.00 |
| 0013 | 18" drainage pipe (0335300000-E) | LF | 88 | $89.00 | $146.00 | $102.00 | $118.00 | $190.00 |
| 0014 | 24" drainage pipe (0335400000-E) | LF | 184 | $97.00 | $116.00 | $117.00 | $137.00 | $200.00 |
| 0015 | 30" drainage pipe (0335500000-E) | LF | 500 | $120.00 | $269.00 | $156.00 | $180.00 | $230.00 |
| 0016 | 42" drainage pipe (0335700000-E) | LF | 1,536 | $200.00 | $263.00 | $359.00 | $315.00 | $382.00 |
| 0017 | 42" RC pipe culverts, class III (0396000000-E) | LF | 1,676 | $400.00 | $424.00 | $513.00 | $300.00 | $450.00 |
| 0018 | ***" RCP culv class IV - (48") (0448000000-E) | LF | 508 | $350.00 | $524.00 | $526.00 | $393.00 | $700.00 |
| 0019 | 15" RC pipe culverts, class IV (0448200000-E) | LF | 2,476 | $97.00 | $99.00 | $156.00 | $120.00 | $185.00 |
| 0020 | 18" RC pipe culverts, class IV (0448300000-E) | LF | 1,196 | $111.00 | $116.00 | $189.00 | $130.00 | $230.00 |
| 0021 | 24" RC pipe culverts, class IV (0448400000-E) | LF | 908 | $168.00 | $159.00 | $252.00 | $167.00 | $280.00 |
| 0022 | 30" RC pipe culverts, class IV (0448500000-E) | LF | 1,752 | $210.00 | $236.00 | $279.00 | $228.00 | $380.00 |
| 0023 | 36" RC pipe culverts, class IV (0448600000-E) | LF | 1,020 | $297.00 | $347.00 | $380.00 | $278.00 | $560.00 |
| 0024 | 42" RC pipe culverts, class IV (0448700000-E) | LF | 348 | $300.00 | $429.00 | $470.00 | $486.00 | $600.00 |
| 0025 | **" RC pipe culv class V - (15") (0449000000-E) | LF | 808 | $160.00 | $120.00 | $251.00 | $126.00 | $230.00 |
| 0026 | **" RC pipe culv class V - (18") (0449000000-E) | LF | 292 | $167.00 | $129.00 | $270.00 | $140.00 | $280.00 |
| 0027 | **" RC pipe culv class V - (36") (0449000000-E) | LF | 104 | $254.00 | $289.00 | $467.00 | $311.00 | $570.00 |
| 0028 | **" RC pipe culv class V - (42") (0449000000-E) | LF | 84 | $333.00 | $505.00 | $541.00 | $537.00 | $665.00 |
| 0029 | **"WLD STL pipe grad B in soil - (48", 0.500") (0973100000-E) | LF | 52 | $2,500.00 | $1,500.00 | $1,800.00 | $1,575.00 | $2,190.00 |
| 0030 | **"WLD STL pipe grad B not in soil - (48", 0.500") (0973300000-E) | LF | 52 | $1.00 | $1,500.00 | $642.00 | $1,985.00 | $0.01 |
| 0031 | Pipe removal (0995000000-E) | LF | 2,764 | $18.00 | $40.00 | $37.00 | $125.00 | $80.00 |
| 0032 | Shallow undercut (1099500000-E) | CY | 500 | $33.00 | $19.00 | $32.00 | $35.00 | $80.00 |
| 0033 | Class IV subgrade stabilization (1099700000-E) | TON | 1,000 | $43.00 | $44.00 | $68.00 | $49.00 | $85.00 |
| 0034 | Geotextile for subgrade stabilization (1112000000-E) | SY | 1,500 | $5.00 | $3.25 | $4.85 | $9.50 | $7.00 |
| 0035 | Aggregate base course (1121000000-E) | TON | 1,050 | $50.00 | $50.00 | $74.75 | $65.00 | $118.00 |
| 0036 | Incidental stone base (1220000000-E) | TON | 200 | $90.00 | $50.00 | $61.25 | $84.00 | $170.00 |
| 0037 | Prime coat (1275000000-E) | GAL | 875 | $4.00 | $6.00 | $11.50 | $6.00 | $3.03 |
| 0038 | Mill asp PVMT *****" DTH - (1-1/2") (1297000000-E) | SY | 3,400 | $12.00 | $5.00 | $6.25 | $6.25 | $15.00 |
| 0039 | Incidental milling (1330000000-E) | SY | 3,800 | $12.00 | $13.00 | $12.97 | $15.00 | $20.00 |
| 0040 | Asphalt conc base course, type B25.0C (1491000000-E) | TON | 11,400 | $90.00 | $89.50 | $104.00 | $86.00 | $98.99 |
| 0041 | Asphalt conc intermediate course, type I19.0C (1503000000-E) | TON | 10,700 | $93.00 | $93.20 | $104.00 | $83.00 | $98.99 |
| 0042 | Asphalt conc surface course, type S9.5B (1519000000-E) | TON | 9,500 | $86.00 | $89.40 | $104.00 | $81.00 | $98.99 |
| 0043 | Asphalt binder for plant mix (1575000000-E) | TON | 1,645 | $600.00 | $567.00 | $650.00 | $581.00 | $631.31 |
| 0044 | Asphalt plant mix, pavement repair (1693000000-E) | TON | 1,010 | $125.00 | $217.00 | $107.00 | $330.00 | $350.00 |
| 0045 | Subdrain excavation (2022000000-E) | CY | 340 | $35.00 | $35.00 | $66.00 | $35.00 | $35.00 |
| 0046 | Geotextile for subsurface drains (2026000000-E) | SY | 515 | $11.00 | $11.00 | $12.50 | $11.00 | $11.00 |
| 0047 | Subdrain fine aggregate (2033000000-E) | CY | 168 | $65.00 | $65.00 | $292.00 | $65.00 | $65.00 |
| 0048 | Subdrain coarse aggregate (2036000000-E) | CY | 87 | $75.00 | $75.00 | $281.00 | $75.00 | $75.00 |
| 0049 | 6" perforated subdrain pipe (2044000000-E) | LF | 1,515 | $16.00 | $16.00 | $19.25 | $16.00 | $16.00 |
| 0050 | Subdrain pipe outlet (2070000000-N) | EACH | 4 | $400.00 | $400.00 | $835.00 | $400.00 | $400.00 |
| 0051 | 6" outlet pipe (2077000000-E) | LF | 24 | $40.00 | $40.00 | $56.00 | $40.00 | $40.00 |
| 0052 | Pipe collars (2253000000-E) | CY | 0.40 | $8,000.00 | $2,500.00 | $8,500.00 | $8,750.00 | $7,250.69 |
| 0053 | Pipe plugs (2264000000-E) | CY | 0.60 | $16,000 | $2,000.00 | $4,000.00 | $5,175.00 | $4,833.79 |
| 0054 | Flowable fill (2275000000-E) | CY | 25 | $500.00 | $500.00 | $749.00 | $2,200.00 | $800.00 |
| 0055 | Masonry drainage structures (2286000000-N) | EACH | 166 | $5,100.00 | $4,000.00 | $6,200.00 | $5,985.00 | $12,610 |
| 0056 | Masonry drainage structures (2308000000-E) | LF | 305.20 | $300.00 | $635.00 | $520.00 | $635.00 | $987.00 |
| 0057 | Frame with two grates, STD 840.16 (2364000000-N) | EACH | 22 | $1,280.00 | $1,430.00 | $4,900.00 | $1,250.00 | $2,000.00 |
| 0058 | Frame with two grates, STD 840.24 (2366000000-N) | EACH | 6 | $2,000.00 | $1,360.00 | $1,900.00 | $1,120.00 | $2,000.00 |
| 0059 | Frame with two grates, STD 840.29 (2367000000-N) | EACH | 19 | $1,200.00 | $1,125.00 | $1,900.00 | $1,165.00 | $2,000.00 |
| 0060 | Frame-GRT-HD 840.03 ** - (E) (2374000000-N) | EACH | 19 | $1,375.00 | $1,300.00 | $2,200.00 | $1,335.00 | $2,000.00 |
| 0061 | Frame-GRT-HD 840.03 ** - (F) (2374000000-N) | EACH | 48 | $1,400.00 | $1,350.00 | $2,200.00 | $1,380.00 | $2,000.00 |
| 0062 | Frame-GRT-HD 840.03 ** - (G) (2374000000-N) | EACH | 34 | $1,400.00 | $1,350.00 | $2,200.00 | $1,380.00 | $2,000.00 |
| 0063 | Frame with cover, STD 840.54 (2396000000-N) | EACH | 17 | $1,000.00 | $935.00 | $1,700.00 | $1,000.00 | $1,500.00 |
| 0064 | Concrete transitional section for drop inlet (2451000000-N) | EACH | 11 | $2,000.00 | $1,275.00 | $965.00 | $875.00 | $3,061.22 |
| 0065 | **"X**" concrete curb - (8" X 18") (2535000000-E) | LF | 750 | $38.00 | $38.95 | $34.75 | $38.95 | $102.00 |
| 0066 | **"X**" concrete curb - (9" X 18") (2535000000-E) | LF | 570 | $38.00 | $40.00 | $35.25 | $40.00 | $102.00 |
| 0067 | **'-**" concrete curb & gutter - (2'-9") (2538000000-E) | LF | 1,600 | $36.00 | $34.00 | $37.00 | $34.00 | $41.00 |
| 0068 | 1'-6" concrete curb & gutter (2542000000-E) | LF | 2,400 | $29.50 | $23.25 | $36.50 | $23.25 | $31.00 |
| 0069 | 2'-6" concrete curb & gutter (2549000000-E) | LF | 14,600 | $31.75 | $32.00 | $35.50 | $32.00 | $35.00 |
| 0070 | 4" concrete sidewalk (2591000000-E) | SY | 5,100 | $60.00 | $56.00 | $82.25 | $56.00 | $56.00 |
| 0071 | Concrete curb ramps (2605000000-N) | EACH | 85 | $2,650.00 | $2,275.00 | $3,400.00 | $2,275.00 | $2,551.00 |
| 0072 | 6" concrete driveway (2612000000-E) | SY | 1,500 | $97.64 | $88.00 | $71.00 | $88.00 | $112.00 |
| 0073 | 5" monolithic concrete islands (keyed in) (2655000000-E) | SY | 3,300 | $90.00 | $88.00 | $96.50 | $88.00 | $122.50 |
| 0074 | Generic paving item (SY) - 12" jointed concrete truck apron (2738000000-E) | SY | 600 | $164.50 | $225.76 | $142.00 | $225.76 | $255.00 |
| 0075 | Generic paving item (LF) - 2'-0" concrete curb and gutter (class AA) (2752000000-E) | LF | 700 | $41.00 | $32.00 | $37.75 | $32.00 | $41.00 |
| 0076 | Generic paving item (EA) - emergency vehicle access for concrete island (2759000000-N) | EACH | 1 | $15,000 | $26,123 | $5,800.00 | $26,123 | $59,541 |
| 0077 | Adjustment of manholes (2830000000-N) | EACH | 5 | $1,100.00 | $1,340.00 | $715.00 | $1,000.00 | $1,300.00 |
| 0078 | Adjustment of meter boxes or valve boxes (2845000000-N) | EACH | 3 | $1,500.00 | $1,340.00 | $309.00 | $1,000.00 | $1,300.00 |
| 0079 | Steel beam guardrail (3030000000-E) | LF | 50 | $50.00 | $50.00 | $57.00 | $50.00 | $50.00 |
| 0080 | Steel beam guardrail terminal sections (3105000000-N) | EACH | 2 | $250.00 | $250.00 | $285.00 | $250.00 | $250.00 |
| 0081 | Additional guardrail posts (3150000000-N) | EACH | 5 | $11.00 | $11.00 | $12.50 | $11.00 | $11.00 |
| 0082 | Generic fencing item (LF) - pedestrian safety rail (3575000000-E) | LF | 80 | $70.00 | $265.00 | $302.00 | $265.00 | $265.00 |
| 0083 | Rip rap, class I (3628000000-E) | TON | 205 | $100.00 | $110.00 | $163.00 | $122.00 | $115.00 |
| 0084 | Rip rap, class II (3635000000-E) | TON | 60 | $100.00 | $115.00 | $216.00 | $129.00 | $115.00 |
| 0085 | Geotextile for drainage (3656000000-E) | SY | 1,225 | $3.00 | $4.25 | $3.05 | $7.00 | $7.00 |
| 0086 | Supports, 3-LB steel U-channel (4072000000-E) | LF | 1,725 | $7.00 | $10.00 | $7.75 | $7.60 | $7.00 |
| 0087 | Sign erection, type E (4102000000-N) | EACH | 103 | $65.00 | $65.00 | $73.00 | $133.75 | $65.00 |
| 0088 | Sign erect, reloc ** GRD MTD - (E) (4116100000-N) | EACH | 5 | $75.00 | $140.00 | $84.25 | $133.75 | $75.00 |
| 0089 | Disposal of sign system, U-channel (4155000000-N) | EACH | 55 | $5.00 | $20.00 | $5.50 | $16.05 | $5.00 |
| 0090 | Work zone signs (stationary) (4400000000-E) | SF | 192 | $8.00 | $6.25 | $7.25 | $7.87 | $6.00 |
| 0091 | Work zone signs (portable) (4405000000-E) | SF | 384 | $15.00 | $10.00 | $14.50 | $15.80 | $33.50 |
| 0092 | Work zone signs (barricade mounted) (4410000000-E) | SF | 273 | $8.00 | $6.50 | $7.25 | $9.58 | $6.00 |
| 0093 | Flashing arrow board (4415000000-N) | EACH | 2 | $1,500.00 | $3,100.00 | $9,900.00 | $3,100.00 | $23,937 |
| 0094 | Portable changeable message sign (4420000000-N) | EACH | 1 | $15,000 | $9,000.00 | $20,000 | $8,500.00 | $42,160 |
| 0095 | Drums (4430000000-N) | EACH | 800 | $25.00 | $22.00 | $50.50 | $47.00 | $95.00 |
| 0096 | Cones (4435000000-N) | EACH | 100 | $20.00 | $22.00 | $26.50 | $22.50 | $71.50 |
| 0097 | Barricades (type III) (4445000000-E) | LF | 184 | $28.00 | $20.00 | $26.50 | $25.15 | $22.00 |
| 0098 | Pedestrian channelizing devices (4447000000-E) | LF | 102 | $40.00 | $35.00 | $27.50 | $72.76 | $46.50 |
| 0099 | Flagger (4455000000-N) | DAY | 60 | $1,150.00 | $500.00 | $850.00 | $450.00 | $1,659.50 |
| 0100 | TMA (4480000000-N) | EACH | 1 | $6,762.92 | $15,000 | $92,000 | $100,000 | $80,000 |
| 0101 | Skinny drum (4516000000-N) | EACH | 100 | $50.00 | $21.00 | $37.25 | $35.00 | $90.00 |
| 0102 | Temporary raised pavement markers (4650000000-N) | EACH | 200 | $11.39 | $11.39 | $12.75 | $7.00 | $11.50 |
| 0103 | Thermoplastic pavement marking lines (4", 90 mils) (4685000000-E) | LF | 18,825 | $0.70 | $0.70 | $0.79 | $1.45 | $0.50 |
| 0104 | Thermoplastic pavement marking lines (8", 90 mils) (4695000000-E) | LF | 6,145 | $1.48 | $1.48 | $1.65 | $2.50 | $1.50 |
| 0105 | Thermoplastic pavement marking lines (24", 90 mils) (4709000000-E) | LF | 1,800 | $14.00 | $14.00 | $15.75 | $12.00 | $14.14 |
| 0106 | Thermoplastic pavement marking character (90 mils) (4720000000-E) | EACH | 46 | $130.00 | $130.00 | $146.00 | $100.00 | $131.31 |
| 0107 | Thermoplastic pavement marking symbol (90 mils) (4725000000-E) | EACH | 129 | $130.00 | $130.00 | $146.00 | $260.00 | $131.31 |
| 0108 | Paint pavement marking lines (4") (4810000000-E) | LF | 20,993 | $0.36 | $0.36 | $0.50 | $1.00 | $0.50 |
| 0109 | Paint pavement marking lines (8") (4820000000-E) | LF | 1,350 | $1.00 | $1.00 | $1.10 | $1.25 | $1.01 |
| 0110 | Paint pavement marking lines (24") (4835000000-E) | LF | 150 | $4.00 | $4.00 | $4.49 | $9.00 | $4.04 |
| 0111 | Paint pavement marking character (4840000000-N) | EACH | 4 | $60.00 | $60.00 | $67.50 | $80.00 | $60.61 |
| 0112 | Paint pavement marking symbol (4845000000-N) | EACH | 27 | $60.00 | $60.00 | $67.50 | $80.00 | $60.61 |
| 0113 | Generic pavement marking item (EA) - polycarbonate H-shaped markers (4895000000-N) | EACH | 474 | $54.00 | $54.00 | $60.75 | $55.00 | $54.55 |
| 0114 | Elect duct **, size ***** - (JA, 4") (5150000000-E) | LF | 1,000 | $17.00 | $52.00 | $51.50 | $52.00 | $52.79 |
| 0115 | 2" water line (5325200000-E) | LF | 27 | $300.00 | $40.50 | $84.25 | $50.50 | $255.00 |
| 0116 | 6" water line (5325600000-E) | LF | 708 | $200.00 | $112.25 | $101.00 | $112.25 | $187.00 |
| 0117 | 8" water line (5325800000-E) | LF | 3,253 | $125.00 | $121.90 | $140.00 | $121.90 | $188.00 |
| 0118 | 10" water line (5326000000-E) | LF | 58 | $400.00 | $145.50 | $185.00 | $145.50 | $361.00 |
| 0119 | 12" water line (5326200000-E) | LF | 8,330 | $140.00 | $155.80 | $163.00 | $155.80 | $201.00 |
| 0120 | DI H2O pipe fittings (5329000000-E) | LB | 31,460 | $11.50 | $11.50 | $15.75 | $11.50 | $14.00 |
| 0121 | 2" valve (5536000000-E) | EACH | 12 | $2,000.00 | $1,670.00 | $2,200.00 | $1,670.00 | $3,900.00 |
| 0122 | 6" valve (5540000000-E) | EACH | 13 | $2,800.00 | $2,675.00 | $3,600.00 | $2,675.00 | $5,700.00 |
| 0123 | 8" valve (5546000000-E) | EACH | 23 | $3,900.00 | $3,575.00 | $4,100.00 | $3,575.00 | $6,800.00 |
| 0124 | 10" valve (5552000000-E) | EACH | 1 | $8,000.00 | $5,015.00 | $4,900.00 | $5,015.00 | $9,900.00 |
| 0125 | 12" valve (5558000000-E) | EACH | 31 | $6,500.00 | $6,455.00 | $5,500.00 | $6,455.00 | $10,800 |
| 0126 | 6" tapping sleeve & valve (5571600000-E) | EACH | 1 | $11,500 | $9,400.00 | $16,000 | $9,400.00 | $12,000 |
| 0127 | 12" tapping sleeve & valve (5572200000-E) | EACH | 1 | $21,000 | $21,800 | $19,000 | $21,800 | $21,000 |
| 0128 | Relocate water meter (5648000000-N) | EACH | 26 | $3,500.00 | $1,335.00 | $3,200.00 | $1,335.00 | $2,400.00 |
| 0129 | Reconnect water meter (5649000000-N) | EACH | 15 | $3,500.00 | $1,335.00 | $2,600.00 | $1,335.00 | $2,200.00 |
| 0130 | Fire hydrant (5666000000-N) | EACH | 16 | $8,500.00 | $7,410.00 | $6,700.00 | $7,410.00 | $10,800 |
| 0131 | Fire hydrant leg (5673000000-E) | LF | 141 | $90.00 | $77.20 | $118.00 | $77.25 | $259.00 |
| 0132 | **" water service line - (2") (5686000000-E) | LF | 186 | $200.00 | $62.50 | $76.50 | $62.50 | $192.00 |
| 0133 | Water service line (<2") (5686500000-E) | LF | 728 | $110.00 | $79.00 | $61.75 | $79.00 | $144.00 |
| 0134 | 8" sanitary gravity sewer (5691300000-E) | LF | 2,093 | $200.00 | $250.00 | $208.00 | $250.00 | $245.00 |
| 0135 | Sanitary sewer clean-out (5768000000-N) | EACH | 7 | $2,300.00 | $5,425.00 | $2,400.00 | $5,425.00 | $2,300.00 |
| 0136 | Sewer service line (5768500000-E) | LF | 163 | $185.00 | $222.25 | $65.25 | $222.25 | $225.00 |
| 0137 | 4' dia utility manhole (5775000000-E) | EACH | 18 | $16,000 | $11,600 | $7,200.00 | $11,600 | $12,800 |
| 0138 | 5' dia utility manhole (5776000000-E) | EACH | 3 | $17,500 | $17,950 | $10,000 | $17,950 | $18,100 |
| 0139 | Utility manhole wall 4' dia (5781000000-E) | LF | 61 | $265.00 | $1,150.00 | $955.00 | $1,150.00 | $870.00 |
| 0140 | Utility manhole wall 5' dia (5782000000-E) | LF | 10 | $265.00 | $1,875.00 | $1,100.00 | $1,875.00 | $910.00 |
| 0141 | Abandon 6" utility pipe (5800000000-E) | LF | 2,149 | $13.00 | $14.90 | $3.00 | $14.90 | $12.00 |
| 0142 | Abandon 8" utility pipe (5801000000-E) | LF | 3,392 | $15.00 | $15.40 | $5.50 | $15.40 | $13.00 |
| 0143 | Abandon 10" utility pipe (5802000000-E) | LF | 255 | $60.00 | $23.00 | $8.50 | $23.00 | $19.00 |
| 0144 | Abandon 12" utility pipe (5804000000-E) | LF | 3,610 | $19.00 | $28.10 | $12.25 | $28.10 | $23.00 |
| 0145 | Remove fire hydrant (5815500000-N) | EACH | 8 | $2,500.00 | $2,800.00 | $3,700.00 | $2,800.00 | $3,700.00 |
| 0146 | Abandon utility manhole (5816000000-N) | EACH | 1 | $2,400.00 | $2,185.00 | $4,300.00 | $2,185.00 | $3,200.00 |
| 0147 | Remove utility manhole (5828000000-N) | EACH | 12 | $3,175.00 | $4,600.00 | $3,200.00 | $4,600.00 | $3,500.00 |
| 0148 | 16" encasement pipe (5835700000-E) | LF | 475 | $300.00 | $325.00 | $275.00 | $325.00 | $187.00 |
| 0149 | 24" encasement pipe (5836000000-E) | LF | 416 | $340.00 | $392.00 | $410.00 | $392.00 | $242.00 |
| 0150 | Bore & jack **" - (16") (5872500000-E) | LF | 475 | $420.00 | $673.00 | $691.00 | $673.00 | $850.00 |
| 0151 | Bore & jack **" - (24") (5872500000-E) | LF | 416 | $500.00 | $728.00 | $843.00 | $728.00 | $875.00 |
| 0152 | Generic utility item (EA) - concrete cradle protection (5882000000-N) | EACH | 1 | $10,000 | $8,750.00 | $4,138.00 | $9,250.00 | $1,900.00 |
| 0153 | Temporary silt fence (6000000000-E) | LF | 42,565 | $1.00 | $2.50 | $3.85 | $2.85 | $2.50 |
| 0154 | Stone for erosion control, class A (6006000000-E) | TON | 900 | $85.00 | $100.00 | $188.00 | $105.00 | $115.00 |
| 0155 | Stone for erosion control, class B (6009000000-E) | TON | 955 | $40.00 | $100.00 | $107.00 | $105.00 | $115.00 |
| 0156 | Sediment control stone (6012000000-E) | TON | 2,000 | $25.00 | $60.00 | $188.00 | $80.00 | $90.00 |
| 0157 | Temporary mulching (6015000000-E) | ACRE | 51.50 | $250.00 | $1,100.00 | $1,200.00 | $1,800.00 | $1,100.00 |
| 0158 | Seed for temporary seeding (6018000000-E) | LB | 3,300 | $1.00 | $3.00 | $3.35 | $2.50 | $3.00 |
| 0159 | Fertilizer for temporary seeding (6021000000-E) | TON | 16.50 | $250.00 | $1,200.00 | $1,200.00 | $950.00 | $1,200.00 |
| 0160 | Temporary slope drains (6024000000-E) | LF | 395 | $15.00 | $18.00 | $45.50 | $24.93 | $26.00 |
| 0161 | Safety fence (6029000000-E) | LF | 560 | $3.00 | $3.00 | $2.20 | $2.20 | $3.00 |
| 0162 | Silt excavation (6030000000-E) | CY | 1,960 | $1.00 | $14.00 | $83.25 | $20.00 | $95.00 |
| 0163 | Matting for erosion control (6036000000-E) | SY | 11,000 | $1.45 | $1.45 | $1.65 | $1.60 | $1.50 |
| 0164 | Coir fiber mat (6037000000-E) | SY | 100 | $9.00 | $4.95 | $5.50 | $11.50 | $5.00 |
| 0165 | 1/4" hardware cloth (6042000000-E) | LF | 4,985 | $3.00 | $3.75 | $4.20 | $6.00 | $13.50 |
| 0166 | Special stilling basins (6070000000-N) | EACH | 3 | $1,750.00 | $850.00 | $755.00 | $7,435.54 | $2,672.50 |
| 0167 | Flocculant (6071002000-E) | LB | 425 | $5.00 | $8.00 | $26.75 | $9.00 | $10.00 |
| 0168 | Coir fiber wattle (6071012000-E) | LF | 1,980 | $18.00 | $13.00 | $16.25 | $11.00 | $13.00 |
| 0169 | Coir fiber baffle (6071030000-E) | LF | 360 | $5.85 | $5.85 | $9.50 | $6.10 | $6.00 |
| 0170 | Seeding and mulching (6084000000-E) | ACRE | 45 | $500.00 | $2,475.00 | $2,800.00 | $2,750.00 | $2,475.00 |
| 0171 | Mowing (6087000000-E) | ACRE | 30 | $200.00 | $200.00 | $225.00 | $200.00 | $200.00 |
| 0172 | Seed for repair seeding (6090000000-E) | LB | 550 | $4.00 | $4.75 | $5.25 | $6.20 | $5.00 |
| 0173 | Fertilizer for repair seeding (6093000000-E) | TON | 1.50 | $1,200.00 | $1,200.00 | $1,300.00 | $1,600.00 | $1,200.00 |
| 0174 | Seed for supplemental seeding (6096000000-E) | LB | 1,125 | $4.00 | $4.25 | $4.80 | $5.50 | $4.50 |
| 0175 | Fertilizer topdressing (6108000000-E) | TON | 33.25 | $500.00 | $1,100.00 | $1,200.00 | $1,000.00 | $1,100.00 |
| 0176 | Specialized hand mowing (6114500000-N) | MHR | 10 | $150.00 | $110.00 | $124.00 | $175.00 | $110.00 |
| 0177 | Response for erosion control (6117000000-N) | EACH | 25 | $400.00 | $1.00 | $197.00 | $100.00 | $200.00 |
| 0178 | Concrete washout structure (6117500000-N) | EACH | 6 | $2,250.00 | $1,000.00 | $1,400.00 | $1,500.00 | $7,000.00 |
| 0179 | Generic erosion control item (EA) - fabric insert inlet protection cleanout (6132000000-N) | EACH | 630 | $120.00 | $100.00 | $100.00 | $150.00 | $371.00 |
| 0180 | Generic erosion control item (EA) - fabric insert inlet protection, type 1 (6132000000-N) | EACH | 210 | $265.00 | $215.00 | $230.00 | $250.00 | $530.00 |
| 0181 | Generic erosion control item (SY) - permanent soil reinforcement mat, type 3 (6141000000-E) | SY | 500 | $10.00 | $9.50 | $8.00 | $14.00 | $12.00 |
| 0182 | Pedestrian signal head (16", 1 section W/countdown) (7048500000-E) | EACH | 6 | $1,250.00 | $1,250.00 | $1,400.00 | $1,250.00 | $1,269.04 |
| 0183 | Signal cable (7060000000-E) | LF | 9,880 | $4.85 | $4.85 | $5.50 | $4.85 | $5.00 |
| 0184 | Vehicle signal head (12", 3 section) (7120000000-E) | EACH | 37 | $1,100.00 | $1,100.00 | $1,300.00 | $1,100.00 | $1,116.75 |
| 0185 | Vehicle signal head (12", 4 section) (7132000000-E) | EACH | 9 | $1,400.00 | $1,400.00 | $1,600.00 | $1,400.00 | $1,421.32 |
| 0186 | Vehicle signal head (12", 5 section) (7144000000-E) | EACH | 5 | $1,775.00 | $1,775.00 | $2,000.00 | $1,775.00 | $1,802.03 |
| 0187 | Messenger cable (1/4") (7252000000-E) | LF | 700 | $4.00 | $4.00 | $4.60 | $4.00 | $4.06 |
| 0188 | Messenger cable (3/8") (7264000000-E) | LF | 2,000 | $4.50 | $4.50 | $5.25 | $4.50 | $4.57 |
| 0189 | Paved trench (***********) - (2, 2") (7288000000-E) | LF | 50 | $50.00 | $50.00 | $57.25 | $50.00 | $50.76 |
| 0190 | Unpaved trench (***********) - (2, 2") (7300000000-E) | LF | 620 | $15.00 | $15.00 | $17.25 | $15.00 | $15.23 |
| 0191 | Junction box (standard size) (7324000000-N) | EACH | 12 | $900.00 | $900.00 | $1,000.00 | $900.00 | $913.71 |
| 0192 | Junction box (over-sized, heavy duty) (7348000000-N) | EACH | 2 | $1,500.00 | $1,500.00 | $1,700.00 | $1,500.00 | $1,522.85 |
| 0193 | Wood pole (7360000000-N) | EACH | 7 | $1,800.00 | $1,800.00 | $2,100.00 | $1,800.00 | $1,827.41 |
| 0194 | Guy assembly (7372000000-N) | EACH | 15 | $900.00 | $900.00 | $1,000.00 | $900.00 | $913.71 |
| 0195 | 1" riser with weatherhead (7408000000-E) | EACH | 1 | $1,000.00 | $1,000.00 | $1,100.00 | $1,000.00 | $1,015.23 |
| 0196 | 2" riser with weatherhead (7420000000-E) | EACH | 3 | $1,200.00 | $1,200.00 | $1,400.00 | $1,200.00 | $1,218.27 |
| 0197 | Heat shrink tubing retrofit kit (7430000000-N) | EACH | 1 | $350.00 | $350.00 | $401.00 | $350.00 | $355.33 |
| 0198 | Inductive loop sawcut (7444000000-E) | LF | 2,600 | $12.00 | $12.00 | $13.75 | $12.00 | $12.18 |
| 0199 | Lead-in cable (14-2) (7456100000-E) | LF | 6,100 | $2.50 | $2.50 | $2.85 | $2.50 | $2.54 |
| 0200 | Site survey (7481000000-N) | EACH | 3 | $100.00 | $100.00 | $115.00 | $100.00 | $101.52 |
| 0201 | Camera without internal loop emulator processing unit (7481240000-N) | EACH | 12 | $4,500.00 | $4,500.00 | $5,200.00 | $4,500.00 | $4,568.53 |
| 0202 | External loop emulator processing unit (7481260000-N) | EACH | 3 | $6,500.00 | $6,500.00 | $7,500.00 | $6,500.00 | $6,598.98 |
| 0203 | Communications cable (** fiber) - (12) (7516000000-E) | LF | 200 | $4.75 | $4.75 | $5.50 | $4.75 | $5.00 |
| 0204 | Drop cable (7528000000-E) | LF | 250 | $4.95 | $4.95 | $5.75 | $4.95 | $5.00 |
| 0205 | Interconnect center (7552000000-N) | EACH | 2 | $3,500.00 | $3,500.00 | $4,000.00 | $3,500.00 | $3,553.30 |
| 0206 | Delineator marker (7566000000-N) | EACH | 2 | $200.00 | $200.00 | $229.00 | $200.00 | $203.05 |
| 0207 | Remove existing communications cable (7575160000-E) | LF | 200 | $2.50 | $2.50 | $2.85 | $2.50 | $2.54 |
| 0208 | Back pull fiber optic cable (7575170000-E) | LF | 600 | $4.00 | $4.00 | $4.60 | $4.00 | $4.06 |
| 0209 | Metal strain signal pole (7576000000-N) | EACH | 7 | $16,750 | $16,750 | $19,000 | $16,750 | $17,005 |
| 0210 | Soil test (7613000000-N) | EACH | 7 | $2,000.00 | $2,000.00 | $2,300.00 | $2,000.00 | $2,030.46 |
| 0211 | Drilled pier foundation (7614100000-E) | CY | 63 | $1,800.00 | $1,800.00 | $2,100.00 | $1,800.00 | $1,827.41 |
| 0212 | Sign for signals (7636000000-N) | EACH | 4 | $445.00 | $445.00 | $510.00 | $445.00 | $451.78 |
| 0213 | Type II pedestal with foundation (7642200000-N) | EACH | 6 | $4,500.00 | $4,500.00 | $5,200.00 | $4,500.00 | $4,568.53 |
| 0214 | Signal cabinet foundation (7684000000-N) | EACH | 2 | $2,500.00 | $2,500.00 | $2,900.00 | $2,500.00 | $2,538.07 |
| 0215 | Contlrs with CBNT (**************) - (2070LX, 332) (7696000000-N) | EACH | 1 | $25,000 | $25,000 | $29,000 | $25,000 | $25,381 |
| 0216 | Detector card (type 170) (7744000000-N) | EACH | 21 | $275.00 | $275.00 | $315.00 | $275.00 | $279.19 |
| 0217 | Traffic signal removal (7948000000-N) | EACH | 1 | $7,500.00 | $7,500.00 | $8,600.00 | $7,500.00 | $7,614.21 |
| 0218 | Generic signal item (EA) - cabinet without controller (332) (7980000000-N) | EACH | 1 | $22,500 | $22,500 | $26,000 | $22,500 | $22,843 |
| 0219 | Generic signal item (EA) - controller (2070LX) (7980000000-N) | EACH | 2 | $6,500.00 | $6,500.00 | $7,500.00 | $6,500.00 | $6,598.99 |
| 0220 | Generic signal item (EA) - ethernet edge switch (7980000000-N) | EACH | 2 | $3,500.00 | $3,500.00 | $4,000.00 | $3,500.00 | $3,553.30 |
| 0221 | Generic signal item (EA) - luminaire arm for tempoary video system (7980000000-N) | EACH | 12 | $250.00 | $250.00 | $287.00 | $250.00 | $253.81 |
| 0222 | Generic signal item (LF) - video cable (cat-6) (7990000000-E) | LF | 250 | $3.50 | $3.50 | $4.00 | $3.50 | $3.55 |
| 0223 | MSE retain wall no ** - (1) (8801000000-E) | SF | 420 | $70.00 | $135.00 | $148.00 | $170.00 | $75.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
Every contract let that day: NCDOT letting of January 21, 2025. Compiled by Mirage Metrics.