NCDOT contract C204797 bid tabulation
GRADING, DRAINAGE, PAVING, SIGNALS, AND CULVERT. US-401 (RAEFORD RD) FROM EAST OF NC-162 (BUNCE RD) TO EAST OF BRIGHTON RD. Let by North Carolina DOT on March 18, 2025, Cumberland. 3 bids received; low bid $48,425,858 by Branch Civil Inc.
- Owner
- North Carolina DOT
- Letting
- 18 MAR 2025
- Pay items
- 309
- Data through
- 20 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Branch Civil Inc | $48,425,858 | Low |
| 2 | Barnhill Contracting Company | $52,201,808 | +8.0% |
| 3 | Highland Paving Co LLC | $55,308,495 | +14% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Branch Civil Inc | 2. Barnhill Contracting Company | 3. Highland Paving Co LLC |
|---|---|---|---|---|---|---|
| 0001 | Mobilization (0000100000-N) | LS | 1 | $2,407,000 | $2,610,109 | $2,765,000 |
| 0002 | Construction surveying (0000400000-N) | LS | 1 | $404,000 | $643,750 | $622,000 |
| 0003 | Clearing & grubbing (0001000000-E) | LS | 1 | $2,871,391 | $128,000 | $5,000,000 |
| 0004 | Supplementary clearing & grubbing (0008000000-E) | ACRE | 1 | $33,300 | $1.00 | $1.00 |
| 0005 | Unclassified excavation (0022000000-E) | CY | 6,000 | $17.25 | $185.00 | $27.55 |
| 0006 | Undercut excavation (0036000000-E) | CY | 600 | $40.75 | $57.00 | $31.50 |
| 0007 | Borrow excavation (0106000000-E) | CY | 16,000 | $49.00 | $51.00 | $32.85 |
| 0008 | Drainage ditch excavation (0134000000-E) | CY | 2,150 | $17.50 | $36.00 | $27.15 |
| 0009 | Removal of existing asphalt pavement (0156000000-E) | SY | 2,200 | $23.50 | $28.00 | $18.60 |
| 0010 | Select granular material (0195000000-E) | CY | 500 | $45.50 | $62.00 | $35.25 |
| 0011 | Geotextile for soil stabilization (0196000000-E) | SY | 1,200 | $4.75 | $5.00 | $4.00 |
| 0012 | Temporary shoring (0199000000-E) | SF | 10,132 | $14.50 | $105.00 | $88.00 |
| 0013 | Generic grading item (TON) - hauling and disposal of petroleum contaminated soil (0255000000-E) | TON | 75 | $78.00 | $157.00 | $118.00 |
| 0014 | Foundation conditioning material, minor structures (0318000000-E) | TON | 12,209 | $72.50 | $64.00 | $44.00 |
| 0015 | FND condit geotextile (4A) (0321000000-E) | SY | 12,755 | $5.75 | $3.50 | $3.50 |
| 0016 | Generic drainage item (CY) - host pipe grouting (0331000000-E) | CY | 110 | $854.00 | $500.00 | $500.00 |
| 0017 | **" drainage pipe - (60") (0335000000-E) | LF | 52 | $337.00 | $520.00 | $520.00 |
| 0018 | 15" drainage pipe (0335200000-E) | LF | 592 | $82.00 | $90.00 | $90.00 |
| 0019 | 18" drainage pipe (0335300000-E) | LF | 292 | $85.00 | $99.00 | $99.00 |
| 0020 | 24" drainage pipe (0335400000-E) | LF | 8 | $224.00 | $191.00 | $191.00 |
| 0021 | 30" drainage pipe (0335500000-E) | LF | 80 | $165.00 | $145.00 | $145.00 |
| 0022 | 36" drainage pipe (0335600000-E) | LF | 68 | $164.00 | $198.00 | $198.00 |
| 0023 | 42" drainage pipe (0335700000-E) | LF | 56 | $354.00 | $230.00 | $230.00 |
| 0024 | 48" drainage pipe (0335800000-E) | LF | 132 | $218.00 | $260.00 | $260.00 |
| 0025 | **" drainage pipe elbow - (48") (0335850000-E) | EACH | 2 | $1,640.00 | $4,150.00 | $4,150.00 |
| 0026 | 72" RC pipe culverts, class III (0426000000-E) | LF | 284 | $1,027.00 | $782.00 | $782.00 |
| 0027 | ***" RCP culv class IV - (12") (0448000000-E) | LF | 8 | $111.50 | $115.00 | $115.00 |
| 0028 | ***" RCP culv class IV - (48") (0448000000-E) | LF | 552 | $532.00 | $422.00 | $422.00 |
| 0029 | ***" RCP culv class IV - (54") (0448000000-E) | LF | 600 | $628.00 | $508.00 | $508.00 |
| 0030 | ***" RCP culv class IV - (60") (0448000000-E) | LF | 344 | $736.00 | $570.00 | $570.00 |
| 0031 | 15" RC pipe culverts, class IV (0448200000-E) | LF | 6,740 | $117.50 | $115.00 | $115.00 |
| 0032 | 18" RC pipe culverts, class IV (0448300000-E) | LF | 1,972 | $119.00 | $132.00 | $132.00 |
| 0033 | 24" RC pipe culverts, class IV (0448400000-E) | LF | 1,812 | $147.00 | $191.00 | $191.00 |
| 0034 | 30" RC pipe culverts, class IV (0448500000-E) | LF | 836 | $204.00 | $207.00 | $207.00 |
| 0035 | 36" RC pipe culverts, class IV (0448600000-E) | LF | 2,868 | $258.00 | $257.00 | $257.00 |
| 0036 | 42" RC pipe culverts, class IV (0448700000-E) | LF | 1,016 | $381.00 | $353.00 | $353.00 |
| 0037 | **"WLD STL pipe grad B in soil - (60", 0.875") (0973100000-E) | LF | 140 | $3,075.00 | $4,935.00 | $2,415.00 |
| 0038 | **"WLD STL pipe grad B in soil - (72", 1.000") (0973100000-E) | LF | 62 | $4,581.00 | $7,690.00 | $3,940.00 |
| 0039 | **"WLD STL pipe grad B in soil - (84", 1.000") (0973100000-E) | LF | 312 | $4,205.00 | $7,425.00 | $3,805.00 |
| 0040 | **"WLD STL pipe grad B not in soil - (60", 0.875") (0973300000-E) | LF | 140 | $0.01 | $0.01 | $1.00 |
| 0041 | **"WLD STL pipe grad B not in soil - (72", 1.000") (0973300000-E) | LF | 62 | $0.01 | $0.01 | $0.01 |
| 0042 | **"WLD STL pipe grad B not in soil - (84", 1.000") (0973300000-E) | LF | 312 | $0.01 | $0.01 | $0.01 |
| 0043 | Generic pipe item (LF) - 4" PVC sleeve (0986000000-E) | LF | 950 | $73.50 | $65.00 | $100.00 |
| 0044 | Generic pipe item (LF) - 72" pipe rehabilitation cipp liner (0986000000-E) | LF | 260 | $2,325.00 | $1,695.00 | $2,050.00 |
| 0045 | Generic pipe item (LF) - pre-installation inspection (0986000000-E) | LF | 260 | $235.00 | $200.00 | $241.00 |
| 0046 | Generic pipe item (EA) - DE-watering (0992000000-E) | EACH | 2 | $11,100 | $50,000 | $10,000 |
| 0047 | Pipe removal (0995000000-E) | LF | 9,680 | $27.50 | $57.00 | $35.00 |
| 0048 | Fine grading (1011000000-N) | LS | 1 | $288,000 | $5,842,500 | $7,431,924 |
| 0049 | Shallow undercut (1099500000-E) | CY | 950 | $44.00 | $41.00 | $23.55 |
| 0050 | Class IV subgrade stabilization (1099700000-E) | TON | 1,900 | $57.00 | $48.00 | $53.70 |
| 0051 | Geotextile for subgrade stabilization (1112000000-E) | SY | 2,850 | $6.25 | $6.80 | $5.75 |
| 0052 | Incidental stone base (1220000000-E) | TON | 1,500 | $65.00 | $75.00 | $57.25 |
| 0053 | Incidental milling (1330000000-E) | SY | 5,000 | $3.50 | $15.00 | $13.40 |
| 0054 | Asphalt conc base course, type B25.0C (1491000000-E) | TON | 15,570 | $139.00 | $110.00 | $100.00 |
| 0055 | Asphalt conc intermediate course, type I19.0C (1503000000-E) | TON | 19,400 | $128.00 | $100.00 | $107.00 |
| 0056 | Asphalt conc surface course, type S9.5B (1519000000-E) | TON | 1,080 | $167.00 | $144.00 | $100.00 |
| 0057 | Asphalt conc surface course, type S9.5C (1523000000-E) | TON | 16,660 | $122.00 | $92.50 | $100.50 |
| 0058 | Asphalt binder for plant mix (1575000000-E) | TON | 2,685 | $625.00 | $586.00 | $562.00 |
| 0059 | Asphalt plant mix, pavement repair (1693000000-E) | TON | 2,099 | $225.00 | $306.00 | $335.00 |
| 0060 | Subdrain excavation (2022000000-E) | CY | 44.80 | $41.00 | $35.00 | $35.00 |
| 0061 | Geotextile for subsurface drains (2026000000-E) | SY | 200 | $6.00 | $12.00 | $12.00 |
| 0062 | Subdrain coarse aggregate (2036000000-E) | CY | 33.60 | $89.50 | $80.00 | $80.00 |
| 0063 | 6" perforated subdrain pipe (2044000000-E) | LF | 200 | $11.00 | $16.00 | $16.00 |
| 0064 | Subdrain pipe outlet (2070000000-N) | EACH | 1 | $590.00 | $400.00 | $400.00 |
| 0065 | 6" outlet pipe (2077000000-E) | LF | 6 | $98.50 | $45.00 | $45.00 |
| 0066 | Endwalls (2209000000-E) | CY | 5.60 | $2,369.00 | $1,500.00 | $1,500.00 |
| 0067 | Reinforced endwalls (2220000000-E) | CY | 269.60 | $2,223.00 | $2,000.00 | $3,110.00 |
| 0068 | Pipe collars (2253000000-E) | CY | 23.59 | $1,662.00 | $2,000.00 | $2,000.00 |
| 0069 | Pipe plugs (2264000000-E) | CY | 15 | $1,701.00 | $2,000.00 | $2,000.00 |
| 0070 | Flowable fill (2275000000-E) | CY | 344 | $400.00 | $475.00 | $475.00 |
| 0071 | Masonry drainage structures (2286000000-N) | EACH | 228 | $4,997.00 | $3,600.00 | $3,705.00 |
| 0072 | Masonry drainage structures (2297000000-E) | CY | 30.50 | $4,000.00 | $4,200.00 | $4,995.00 |
| 0073 | Masonry drainage structures (2308000000-E) | LF | 136.80 | $1,170.00 | $750.00 | $795.00 |
| 0074 | Frame with two grates, STD 840.16 (2364000000-N) | EACH | 77 | $1,883.00 | $1,150.00 | $1,500.00 |
| 0075 | Frame with two grates, STD 840.29 (2367000000-N) | EACH | 9 | $1,786.00 | $1,100.00 | $1,450.00 |
| 0076 | Frame-GRT-HD 840.03 ** - (E) (2374000000-N) | EACH | 24 | $2,044.00 | $1,275.00 | $1,625.00 |
| 0077 | Frame-GRT-HD 840.03 ** - (F) (2374000000-N) | EACH | 58 | $2,044.00 | $1,275.00 | $1,625.00 |
| 0078 | Frame-GRT-HD 840.03 ** - (G) (2374000000-N) | EACH | 55 | $2,044.00 | $1,275.00 | $1,625.00 |
| 0079 | Frame with cover, STD 840.54 (2396000000-N) | EACH | 20 | $1,582.00 | $950.00 | $1,300.00 |
| 0080 | Concrete transitional section for drop inlet (2451000000-N) | EACH | 50 | $1,223.00 | $985.00 | $1,320.00 |
| 0081 | **"X**" concrete curb - (8" X 12") (2535000000-E) | LF | 2,950 | $41.50 | $28.85 | $28.85 |
| 0082 | 1'-6" concrete curb & gutter (2542000000-E) | LF | 3,140 | $37.00 | $34.35 | $34.35 |
| 0083 | 2'-6" concrete curb & gutter (2549000000-E) | LF | 19,909 | $39.50 | $39.69 | $39.70 |
| 0085 | 4" concrete sidewalk (2591000000-E) | SY | 10,142 | $72.50 | $62.94 | $62.95 |
| 0086 | Concrete curb ramps (2605000000-N) | EACH | 113 | $2,946.00 | $2,450.00 | $2,450.00 |
| 0087 | 6" concrete driveway (2612000000-E) | SY | 1,730 | $106.50 | $83.46 | $83.50 |
| 0088 | 5" monolithic concrete islands (keyed in) (2655000000-E) | SY | 5,250 | $98.50 | $82.18 | $82.20 |
| 0089 | Precast reinforced concrete barrier, single faced (2724000000-E) | LF | 64 | $111.00 | $305.30 | $312.50 |
| 0090 | Adjustment of catch basins (2800000000-N) | EACH | 7 | $712.00 | $1,200.00 | $1,200.00 |
| 0091 | Adjustment of drop inlets (2815000000-N) | EACH | 2 | $712.00 | $1,200.00 | $2,500.00 |
| 0092 | Adjustment of manholes (2830000000-N) | EACH | 3 | $712.00 | $2,500.00 | $2,500.00 |
| 0093 | Adjustment of meter boxes or valve boxes (2845000000-N) | EACH | 7 | $295.00 | $1,527.73 | $1,535.00 |
| 0094 | Convert existing catch basin to junction box (2860000000-N) | EACH | 2 | $5,737.00 | $1,500.00 | $1,500.00 |
| 0095 | Convert existing drop inlet to junction box (2905000000-N) | EACH | 2 | $5,737.00 | $1,500.00 | $1,500.00 |
| 0096 | Convert existing junction box to catch basin (2965000000-N) | EACH | 2 | $4,378.00 | $1,500.00 | $1,500.00 |
| 0097 | Steel beam guardrail (3030000000-E) | LF | 625 | $29.25 | $24.00 | $24.00 |
| 0098 | Additional guardrail posts (3150000000-N) | EACH | 5 | $51.50 | $11.00 | $42.00 |
| 0099 | Guardrail end units, type cat-1 (3210000000-N) | EACH | 3 | $1,162.00 | $850.00 | $950.00 |
| 0100 | Guardrail end units, type TL-3 (3287000000-N) | EACH | 3 | $4,158.00 | $3,250.00 | $3,400.00 |
| 0101 | Remove existing guardrail (3360000000-E) | LF | 420 | $5.00 | $1.00 | $4.00 |
| 0102 | CHN LK fence **" fabric - (72") (3533000000-E) | LF | 259 | $30.50 | $32.00 | $25.00 |
| 0103 | Chain link fence, 48" fabric (3536000000-E) | LF | 210 | $17.00 | $30.00 | $14.00 |
| 0104 | Met line PST **" CL fen - (72") (3539000000-E) | EACH | 25 | $395.00 | $250.00 | $325.00 |
| 0105 | Metal line posts for 48" chain link fence (3542000000-E) | EACH | 18 | $231.00 | $225.00 | $190.00 |
| 0106 | Met term PST **" CL fen - (72") (3545000000-E) | EACH | 23 | $547.00 | $310.00 | $450.00 |
| 0107 | Metal terminal posts for 48" chain link fence (3548000000-E) | EACH | 2 | $547.00 | $300.00 | $450.00 |
| 0108 | Rip rap, class II (3635000000-E) | TON | 2,400 | $118.00 | $131.02 | $114.00 |
| 0109 | Rip rap, class B (3649000000-E) | TON | 1,100 | $0.01 | $107.84 | $96.00 |
| 0110 | Geotextile for drainage (3656000000-E) | SY | 3,895 | $3.75 | $5.75 | $4.50 |
| 0111 | Supports, 3-LB steel U-channel (4072000000-E) | LF | 2,960 | $7.75 | $7.60 | $7.00 |
| 0112 | Sign erection, type D (4096000000-N) | EACH | 2 | $111.00 | $294.25 | $100.00 |
| 0113 | Sign erection, type E (4102000000-N) | EACH | 161 | $83.50 | $246.10 | $75.00 |
| 0114 | Sign erection, type F (4108000000-N) | EACH | 16 | $83.50 | $283.55 | $75.00 |
| 0115 | Sign erection, type *** (ovrhd) - (A) (4109000000-N) | EACH | 2 | $2,779.00 | $2,000.00 | $2,500.00 |
| 0116 | Sign erect, reloc ** GRD MTD - (D) (4116100000-N) | EACH | 1 | $111.00 | $160.50 | $100.00 |
| 0117 | Sign erect, reloc ** GRD MTD - (E) (4116100000-N) | EACH | 11 | $111.00 | $160.50 | $100.00 |
| 0118 | Disposal of sign system, U-channel (4155000000-N) | EACH | 71 | $50.00 | $10.70 | $45.00 |
| 0119 | Disposal of support, U-channel (4192000000-N) | EACH | 12 | $27.75 | $10.70 | $25.00 |
| 0120 | Disposal of sign, A or B (overhead) (4234000000-N) | EACH | 5 | $556.00 | $250.00 | $500.00 |
| 0121 | Work zone signs (stationary) (4400000000-E) | SF | 376 | $7.50 | $6.59 | $7.00 |
| 0122 | Work zone signs (portable) (4405000000-E) | SF | 576 | $10.75 | $9.47 | $18.85 |
| 0123 | Work zone signs (barricade mounted) (4410000000-E) | SF | 31 | $10.75 | $9.58 | $6.50 |
| 0124 | Flashing arrow board (4415000000-N) | EACH | 6 | $13,600 | $2,461.00 | $3,330.00 |
| 0125 | Portable changeable message sign (4420000000-N) | EACH | 6 | $16,000 | $10,272 | $13,895 |
| 0126 | Drums (4430000000-N) | EACH | 300 | $37.25 | $49.22 | $67.00 |
| 0127 | Cones (4435000000-N) | EACH | 100 | $17.00 | $22.47 | $39.80 |
| 0128 | Barricades (type III) (4445000000-E) | LF | 48 | $40.50 | $26.75 | $36.20 |
| 0129 | Pedestrian channelizing devices (4447000000-E) | LF | 128 | $67.00 | $58.85 | $25.00 |
| 0130 | Flagger (4455000000-N) | DAY | 100 | $481.00 | $468.39 | $517.00 |
| 0131 | Temporary crash cushions (4465000000-N) | EACH | 1 | $6,556.00 | $5,778.00 | $10,000 |
| 0132 | Remove & reset temporary crash cushion (4470000000-N) | EACH | 2 | $2,428.00 | $2,354.00 | $8,000.00 |
| 0133 | TMA (4480000000-N) | EACH | 4 | $80,000 | $29,996 | $38,000 |
| 0134 | Portable concrete barrier (4485000000-E) | LF | 220 | $89.00 | $100.00 | $65.00 |
| 0135 | Remove and reset portable concrete barrier (4500000000-E) | LF | 200 | $35.75 | $75.00 | $50.00 |
| 0136 | Law enforcement (4510000000-N) | HR | 240 | $111.00 | $75.00 | $70.00 |
| 0137 | Skinny drum (4516000000-N) | EACH | 50 | $26.75 | $35.31 | $45.00 |
| 0138 | Generic traffic control item (EA) - pedestrian transport service (4600000000-N) | EACH | 50 | $59.50 | $75.00 | $75.00 |
| 0139 | Temporary raised pavement markers (4650000000-N) | EACH | 252 | $11.00 | $10.00 | $10.00 |
| 0140 | Thermoplastic pavement marking lines (4", 90 mils) (4685000000-E) | LF | 38,536 | $1.50 | $1.25 | $1.25 |
| 0141 | Thermoplastic pavement marking lines (8", 90 mils) (4695000000-E) | LF | 10,595 | $3.25 | $3.00 | $3.00 |
| 0142 | Thermoplastic pavement marking lines (24", 90 mils) (4709000000-E) | LF | 1,402 | $15.50 | $14.00 | $14.00 |
| 0143 | Thermoplastic pavement marking character (90 mils) (4720000000-E) | EACH | 48 | $139.00 | $125.00 | $125.00 |
| 0144 | Thermoplastic pavement marking symbol (90 mils) (4725000000-E) | EACH | 208 | $161.00 | $145.00 | $145.00 |
| 0145 | Paint pavement marking lines (4") (4810000000-E) | LF | 75,513 | $0.65 | $0.60 | $0.60 |
| 0146 | Paint pavement marking lines (8") (4820000000-E) | LF | 12,000 | $1.00 | $1.00 | $1.00 |
| 0147 | Paint pavement marking lines (24") (4835000000-E) | LF | 1,200 | $4.50 | $4.00 | $4.00 |
| 0148 | Paint pavement marking symbol (4845000000-N) | EACH | 60 | $66.50 | $60.00 | $60.00 |
| 0149 | Portable lighting (5255000000-N) | LS | 1 | $105,000 | $228,333 | $165,000 |
| 0150 | 2" water line (5325200000-E) | LF | 569 | $86.00 | $65.00 | $65.00 |
| 0151 | 4" water line (5325400000-E) | LF | 193 | $153.00 | $150.00 | $150.00 |
| 0152 | 6" water line (5325600000-E) | LF | 269 | $175.00 | $200.00 | $200.00 |
| 0153 | 8" water line (5325800000-E) | LF | 5,851 | $192.00 | $125.00 | $125.00 |
| 0154 | 12" water line (5326200000-E) | LF | 25 | $322.00 | $400.00 | $400.00 |
| 0155 | 24" water line (5327400000-E) | LF | 7,323 | $447.00 | $370.00 | $370.00 |
| 0156 | 30" water line (5328000000-E) | LF | 1,669 | $730.00 | $520.00 | $520.00 |
| 0157 | DI H2O pipe fittings (5329000000-E) | LB | 121,103 | $16.50 | $20.00 | $20.00 |
| 0158 | 2" valve (5536000000-E) | EACH | 6 | $1,641.00 | $1,800.00 | $1,800.00 |
| 0159 | 6" valve (5540000000-E) | EACH | 22 | $3,536.00 | $2,650.00 | $2,650.00 |
| 0160 | 8" valve (5546000000-E) | EACH | 26 | $5,431.00 | $3,700.00 | $3,700.00 |
| 0161 | 24" valve (5559400000-E) | EACH | 12 | $50,300 | $46,500 | $46,500 |
| 0162 | 30" valve (5560000000-E) | EACH | 2 | $74,700 | $77,500 | $77,500 |
| 0163 | 6" tapping sleeve & valve (5571600000-E) | EACH | 2 | $16,900 | $7,500.00 | $7,500.00 |
| 0164 | 8" tapping sleeve & valve (5571800000-E) | EACH | 1 | $18,600 | $9,100.00 | $9,100.00 |
| 0165 | 12" tapping sleeve & valve (5572200000-E) | EACH | 1 | $25,400 | $15,900 | $15,900 |
| 0166 | 24" tapping sleeve & valve (5573400000-E) | EACH | 4 | $105,000 | $195,500 | $195,500 |
| 0167 | **" comb air valve - (2") (5590000000-E) | EACH | 10 | $16,700 | $12,750 | $12,750 |
| 0168 | **" blow off - (1") (5600000000-E) | EACH | 1 | $3,225.00 | $3,000.00 | $3,000.00 |
| 0169 | 2" blow off (5606000000-E) | EACH | 4 | $6,195.00 | $3,500.00 | $3,500.00 |
| 0170 | **" water meter - (1") (5643000000-E) | EACH | 1 | $3,677.00 | $2,500.00 | $2,500.00 |
| 0171 | 1-1/2" water meter (5643150000-E) | EACH | 2 | $9,900.00 | $10,000 | $10,000 |
| 0172 | 2" water meter (5643200000-E) | EACH | 1 | $16,900 | $11,000 | $11,000 |
| 0173 | Relocate water meter (5648000000-N) | EACH | 73 | $4,520.00 | $3,000.00 | $3,000.00 |
| 0174 | Reconnect water meter (5649000000-N) | EACH | 8 | $2,206.00 | $3,000.00 | $3,000.00 |
| 0175 | **" DCV backflow prevnt asmbly - (1-1/2") (5653000000-E) | EACH | 2 | $14,000 | $4,000.00 | $4,000.00 |
| 0176 | Relc **" DCV backflow prevnt A - (1") (5653100000-E) | EACH | 2 | $7,416.00 | $2,000.00 | $2,000.00 |
| 0177 | Relocate 6" DCV backflow prevention assembly (5653610000-E) | EACH | 1 | $33,400 | $8,500.00 | $8,500.00 |
| 0178 | Fire hydrant (5666000000-N) | EACH | 22 | $7,863.00 | $6,350.00 | $6,350.00 |
| 0179 | Relocate fire hydrant (5672000000-N) | EACH | 2 | $3,903.00 | $5,050.00 | $5,050.00 |
| 0180 | Fire hydrant leg (5673000000-E) | LF | 313 | $130.00 | $70.00 | $70.00 |
| 0181 | **" water service line - (2") (5686000000-E) | LF | 513 | $86.00 | $50.00 | $50.00 |
| 0182 | Water service line (<2") (5686500000-E) | LF | 817 | $86.00 | $50.00 | $50.00 |
| 0183 | 8" sanitary gravity sewer (5691300000-E) | LF | 1,196 | $232.00 | $325.00 | $325.00 |
| 0184 | Sanitary sewer clean-out (5768000000-N) | EACH | 8 | $2,093.00 | $2,100.00 | $2,100.00 |
| 0185 | Sewer service line (5768500000-E) | LF | 347 | $68.00 | $100.00 | $100.00 |
| 0186 | 4' dia utility manhole (5775000000-E) | EACH | 3 | $9,787.00 | $8,500.00 | $8,500.00 |
| 0187 | 5' dia utility manhole (5776000000-E) | EACH | 1 | $14,100 | $10,500 | $10,500 |
| 0188 | Utility manhole wall 4' dia (5781000000-E) | LF | 8 | $2,715.00 | $850.00 | $850.00 |
| 0189 | Utility manhole wall 5' dia (5782000000-E) | LF | 2 | $3,225.00 | $1,000.00 | $1,000.00 |
| 0190 | Abandon **" utility pipe - (2") (5798000000-E) | LF | 279 | $29.50 | $6.00 | $6.00 |
| 0191 | Abandon 6" utility pipe (5800000000-E) | LF | 2,660 | $22.75 | $12.00 | $12.00 |
| 0192 | Abandon 8" utility pipe (5801000000-E) | LF | 1,168 | $25.00 | $16.00 | $16.00 |
| 0193 | Abandon 12" utility pipe (5804000000-E) | LF | 1,561 | $28.25 | $25.00 | $25.00 |
| 0194 | Abandon 24" utility pipe (5813000000-E) | LF | 7,116 | $34.00 | $45.00 | $45.00 |
| 0195 | Remove water meter (5815000000-N) | EACH | 2 | $3,338.00 | $1,000.00 | $1,000.00 |
| 0196 | Remove fire hydrant (5815500000-N) | EACH | 17 | $3,677.00 | $1,000.00 | $1,000.00 |
| 0197 | 16" encasement pipe (5835700000-E) | LF | 210 | $205.00 | $165.00 | $165.00 |
| 0198 | 30" encasement pipe (5836200000-E) | LF | 248 | $416.00 | $385.00 | $385.00 |
| 0199 | 36" encasement pipe (5836400000-E) | LF | 267 | $506.00 | $440.00 | $440.00 |
| 0200 | Bore & jack **" - (16") (5872500000-E) | LF | 210 | $883.00 | $880.00 | $880.00 |
| 0201 | Bore & jack **" - (30") (5872500000-E) | LF | 248 | $711.00 | $1,430.00 | $1,430.00 |
| 0202 | Bore & jack **" - (36") (5872500000-E) | LF | 267 | $1,025.00 | $1,320.00 | $1,320.00 |
| 0203 | Direct drill **" - (30") (5872600000-E) | LF | 516 | $697.00 | $485.00 | $485.00 |
| 0204 | Generic utility item (EA) - 24" nitrile pipe gaskets (5882000000-N) | EACH | 14 | $402.00 | $295.00 | $295.00 |
| 0205 | Generic utility item (EA) - 30" nitrile pipe gaskets (5882000000-N) | EACH | 6 | $888.00 | $625.00 | $625.00 |
| 0206 | Generic utility item (EA) - 4" nitrile pipe gaskets (5882000000-N) | EACH | 6 | $96.00 | $35.00 | $35.00 |
| 0207 | Generic utility item (EA) - 8" nitrile pipe gaskets (5882000000-N) | EACH | 16 | $119.00 | $65.00 | $65.00 |
| 0208 | Generic utility item (EA) - adjustment of precast manholes (5882000000-N) | EACH | 21 | $1,414.00 | $2,500.00 | $2,500.00 |
| 0209 | Generic utility item (EA) - removal of steel piers (5882000000-N) | EACH | 5 | $2,829.00 | $6,600.00 | $6,600.00 |
| 0210 | Generic utility item (EA) - steel piles piers (5882000000-N) | EACH | 6 | $5,431.00 | $13,500 | $13,500 |
| 0211 | Generic utility item (LF) - polywrap of 24" pipe (5888000000-E) | LF | 270 | $11.25 | $12.00 | $12.00 |
| 0212 | Generic utility item (LF) - polywrap of 30" pipe (5888000000-E) | LF | 100 | $13.50 | $15.00 | $15.00 |
| 0213 | Generic utility item (LF) - polywrap of 4" pipe (5888000000-E) | LF | 100 | $4.00 | $5.00 | $5.00 |
| 0214 | Generic utility item (LF) - polywrap of 8" pipe (5888000000-E) | LF | 270 | $5.75 | $8.00 | $8.00 |
| 0215 | Temporary silt fence (6000000000-E) | LF | 13,000 | $2.75 | $2.95 | $3.75 |
| 0216 | Stone for erosion control, class A (6006000000-E) | TON | 225 | $65.00 | $107.84 | $105.00 |
| 0217 | Stone for erosion control, class B (6009000000-E) | TON | 325 | $61.00 | $109.02 | $96.00 |
| 0218 | Sediment control stone (6012000000-E) | TON | 2,750 | $0.01 | $76.59 | $63.00 |
| 0219 | Temporary mulching (6015000000-E) | ACRE | 16.50 | $1,278.00 | $1,800.00 | $1,150.00 |
| 0220 | Seed for temporary seeding (6018000000-E) | LB | 1,100 | $3.25 | $3.00 | $3.00 |
| 0221 | Fertilizer for temporary seeding (6021000000-E) | TON | 5.50 | $1,278.00 | $900.00 | $1,150.00 |
| 0222 | Temporary slope drains (6024000000-E) | LF | 400 | $51.00 | $25.99 | $17.00 |
| 0223 | Safety fence (6029000000-E) | LF | 1,040 | $2.50 | $3.00 | $2.25 |
| 0224 | Silt excavation (6030000000-E) | CY | 460 | $44.36 | $41.49 | $12.00 |
| 0225 | Matting for erosion control (6036000000-E) | SY | 22,600 | $1.75 | $1.45 | $1.55 |
| 0226 | Coir fiber mat (6037000000-E) | SY | 100 | $5.50 | $6.00 | $5.00 |
| 0227 | 1/4" hardware cloth (6042000000-E) | LF | 11,545 | $3.50 | $3.50 | $3.25 |
| 0228 | Floating turbidity curtain (6048000000-E) | SY | 200 | $55.00 | $63.02 | $55.50 |
| 0229 | Stilling basins (6069000000-E) | CY | 540 | $47.25 | $78.12 | $19.50 |
| 0230 | Special stilling basins (6070000000-N) | EACH | 14 | $344.00 | $50.00 | $670.00 |
| 0231 | Flocculant (6071002000-E) | LB | 50 | $13.25 | $10.00 | $11.00 |
| 0232 | Coir fiber wattle (6071012000-E) | LF | 500 | $14.50 | $7.00 | $13.00 |
| 0233 | Coir fiber baffle (6071030000-E) | LF | 725 | $7.75 | $7.00 | $7.00 |
| 0234 | **" skimmer - (1-1/2") (6071050000-E) | EACH | 2 | $1,202.00 | $1,916.16 | $1,820.00 |
| 0235 | Seeding and mulching (6084000000-E) | ACRE | 15 | $2,751.00 | $2,950.00 | $2,475.00 |
| 0236 | Mowing (6087000000-E) | ACRE | 12 | $278.00 | $300.00 | $250.00 |
| 0237 | Seed for repair seeding (6090000000-E) | LB | 200 | $5.75 | $8.00 | $5.25 |
| 0238 | Fertilizer for repair seeding (6093000000-E) | TON | 0.50 | $1,334.00 | $1,000.00 | $1,200.00 |
| 0239 | Seed for supplemental seeding (6096000000-E) | LB | 375 | $5.00 | $7.00 | $4.50 |
| 0240 | Fertilizer topdressing (6108000000-E) | TON | 11 | $1,223.00 | $1,100.00 | $1,100.00 |
| 0241 | Impervious dike (6111000000-E) | LF | 1,050 | $67.50 | $100.00 | $84.00 |
| 0242 | Specialized hand mowing (6114500000-N) | MHR | 10 | $139.00 | $200.00 | $125.00 |
| 0243 | Manual litter removal (6114800000-N) | MHR | 7 | $167.00 | $250.00 | $150.00 |
| 0244 | Litter disposal (6114900000-E) | TON | 3 | $834.00 | $300.00 | $750.00 |
| 0245 | Response for erosion control (6117000000-N) | EACH | 25 | $111.00 | $100.00 | $100.00 |
| 0246 | Concrete washout structure (6117500000-N) | EACH | 4 | $2,610.00 | $1,893.67 | $1,085.00 |
| 0247 | Culvert diversion channel (6120000000-E) | CY | 250 | $94.50 | $300.00 | $367.00 |
| 0248 | Generic erosion control item (EA) - fabric insert inlet protection cleanout (6132000000-N) | EACH | 1,539 | $41.00 | $160.47 | $101.00 |
| 0249 | Generic erosion control item (EA) - fabric insert inlet protection, type 1 (6132000000-N) | EACH | 513 | $66.00 | $256.79 | $198.00 |
| 0250 | Pedestrian signal head (16", 1 section W/countdown) (7048500000-E) | EACH | 49 | $1,418.00 | $1,250.00 | $1,250.00 |
| 0251 | Signal cable (7060000000-E) | LF | 24,090 | $5.50 | $4.75 | $4.75 |
| 0252 | Vehicle signal head (12", 3 section) (7120000000-E) | EACH | 110 | $1,418.00 | $1,250.00 | $1,250.00 |
| 0253 | Vehicle signal head (12", 4 section) (7132000000-E) | EACH | 19 | $1,701.00 | $1,500.00 | $1,500.00 |
| 0254 | Vehicle signal head (12", 5 section) (7144000000-E) | EACH | 2 | $2,325.00 | $2,050.00 | $2,050.00 |
| 0255 | Backplate (7180000000-N) | EACH | 129 | $335.00 | $295.00 | $295.00 |
| 0256 | Messenger cable (1/4") (7252000000-E) | LF | 660 | $4.25 | $3.75 | $3.75 |
| 0257 | Messenger cable (3/8") (7264000000-E) | LF | 4,870 | $5.75 | $5.00 | $5.00 |
| 0258 | Tracer wire (7279000000-E) | LF | 370 | $2.25 | $2.00 | $2.00 |
| 0259 | Paved trench (***********) - (1, 2") (7288000000-E) | LF | 50 | $28.25 | $25.00 | $25.00 |
| 0260 | Paved trench (***********) - (2, 2") (7288000000-E) | LF | 40 | $34.00 | $30.00 | $30.00 |
| 0261 | Unpaved trench (***********) - (1, 2") (7300000000-E) | LF | 4,050 | $18.25 | $16.00 | $16.00 |
| 0262 | Unpaved trench (***********) - (2, 2") (7300000000-E) | LF | 830 | $25.00 | $22.00 | $22.00 |
| 0263 | Unpaved trench (***********) - (3, 2") (7300000000-E) | LF | 80 | $56.50 | $50.00 | $50.00 |
| 0264 | Unpaved trench (***********) - (4, 2") (7300000000-E) | LF | 240 | $56.50 | $50.00 | $50.00 |
| 0265 | Direct drill (***********) - (1, 2") (7301000000-E) | LF | 830 | $28.25 | $25.00 | $25.00 |
| 0266 | Direct drill (***********) - (2, 2") (7301000000-E) | LF | 130 | $34.00 | $30.00 | $30.00 |
| 0267 | Direct drill (***********) - (4, 2") (7301000000-E) | LF | 75 | $73.50 | $65.00 | $65.00 |
| 0268 | Junction box (standard size) (7324000000-N) | EACH | 82 | $851.00 | $750.00 | $750.00 |
| 0269 | Junction box (over-sized, heavy duty) (7348000000-N) | EACH | 10 | $1,673.00 | $1,475.00 | $1,475.00 |
| 0270 | Wood pole (7360000000-N) | EACH | 10 | $2,269.00 | $2,000.00 | $2,000.00 |
| 0271 | Guy assembly (7372000000-N) | EACH | 20 | $1,248.00 | $1,100.00 | $1,100.00 |
| 0272 | 1" riser with weatherhead (7408000000-E) | EACH | 5 | $907.00 | $800.00 | $800.00 |
| 0273 | 2" riser with weatherhead (7420000000-E) | EACH | 10 | $1,361.00 | $1,200.00 | $1,200.00 |
| 0274 | Heat shrink tubing retrofit kit (7430000000-N) | EACH | 7 | $340.00 | $300.00 | $300.00 |
| 0275 | 2" riser with heat shrink tubing (7432000000-E) | EACH | 1 | $1,673.00 | $1,475.00 | $1,475.00 |
| 0276 | Inductive loop sawcut (7444000000-E) | LF | 9,500 | $13.50 | $12.00 | $12.00 |
| 0277 | Lead-in cable (14-2) (7456100000-E) | LF | 41,650 | $2.75 | $2.45 | $2.45 |
| 0278 | Site survey (7481000000-N) | EACH | 6 | $113.50 | $100.00 | $100.00 |
| 0279 | Camera without internal loop emulator processing unit (7481240000-N) | EACH | 23 | $3,970.00 | $3,500.00 | $3,500.00 |
| 0280 | External loop emulator processing unit (7481260000-N) | EACH | 6 | $7,373.00 | $6,500.00 | $6,500.00 |
| 0281 | Drop cable (7528000000-E) | LF | 1,200 | $5.50 | $4.75 | $4.75 |
| 0282 | Modify splice enclosure (7541000000-N) | EACH | 15 | $1,957.00 | $1,725.00 | $1,725.00 |
| 0283 | Interconnect center (7552000000-N) | EACH | 1 | $2,881.00 | $2,540.00 | $2,540.00 |
| 0284 | Delineator marker (7566000000-N) | EACH | 7 | $425.00 | $375.00 | $375.00 |
| 0285 | Back pull fiber optic cable (7575170000-E) | LF | 1,655 | $4.50 | $3.95 | $3.95 |
| 0286 | Metal strain signal pole (7576000000-N) | EACH | 13 | $26,400 | $23,285 | $23,285 |
| 0287 | Soil test (7613000000-N) | EACH | 13 | $2,269.00 | $2,000.00 | $2,000.00 |
| 0288 | Drilled pier foundation (7614100000-E) | CY | 78 | $2,552.00 | $2,250.00 | $2,250.00 |
| 0289 | Sign for signals (7636000000-N) | EACH | 9 | $437.00 | $385.00 | $385.00 |
| 0290 | Type I post with foundation (7642100000-N) | EACH | 1 | $4,537.00 | $4,000.00 | $4,000.00 |
| 0291 | Type II pedestal with foundation (7642200000-N) | EACH | 46 | $3,970.00 | $3,500.00 | $3,500.00 |
| 0292 | Signal cabinet foundation (7684000000-N) | EACH | 7 | $2,269.00 | $2,000.00 | $2,000.00 |
| 0293 | Detector card (***********) - (170) (7708000000-N) | EACH | 70 | $335.00 | $295.00 | $295.00 |
| 0294 | Install department supplied 2070 controller (7853000000-N) | EACH | 1 | $5,672.00 | $5,000.00 | $5,000.00 |
| 0295 | Cabinet WO contrlr (*****) - (base-mounted) (7854000000-N) | EACH | 1 | $25,000 | $22,000 | $22,000 |
| 0296 | Cabinet base extender (7901000000-N) | EACH | 1 | $851.00 | $750.00 | $750.00 |
| 0297 | Generic signal item (EA) - ethernet edge switch (7980000000-N) | EACH | 1 | $4,452.00 | $3,925.00 | $3,925.00 |
| 0298 | Generic signal item (EA) - luminaire arm for temporary video system (7980000000-N) | EACH | 23 | $567.00 | $500.00 | $500.00 |
| 0299 | Generic signal item (EA) - relocate existing cabinet and controller (7980000000-N) | EACH | 6 | $8,507.00 | $7,500.00 | $7,500.00 |
| 0300 | Generic signal item (EA) - relocate temporary camera sensor unit (7980000000-N) | EACH | 12 | $567.00 | $500.00 | $500.00 |
| 0305 | Generic pavement marking item (EA) - polycarbonate H-shaped markers (4895000000-N) | EACH | 1,921 | $55.50 | $50.00 | $50.00 |
| 0306 | Concrete valley gutter (2580000000-E) | LF | 64 | $55.50 | $52.00 | $52.00 |
| 0307 | Remv exist STR ****** culv (402) - (137+99.59 -L-) (8056000000-N) | LS | 1 | $167,000 | $150,000 | $50,000 |
| 0308 | Box culv excav @ ******** - (137+99.59 -L-) (8130000000-N) | LS | 1 | $111,000 | $100,000 | $75,000 |
| 0309 | Foundation conditioning material, box culvert (8133000000-E) | TON | 117 | $111.00 | $100.00 | $80.00 |
| 0310 | Channel excavation (8140000000-E) | CY | 160 | $55.50 | $50.00 | $294.00 |
| 0311 | Class A concrete (culvert) (8196000000-E) | CY | 219.20 | $2,946.00 | $2,650.00 | $2,850.00 |
| 0312 | Reinforcing steel (culvert) (8245000000-E) | LB | 29,199 | $3.25 | $3.00 | $3.50 |
| 0313 | Generic culvert item (SF) - anchored sheet pile walls (8821000000-E) | SF | 2,363 | $195.00 | $175.00 | $155.00 |
| 0314 | Cip gravity retaining walls (8802040000-E) | SF | 990 | $125.00 | $200.00 | $197.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
Every contract let that day: NCDOT letting of March 18, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.