NCDOT contract C205036 bid tabulation
GRADING, DRAINAGE, PAVING, SIGNALS, AND CULVERTS. SR-1997 (FAYETTEVILLE RD) FROM FARRINGDOM ST TO EAST 22ND ST. Let by North Carolina DOT on February 17, 2026, Robeson. 4 bids received; low bid $39,239,190 by Barnhill Contracting Company.
- Owner
- North Carolina DOT
- Letting
- 17 FEB 2026
- Pay items
- 266
- Data through
- 20 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Barnhill Contracting Company | $39,239,190 | Low |
| 2 | Highland Paving Co LLC | $43,468,914 | +11% |
| 3 | Branch Civil Inc | $43,545,850 | +11% |
| 4 | FSC II LLC DBA Fred Smith Company | $46,934,500 | +20% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Barnhill Contracting Company | 2. Highland Paving Co LLC | 3. Branch Civil Inc | 4. FSC II LLC DBA Fred Smith Company |
|---|---|---|---|---|---|---|---|
| 0001 | Mobilization (0000100000-N) | LS | 1 | $1,961,000 | $2,190,000 | $1,986,780 | $2,340,000 |
| 0002 | Construction surveying (0000400000-N) | LS | 1 | $455,000 | $300,000 | $329,810 | $442,000 |
| 0003 | Grading (0043000000-N) | LS | 1 | $5,925,000 | $10,153,350 | $2,587,052 | $9,595,000 |
| 0004 | Supplementary clearing & grubbing (0050000000-E) | ACRE | 1 | $1.00 | $1,500.00 | $0.01 | $1.00 |
| 0005 | Undercut excavation (0057000000-E) | CY | 850 | $40.00 | $57.00 | $64.50 | $35.00 |
| 0006 | Drainage ditch excavation (0134000000-E) | CY | 210 | $30.00 | $19.00 | $30.00 | $30.00 |
| 0007 | Select granular material (0195000000-E) | CY | 800 | $65.00 | $39.00 | $43.50 | $50.00 |
| 0008 | Geotextile for soil stabilization (0196000000-E) | SY | 1,500 | $5.00 | $4.30 | $4.10 | $5.00 |
| 0009 | Temporary shoring (0199000000-E) | SF | 15,500 | $75.00 | $88.00 | $139.75 | $72.00 |
| 0010 | Generic grading item (TON) - hauling and disposal of petroleum contaminated soil (0255000000-E) | TON | 50 | $110.00 | $132.00 | $279.25 | $55.00 |
| 0011 | Foundation conditioning material, minor structures (0318000000-E) | TON | 2,180 | $75.00 | $75.50 | $92.50 | $60.00 |
| 0012 | FND condit geotextile (4A) (0321000000-E) | SY | 6,860 | $3.50 | $3.50 | $4.10 | $4.00 |
| 0013 | 24" drainage pipe (0335400000-E) | LF | 124 | $150.00 | $150.00 | $115.50 | $140.00 |
| 0014 | ***" RCP culv class IV - (12") (0448000000-E) | LF | 52 | $95.00 | $95.00 | $154.25 | $110.00 |
| 0015 | ***" RCP culv class IV - (60") (0448000000-E) | LF | 32 | $650.00 | $650.00 | $759.25 | $675.00 |
| 0016 | ***" RCP culv class IV - (72") (0448000000-E) | LF | 252 | $850.00 | $850.00 | $1,017.00 | $965.00 |
| 0017 | 15" RC pipe culverts, class IV (0448200000-E) | LF | 9,916 | $105.00 | $105.00 | $117.75 | $135.00 |
| 0018 | 18" RC pipe culverts, class IV (0448300000-E) | LF | 2,624 | $130.00 | $130.00 | $125.00 | $150.00 |
| 0019 | 24" RC pipe culverts, class IV (0448400000-E) | LF | 4,302 | $165.00 | $165.00 | $209.00 | $205.00 |
| 0020 | 30" RC pipe culverts, class IV (0448500000-E) | LF | 960 | $215.00 | $215.00 | $270.25 | $265.00 |
| 0021 | 36" RC pipe culverts, class IV (0448600000-E) | LF | 1,446 | $265.00 | $265.00 | $370.00 | $280.00 |
| 0022 | 42" RC pipe culverts, class IV (0448700000-E) | LF | 300 | $320.00 | $320.00 | $533.75 | $400.00 |
| 0023 | 15" CS pipe culverts, 0.064" thick (0582000000-E) | LF | 24 | $100.00 | $100.00 | $108.00 | $160.00 |
| 0024 | **"WLD STL pipe grad B in soil - (30", 0.250") (0973100000-E) | LF | 18 | $1,265.00 | $1,265.00 | $560.50 | $3,000.00 |
| 0025 | **"WLD STL pipe grad B not in soil - (30", 0.250") (0973300000-E) | LF | 18 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0026 | Pipe removal (0995000000-E) | LF | 6,385 | $56.00 | $35.00 | $36.75 | $45.00 |
| 0027 | Shallow undercut (1099500000-E) | CY | 3,000 | $39.00 | $21.70 | $31.15 | $48.00 |
| 0028 | Class IV subgrade stabilization (1099700000-E) | TON | 6,000 | $54.00 | $68.00 | $70.50 | $57.00 |
| 0029 | Class IV aggregate stabilization (1111000000-E) | TON | 75 | $54.00 | $68.00 | $165.25 | $70.00 |
| 0030 | Geotextile for subgrade stabilization (1112000000-E) | SY | 9,000 | $5.00 | $5.00 | $4.85 | $5.30 |
| 0031 | Incidental stone base (1220000000-E) | TON | 1,000 | $69.00 | $72.00 | $91.00 | $90.00 |
| 0032 | Mill asp PVMT *****" DTH - (3") (1297000000-E) | SY | 6,670 | $14.50 | $17.00 | $11.30 | $17.00 |
| 0033 | Milln asphalt PVMT ***** - ***** - (0" to 3") (1308000000-E) | SY | 1,580 | $14.50 | $15.00 | $11.65 | $14.50 |
| 0034 | Incidental milling (1330000000-E) | SY | 5,000 | $11.50 | $14.00 | $8.10 | $15.50 |
| 0035 | Asphalt conc base course, type B25.0C (1491000000-E) | TON | 16,470 | $115.00 | $104.00 | $148.00 | $115.00 |
| 0036 | Asphalt conc intermediate course, type I19.0C (1503000000-E) | TON | 15,010 | $108.00 | $110.00 | $143.00 | $120.00 |
| 0037 | Asphalt conc surface course, type S9.5C (1523000000-E) | TON | 17,950 | $101.50 | $94.00 | $138.00 | $125.00 |
| 0038 | Asphalt binder for plant mix (1575000000-E) | TON | 2,525 | $566.00 | $552.00 | $672.00 | $700.00 |
| 0039 | Asphalt plant mix, pavement repair (1693000000-E) | TON | 3,850 | $275.00 | $215.00 | $320.00 | $185.00 |
| 0040 | Generic paving item (SY) - 9" jointed concrete truck apron (1891000000-E) | SY | 450 | $156.75 | $190.00 | $194.25 | $150.00 |
| 0041 | Subdrain excavation (2022000000-E) | CY | 112 | $35.00 | $35.00 | $50.25 | $35.00 |
| 0042 | Geotextile for subsurface drains (2026000000-E) | SY | 500 | $12.00 | $12.00 | $17.20 | $12.00 |
| 0043 | Subdrain coarse aggregate (2036000000-E) | CY | 84 | $90.00 | $90.00 | $129.00 | $90.00 |
| 0044 | 6" perforated subdrain pipe (2044000000-E) | LF | 500 | $17.00 | $17.00 | $24.35 | $17.00 |
| 0045 | Subdrain pipe outlet (2070000000-N) | EACH | 1 | $400.00 | $400.00 | $24.35 | $400.00 |
| 0046 | 6" outlet pipe (2077000000-E) | LF | 6 | $40.00 | $40.00 | $57.25 | $40.00 |
| 0047 | Temporary steel plate covers for masonry drainage structure (2190000000-N) | EACH | 3 | $1,500.00 | $1,500.00 | $3,500.00 | $3,000.00 |
| 0048 | Pipe collars (2253000000-E) | CY | 5.09 | $2,000.00 | $2,000.00 | $1,840.00 | $3,300.00 |
| 0049 | Pipe plugs (2264000000-E) | CY | 0.49 | $2,000.00 | $2,000.00 | $3,395.00 | $28,000 |
| 0050 | Flowable fill (2275000000-E) | CY | 115 | $500.00 | $500.00 | $428.25 | $875.00 |
| 0051 | Masonry drainage structures (2286000000-N) | EACH | 258 | $3,875.00 | $3,875.00 | $5,410.00 | $6,000.00 |
| 0052 | Masonry drainage structures (2297000000-E) | CY | 22.95 | $6,800.00 | $6,800.00 | $10,820 | $5,500.00 |
| 0053 | Masonry drainage structures (2308000000-E) | LF | 134.10 | $600.00 | $600.00 | $912.50 | $800.00 |
| 0054 | Frame with two grates, STD 840.16 (2364000000-N) | EACH | 42 | $1,200.00 | $1,550.00 | $861.00 | $1,480.00 |
| 0055 | Frame with two grates, STD 840.24 (2366000000-N) | EACH | 3 | $2,600.00 | $2,950.00 | $887.00 | $1,380.00 |
| 0056 | Frame with two grates, STD 840.29 (2367000000-N) | EACH | 3 | $1,100.00 | $1,450.00 | $898.25 | $1,380.00 |
| 0057 | Frame-GRT-HD 840.03 ** - (E) (2374000000-N) | EACH | 44 | $1,350.00 | $1,700.00 | $1,344.00 | $1,575.00 |
| 0058 | Frame-GRT-HD 840.03 ** - (F) (2374000000-N) | EACH | 67 | $1,350.00 | $1,700.00 | $1,344.00 | $1,575.00 |
| 0059 | Frame-GRT-HD 840.03 ** - (G) (2374000000-N) | EACH | 72 | $1,350.00 | $1,700.00 | $1,344.00 | $1,575.00 |
| 0060 | Frame with cover, STD 840.54 (2396000000-N) | EACH | 7 | $950.00 | $1,300.00 | $943.00 | $1,220.00 |
| 0061 | Steel frame with two grates, STD 840.37 (2407000000-N) | EACH | 24 | $3,000.00 | $3,350.00 | $2,744.00 | $3,700.00 |
| 0062 | Concrete transitional section for drop inlet (2451000000-N) | EACH | 36 | $1,200.00 | $1,400.00 | $1,486.00 | $1,700.00 |
| 0063 | **"X**" concrete curb - (8" X 12") (2535000000-E) | LF | 100 | $50.30 | $28.52 | $69.00 | $45.00 |
| 0064 | **"X**" concrete curb - (8" X 18") (2535000000-E) | LF | 180 | $52.10 | $28.52 | $68.25 | $45.00 |
| 0065 | **'-**" concrete curb & gutter - (2'-9") (2538000000-E) | LF | 360 | $48.10 | $59.43 | $61.25 | $50.00 |
| 0066 | 1'-6" concrete curb & gutter (2542000000-E) | LF | 710 | $33.25 | $33.96 | $42.75 | $32.00 |
| 0067 | 2'-6" concrete curb & gutter (2549000000-E) | LF | 22,400 | $29.90 | $42.15 | $41.15 | $32.00 |
| 0068 | 4" concrete sidewalk (2591000000-E) | SY | 6,210 | $58.25 | $79.23 | $90.00 | $60.00 |
| 0069 | Concrete curb ramps (2605000000-N) | EACH | 83 | $2,750.00 | $2,500.00 | $3,405.00 | $2,850.00 |
| 0070 | 6" concrete driveway (2612000000-E) | SY | 640 | $104.50 | $117.76 | $137.50 | $100.00 |
| 0071 | 4" concrete island cover (2627000000-E) | SY | 600 | $55.30 | $79.23 | $66.25 | $55.00 |
| 0072 | 5" monolithic concrete islands (keyed in) (2655000000-E) | SY | 4,080 | $89.25 | $110.02 | $110.50 | $90.00 |
| 0073 | **" mono conc median (*****) - (6", surface mounted) (2657000000-E) | SY | 110 | $127.05 | $137.39 | $557.75 | $120.00 |
| 0074 | Generic paving item (LF) - 1'-10" rolled curb and gutter (2752000000-E) | LF | 295 | $40.00 | $45.00 | $49.55 | $35.00 |
| 0075 | Adjustment of catch basins (2800000000-N) | EACH | 1 | $1,500.00 | $1,500.00 | $932.25 | $1,850.00 |
| 0076 | Adjustment of drop inlets (2815000000-N) | EACH | 1 | $1,500.00 | $1,500.00 | $932.25 | $1,850.00 |
| 0077 | Impact attenuator units, type TL-3 (3001000000-N) | EACH | 2 | $27,840 | $28,000 | $29,049 | $26,840 |
| 0078 | Steel beam guardrail (3030000000-E) | LF | 1,875 | $26.00 | $26.00 | $25.70 | $26.00 |
| 0079 | Steel beam guardrail, shop curved (3045000000-E) | LF | 212.50 | $27.00 | $27.00 | $35.75 | $27.00 |
| 0080 | Steel beam guardrail terminal sections (3105000000-N) | EACH | 4 | $95.00 | $95.00 | $391.00 | $95.00 |
| 0081 | Additional guardrail posts (3150000000-N) | EACH | 10 | $55.00 | $55.00 | $11.15 | $55.00 |
| 0082 | Guardrail end units, type at-1 (3195000000-N) | EACH | 2 | $850.00 | $850.00 | $1,112.00 | $850.00 |
| 0083 | Guardrail end units, type cat-1 (3210000000-N) | EACH | 6 | $950.00 | $950.00 | $1,173.00 | $950.00 |
| 0084 | Guardrail end units, type TL-3 (3287000000-N) | EACH | 5 | $3,300.00 | $3,300.00 | $3,687.00 | $3,300.00 |
| 0085 | Guardrail end units, type TL-2 (3288000000-N) | EACH | 6 | $3,250.00 | $3,250.00 | $3,464.00 | $3,250.00 |
| 0086 | Remove & reset existing guardrail (3345000000-E) | LF | 369 | $8.00 | $8.00 | $12.30 | $8.00 |
| 0087 | Remove existing guardrail (3360000000-E) | LF | 193.50 | $1.00 | $1.00 | $2.25 | $1.00 |
| 0088 | Temporary steel beam guardrail (3380000000-E) | LF | 150 | $9.00 | $9.00 | $12.30 | $9.00 |
| 0089 | Temporary steel beam guardrail, shop curved (3382000000-E) | LF | 50 | $15.00 | $15.00 | $22.35 | $15.00 |
| 0090 | Temp GDRL end units ***** - (at-1) (3389150000-N) | EACH | 1 | $400.00 | $400.00 | $335.25 | $400.00 |
| 0091 | Temp GDRL end units ***** - (TL-2) (3389150000-N) | EACH | 1 | $2,000.00 | $2,000.00 | $1,955.00 | $2,000.00 |
| 0092 | Temporary additional guardrail posts (3389160000-N) | EACH | 10 | $1.00 | $1.00 | $5.60 | $1.00 |
| 0093 | Chain link fence reset (3572000000-E) | LF | 275 | $25.00 | $25.00 | $44.70 | $25.00 |
| 0094 | Rip rap, class I (3628000000-E) | TON | 490 | $128.00 | $115.00 | $121.50 | $112.00 |
| 0095 | Rip rap, class B (3649000000-E) | TON | 16 | $112.00 | $105.00 | $136.75 | $155.00 |
| 0096 | Geotextile for drainage (3656000000-E) | SY | 5,090 | $5.00 | $3.40 | $3.70 | $3.00 |
| 0097 | Supports, 3-LB steel U-channel (4072000000-E) | LF | 1,710 | $8.00 | $8.00 | $9.85 | $8.00 |
| 0098 | Sign erection, type D (4096000000-N) | EACH | 4 | $150.00 | $150.00 | $185.25 | $150.00 |
| 0099 | Sign erection, type E (4102000000-N) | EACH | 81 | $65.00 | $65.00 | $80.25 | $65.00 |
| 0100 | Sign erection, type F (4108000000-N) | EACH | 10 | $150.00 | $150.00 | $185.25 | $150.00 |
| 0101 | Sign erection, type *** (ovrhd) - (A) (4109000000-N) | EACH | 5 | $10.00 | $10.00 | $12.35 | $10.00 |
| 0102 | Sign erect, reloc ** GRD MTD - (E) (4116100000-N) | EACH | 10 | $125.00 | $125.00 | $154.25 | $125.00 |
| 0103 | Support, ovrhd sign STR ***** - (41+60 -L-) (4130000000-N) | LS | 1 | $100,000 | $100,000 | $123,420 | $100,000 |
| 0104 | Support, ovrhd sign STR ***** - (49+20 -L-) (4130000000-N) | LS | 1 | $75,000 | $75,000 | $92,567 | $75,000 |
| 0105 | Support, ovrhd sign STR ***** - (60+05 -L-) (4130000000-N) | LS | 1 | $100,000 | $100,000 | $123,420 | $100,000 |
| 0106 | Disposal of sign system, U-channel (4155000000-N) | EACH | 62 | $2.00 | $2.00 | $2.45 | $2.00 |
| 0107 | Disposal of support, U-channel (4192000000-N) | EACH | 10 | $2.00 | $2.00 | $2.45 | $2.00 |
| 0108 | Work zone signs (stationary) (4400000000-E) | SF | 1,537 | $8.56 | $8.56 | $7.00 | $7.00 |
| 0109 | Work zone signs (portable) (4405000000-E) | SF | 122 | $10.00 | $21.00 | $10.20 | $65.00 |
| 0110 | Work zone signs (barricade mounted) (4410000000-E) | SF | 1,121 | $8.51 | $8.51 | $10.45 | $11.00 |
| 0111 | Flashing arrow board (4415000000-N) | EACH | 3 | $2,350.00 | $3,100.00 | $3,706.00 | $3,000.00 |
| 0112 | Portable changeable message sign (4420000000-N) | EACH | 5 | $9,625.00 | $12,550 | $9,683.00 | $8,750.00 |
| 0113 | Work zone presence lighting (4424000000-N) | EACH | 6 | $3,210.00 | $3,210.00 | $3,228.00 | $2,500.00 |
| 0114 | Drums (4430000000-N) | EACH | 607 | $50.00 | $66.00 | $52.50 | $50.00 |
| 0115 | Barricades (type III) (4445000000-E) | LF | 410 | $25.00 | $32.00 | $28.70 | $26.00 |
| 0116 | Pedestrian channelizing devices (4447000000-E) | LF | 1,676 | $22.00 | $23.00 | $35.85 | $33.00 |
| 0117 | Flagger (4455000000-N) | DAY | 28 | $465.00 | $556.00 | $1,620.00 | $850.00 |
| 0118 | Temporary crash cushions (4465000000-N) | EACH | 10 | $9,500.00 | $9,580.00 | $10,798 | $11,250 |
| 0119 | Remove & reset temporary crash cushion (4470000000-N) | EACH | 7 | $3,250.00 | $3,100.00 | $3,694.00 | $3,250.00 |
| 0120 | TMA (4480000000-N) | EACH | 2 | $40,000 | $26,300 | $66,365 | $19,930 |
| 0121 | Portable concrete barrier (4485000000-E) | LF | 384 | $64.46 | $57.75 | $73.25 | $75.00 |
| 0122 | Portable concrete barrier (anchored) (4490000000-E) | LF | 2,151 | $85.71 | $64.20 | $97.50 | $95.00 |
| 0123 | Remove and reset portable concrete barrier (4500000000-E) | LF | 497 | $315.15 | $6.50 | $39.95 | $38.00 |
| 0124 | Remove & reset portable concrete barrier (anchored) (4505000000-E) | LF | 630 | $28.56 | $21.50 | $32.45 | $30.00 |
| 0125 | Law enforcement (4510000000-N) | HR | 32 | $75.00 | $90.00 | $111.75 | $100.00 |
| 0126 | Tubular markers (fixed) (4520000000-N) | EACH | 18 | $150.00 | $150.00 | $181.00 | $55.00 |
| 0127 | Generic traffic control item (EA) - audible warning devices (4600000000-N) | EACH | 2 | $600.00 | $535.00 | $609.00 | $600.00 |
| 0128 | Generic traffic control item (EA) - temporary curb ramps (4600000000-N) | EACH | 3 | $550.00 | $745.00 | $553.00 | $950.00 |
| 0129 | Temporary raised pavement markers (4650000000-N) | EACH | 1,038 | $7.30 | $7.30 | $8.80 | $7.30 |
| 0130 | Thermoplastic pavement marking lines (4", 90 mils) (4685000000-E) | LF | 35,138 | $0.50 | $0.50 | $0.60 | $0.50 |
| 0131 | Thermoplastic pavement marking lines (8", 90 mils) (4695000000-E) | LF | 5,363 | $1.30 | $1.30 | $1.55 | $1.30 |
| 0132 | Thermoplastic pavement marking lines (16", 90 mils) (4704000000-E) | LF | 80 | $10.00 | $10.00 | $12.05 | $10.00 |
| 0133 | Thermoplastic pavement marking lines (24", 90 mils) (4709000000-E) | LF | 2,735 | $15.00 | $15.00 | $18.10 | $15.00 |
| 0134 | Thermoplastic pavement marking character (90 mils) (4720000000-E) | EACH | 19 | $115.00 | $115.00 | $138.75 | $115.00 |
| 0135 | Thermoplastic pavement marking symbol (90 mils) (4725000000-E) | EACH | 149 | $115.00 | $115.00 | $138.75 | $115.00 |
| 0136 | Paint pavement marking lines (4") (4810000000-E) | LF | 72,917 | $0.20 | $0.20 | $0.25 | $0.20 |
| 0137 | Paint pavement marking lines (8") (4820000000-E) | LF | 2,342 | $0.62 | $0.62 | $0.75 | $0.62 |
| 0138 | Paint pavement marking lines (24") (4835000000-E) | LF | 2,235 | $6.25 | $6.25 | $7.55 | $6.25 |
| 0139 | Paint pavement marking character (4840000000-N) | EACH | 46 | $65.00 | $65.00 | $78.50 | $65.00 |
| 0140 | Paint pavement marking symbol (4845000000-N) | EACH | 101 | $65.00 | $65.00 | $78.50 | $65.00 |
| 0141 | Removal of pavement marking lines (4") (4850000000-E) | LF | 72,917 | $0.25 | $0.25 | $0.30 | $0.25 |
| 0142 | Removal of pavement marking lines (8") (4860000000-E) | LF | 2,342 | $1.60 | $1.60 | $1.95 | $1.60 |
| 0143 | Removal of pavement marking lines (24") (4870000000-E) | LF | 2,235 | $9.75 | $9.75 | $11.75 | $9.75 |
| 0144 | Removal of pavement marking symbols & characters (4875000000-N) | EACH | 147 | $62.00 | $62.00 | $74.75 | $62.00 |
| 0145 | Generic pavement marking item (LF) - yield line paint pavement marking (24") (4890000000-E) | LF | 69 | $31.00 | $31.00 | $37.40 | $31.00 |
| 0146 | Generic pavement marking item (LF) - yield line thermoplastic pavement marking (24", 90 mils) (4890000000-E) | LF | 69 | $31.00 | $31.00 | $37.40 | $31.00 |
| 0147 | Permanent raised pavement markers (4900000000-N) | EACH | 790 | $7.30 | $7.30 | $8.80 | $7.30 |
| 0148 | Object markers (type **) - (1) (4957000000-N) | EACH | 23 | $150.00 | $150.00 | $172.75 | $150.00 |
| 0149 | 6" water line (5325600000-E) | LF | 423 | $208.00 | $208.00 | $177.50 | $290.00 |
| 0150 | 8" water line (5325800000-E) | LF | 2,981 | $220.25 | $220.25 | $207.25 | $230.00 |
| 0151 | 12" water line (5326200000-E) | LF | 1,676 | $343.50 | $343.50 | $313.25 | $300.00 |
| 0152 | DI H2O pipe fittings (5329000000-E) | LB | 26,740 | $11.95 | $11.95 | $26.75 | $21.00 |
| 0153 | 6" valve (5540000000-E) | EACH | 13 | $3,000.00 | $3,000.00 | $2,960.00 | $3,900.00 |
| 0154 | 8" valve (5546000000-E) | EACH | 3 | $4,000.00 | $4,000.00 | $4,144.00 | $5,850.00 |
| 0155 | **" insertion valve - (12") (5562000000-E) | EACH | 12 | $26,800 | $26,800 | $20,426 | $23,500 |
| 0156 | **" insertion valve - (6") (5562000000-E) | EACH | 2 | $20,500 | $20,500 | $18,650 | $13,000 |
| 0157 | **" insertion valve - (8") (5562000000-E) | EACH | 15 | $21,900 | $21,900 | $27,827 | $15,000 |
| 0158 | Relocate water meter (5648000000-N) | EACH | 30 | $1,900.00 | $1,900.00 | $4,144.00 | $3,425.00 |
| 0159 | Reconnect water meter (5649000000-N) | EACH | 26 | $1,900.00 | $1,900.00 | $4,144.00 | $3,475.00 |
| 0160 | Relocate 2" DCV backflow prevention assembly (5653210000-E) | EACH | 5 | $5,600.00 | $5,600.00 | $6,039.00 | $8,000.00 |
| 0161 | Relocate fire hydrant (5672000000-N) | EACH | 11 | $5,680.00 | $5,680.00 | $10,065 | $5,900.00 |
| 0162 | Fire hydrant leg (5673000000-E) | LF | 530 | $225.00 | $225.00 | $100.75 | $250.00 |
| 0163 | Water service line (<2") (5686500000-E) | LF | 1,107 | $178.50 | $178.50 | $45.00 | $100.00 |
| 0164 | 8" sanitary gravity sewer (5691300000-E) | LF | 1,545 | $281.00 | $281.00 | $473.75 | $330.00 |
| 0165 | 12" sanitary gravity sewer (5691500000-E) | LF | 1,107 | $392.75 | $392.75 | $621.75 | $420.00 |
| 0166 | 2" force main sewer (5709100000-E) | LF | 33 | $101.00 | $101.00 | $177.50 | $375.00 |
| 0167 | Sanitary sewer clean-out (5768000000-N) | EACH | 6 | $3,100.00 | $3,100.00 | $8,052.00 | $4,800.00 |
| 0168 | Sewer service line (5768500000-E) | LF | 363 | $254.50 | $254.50 | $266.50 | $280.00 |
| 0169 | 4' dia utility manhole (5775000000-E) | EACH | 30 | $8,200.00 | $8,200.00 | $9,888.00 | $10,550 |
| 0170 | Utility manhole wall 4' dia (5781000000-E) | LF | 56.70 | $1,380.00 | $1,380.00 | $1,125.00 | $1,425.00 |
| 0171 | Abandon 6" utility pipe (5800000000-E) | LF | 453 | $27.50 | $27.50 | $23.70 | $40.00 |
| 0172 | Abandon 8" utility pipe (5801000000-E) | LF | 3,940 | $29.00 | $29.00 | $29.50 | $30.00 |
| 0173 | Abandon 12" utility pipe (5804000000-E) | LF | 2,749 | $31.00 | $31.00 | $36.80 | $40.00 |
| 0174 | Abandon utility manhole (5816000000-N) | EACH | 5 | $2,150.00 | $2,150.00 | $2,960.00 | $3,000.00 |
| 0175 | Remove utility manhole (5828000000-N) | EACH | 4 | $2,650.00 | $2,650.00 | $3,552.00 | $3,000.00 |
| 0176 | 16" encasement pipe (5835700000-E) | LF | 59 | $585.00 | $585.00 | $340.25 | $270.00 |
| 0177 | 24" encasement pipe (5836000000-E) | LF | 46 | $710.00 | $710.00 | $510.50 | $330.00 |
| 0178 | Bore & jack **" - (24") (5872500000-E) | LF | 25 | $3,215.00 | $3,215.00 | $2,734.00 | $1,400.00 |
| 0179 | Steel pile piers (5876000000-N) | EACH | 3 | $26,000 | $26,000 | $57,727 | $72,250 |
| 0180 | Temporary silt fence (6000000000-E) | LF | 22,145 | $2.50 | $2.40 | $3.05 | $2.40 |
| 0181 | Stone for erosion control, class A (6006000000-E) | TON | 570 | $120.00 | $105.00 | $106.50 | $100.00 |
| 0182 | Stone for erosion control, class B (6009000000-E) | TON | 555 | $120.00 | $105.00 | $110.25 | $85.00 |
| 0183 | Sediment control stone (6012000000-E) | TON | 4,315 | $72.00 | $74.00 | $100.75 | $45.00 |
| 0184 | Temporary mulching (6015000000-E) | ACRE | 5.12 | $1,600.00 | $1,200.00 | $2,294.00 | $1,200.00 |
| 0185 | Seed for temporary seeding (6018000000-E) | LB | 300 | $3.00 | $2.00 | $2.65 | $2.00 |
| 0186 | Fertilizer for temporary seeding (6021000000-E) | TON | 1.50 | $800.00 | $1,000.00 | $1,324.00 | $1,000.00 |
| 0187 | Temporary slope drains (6024000000-E) | LF | 405 | $25.00 | $18.00 | $6.10 | $25.00 |
| 0188 | Safety fence (6029000000-E) | LF | 380 | $2.50 | $3.00 | $3.15 | $4.00 |
| 0189 | Silt excavation (6030000000-E) | CY | 940 | $30.00 | $28.00 | $50.50 | $35.00 |
| 0190 | Matting for erosion control (6036000000-E) | SY | 32,440 | $1.45 | $1.40 | $1.85 | $1.40 |
| 0191 | Coir fiber mat (6037000000-E) | SY | 1,200 | $6.00 | $4.50 | $6.00 | $4.50 |
| 0192 | 1/4" hardware cloth (6042000000-E) | LF | 15,440 | $4.00 | $3.50 | $6.50 | $3.50 |
| 0193 | Special stilling basins (6070000000-N) | EACH | 31 | $850.00 | $600.00 | $379.25 | $2,000.00 |
| 0194 | Flocculant (6071002000-E) | LB | 290 | $9.00 | $10.00 | $5.80 | $10.00 |
| 0195 | Coir fiber wattle (6071012000-E) | LF | 1,900 | $8.50 | $9.75 | $10.45 | $15.00 |
| 0196 | Coir fiber wattle barrier (6071014000-E) | LF | 210 | $9.00 | $8.00 | $32.60 | $15.00 |
| 0197 | Coir fiber baffle (6071030000-E) | LF | 60 | $6.50 | $10.00 | $2.60 | $10.00 |
| 0198 | Seeding and mulching (6084000000-E) | ACRE | 5.12 | $2,500.00 | $2,475.00 | $3,574.00 | $2,475.00 |
| 0199 | Mowing (6087000000-E) | ACRE | 2.60 | $200.00 | $250.00 | $331.00 | $250.00 |
| 0200 | Seed for repair seeding (6090000000-E) | LB | 100 | $8.00 | $5.75 | $5.30 | $5.75 |
| 0201 | Fertilizer for repair seeding (6093000000-E) | TON | 0.25 | $1,200.00 | $1,000.00 | $1,456.00 | $1,000.00 |
| 0202 | Seed for supplemental seeding (6096000000-E) | LB | 125 | $5.00 | $5.00 | $5.30 | $5.00 |
| 0203 | Fertilizer topdressing (6108000000-E) | TON | 3.75 | $1,200.00 | $1,000.00 | $1,257.00 | $1,000.00 |
| 0204 | Impervious dike (6111000000-E) | LF | 1,470 | $85.00 | $87.00 | $139.75 | $110.00 |
| 0205 | Specialized hand mowing (6114500000-N) | MHR | 5 | $200.00 | $100.00 | $231.75 | $175.00 |
| 0206 | Response for erosion control (6117000000-N) | EACH | 100 | $100.00 | $100.00 | $174.50 | $100.00 |
| 0207 | Concrete washout structure (6117500000-N) | EACH | 3 | $1,850.00 | $1,425.00 | $1,302.00 | $2,000.00 |
| 0208 | Culvert diversion channel (6120000000-E) | CY | 281 | $75.00 | $55.00 | $44.70 | $60.00 |
| 0209 | Generic erosion control item (EA) - fabric insert inlet protection cleanout (6132000000-N) | EACH | 366 | $75.00 | $110.00 | $45.95 | $175.00 |
| 0210 | Generic erosion control item (EA) - fabric insert inlet protection, type 1 (6132000000-N) | EACH | 122 | $65.00 | $65.00 | $170.75 | $175.00 |
| 0211 | Generic erosion control item (EA) - prefabricated concrete washout (6132000000-N) | EACH | 14 | $1,850.00 | $1,425.00 | $1,625.00 | $2,000.00 |
| 0212 | Generic erosion control item (LF) - 24" RCP temporary pipe (6147000000-E) | LF | 124 | $165.00 | $165.00 | $175.25 | $135.00 |
| 0213 | Generic erosion control item (LF) - 42" RCP class IV temporary pipe (6147000000-E) | LF | 32 | $320.00 | $245.00 | $279.25 | $375.00 |
| 0214 | Generic erosion control item (LF) - temporary 108" CS structural plate pipe, 12 gauge (6147000000-E) | LF | 96 | $1,375.00 | $1,300.00 | $670.25 | $1,700.00 |
| 0215 | Pedestrian signal head (16", 1 section W/countdown) (7048500000-E) | EACH | 31 | $1,350.00 | $1,350.00 | $1,620.00 | $1,350.00 |
| 0216 | Signal cable (7060000000-E) | LF | 33,865 | $5.50 | $5.50 | $6.50 | $5.50 |
| 0217 | Vehicle signal head (12", 3 section) (7120000000-E) | EACH | 121 | $1,250.00 | $1,250.00 | $1,500.00 | $1,250.00 |
| 0218 | Vehicle signal head (12", 4 section) (7132000000-E) | EACH | 30 | $1,700.00 | $1,700.00 | $2,040.00 | $1,700.00 |
| 0219 | Vehicle signal head (12", 5 section) (7144000000-E) | EACH | 3 | $2,275.00 | $2,275.00 | $2,730.00 | $2,275.00 |
| 0220 | Messenger cable (1/4") (7252000000-E) | LF | 295 | $5.00 | $5.00 | $6.00 | $5.00 |
| 0221 | Messenger cable (3/8") (7264000000-E) | LF | 16,085 | $7.00 | $7.00 | $8.25 | $7.00 |
| 0222 | Tracer wire (7279000000-E) | LF | 2,400 | $2.00 | $2.00 | $2.40 | $2.00 |
| 0223 | Unpaved trench (***********) - (1, 2") (7300000000-E) | LF | 30 | $25.00 | $25.00 | $30.00 | $25.00 |
| 0224 | Unpaved trench (***********) - (2, 2") (7300000000-E) | LF | 1,575 | $20.00 | $20.00 | $24.00 | $20.00 |
| 0225 | Unpaved trench (***********) - (3, 2") (7300000000-E) | LF | 260 | $30.00 | $30.00 | $36.00 | $30.00 |
| 0226 | Direct drill (***********) - (1, 2") (7301000000-E) | LF | 50 | $32.00 | $32.00 | $38.25 | $32.00 |
| 0227 | Direct drill (***********) - (2, 2") (7301000000-E) | LF | 1,700 | $25.00 | $25.00 | $30.00 | $25.00 |
| 0228 | Junction box (standard size) (7324000000-N) | EACH | 24 | $950.00 | $950.00 | $1,140.00 | $950.00 |
| 0229 | Junction box (over-sized, heavy duty) (7348000000-N) | EACH | 19 | $1,500.00 | $1,500.00 | $1,800.00 | $1,500.00 |
| 0230 | Wood pole (7360000000-N) | EACH | 33 | $1,800.00 | $1,800.00 | $2,160.00 | $1,800.00 |
| 0231 | Guy assembly (7372000000-N) | EACH | 79 | $900.00 | $900.00 | $1,080.00 | $900.00 |
| 0232 | 1/2" riser with weatherhead (7396000000-E) | EACH | 10 | $625.00 | $625.00 | $750.00 | $625.00 |
| 0233 | 2" riser with weatherhead (7420000000-E) | EACH | 28 | $900.00 | $900.00 | $1,080.00 | $900.00 |
| 0234 | Lead-in cable (14-2) (7456100000-E) | LF | 10,330 | $2.95 | $2.95 | $3.55 | $2.95 |
| 0235 | Communications cable (** fiber) - (24) (7516000000-E) | LF | 14,250 | $4.00 | $4.00 | $4.75 | $4.00 |
| 0236 | Drop cable (7528000000-E) | LF | 2,185 | $4.00 | $4.00 | $4.75 | $4.00 |
| 0237 | Splice enclosure (7540000000-N) | EACH | 5 | $2,000.00 | $2,000.00 | $2,400.00 | $2,000.00 |
| 0238 | Modify splice enclosure (7541000000-N) | EACH | 2 | $1,500.00 | $1,500.00 | $1,800.00 | $1,500.00 |
| 0239 | Interconnect center (7552000000-N) | EACH | 6 | $2,400.00 | $2,400.00 | $2,880.00 | $2,400.00 |
| 0240 | Delineator marker (7566000000-N) | EACH | 19 | $250.00 | $250.00 | $300.00 | $250.00 |
| 0241 | Metal strain signal pole (7576000000-N) | EACH | 20 | $22,000 | $22,000 | $26,403 | $22,000 |
| 0242 | Soil test (7613000000-N) | EACH | 20 | $2,000.00 | $2,000.00 | $2,400.00 | $2,000.00 |
| 0243 | Drilled pier foundation (7614100000-E) | CY | 120 | $2,250.00 | $2,250.00 | $2,700.00 | $2,250.00 |
| 0244 | Metal strain pole design (7630000000-N) | EACH | 20 | $250.00 | $250.00 | $300.00 | $250.00 |
| 0245 | Sign for signals (7636000000-N) | EACH | 24 | $650.00 | $650.00 | $780.00 | $650.00 |
| 0246 | Type II pedestal with foundation (7642200000-N) | EACH | 29 | $4,250.00 | $4,250.00 | $5,101.00 | $4,250.00 |
| 0247 | Relocate existing sign (7648000000-N) | EACH | 1 | $200.00 | $200.00 | $240.00 | $200.00 |
| 0248 | Signal cabinet foundation (7684000000-N) | EACH | 7 | $2,500.00 | $2,500.00 | $3,000.00 | $2,500.00 |
| 0249 | Conduit entrance into existing foundation (7686000000-N) | EACH | 1 | $500.00 | $500.00 | $600.00 | $500.00 |
| 0250 | Contlrs with CBNT (**************) - (2070LX, base mounted) (7696000000-N) | EACH | 6 | $24,000 | $24,000 | $28,803 | $24,000 |
| 0251 | Contlrs with CBNT (**************) - (2070LX, pole mounted) (7696000000-N) | EACH | 3 | $26,000 | $26,000 | $31,203 | $26,000 |
| 0252 | Cabinet base extender (7901000000-N) | EACH | 7 | $750.00 | $750.00 | $900.00 | $750.00 |
| 0253 | Beacon CNTRL assm & CBNT ***** - (F3) (7912000000-N) | EACH | 1 | $5,000.00 | $5,000.00 | $6,001.00 | $5,004.81 |
| 0254 | Traffic signal removal (7948000000-N) | EACH | 4 | $7,500.00 | $7,500.00 | $9,001.00 | $7,500.00 |
| 0255 | Generic signal item (EA) - ethernet edge switch (7980000000-N) | EACH | 10 | $3,400.00 | $3,400.00 | $4,080.00 | $3,400.00 |
| 0256 | Generic signal item (EA) - microwave vehicle detection system - multiple zones (7980000000-N) | EACH | 49 | $13,400 | $13,400 | $16,082 | $13,400 |
| 0257 | Remv exist STR ****** culv (402) - (20+80.00 -Y2-) (8056000000-N) | LS | 1 | $100,000 | $100,000 | $111,150 | $275,000 |
| 0258 | Remv exist STR ****** culv (402) - (43+26.00 -L-) (8056000000-N) | LS | 1 | $100,000 | $100,000 | $111,150 | $275,000 |
| 0259 | Box culv excav @ ******** - (20+80.00 -Y2-) (8130000000-N) | LS | 1 | $250,000 | $250,000 | $438,230 | $420,000 |
| 0260 | Box culv excav @ ******** - (43+26.00 -L-) (8130000000-N) | LS | 1 | $175,000 | $175,000 | $291,465 | $295,000 |
| 0261 | Box culv excav @ ******** - (68+62.00 -L-) (8130000000-N) | LS | 1 | $300,000 | $300,000 | $534,000 | $500,000 |
| 0262 | Foundation conditioning material, box culvert (8133000000-E) | TON | 1,405 | $85.00 | $85.00 | $94.75 | $90.00 |
| 0263 | Class A concrete (culvert) (8196000000-E) | CY | 2,063.60 | $875.00 | $875.00 | $975.00 | $1,100.00 |
| 0264 | Reinforcing steel (culvert) (8245000000-E) | LB | 284,512 | $2.25 | $2.25 | $2.50 | $2.50 |
| 0265 | Sheet pile retaining walls (8430000000-E) | SF | 225 | $500.00 | $500.00 | $558.00 | $500.00 |
| 0266 | Overhead footing (4057000000-E) | CY | 45 | $1,162.00 | $1,162.00 | $1,434.00 | $1,162.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
Every contract let that day: NCDOT letting of February 17, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way