NCDOT contract C204970 bid tabulation
GRADING, DRAINAGE, PAVING, AND SIGNALS. NEW ROUTE FROM 0.5 MILES EAST OF BRUNSWICK COUNTY LINE TO 1.5 MILES EAST OF BRUNSWICK COUNTY LINE ON US 74. Let by North Carolina DOT on June 16, 2026, Brunswick. 7 bids received; low bid $7,881,585 by Barnhill Contracting Company.
- Owner
- North Carolina DOT
- Letting
- 16 JUN 2026
- Pay items
- 136
- Data through
- 20 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Barnhill Contracting Company | $7,881,585 | Low |
| 2 | S T Wooten Corporation | $7,976,746 | +1.0% |
| 3 | Highland Paving Co LLC | $8,411,806 | +7.0% |
| 4 | Bmco Construction, Inc. | $8,496,363 | +8.0% |
| 5 | Civil Works Contracting LLC | $8,627,145 | +9.0% |
| 6 | Mastec Civil, LLC | $9,405,403 | +19% |
| 7 | King Asphalt Inc | $9,624,333 | +22% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Barnhill Contracting Company | 2. S T Wooten Corporation | 3. Highland Paving Co LLC | 4. Bmco Construction, Inc. | 5. Civil Works Contracting LLC | 6. Mastec Civil, LLC |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Mobilization (0000100000-N) | LS | 1 | $390,061 | $398,000 | $410,000 | $404,589 | $136,568 | $470,000 |
| 0002 | Construction surveying (0000400000-N) | LS | 1 | $145,550 | $120,000 | $115,000 | $105,000 | $100,000 | $124,000 |
| 0003 | Clearing & grubbing (0001000000-E) | LS | 1 | $237,325 | $200,000 | $600,000 | $1,005,000 | $250,000 | $650,000 |
| 0004 | Supplementary clearing & grubbing (0008000000-E) | ACRE | 2 | $1.00 | $6,500.00 | $100.00 | $1.00 | $1.00 | $13,680 |
| 0005 | Unclassified excavation (0022000000-E) | CY | 11,300 | $9.00 | $11.50 | $10.00 | $12.75 | $12.27 | $9.00 |
| 0006 | Undercut excavation (0036000000-E) | CY | 1,300 | $26.60 | $24.00 | $40.00 | $21.50 | $22.00 | $41.00 |
| 0007 | Borrow excavation (0106000000-E) | CY | 59,100 | $18.00 | $25.00 | $26.00 | $20.00 | $25.47 | $21.20 |
| 0008 | Drainage ditch excavation (0134000000-E) | CY | 1,880 | $12.00 | $6.20 | $20.00 | $12.50 | $20.67 | $43.10 |
| 0009 | Removal of existing asphalt pavement (0156000000-E) | SY | 2,250 | $16.25 | $8.15 | $11.70 | $8.00 | $25.47 | $16.00 |
| 0010 | Proof rolling (0192000000-N) | HR | 10 | $303.00 | $150.00 | $400.00 | $300.00 | $268.31 | $150.00 |
| 0011 | Select granular material (0195000000-E) | CY | 800 | $31.50 | $28.00 | $40.00 | $24.00 | $23.00 | $29.00 |
| 0012 | Geotextile for soil stabilization (0196000000-E) | SY | 800 | $1.40 | $3.05 | $5.50 | $3.50 | $3.00 | $4.60 |
| 0013 | Foundation conditioning material, minor structures (0318000000-E) | TON | 130 | $87.50 | $167.00 | $86.00 | $55.00 | $101.08 | $100.00 |
| 0014 | FND condit geotextile (4A) (0321000000-E) | SY | 400 | $1.40 | $8.65 | $6.00 | $6.50 | $2.00 | $7.00 |
| 0015 | 18" RC pipe culverts, class III (0372000000-E) | LF | 12 | $217.00 | $201.00 | $124.00 | $113.30 | $179.75 | $110.00 |
| 0016 | ***" RCP culv class IV - (48") (0448000000-E) | LF | 100 | $350.00 | $440.00 | $382.00 | $366.68 | $385.92 | $425.00 |
| 0017 | ***" RCP culv class IV - (54") (0448000000-E) | LF | 128 | $447.00 | $640.00 | $482.00 | $500.00 | $496.79 | $521.00 |
| 0018 | ***" RCP culv class IV - (66") (0448000000-E) | LF | 64 | $713.00 | $940.00 | $780.00 | $782.80 | $776.24 | $892.00 |
| 0019 | 18" RC pipe culverts, class IV (0448300000-E) | LF | 332 | $135.00 | $200.00 | $169.00 | $128.75 | $107.53 | $110.00 |
| 0020 | 42" RC pipe culverts, class IV (0448700000-E) | LF | 76 | $288.00 | $420.00 | $351.00 | $314.15 | $352.26 | $351.00 |
| 0021 | **" RC pipe culv class V - (24") (0449000000-E) | LF | 284 | $132.00 | $185.00 | $138.00 | $180.25 | $138.42 | $160.00 |
| 0022 | **" RC pipe culv class V - (30") (0449000000-E) | LF | 128 | $175.00 | $236.00 | $181.00 | $231.75 | $185.48 | $211.00 |
| 0023 | Generic pipe item (LF) 310 - 73" X 55" caa pipe arch culvert, 0.079" thick (0987000000-E) | LF | 64 | $771.00 | $1,000.00 | $1,295.00 | $659.20 | $757.37 | $360.00 |
| 0024 | Pipe removal (0995000000-E) | LF | 191 | $37.95 | $100.00 | $34.00 | $41.20 | $30.37 | $18.00 |
| 0025 | Pipe clean out (0996000000-N) | EACH | 2 | $2,110.00 | $2,500.00 | $1,750.00 | $6,695.00 | $2,742.22 | $3,000.00 |
| 0026 | Fine grading (1011000000-N) | LS | 1 | $554,500 | $178,000 | $460,000 | $220,000 | $100,000 | $890,000 |
| 0027 | Class IV aggregate stabilization (1111000000-E) | TON | 250 | $74.00 | $68.00 | $90.00 | $65.00 | $54.51 | $80.00 |
| 0028 | Aggregate base course (1121000000-E) | TON | 33 | $128.00 | $82.00 | $90.00 | $80.00 | $72.61 | $95.00 |
| 0029 | Incidental stone base (1220000000-E) | TON | 50 | $250.00 | $70.00 | $90.00 | $85.00 | $65.39 | $95.00 |
| 0030 | Mill asp PVMT *****" DTH - (1-1/2") (1297000000-E) | SY | 1,020 | $16.50 | $20.00 | $15.00 | $25.00 | $39.25 | $34.77 |
| 0031 | Asphalt conc base course, type B25.0C (1491000000-E) | TON | 10,390 | $94.85 | $96.00 | $86.50 | $89.10 | $100.38 | $90.30 |
| 0032 | Asphalt conc intermediate course, type I19.0C (1503000000-E) | TON | 6,890 | $99.55 | $98.50 | $88.65 | $91.31 | $104.24 | $94.00 |
| 0033 | Asphalt conc surface course, type S9.5C (1523000000-E) | TON | 7,100 | $97.30 | $93.50 | $80.00 | $82.40 | $109.38 | $99.00 |
| 0034 | Asphalt binder for plant mix (1575000000-E) | TON | 1,220 | $700.00 | $575.00 | $687.00 | $764.26 | $1,029.50 | $925.00 |
| 0035 | Asphalt plant mix, pavement repair (1693000000-E) | TON | 20 | $288.00 | $315.00 | $500.00 | $300.00 | $338.18 | $285.00 |
| 0036 | Generic paving item (LF) 665 - milled rumble strips (asphalt concrete), (16") (1841000000-E) | LF | 3,500 | $1.00 | $1.00 | $1.00 | $2.00 | $4.75 | $2.12 |
| 0037 | Subdrain excavation (2022000000-E) | CY | 168 | $35.00 | $35.00 | $35.00 | $36.00 | $3.64 | $45.00 |
| 0038 | Geotextile for subsurface drains (2026000000-E) | SY | 500 | $12.00 | $12.00 | $12.00 | $14.00 | $1.24 | $1.00 |
| 0039 | Subdrain coarse aggregate (2036000000-E) | CY | 84 | $80.00 | $80.00 | $80.00 | $84.00 | $125.00 | $155.00 |
| 0040 | 6" perforated subdrain pipe (2044000000-E) | LF | 500 | $17.00 | $17.00 | $17.00 | $19.00 | $12.00 | $25.00 |
| 0041 | Subdrain pipe outlet (2070000000-N) | EACH | 1 | $400.00 | $400.00 | $400.00 | $420.00 | $180.00 | $320.00 |
| 0042 | 6" outlet pipe (2077000000-E) | LF | 6 | $40.00 | $40.00 | $40.00 | $44.00 | $30.00 | $37.00 |
| 0043 | Temporary steel plate covers for masonry drainage structure (2190000000-N) | EACH | 2 | $2,060.00 | $2,600.00 | $2,000.00 | $2,060.00 | $857.18 | $650.00 |
| 0044 | Endwalls (2209000000-E) | CY | 21 | $1,383.00 | $1,500.00 | $1,450.00 | $1,699.50 | $1,432.30 | $2,050.00 |
| 0045 | Reinforced endwalls (2220000000-E) | CY | 43 | $3,425.00 | $2,200.00 | $2,335.00 | $2,420.50 | $1,674.67 | $1,400.00 |
| 0046 | Pipe collars (2253000000-E) | CY | 1 | $3,068.00 | $3,650.00 | $1,375.00 | $2,575.00 | $1,847.33 | $1,800.00 |
| 0047 | Flowable fill (2275000000-E) | CY | 12 | $900.00 | $1,520.00 | $890.00 | $515.00 | $799.79 | $750.00 |
| 0048 | Masonry drainage structures (2286000000-N) | EACH | 2 | $2,830.00 | $5,500.00 | $3,900.00 | $4,635.00 | $4,175.16 | $2,600.00 |
| 0049 | Frame with two grates, STD 840.16 (2364000000-N) | EACH | 2 | $1,241.00 | $1,370.00 | $1,500.00 | $1,442.00 | $784.18 | $1,750.00 |
| 0050 | Concrete transitional section for drop inlet (2451000000-N) | EACH | 2 | $1,250.00 | $1,750.00 | $1,250.00 | $1,500.00 | $2,773.03 | $2,565.00 |
| 0051 | 5" monolithic concrete islands (surface mounted) (2647000000-E) | SY | 630 | $85.00 | $85.00 | $85.00 | $110.00 | $117.08 | $109.00 |
| 0052 | 5" monolithic concrete islands (keyed in) (2655000000-E) | SY | 160 | $88.50 | $85.00 | $88.50 | $120.00 | $166.38 | $153.00 |
| 0053 | Rip rap, class I (3628000000-E) | TON | 150 | $153.00 | $120.00 | $130.00 | $95.00 | $148.61 | $133.00 |
| 0054 | Rip rap, class B (3649000000-E) | TON | 50 | $138.00 | $120.00 | $130.00 | $90.00 | $148.64 | $140.00 |
| 0055 | Geotextile for drainage (3656000000-E) | SY | 2,265 | $2.70 | $2.15 | $4.50 | $3.50 | $2.51 | $2.50 |
| 0056 | Contr furn, type ***sign - (E) (4025000000-E) | SF | 234.80 | $22.10 | $14.40 | $22.10 | $22.00 | $24.85 | $23.00 |
| 0057 | Supports, 3-LB steel U-channel (4072000000-E) | LF | 639.60 | $6.00 | $9.05 | $6.00 | $13.00 | $13.67 | $12.50 |
| 0058 | Sign erection, type E (4102000000-N) | EACH | 41 | $185.00 | $102.00 | $185.00 | $78.00 | $93.21 | $85.50 |
| 0059 | Disposal of sign system, U-channel (4155000000-N) | EACH | 2 | $25.00 | $16.00 | $25.00 | $100.00 | $1.24 | $2.00 |
| 0060 | Work zone signs (stationary) (4400000000-E) | SF | 160 | $6.00 | $9.10 | $6.00 | $10.00 | $22.37 | $7.00 |
| 0061 | Work zone signs (portable) (4405000000-E) | SF | 580 | $12.00 | $27.60 | $15.00 | $14.00 | $11.81 | $11.00 |
| 0062 | Work zone signs (barricade mounted) (4410000000-E) | SF | 80 | $8.12 | $11.40 | $8.12 | $20.00 | $7.46 | $9.30 |
| 0063 | Flashing arrow board (4415000000-N) | EACH | 2 | $3,620.00 | $5,000.00 | $2,000.00 | $4,500.00 | $1,118.47 | $3,135.00 |
| 0064 | Portable changeable message sign (4420000000-N) | EACH | 3 | $7,900.00 | $10,000 | $5,500.00 | $18,000 | $5,965.15 | $6,800.00 |
| 0065 | Drums (4430000000-N) | EACH | 990 | $55.00 | $52.00 | $63.00 | $50.00 | $53.44 | $53.00 |
| 0066 | Sequential flashing warning lights (4434000000-N) | EACH | 70 | $177.00 | $170.00 | $195.00 | $125.00 | $150.93 | $122.00 |
| 0067 | Barricades (type III) (4445000000-E) | LF | 120 | $22.00 | $49.55 | $22.00 | $30.00 | $31.07 | $31.00 |
| 0068 | Flagger (4455000000-N) | DAY | 20 | $685.00 | $370.00 | $350.00 | $480.00 | $550.00 | $450.00 |
| 0069 | TMA (4480000000-N) | EACH | 2 | $13,620 | $40,000 | $6,900.00 | $18,000 | $14,540 | $4,400.00 |
| 0070 | Law enforcement (4510000000-N) | HR | 600 | $80.00 | $50.00 | $65.00 | $50.00 | $78.88 | $75.00 |
| 0071 | Temporary raised pavement markers (4650000000-N) | EACH | 10 | $20.00 | $20.00 | $20.00 | $11.00 | $29.49 | $22.80 |
| 0072 | Thermoplastic pavement marking lines (4", 90 mils) (4685000000-E) | LF | 34,069 | $0.53 | $0.53 | $0.53 | $1.06 | $0.78 | $0.60 |
| 0073 | Thermoplastic pavement marking lines (6", 90 mils) (4688000000-E) | LF | 6,450 | $0.76 | $0.76 | $0.76 | $2.10 | $1.12 | $0.80 |
| 0074 | Thermoplastic pavement marking lines (8", 90 mils) (4695000000-E) | LF | 700 | $2.42 | $2.42 | $2.42 | $2.60 | $3.57 | $2.76 |
| 0075 | Thermoplastic pavement marking lines (12", 90 mils) (4700000000-E) | LF | 4,320 | $2.50 | $2.50 | $2.50 | $3.15 | $3.69 | $3.00 |
| 0076 | Thermoplastic pavement marking lines (24", 90 mils) (4709000000-E) | LF | 320 | $20.00 | $20.00 | $20.00 | $13.70 | $29.49 | $22.80 |
| 0077 | Thermoplastic pavement marking character (90 mils) (4720000000-E) | EACH | 12 | $150.00 | $150.00 | $150.00 | $130.00 | $221.19 | $171.00 |
| 0078 | Thermoplastic pavement marking symbol (90 mils) (4725000000-E) | EACH | 40 | $150.00 | $150.00 | $150.00 | $140.00 | $221.19 | $171.00 |
| 0079 | Paint pavement marking lines (6") (4815000000-E) | LF | 400 | $0.50 | $0.50 | $0.50 | $5.75 | $0.74 | $0.60 |
| 0080 | Removal of pavement marking lines (4") (4850000000-E) | LF | 1,000 | $1.20 | $1.20 | $1.20 | $3.65 | $1.77 | $1.40 |
| 0081 | Removal of pavement marking lines (6") (4855000000-E) | LF | 3,350 | $1.20 | $1.20 | $1.20 | $3.65 | $1.77 | $1.40 |
| 0082 | Generic pavement marking item (LF) - yield line thermoplastic pavement marking (24", 90 mils) (4890000000-E) | LF | 40 | $35.00 | $35.00 | $35.00 | $14.00 | $51.61 | $40.00 |
| 0083 | Generic pavement marking item (EA) - polycarbonate H-shaped markers (4895000000-N) | EACH | 310 | $55.25 | $55.25 | $55.25 | $78.00 | $81.47 | $63.00 |
| 0084 | 8" valve (5546000000-E) | EACH | 3 | $3,850.00 | $4,340.00 | $3,850.00 | $6,566.25 | $7,408.53 | $6,000.00 |
| 0085 | 8" force main sewer (5709400000-E) | LF | 700 | $81.00 | $93.00 | $81.00 | $128.75 | $55.84 | $54.00 |
| 0086 | Ductile iron sewer pipe fittings (5769000000-E) | LB | 1,065 | $21.00 | $34.00 | $21.00 | $25.75 | $14.53 | $21.00 |
| 0087 | Abandon 8" utility pipe (5801000000-E) | LF | 691 | $17.00 | $45.00 | $17.00 | $36.05 | $4.52 | $23.00 |
| 0088 | 30" encasement pipe (5836200000-E) | LF | 100 | $290.00 | $360.00 | $290.00 | $386.25 | $275.55 | $926.00 |
| 0089 | Temporary silt fence (6000000000-E) | LF | 23,365 | $3.50 | $3.00 | $2.50 | $2.00 | $5.26 | $2.85 |
| 0090 | Stone for erosion control, class A (6006000000-E) | TON | 270 | $113.00 | $116.00 | $120.00 | $90.00 | $133.46 | $110.00 |
| 0091 | Stone for erosion control, class B (6009000000-E) | TON | 945 | $100.00 | $104.00 | $120.00 | $90.00 | $133.46 | $115.00 |
| 0092 | Sediment control stone (6012000000-E) | TON | 860 | $75.00 | $106.00 | $105.00 | $85.00 | $117.66 | $101.00 |
| 0093 | Temporary mulching (6015000000-E) | ACRE | 16 | $1,200.00 | $1,800.00 | $1,200.00 | $1,050.00 | $1,219.34 | $1,400.00 |
| 0094 | Seed for temporary seeding (6018000000-E) | LB | 1,000 | $3.00 | $2.00 | $3.00 | $2.50 | $8.44 | $3.40 |
| 0095 | Fertilizer for temporary seeding (6021000000-E) | TON | 5 | $1,150.00 | $1,000.00 | $1,150.00 | $2,000.00 | $1,068.79 | $1,310.00 |
| 0096 | Temporary slope drains (6024000000-E) | LF | 200 | $25.82 | $25.00 | $38.00 | $27.00 | $17.84 | $43.00 |
| 0097 | Safety fence (6029000000-E) | LF | 260 | $3.00 | $3.00 | $3.00 | $2.00 | $3.89 | $3.50 |
| 0098 | Silt excavation (6030000000-E) | CY | 890 | $1.00 | $15.00 | $23.00 | $20.00 | $8.96 | $24.00 |
| 0099 | Matting for erosion control (6036000000-E) | SY | 7,000 | $1.45 | $1.70 | $1.45 | $2.00 | $2.18 | $1.65 |
| 0100 | Coir fiber mat (6037000000-E) | SY | 1,650 | $4.75 | $6.00 | $4.75 | $7.00 | $4.19 | $5.50 |
| 0101 | 1/4" hardware cloth (6042000000-E) | LF | 115 | $4.00 | $6.00 | $4.00 | $10.00 | $1.38 | $5.00 |
| 0102 | Temporary pipe for stream crossing (6046000000-E) | LF | 125 | $65.00 | $160.00 | $75.00 | $200.00 | $11.08 | $200.00 |
| 0103 | Special stilling basins (6070000000-N) | EACH | 12 | $535.00 | $1,860.00 | $150.00 | $1,500.00 | $3,895.07 | $360.00 |
| 0104 | Flocculant (6071002000-E) | LB | 1,950 | $9.00 | $5.00 | $9.00 | $15.25 | $2.87 | $11.00 |
| 0105 | Coir fiber wattle (6071012000-E) | LF | 7,710 | $6.50 | $9.00 | $6.50 | $7.50 | $7.83 | $9.00 |
| 0106 | Seeding and mulching (6084000000-E) | ACRE | 18 | $2,525.00 | $2,700.00 | $2,525.00 | $2,300.00 | $3,358.44 | $2,900.00 |
| 0107 | Mowing (6087000000-E) | ACRE | 12 | $275.00 | $250.00 | $275.00 | $150.00 | $1.00 | $300.00 |
| 0108 | Seed for repair seeding (6090000000-E) | LB | 200 | $6.00 | $4.50 | $6.00 | $7.00 | $24.26 | $7.00 |
| 0109 | Fertilizer for repair seeding (6093000000-E) | TON | 0.50 | $1,100.00 | $1,100.00 | $1,100.00 | $2,000.00 | $1,472.00 | $1,250.00 |
| 0110 | Seed for supplemental seeding (6096000000-E) | LB | 400 | $5.50 | $4.50 | $5.50 | $6.50 | $24.26 | $6.30 |
| 0111 | Fertilizer topdressing (6108000000-E) | TON | 11.50 | $1,050.00 | $950.00 | $1,050.00 | $3,100.00 | $1,471.97 | $1,200.00 |
| 0112 | Impervious dike (6111000000-E) | LF | 187 | $80.00 | $158.00 | $250.00 | $150.00 | $140.30 | $57.00 |
| 0113 | Specialized hand mowing (6114500000-N) | MHR | 10 | $95.00 | $175.00 | $95.00 | $50.00 | $1.00 | $109.00 |
| 0114 | Response for erosion control (6117000000-N) | EACH | 25 | $375.00 | $250.00 | $375.00 | $325.00 | $1,500.00 | $570.00 |
| 0115 | Concrete washout structure (6117500000-N) | EACH | 1 | $4,768.00 | $1,125.00 | $2,200.00 | $1,800.00 | $3,075.28 | $700.00 |
| 0116 | Generic erosion control item (EA) - prefabricated concrete washout (6132000000-N) | EACH | 6 | $725.00 | $1,125.00 | $250.00 | $1,100.00 | $94.95 | $400.00 |
| 0117 | Signal cable (7060000000-E) | LF | 6,300 | $5.00 | $5.00 | $5.00 | $5.25 | $6.53 | $5.80 |
| 0118 | Vehicle signal head (12", 1 section) (7108000000-E) | EACH | 8 | $1,000.00 | $1,000.00 | $1,000.00 | $1,045.00 | $914.57 | $815.00 |
| 0119 | Vehicle signal head (12", 3 section) (7120000000-E) | EACH | 9 | $1,300.00 | $1,300.00 | $1,300.00 | $1,359.00 | $1,829.14 | $1,620.00 |
| 0120 | Vehicle signal head (12", 4 section) (7132000000-E) | EACH | 8 | $1,600.00 | $1,600.00 | $1,600.00 | $1,672.00 | $2,351.75 | $2,080.00 |
| 0121 | Messenger cable (3/8") (7264000000-E) | LF | 850 | $5.00 | $5.00 | $5.00 | $5.25 | $11.76 | $10.40 |
| 0122 | Unpaved trench (***********) - (2, 2") (7300000000-E) | LF | 2,200 | $18.00 | $18.00 | $18.00 | $18.80 | $22.21 | $19.60 |
| 0123 | Junction box (standard size) (7324000000-N) | EACH | 8 | $520.00 | $520.00 | $520.00 | $543.40 | $1,175.88 | $1,045.00 |
| 0124 | Inductive loop sawcut (7444000000-E) | LF | 200 | $13.00 | $13.00 | $13.00 | $13.59 | $33.97 | $33.40 |
| 0125 | Lead-in cable (14-2) (7456100000-E) | LF | 3,100 | $4.00 | $4.00 | $4.00 | $4.18 | $3.92 | $3.45 |
| 0126 | Microwave vehicle detector (7484000000-N) | EACH | 4 | $12,000 | $12,000 | $12,000 | $12,540 | $21,558 | $18,000 |
| 0127 | Metal strain signal pole (7576000000-N) | EACH | 4 | $22,000 | $22,000 | $22,000 | $22,990 | $29,103 | $24,000 |
| 0128 | Soil test (7613000000-N) | EACH | 4 | $4,200.00 | $4,200.00 | $4,200.00 | $4,390.00 | $3,266.32 | $2,600.00 |
| 0129 | Drilled pier foundation (7614100000-E) | CY | 24 | $1,700.00 | $1,700.00 | $1,700.00 | $1,775.00 | $3,266.32 | $2,900.00 |
| 0130 | Metal strain pole design (7630000000-N) | EACH | 4 | $100.00 | $100.00 | $100.00 | $105.00 | $1.31 | $1.10 |
| 0131 | Type III pedestal with foundation (7642300000-N) | EACH | 4 | $5,600.00 | $5,600.00 | $5,600.00 | $5,852.00 | $11,106 | $10,000 |
| 0132 | Signal cabinet foundation (7684000000-N) | EACH | 1 | $1,300.00 | $1,300.00 | $1,300.00 | $1,359.00 | $3,919.60 | $3,300.00 |
| 0133 | Controller with cabinet (type 170E, base mounted) (7720000000-N) | EACH | 1 | $27,000 | $27,000 | $27,000 | $28,215 | $39,196 | $34,500 |
| 0134 | Detector card (type 170) (7744000000-N) | EACH | 4 | $220.00 | $220.00 | $220.00 | $230.00 | $371.06 | $320.00 |
| 0135 | Cabinet base extender (7901000000-N) | EACH | 1 | $650.00 | $650.00 | $650.00 | $678.00 | $1,029.55 | $900.00 |
| 0136 | Beacon CNTRL assm & CBNT ***** - (F3) (7912000000-N) | EACH | 2 | $6,500.00 | $6,500.00 | $6,500.00 | $6,792.50 | $14,995 | $13,200 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
Every contract let that day: NCDOT letting of June 16, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.