NCDOT letting results, December 20, 2022

13 contracts let by North Carolina DOT on December 20, 2022, $123,393,850 in low bids, a median of 4 bidders per contract.

Owner
North Carolina DOT
Contracts
13
Low bids, total
$123,393,850
Data through
20 OCT 2026

Contracts let that day

ContractProjectCountyBidsLow bidderLow bidSecond bidGapSource
C204812Grading, drainage, paving, and structures. NC-143 FROM 0.5 MI NORTH OF APPALACHIAN TRAIL TO NC-28 AND NC-28 FROM 0.2 MI WEST NC-143 TO 0.2 MI WEST OF SR-1228.Graham2Adams Contracting Co Inc$67,387,346$71,889,086+7.0%NCDOT
C204656Pavement rehabilitation. I-540 FROM US-70 (GLENWOOD AVE) TO EAST OF TRIANGLE TOWN BLVD.Wake2Blythe Construction Inc$10,878,800$13,006,660+20%NCDOT
C204809Milling, resurfacing, and shoulder reconstruction. 2 SECTIONS OF US-421.Chatham, Randolph5Boggs Contracting Inc$6,259,370$6,264,1800.0%NCDOT
C204800Widening, grading, drainage, paving, signals, and walls. US-311 (S MAIN ST) AT NC-65 AND SR-1928 (STOKESBURG RD) AND NC-65 AT NORFOLK SOUTHERN RAIL CROSSING IN Stokes2Smith-Rowe, LLC$6,054,987$6,449,479+7.0%NCDOT
C204810Milling, resurfacing, and shoulder reconstruction. 1 SECTION OF US-74, NC-150, NC-226 AND US-74 RAMPS, AND 1 SECTION OF SECONDARY ROAD.Cleveland4Asphalt Paving of Shelby Inc$5,143,348$6,207,534+21%NCDOT
C204811Milling, resurfacing, and shoulder reconstruction. 1 SECTION OF US-70, US-29, AND NC-150, AND 5 SECTIONS OF SECONDARY ROADS.Rowan3J. T. Russell & Sons, Inc.$4,651,490$4,991,670+7.0%NCDOT
C204385Grading, drainage, paving, and structure. BRIDGE #115 OVER WINSTON-SALEM SOUTHERN RAILWAY ON SR-1711 (GUMTREE RD).Davidson8Kemp Sigmon Construction Co Inc$4,591,917$4,722,330+3.0%NCDOT
C204806Milling and resurfacing. 27 SECTIONS OF SECONDARY ROADS.Orange3Carolina Sunrock LLC$4,512,658$5,253,250+16%NCDOT
C204807Milling, and resurfacing. 1 SECTION OF NC-903 AND 10 SECTIONS OF PRIMARY ROADS.Warren3Carolina Sunrock LLC$4,161,345$4,489,000+8.0%NCDOT
C204477Grading, drainage, paving, and structure. BRIDGE #33 OVER WOLF SWAMP ON US-17 (NBL).Onslow5S T Wooten Corporation$3,470,217$4,194,761+21%NCDOT
C204361Grading, drainage, paving, and structure. BRIDGE #7 OVER INDIAN CREEK ON NC-182.Lincoln5Apple Tuck & Associates, Inc.$2,176,063$2,293,749+5.0%NCDOT
C204808Shoulder reconstruction, milling, and resurfacing. 4 SECTIONS OF SECONDARY ROADS.Chatham4Vecellio & Grogan Inc DBA Sharpe Brothers$2,157,118$2,169,063+1.0%NCDOT
C204435Grading, drainage, paving, and structure., grading, drainage, paving, signals, and structure. BRIDGE #15 OVER CROOKED RUN ON NC-11.Pender6S & C Construction LLC$1,949,189$2,484,579+27%NCDOT
NCDOT contracts let on December 20, 2022, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than NCDOT received, the others did not match their published totals and are left out.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy