Boggs Contracting Inc: NCDOT bid record

Boggs Contracting Inc submitted 27 bids on North Carolina DOT contracts in the data, from 21 JAN 2020 to 19 DEC 2023, and was the low bidder on 6 of them (22%). When it was not low, its total sat a median +12% above the low bid.

Owner
North Carolina DOT
Low bid volume
$104,834,572
Latest bid
19 DEC 2023
Data through
20 OCT 2026
27Bids
6Low bids
22Win rate, percent
+12%Median gap to the low bid when not low, 21 bids

By year

YearBidsLow bidsWin rate
20203133%
202111218%
202210330%
2023300%
Boggs Contracting Inc, NCDOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
Mecklenburg4375%
Chatham3133%
Randolph300%
Richmond300%
Union200%
Lee2150%
Guilford200%
Cabarrus200%
Davidson100%
Alamance100%
Chatham, Randolph11100%
Mecklenburg, Cabarrus100%
Boggs Contracting Inc, NCDOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Thermoplastic pavement marking symbol (90 mils)4725000000-EEACH2216 (73%)$147.50$135.00
Incidental milling1330000000-ESY2413 (54%)$9.00$12.00
Paint pavement marking lines (4")4810000000-ELF1813 (72%)$0.19$0.27
Thermoplastic pavement marking lines (8", 90 mils)4695000000-ELF1813 (72%)$1.95$2.25
Asphalt binder for plant mix1575000000-ETON2511 (44%)$625.00$595.00
Paint pavement marking lines (24")4835000000-ELF1911 (58%)$3.00$3.50
Thermoplastic pavement marking lines (4", 90 mils)4685000000-ELF1711 (65%)$0.65$0.75
Thermoplastic pavement marking lines (12", 90 mils)4700000000-ELF1710 (59%)$3.50$3.05
Thermoplastic pavement marking character (90 mils)4720000000-EEACH1610 (63%)$123.50$116.50
Paint pavement marking lines (8")4820000000-ELF1510 (67%)$0.60$0.82
Paint pavement marking symbol4845000000-NEACH189 (50%)$50.00$50.00
Paint pavement marking lines (12")4825000000-ELF148 (57%)$0.90$1.00
Boggs Contracting Inc, NCDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
19 DEC 2023C204842UnionGrading, drainage, paving, signals, and structure. SR-1362 (CHESTNUT LANE CONNECTOR) FROM SR-1367 (MATTHEWS INDIAN TRAIL ROAD) TO SR-1368 (G5 of 5$27,125,397+50%
17 OCT 2023C204895ChathamGrading, drainage, and paving. WOLFSPEED - ROADWAY IMPROVEMENTS AND CONSTRUCTION OF INDUSTRIAL ACCESS ROADS ALONG US 64 JUST WEST OF SILER C6 of 6$10,694,010+68%
21 FEB 2023C204849RandolphMilling, resurfacing, and shoulder reconstruction. 1 SECTION OF NC-49 AND 19 SECTIONS OF SECONDARY ROADS.4 of 4$5,564,396+15%
20 DEC 2022C204809Chatham, RandolphMilling, resurfacing, and shoulder reconstruction. 2 SECTIONS OF US-421.1 of 5$6,259,370Low, 0.0% under the second
20 DEC 2022C204808ChathamShoulder reconstruction, milling, and resurfacing. 4 SECTIONS OF SECONDARY ROADS.2 of 4$2,169,063+1.0%
15 NOV 2022C204788AlamanceResurfacing and shoulder reconstruction. 6 SECTIONS OF SECONDARY ROADS.5 of 5$6,361,911+46%
15 NOV 2022C204791LeeMilling, and resurfacing. 2 SECTIONS OF US-1 BUS, 2 SECTIONS OF US-15-501, 2 SECTIONS OF US-1, AND 6 SECTIONS OF SECONDARY ROADS.3 of 3$2,671,807+23%
16 AUG 2022C204369LeeGrading, drainage, paving, and signals. NC-42/SR-1579 (BROADWAY RD) FROM US-421 IN SANFORD TO SR-1538 (E HARRINGTON AVE) IN BROADWAY.1 of 2$61,627,416Low, 20% under the second
19 JUL 2022C204708UnionGrading, drainage, and paving. RAILWAY CROSSING CLOSURE AT SR-1432 (TORY PATH RD) AND SR-1300 EXT (HELMS RD).2 of 4$6,127,397+2.0%
15 MAR 2022C204700GuilfordMilling, resurfacing, and shoulder reconstruction. 1 SECTION OF US-158 AND 49 SECTIONS OF SECONDARY ROADS.4 of 4$7,731,765+46%
15 MAR 2022C204705ForsythMilling, resurfacing, and shoulder reconstruction. 1 SECTION OF NC-150 AND 11 SECTIONS OF SECONDARY ROADS.4 of 4$8,860,473+54%
18 JAN 2022C204691ChathamMilling, resurfacing, and shoulder reconstruction. 1 SECTION OF US-421, AND 24 SECTIONS OF SECONDARY ROADS.1 of 3$4,465,396Low, 11% under the second
18 JAN 2022C204417CabarrusGrading, drainage, paving, and structure. BRIDGE #132 OVER DUTCH BUFFALO CREEK ON NC-73.4 of 8$4,933,526+22%
21 DEC 2021C204686CabarrusMilling, resurfacing, and shoulder reconstruction. 1 SECTION OF NC-3 AND 39 SECTIONS OF SECONDARY ROADS.3 of 6$6,072,888+10%
16 NOV 2021C204665GuilfordGrading, paving, and drainage. US-29/US-70/US-220 (O'HENRY BLVD) FROM I-40/I-85 BUS TO SOUTH OF FLORIDA ST IN GREENSBORO.2 of 3$5,320,047+3.0%
16 NOV 2021C204660RichmondPavement rehabilitation and bridge rehabilitation. I-73/I-74 FROM SR-1455 (FIRE TOWER ROAD) TO MONTGOMERY COUNTY LINE.2 of 3$5,997,504+1.0%
16 NOV 2021C204680RandolphMilling, resurfacing, and shoulder reconstruction. 1 SECTION US-220 BUS, 2 SECTIONS NC-22, 2 SECTIONS NC-42 E, 1 SECTION NC-159, AND 4 SECTI5 of 5$2,957,698+8.0%
16 NOV 2021C204679RandolphMilling, resurfacing, and shoulder reconstruction. 11 SECTIONS SECONDARY ROADS.4 of 5$3,194,585+12%
19 OCT 2021C204399DavidsonGrading, drainage, paving, and structure. US-29/70 & I-85 BUSINESS AT SR-1798 (OLD GREENSBORO ROAD).2 of 12$26,458,836+2.0%
19 OCT 2021C204027MecklenburgGrading, drainage, paving, and bridge rehabilitation. I-277 (BROOKSHIRE FRWY) FROM BRIDGE DECK OVER 10TH STREET TO BRIDGE DECK OVER JOHNSON 3 of 3$28,920,044+11%
15 JUN 2021C204647MecklenburgPavement and structure rehabilitation. I-85 FROM MILE MARKER 35.95 TO MILE MARKER 42.03.1 of 3$15,294,743Low, 10% under the second
15 JUN 2021C204646MecklenburgMilling, resurfacing, and shoulder grading. 1 SECTION OF US-74, 2 SECTIONS OF NC-16, 1 SECTION OF NC-160 , 1 SECTION OF NC-115, AND 19 SECTI1 of 4$6,739,307Low, 3.0% under the second
15 JUN 2021C204644RichmondMilling, resurfacing, and shoulder grading. 7 SECTIONS OF US-74 BYPASS, 1 SECTION OF US-74, AND 4 SECTIONS OF SECONDARY ROADS.2 of 2$6,325,801+15%
18 MAY 2021C204555AnsonGrading, drainage, paving & structure. BRIDGE #11 OVER DEADFALL CREEK ON NC-109.2 of 5$2,940,0270.0%
15 DEC 2020C204589RichmondMilling, resurfacing, and shoulder reconstruction. 4 SECTIONS OF US-1, 2 SECTIONS OF US-220, 9 SECTIONS OF US-74, 1 SECTION OF NC-109, AND 93 of 3$3,473,154+3.0%
Boggs Contracting Inc: latest NCDOT bids in the data

How this record was read

NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; NCDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy