Sloan Construction A Division of Reeves Construction Co: NCDOT bid record
Sloan Construction A Division of Reeves Construction Co submitted 45 bids on North Carolina DOT contracts in the data, from 17 SEP 2013 to 18 JAN 2022, and was the low bidder on 4 of them (9%). When it was not low, its total sat a median +18% above the low bid.
- Owner
- North Carolina DOT
- Low bid volume
- $39,147,931
- Latest bid
- 18 JAN 2022
- Data through
- 20 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2013 | 3 | 0 | 0% |
| 2015 | 1 | 0 | 0% |
| 2017 | 9 | 0 | 0% |
| 2018 | 13 | 3 | 23% |
| 2019 | 4 | 0 | 0% |
| 2020 | 5 | 0 | 0% |
| 2021 | 9 | 1 | 11% |
| 2022 | 1 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Gaston | 6 | 1 | 17% |
| Cabarrus | 4 | 0 | 0% |
| Brunswick | 3 | 1 | 33% |
| Cleveland | 2 | 0 | 0% |
| Robeson | 2 | 0 | 0% |
| Rockingham | 2 | 0 | 0% |
| Anson | 2 | 0 | 0% |
| Rutherford | 2 | 0 | 0% |
| Mecklenburg | 2 | 0 | 0% |
| Davidson, Rowan, Stanly | 1 | 0 | 0% |
| Craven | 1 | 0 | 0% |
| Pender, Duplin | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Asphalt binder for plant mix | 1575000000-E | TON | 43 | 24 (56%) | $510.00 | $595.00 |
| Seed for repair seeding | 6090000000-E | LB | 31 | 15 (48%) | $4.50 | $5.50 |
| Seed for supplemental seeding | 6096000000-E | LB | 31 | 15 (48%) | $4.00 | $4.50 |
| Guardrail end units, type TL-3 | 3287000000-N | EACH | 26 | 14 (54%) | $3,100.00 | $3,250.00 |
| 1/4" hardware cloth | 6042000000-E | LF | 31 | 13 (42%) | $4.00 | $4.50 |
| Seed for temporary seeding | 6018000000-E | LB | 31 | 13 (42%) | $2.00 | $3.00 |
| Paint pavement marking lines (4") | 4810000000-E | LF | 30 | 12 (40%) | $0.30 | $0.27 |
| Asphalt conc base course, type B25.0C | 1491000000-E | TON | 25 | 12 (48%) | $71.00 | $85.35 |
| Asphalt conc intermediate course, type I19.0C | 1503000000-E | TON | 24 | 12 (50%) | $68.00 | $80.64 |
| Steel beam guardrail | 3030000000-E | LF | 21 | 12 (57%) | $18.00 | $24.00 |
| Paint pavement marking lines (24") | 4835000000-E | LF | 15 | 12 (80%) | $3.00 | $3.50 |
| Polyacrylamide (pam) | 6071020000-E | LB | 30 | 11 (37%) | $10.00 | $10.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Dane Construction, Inc. | 22 | 10 of 22 |
| Smith-Rowe, LLC | 17 | 13 of 17 |
| Blythe Construction Inc | 12 | 8 of 12 |
| Dellinger, Inc. | 10 | 7 of 10 |
| S T Wooten Corporation | 8 | 7 of 8 |
| W C English Incorporated | 8 | 7 of 8 |
| Conti Enterprises, Inc | 6 | 3 of 6 |
| Sanford Contractors Inc | 6 | 4 of 6 |
| Lee Construction Company of the Carolinas, Inc. | 6 | 2 of 6 |
| Blythe Development Co. | 6 | 2 of 6 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 18 JAN 2022 | C204417 | Cabarrus | Grading, drainage, paving, and structure. BRIDGE #132 OVER DUTCH BUFFALO CREEK ON NC-73. | 6 of 8 | $5,414,525 | +34% |
| 21 DEC 2021 | C204686 | Cabarrus | Milling, resurfacing, and shoulder reconstruction. 1 SECTION OF NC-3 AND 39 SECTIONS OF SECONDARY ROADS. | 6 of 6 | $6,498,944 | +18% |
| 19 OCT 2021 | C204446 | Davidson, Rowan, Stanly | Grading, drainage, paving, and structure. BRIDGES #3 AND #8 OVER YADKIN RIVER AND WINSTON-SALEM SOUTHBOUND RAILROAD ON NC-49. | 4 of 8 | $15,834,161 | +15% |
| 15 JUN 2021 | C204646 | Mecklenburg | Milling, resurfacing, and shoulder grading. 1 SECTION OF US-74, 2 SECTIONS OF NC-16, 1 SECTION OF NC-160 , 1 SECTION OF NC-115, AND 19 SECTI | 3 of 4 | $7,531,989 | +12% |
| 18 MAY 2021 | C204469 | Anson, Stanly | Grading, drainage, paving & structure. BRIDGE #70 OVER ROCKY RIVER ON US-52. | 1 of 8 | $5,291,750 | Low, 4.0% under the second |
| 18 MAY 2021 | C204555 | Anson | Grading, drainage, paving & structure. BRIDGE #11 OVER DEADFALL CREEK ON NC-109. | 3 of 5 | $3,238,758 | +10% |
| 16 MAR 2021 | C204392 | Rockingham | Grading, drainage, paving, and structure. BRIDGE #116 OVER US-29 ON SR-2600. | 3 of 7 | $4,577,381 | +24% |
| 16 FEB 2021 | C204434 | Craven | Grading, drainage, paving, and structures. BRIDGE 138 AND BRIDGE 139 OVER THE NEUSE RIVER ON SR-1470. | 7 of 7 | $19,928,190 | +44% |
| 16 FEB 2021 | C204449 | Pender, Duplin | Bridge preservation. STRUCTURES #300433 OVER I-40 ON NC-903 AND #700219 OVER I-40 ON US-117. | 4 of 7 | $1,204,334 | +30% |
| 16 FEB 2021 | C204490 | Yadkin, Forsyth | Grading, drainage, paving, and structure. BRIDGE #35 OVER THE YADKIN RIVER ON NC-67. | 9 of 10 | $13,271,753 | +39% |
| 15 DEC 2020 | C204561 | Brunswick | Bridge preservation. BRIDGE #13 OVER THE INTRACOASTAL WATERWAY ON NC-904. | 5 of 8 | $3,699,186 | +32% |
| 15 DEC 2020 | C204530 | Northampton | Grading, drainage, paving, and structure. BRIDGE #93 OVER JACKS SWAMP ON SR-1203 (JACKS SWAMP RD). | 7 of 10 | $1,229,416 | +35% |
| 15 DEC 2020 | C204580 | Mecklenburg | Milling, resurfacing, and shoulder grading. 2 SECTIONS OF US-21, 3 SECTIONS OF NC-16, 1 SECTION OF NC-24/27, AND 15 SECTIONS OF SECONDARY RO | 3 of 5 | $4,786,277 | +23% |
| 15 SEP 2020 | C204558 | Bladen | Grading, drainage, paving, and structure. REPLACE BRIDGES #16 &17 ON US-701 OVER CAPE FEAR RIVER. | 5 of 8 | $26,674,150 | +14% |
| 17 MAR 2020 | C204363 | Mecklenburg, Cabarrus | Pavement and structure rehabilitation. I-85 FROM US-29 BYPASS CONNECTOR TO MALLARD CREEK CHURCH ROAD. | 2 of 5 | $6,496,448 | +3.0% |
| 17 SEP 2019 | C204220 | Yadkin | Grading, drainage, paving, and structure. BRIDGE #105 OVER YADKIN RIVER ON US-421 NORTH BOUND LANES. | 8 of 9 | $8,533,238 | +26% |
| 18 JUN 2019 | C204151 | Brunswick | Grading, drainage, paving, and structure. BRIDGE #47 OVER BEAR PEN ISLAND SWAMP ON NC-211 (GREEN SWAMP RD). | 5 of 6 | $3,115,613 | +26% |
| 16 APR 2019 | C204179 | Chatham, Lee | Grading, drainage, paving, and structure. BRIDGE # 10 OVER DEEP RIVER ON US-15/501 AND NC-87. | 7 of 9 | $9,812,213 | +11% |
| 19 MAR 2019 | C204238 | Chatham | Bridge preservation. US-64 EB OVER JORDAN LAKE STRUCTURE #180058 AND US-64 WB OVER JORDAN LAKE STRUCTURE #180059. | 4 of 7 | $1,806,172 | +11% |
| 18 DEC 2018 | C204234 | Gaston | Bridge preservation. SR-1118 OVER I-85 STRUCTURE # 350039. | 4 of 6 | $775,993 | +93% |
| 18 DEC 2018 | C204228 | Rutherford | Grading, drainage, paving, signals & retaining wall. SR-2241 (OAK ST EXT) FROM SR-2159 (PINEY RIDGE RD) TO US-74A. | 2 of 3 | $6,542,375 | +24% |
| 20 NOV 2018 | C204262 | Gaston | Grading, drainage, paving, culverts, and resurfacing. NC-279 FROM SR-1438 TO NC-275. | 1 of 2 | $15,853,698 | Low, 14% under the second |
| 19 JUN 2018 | C203938 | Edgecombe | Grading, drainage, paving, and structure. BRIDGE #28 OVER TAR RIVER ON NC-42. | 4 of 5 | $9,549,080 | +27% |
| 19 JUN 2018 | C204100 | Guilford | Grading, drainage, paving, signals, and structures. BRIDGE #237 AND #242 OVER DEEP RIVER ON US-29/US-70/I-85 BUS IN HIGH POINT. | 4 of 4 | $8,577,777 | +7.0% |
| 19 JUN 2018 | C204186 | Rutherford | Milling, resurfacing, and shoulder reconstruction. 3 SECTIONS OF US-64/74A , 2 SECTIONS OF NC-108, 1 SECTION OF US-221 ALT, AND 61 SECTIONS | 3 of 3 | $9,667,506 | +27% |
How this record was read
NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; NCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.