NCDOT letting results, January 18, 2022

10 contracts let by North Carolina DOT on January 18, 2022, $250,862,072 in low bids, a median of 4 bidders per contract.

Owner
North Carolina DOT
Contracts
10
Low bids, total
$250,862,072
Data through
20 OCT 2026

Contracts let that day

ContractProjectCountyBidsLow bidderLow bidSecond bidGapSource
C204553Grading, drainage, paving, signals, and structures. NC-417 (HAMPSTEAD BYPASS) FROM SOUTH OF NC-210 TO NORTH OF SR-1563 (SLOOP POINT LOOP RD).Pender2Conti Civil LLC$185,680,442$224,743,684+21%NCDOT
C204568Bridge preservation. BRIDGE #270012 OVER ROANOKE SOUND ON US-64.Dare5Freyssinet Inc$21,305,653$25,676,533+21%NCDOT
C204542Grading, drainage, paving, reatining walls, and structure. SR-1603 (N CARRIAGE RD) FROM NORTH OF SR-1770 (EASTERN AVE/ SUNSET AVE) TO SR-1601 (REGES STORE RD).Nash4Barnhill Contracting Company$20,329,828$20,920,719+3.0%NCDOT
C204691Milling, resurfacing, and shoulder reconstruction. 1 SECTION OF US-421, AND 24 SECTIONS OF SECONDARY ROADS.Chatham3Boggs Contracting Inc$4,465,396$4,948,032+11%NCDOT
C204417Grading, drainage, paving, and structure. BRIDGE #132 OVER DUTCH BUFFALO CREEK ON NC-73.Cabarrus8NJR Group Inc$4,042,182$4,326,753+7.0%NCDOT
C204692Grading, drainage, paving, and culvert. BRIDGE #24 OVER NICK'S CREEK ON NC-22.Moore4Mountain Creek Contractors Inc$3,488,269$3,636,900+4.0%NCDOT
C204689Milling, resurfacing, and shoulder grading. 16 SECTIONS OF SECONDARY ROADS.Franklin3S T Wooten Corporation$3,225,035$3,353,003+4.0%NCDOT
C204301Bridge preservation. STRUCTURE #640048 AND STRUCTURE #640049 ON I-40 OVER NORTHEAST CAPE FEAR RIVER.New Hanover, Pender5The Truesdell Corporation$2,933,933$3,076,006+5.0%NCDOT
C204629Grading, drainage, paving, and structure. BRIDGE #57 OVER DRIVING CREEK ON NC-211.Brunswick7The Tara Group of Lumberton Inc$2,765,532$2,918,699+6.0%NCDOT
C204690Milling, resurfacing, and shoulder grading. 1 SECTION OF NC-96, AND 3 SECTIONS OF SECONDARY ROADS.Granville2Carolina Sunrock LLC$2,625,801$2,919,145+11%NCDOT
NCDOT contracts let on January 18, 2022, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than NCDOT received, the others did not match their published totals and are left out.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy