Asphalt Paving of Shelby Inc: NCDOT bid record
Asphalt Paving of Shelby Inc submitted 15 bids on North Carolina DOT contracts in the data, from 15 JAN 2013 to 18 NOV 2025, and was the low bidder on 12 of them (80%). When it was not low, its total sat a median +5.0% above the low bid.
- Owner
- North Carolina DOT
- Low bid volume
- $73,040,052
- Latest bid
- 18 NOV 2025
- Data through
- 20 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2013 | 4 | 2 | 50% |
| 2015 | 1 | 1 | 100% |
| 2016 | 2 | 2 | 100% |
| 2017 | 2 | 2 | 100% |
| 2018 | 2 | 1 | 50% |
| 2019 | 1 | 1 | 100% |
| 2022 | 1 | 1 | 100% |
| 2024 | 1 | 1 | 100% |
| 2025 | 1 | 1 | 100% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Cleveland | 7 | 7 | 100% |
| Gaston | 7 | 5 | 71% |
| Rutherford | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Patching existing pavement | 1704000000-E | TON | 15 | 14 (93%) | $85.00 | $125.00 |
| Mill asp PVMT *****" DTH - (1-1/2") | 1297000000-E | SY | 13 | 11 (85%) | $1.50 | $2.75 |
| Shoulder reconstruction | 1245000000-E | SMI | 15 | 10 (67%) | $1,800.00 | $2,670.00 |
| Paint pavement marking lines (4") | 4810000000-E | LF | 14 | 10 (71%) | $0.13 | $0.27 |
| Asphalt conc surface course, type S9.5C (leveling course) | 1524000000-E | TON | 12 | 10 (83%) | $41.00 | $54.50 |
| Adjustment of meter boxes or valve boxes | 2845000000-N | EACH | 14 | 9 (64%) | $1,012.50 | $725.00 |
| Paint pavement marking symbol | 4845000000-N | EACH | 9 | 9 (100%) | $50.00 | $50.00 |
| Thermoplastic pavement marking symbol (90 mils) | 4725000000-E | EACH | 15 | 8 (53%) | $125.00 | $135.00 |
| Incidental stone base | 1220000000-E | TON | 14 | 8 (57%) | $30.00 | $40.00 |
| Thermoplastic pavement marking lines (8", 90 mils) | 4695000000-E | LF | 14 | 8 (57%) | $2.12 | $2.25 |
| Asphalt conc surface course, type S9.5C | 1523000000-E | TON | 13 | 8 (62%) | $40.00 | $64.72 |
| Asphalt conc surface course, type S9.5B (leveling course) | 1520000000-E | TON | 10 | 8 (80%) | $39.00 | $56.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Blythe Construction Inc | 10 | 2 of 10 |
| The Lane Construction Corp | 10 | 1 of 10 |
| Sloan Construction A Division of Reeves Construction Co | 4 | 0 of 4 |
| Rogers Group, Inc. | 3 | 1 of 3 |
| Blythe Brothers Asphalt Co LLC | 2 | 0 of 2 |
| Harrison Construction Company Division of Apac-Atlantic Inc | 1 | 1 of 1 |
| Sloan Construction Company, Inc. | 1 | 1 of 1 |
| Reeves Construction Company | 1 | 0 of 1 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 18 NOV 2025 | C205147 | Cleveland | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF NC-18, 1 SECTION OF NC-161, AND 8 SECTIONS OF SECONDARY ROADS | 1 of 3 | $5,677,061 | Low, 18% under the second |
| 17 DEC 2024 | C205004 | Cleveland | MILLLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF NC-18, 1 SECTION OF NC-216, AND 5 SECTIONS OF SECONDARY ROADS | 1 of 2 | $5,104,283 | Low, 18% under the second |
| 20 DEC 2022 | C204810 | Cleveland | Milling, resurfacing, and shoulder reconstruction. 1 SECTION OF US-74, NC-150, NC-226 AND US-74 RAMPS, AND 1 SECTION OF SECONDARY ROAD. | 1 of 4 | $5,143,348 | Low, 21% under the second |
| 19 FEB 2019 | C204306 | Gaston | Milling, resurfacing, and shoulder reconstruction. 2 SECTIONS OF NC-279,1 SECTION OF US-321, NC-27, NC-216, NC-273, NC-274, AND 77 SECTIONS | 1 of 2 | $10,287,383 | Low, 3.0% under the second |
| 17 APR 2018 | C204161 | Gaston | Milling, resurfacing, shoulder reconstruction, and signals. 2 SECTIONS OF NC-16, 3 SECTIONS OF NC-279, 1 SECTION OF NC-274, AND 99 SECTIONS | 3 of 3 | $11,148,658 | +3.0% |
| 20 MAR 2018 | C204142 | Cleveland | Milling, resurfacing, widening, and shoulder reconstruction. 2 SECTIONS OF NC-216, 1 SECTION OF NC-150, NC-180, AND NC-182, AND 51 SECTIONS | 1 of 2 | $9,039,672 | Low, 36% under the second |
| 16 MAY 2017 | C204016 | Gaston | Milling, resurfacing, and shoulder reconstruction. 1 SECTION OF US-29/74, 1 SECTION OF NC-7, 2 SECTIONS OF NC-27, AND 38 SECTIONS OF SECONDA | 1 of 3 | $9,006,878 | Low, 0.0% under the second |
| 18 APR 2017 | C204008 | Cleveland | Widening, milling, resurfacing, and shoulder reconstruction. US-74 (WEST DIXON BLVD) FROM SR-2049 TO SR-1152 AND 43 SECTIONS OF SECONDARY RO | 1 of 2 | $6,147,519 | Low, 12% under the second |
| 17 MAY 2016 | C203859 | Cleveland | Widening, milling, resurfacing, and shoulder reconstruction. US-74 FROM SR-2244 (HARMON ROAD) TO 528 FEET WEST OF GROVE STREET AND 5 SECTION | 1 of 2 | $3,870,385 | Low, 12% under the second |
| 19 APR 2016 | C203836 | Gaston | Milling, resurfacing, widening and shoulder reconstruction. 1 SECTION EACH OF US-29/US-74, NC-150, NC-274 & NC-275, 2 SECTIONS OF NC-7, AND | 1 of 3 | $6,766,198 | Low, 14% under the second |
| 21 APR 2015 | C203678 | Gaston | Milling, resurfacing & shoulder reconstruction. 1 SECTION EACH OF NC-279, NC-275, NC-273, US-321 & NC-7 AND 13 SECTIONS OF SECONDARY ROADS. | 1 of 4 | $4,051,087 | Low, 4.0% under the second |
| 17 DEC 2013 | C203472 | Cleveland | Milling, resurfacing, and shoulder reconstruction. 1 SECTION OF US-74 BUS, NC-161, AND NC-198, AND 7 SECTIONS OF SECONDARY ROADS. | 1 of 3 | $3,925,378 | Low, 6.0% under the second |
| 19 NOV 2013 | C203448 | Gaston | Milling, resurfacing, retrofit curb ramps, & shlder reconst. 2 SECTIONS OF US-321, 1 SECTION OF NC-150, 1 SECTION OF NC-279, AND 12 SECTIONS | 1 of 5 | $4,020,860 | Low, 1.0% under the second |
| 17 SEP 2013 | C203430 | Gaston | Milling, resurfacing & aggregate shoulder reconstruction. US-321 FROM LINCOLN CO LINE TO NORTH OF ROECHLING ST. | 2 of 5 | $8,275,584 | +6.0% |
| 15 JAN 2013 | C203236 | Rutherford | Widening, resurfacing, and shoulder reconstruction. 2 SECTIONS OF US-221, 1 SECTION OF NC-120, AND 9 SECTIONS OF SECONDARY ROADS. | 4 of 4 | $2,922,417 | +5.0% |
How this record was read
NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; NCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.