J. T. Russell & Sons, Inc.: NCDOT bid record
J. T. Russell & Sons, Inc. submitted 122 bids on North Carolina DOT contracts in the data, from 15 JAN 2013 to 20 OCT 2026, and was the low bidder on 29 of them (24%). When it was not low, its total sat a median +11% above the low bid.
- Owner
- North Carolina DOT
- Low bid volume
- $208,098,702
- Latest bid
- 20 OCT 2026
- Data through
- 20 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2013 | 17 | 3 | 18% |
| 2014 | 16 | 4 | 25% |
| 2015 | 16 | 3 | 19% |
| 2016 | 13 | 5 | 38% |
| 2017 | 9 | 3 | 33% |
| 2018 | 4 | 4 | 100% |
| 2019 | 5 | 0 | 0% |
| 2020 | 2 | 0 | 0% |
| 2021 | 5 | 0 | 0% |
| 2022 | 6 | 1 | 17% |
| 2023 | 5 | 3 | 60% |
| 2024 | 7 | 0 | 0% |
| 2025 | 10 | 2 | 20% |
| 2026 | 7 | 1 | 14% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Davidson | 17 | 8 | 47% |
| Rowan | 15 | 6 | 40% |
| Montgomery | 10 | 3 | 30% |
| Catawba | 10 | 0 | 0% |
| Cabarrus | 9 | 2 | 22% |
| Mecklenburg | 8 | 3 | 38% |
| Burke | 7 | 0 | 0% |
| Union | 6 | 0 | 0% |
| Anson | 6 | 1 | 17% |
| Randolph | 5 | 0 | 0% |
| Stanly | 5 | 3 | 60% |
| Iredell | 4 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Paint pavement marking lines (4") | 4810000000-E | LF | 106 | 40 (38%) | $0.17 | $0.27 |
| Asphalt conc surface course, type S9.5B | 1519000000-E | TON | 100 | 40 (40%) | $45.23 | $63.50 |
| Law enforcement | 4510000000-N | HR | 68 | 38 (56%) | $40.00 | $60.00 |
| Shoulder reconstruction | 1245000000-E | SMI | 89 | 35 (39%) | $2,200.00 | $2,670.00 |
| Incidental milling | 1330000000-E | SY | 113 | 34 (30%) | $8.00 | $12.00 |
| Patching existing pavement | 1704000000-E | TON | 87 | 32 (37%) | $105.00 | $125.00 |
| Thermoplastic pavement marking symbol (90 mils) | 4725000000-E | EACH | 104 | 31 (30%) | $122.50 | $135.00 |
| Adjustment of manholes | 2830000000-N | EACH | 82 | 30 (37%) | $953.50 | $900.00 |
| Thermoplastic pavement marking lines (4", 90 mils) | 4685000000-E | LF | 81 | 30 (37%) | $0.55 | $0.75 |
| Mill asp PVMT *****" DTH - (1-1/2") | 1297000000-E | SY | 86 | 29 (34%) | $2.00 | $2.75 |
| Adjustment of meter boxes or valve boxes | 2845000000-N | EACH | 85 | 28 (33%) | $860.00 | $725.00 |
| Asphalt conc surface course, type S9.5C | 1523000000-E | TON | 72 | 28 (39%) | $47.00 | $64.72 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Blythe Construction Inc | 61 | 31 of 61 |
| Maymead, Inc. | 24 | 24 of 24 |
| Apac - Atlantic, Inc. Thompson Arthur Division | 23 | 13 of 23 |
| NJR Group Inc | 20 | 15 of 20 |
| The Lane Construction Corp | 19 | 4 of 19 |
| Blythe Development Co. | 14 | 7 of 14 |
| Barnhill Contracting Company | 13 | 6 of 13 |
| Lynches River Contracting Inc | 13 | 9 of 13 |
| Blythe Brothers Asphalt Co LLC | 12 | 4 of 12 |
| Dane Construction, Inc. | 10 | 4 of 10 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 20 OCT 2026 | C205247 | Rowan | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-29, 1 SECTION OF NC-150, AND 13 SECTIONS OF SECONDARY ROADS | 2 of 2 | $8,058,230 | +4.0% |
| 15 SEP 2026 | C204990 | Randolph | GRADING, DRAINAGE, PAVING, SIGNALS, AND CULVERT. SR-1712 (PINEVIEW ST) FROM W OF SYLVAN DR TO US-220 BUSINESS | 9 of 9 | $10,556,579 | +26% |
| 16 JUN 2026 | C205157 | Randolph | GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. NC-42/SR-2194 (DUBLIN SQUARE RD) FROM SR-2237 (E SALISBURY ST) TO N OF US-64/NC-49 (DIXI | 11 of 11 | $17,561,777 | +41% |
| 19 MAY 2026 | C205198 | Burke | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 24 SECTIONS OF SECONDARY ROADS | 2 of 2 | $4,882,271 | +3.0% |
| 17 MAR 2026 | C205013 | Mecklenburg | GRADING, DRAINAGE, PAVING, AND SIGNALS. GREYLOCK RIDGE RD FROM EAST JOHN ST TO TANK TOWN RD | 9 of 9 | $6,926,042 | +65% |
| 17 FEB 2026 | C205173 | Montgomery | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION EACH OF US-220 ALT, NC-109, NC-134, & NC-731, AND 5 SECTIONS OF SECONDARY ROADS | 3 of 3 | $3,299,042 | +15% |
| 17 FEB 2026 | C205170 | Rowan | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-29 S,1 SECTION US-29 N, AND 13 SECTIONS OF SECONDARY ROADS | 1 of 3 | $7,177,426 | Low, 6.0% under the second |
| 21 OCT 2025 | C205143 | Davidson | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 16 SECTIONS OF SECONDARY ROADS | 1 of 3 | $6,343,738 | Low, 11% under the second |
| 19 AUG 2025 | C205039 | Mecklenburg | GRADING, DRAINAGE, AND PAVING. SR-3174 (IDLEWILD RD) FROM SR-3175 (STALLINGS RD) TO I-485 | 1 of 7 | $8,676,763 | Low, 3.0% under the second |
| 17 JUN 2025 | C205016 | Davidson | GRADING, DRAINAGE, PAVING, AND STRUCTURES. REPLACE BRIDGE #58 OVER US-64 ON NC-109 | 5 of 9 | $8,683,108 | +13% |
| 17 JUN 2025 | C205037 | Davidson | GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. BRIDGE #280067 AND #280068 OVER SR-1192 ON US-29/US-70 | 5 of 5 | $29,905,815 | +38% |
| 20 MAY 2025 | C205102 | Randolph | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-64, 2 SECTIONS OF NC-22, AND 1 SECTION OF NC-42 | 3 of 5 | $4,489,595 | +12% |
| 18 FEB 2025 | C205051 | Montgomery | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF NC-109, 1 SECTION OF NC-134, AND 3 SECTIONS OF SECONDARY ROADS | 2 of 4 | $2,144,070 | 0.0% |
| 18 FEB 2025 | C204940 | Richmond | GRADING, DRAINAGE, PAVING, AND BRIDGE PRESERVATION. US-74 (FUTURE I-74) AT INTERCHANGE WITH US-1 (EXIT 311) | 3 of 3 | $10,437,594 | +23% |
| 18 FEB 2025 | C205054 | Rowan, Davie | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-601, 1 SECTION OF NC-150, 5 SECTIONS OF NC-801, AND 12 SECTIONS OF SECOND | 2 of 3 | $11,785,661 | +2.0% |
| 18 FEB 2025 | C205048 | Catawba | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF NC-10, AND 53 SECTIONS OF SECONDARY ROADS | 2 of 2 | $5,574,878 | +17% |
| 18 FEB 2025 | C205053 | Iredell | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-70, AND 31 SECTIONS OF SECONDARY ROADS | 2 of 2 | $9,441,879 | +51% |
| 15 OCT 2024 | C204986 | Davidson | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF NC-109, AND 7 SECTIONS OF SECONDARY ROADS | 3 of 4 | $7,254,763 | +3.0% |
| 15 OCT 2024 | C204966 | Mecklenburg | GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. SR-3440 (MCKEE RD EXT) FROM SR-3448 (PLEASANT PLAINS RD) TO SR-1010 (E JOHN ST) | 4 of 6 | $11,896,950 | +11% |
| 17 SEP 2024 | C204941 | Davidson | GRADING, DRAINAGE, PAVING, AND SIGNALS. NC-8 (WINSTON RD) FROM US-29/US-70 TO SR-1846 (ARRINGTON DR) | 3 of 4 | $14,287,618 | +6.0% |
| 19 MAR 2024 | C204822 | Union | GRADING, DRAINAGE, PAVING, AND SIGNALS. SR-1364 (PLEASANT PLAINS ROAD) AT SR-1357 (POTTERS ROAD) | 3 of 4 | $10,328,015 | +14% |
| 20 FEB 2024 | C204917 | Montgomery | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION EACH OF NC-134, NC-109 BUS, NC-109, US-220 ALT, AND 4 SECTIONS OF SECONDARY ROA | 2 of 4 | $2,504,083 | +6.0% |
| 20 FEB 2024 | C204418 | Rowan | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-70 E & W, 1 SECTION OF NC-150, AND 8 SECTIONS OF SECONDARY ROADS | 2 of 3 | $6,270,067 | +6.0% |
| 20 FEB 2024 | C204919 | Catawba | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-70, AND 24 SECTIONS OF SECONDARY ROADS | 2 of 2 | $6,215,483 | +30% |
| 21 NOV 2023 | C204906 | Davidson | Milling, resurfacing, and shoulder reconstruction. 1 SECTION OF NC 109, 2 SECTIONS OF NC 8 AND 11 SECTIONS OF SECONDARY ROADS | 1 of 2 | $7,681,070 | Low, 11% under the second |
How this record was read
NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; NCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.