NCDOT contract C205157 bid tabulation
GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. NC-42/SR-2194 (DUBLIN SQUARE RD) FROM SR-2237 (E SALISBURY ST) TO N OF US-64/NC-49 (DIXIE DR). Let by North Carolina DOT on June 16, 2026, Randolph. 11 bids received; low bid $12,414,648 by Branch Civil Inc.
- Owner
- North Carolina DOT
- Letting
- 16 JUN 2026
- Pay items
- 237
- Data through
- 20 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Branch Civil Inc | $12,414,648 | Low |
| 2 | Apac - Atlantic, Inc. Thompson Arthur Division | $13,168,309 | +6.0% |
| 3 | Blythe Construction Inc | $13,414,717 | +8.0% |
| 4 | Triangle Grading & Paving Inc | $13,696,285 | +10% |
| 5 | NJR Group Inc | $14,590,554 | +18% |
| 6 | Mastec Civil, LLC | $14,761,557 | +19% |
| 7 | FSC II LLC DBA Fred Smith Company | $14,779,900 | +19% |
| 8 | Vecellio & Grogan Inc DBA Sharpe Brothers | $14,850,511 | +20% |
| 9 | Dane Construction, Inc. | $16,830,308 | +36% |
| 10 | Truerock Construction LLC | $16,967,664 | +37% |
| 11 | J. T. Russell & Sons, Inc. | $17,561,777 | +41% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Branch Civil Inc | 2. Apac - Atlantic, Inc. Thompson Arthur Division | 3. Blythe Construction Inc | 4. Triangle Grading & Paving Inc | 5. NJR Group Inc | 6. Mastec Civil, LLC |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Mobilization (0000100000-N) | LS | 1 | $417,860 | $650,000 | $670,000 | $650,000 | $728,600 | $735,000 |
| 0002 | Construction surveying (0000400000-N) | LS | 1 | $258,275 | $200,000 | $160,155 | $229,000 | $234,171 | $265,000 |
| 0003 | Undercut excavation (0036000000-E) | CY | 2,150 | $1.00 | $27.00 | $16.00 | $24.00 | $30.00 | $36.20 |
| 0004 | Supplementary clearing & grubbing (0050000000-E) | ACRE | 1 | $25,700 | $1.00 | $23,000 | $12,000 | $8,000.00 | $26,220 |
| 0005 | Grading (0063000000-N) | LS | 1 | $637,365 | $1,550,000 | $685,926 | $2,990,000 | $2,200,000 | $2,915,000 |
| 0006 | Borrow excavation (0106000000-E) | CY | 19,200 | $18.00 | $23.00 | $23.69 | $0.01 | $33.00 | $21.50 |
| 0007 | Drainage ditch excavation (0134000000-E) | CY | 222 | $40.25 | $40.00 | $21.79 | $19.00 | $5.00 | $38.70 |
| 0008 | Select granular material (0195000000-E) | CY | 2,100 | $37.75 | $40.00 | $68.48 | $35.00 | $15.00 | $52.15 |
| 0009 | Geotextile for soil stabilization (0196000000-E) | SY | 2,100 | $5.75 | $5.00 | $5.82 | $5.00 | $2.00 | $4.60 |
| 0010 | Temporary shoring (0199000000-E) | SF | 1,115.80 | $89.00 | $100.00 | $106.23 | $85.00 | $85.96 | $95.00 |
| 0011 | Foundation conditioning material, minor structures (0318000000-E) | TON | 926 | $101.00 | $75.00 | $61.74 | $70.00 | $30.00 | $61.50 |
| 0012 | FND condit geotextile (4A) (0321000000-E) | SY | 3,908 | $7.85 | $8.00 | $6.16 | $5.00 | $2.00 | $6.75 |
| 0013 | 15" drainage pipe (0335200000-E) | LF | 218 | $121.00 | $100.00 | $82.17 | $85.00 | $50.00 | $84.10 |
| 0014 | 18" drainage pipe (0335300000-E) | LF | 40 | $147.00 | $110.00 | $112.04 | $95.00 | $65.00 | $122.00 |
| 0015 | 24" drainage pipe (0335400000-E) | LF | 52 | $193.00 | $120.00 | $129.71 | $125.00 | $90.00 | $136.00 |
| 0016 | **" drainage pipe elbow - (24") (0335850000-E) | EACH | 2 | $1,675.00 | $2,100.00 | $964.71 | $1,200.00 | $850.00 | $904.00 |
| 0017 | 15" RC pipe culverts, class III (0366000000-E) | LF | 3,086 | $140.00 | $96.00 | $96.75 | $135.00 | $100.00 | $119.30 |
| 0018 | 18" RC pipe culverts, class III (0372000000-E) | LF | 92 | $174.00 | $124.00 | $102.11 | $145.00 | $150.00 | $109.30 |
| 0019 | 24" RC pipe culverts, class III (0378000000-E) | LF | 156 | $238.00 | $146.00 | $198.24 | $165.00 | $175.00 | $155.20 |
| 0020 | 30" RC pipe culverts, class III (0384000000-E) | LF | 624 | $279.00 | $196.00 | $168.33 | $190.00 | $250.00 | $177.30 |
| 0021 | 42" RC pipe culverts, class III (0396000000-E) | LF | 28 | $785.00 | $330.00 | $386.38 | $280.00 | $400.00 | $305.50 |
| 0022 | 48" RC pipe culverts, class III (0402000000-E) | LF | 24 | $999.00 | $390.00 | $438.34 | $320.00 | $685.00 | $367.95 |
| 0023 | 15" RC pipe culverts, class IV (0448200000-E) | LF | 872 | $209.00 | $120.00 | $89.24 | $145.00 | $125.00 | $97.60 |
| 0024 | 18" RC pipe culverts, class IV (0448300000-E) | LF | 400 | $165.00 | $130.00 | $105.93 | $150.00 | $185.00 | $119.70 |
| 0025 | 24" RC pipe culverts, class IV (0448400000-E) | LF | 116 | $385.00 | $186.00 | $151.30 | $185.00 | $250.00 | $157.00 |
| 0026 | 30" RC pipe culverts, class IV (0448500000-E) | LF | 44 | $545.00 | $256.00 | $240.00 | $215.00 | $350.00 | $241.60 |
| 0027 | Pipe removal (0995000000-E) | LF | 1,906 | $59.00 | $36.00 | $43.20 | $30.00 | $35.00 | $33.25 |
| 0028 | Shallow undercut (1099500000-E) | CY | 1,300 | $14.50 | $38.00 | $18.49 | $30.00 | $5.00 | $33.30 |
| 0029 | Class IV subgrade stabilization (1099700000-E) | TON | 3,066 | $30.50 | $44.00 | $41.83 | $40.00 | $30.00 | $49.00 |
| 0030 | Stabilizer aggregate (1110000000-E) | TON | 250 | $61.00 | $44.00 | $65.91 | $40.00 | $30.00 | $49.00 |
| 0031 | Geotextile for subgrade stabilization (1112000000-E) | SY | 5,095 | $7.25 | $6.40 | $6.58 | $5.00 | $2.00 | $4.60 |
| 0032 | Aggregate base course (1121000000-E) | TON | 60 | $70.50 | $100.00 | $59.65 | $55.00 | $60.00 | $60.00 |
| 0033 | Incidental stone base (1220000000-E) | TON | 120 | $63.25 | $100.00 | $128.82 | $65.00 | $60.00 | $65.00 |
| 0034 | Prime coat (1275000000-E) | GAL | 90 | $11.25 | $16.00 | $3.80 | $11.00 | $100.00 | $60.00 |
| 0035 | Mill asp PVMT *****" DTH - (1-1/2") (1297000000-E) | SY | 4,350 | $3.75 | $3.35 | $4.65 | $8.00 | $10.00 | $17.50 |
| 0036 | Incidental milling (1330000000-E) | SY | 980 | $11.80 | $10.50 | $16.34 | $27.00 | $25.00 | $22.45 |
| 0037 | Asphalt conc base course, type B25.0C (1491000000-E) | TON | 4,325 | $90.00 | $83.00 | $105.27 | $92.00 | $88.12 | $94.60 |
| 0038 | Asphalt conc intermediate course, type I19.0C (1503000000-E) | TON | 4,660 | $90.00 | $83.00 | $105.27 | $92.00 | $84.68 | $94.60 |
| 0039 | Asphalt conc surface course, type S9.5B (1519000000-E) | TON | 4,370 | $82.75 | $76.00 | $96.39 | $90.00 | $85.22 | $86.60 |
| 0040 | Asphalt binder for plant mix (1575000000-E) | TON | 705 | $880.00 | $825.00 | $1,046.36 | $750.00 | $850.00 | $940.50 |
| 0041 | Asphalt plant mix, pavement repair (1693000000-E) | TON | 105 | $520.00 | $300.00 | $298.68 | $250.00 | $300.00 | $342.00 |
| 0042 | Right-of-way markers (2000000000-N) | EACH | 50 | $458.00 | $285.00 | $361.47 | $340.00 | $350.00 | $187.00 |
| 0043 | Subdrain excavation (2022000000-E) | CY | 44.80 | $41.15 | $65.00 | $35.00 | $30.00 | $50.00 | $40.00 |
| 0044 | Geotextile for subsurface drains (2026000000-E) | SY | 200 | $7.75 | $10.00 | $12.00 | $9.00 | $5.00 | $1.20 |
| 0045 | Subdrain coarse aggregate (2036000000-E) | CY | 33.60 | $168.00 | $200.00 | $80.00 | $81.00 | $100.00 | $69.00 |
| 0046 | 6" perforated subdrain pipe (2044000000-E) | LF | 200 | $16.50 | $30.00 | $17.00 | $13.00 | $50.00 | $24.00 |
| 0047 | Subdrain pipe outlet (2070000000-N) | EACH | 1 | $679.00 | $700.00 | $400.00 | $400.00 | $500.00 | $315.00 |
| 0048 | 6" outlet pipe (2077000000-E) | LF | 6 | $107.00 | $100.00 | $40.00 | $35.00 | $500.00 | $45.00 |
| 0049 | Endwalls (2209000000-E) | CY | 4.50 | $2,995.00 | $5,000.00 | $5,113.17 | $2,318.00 | $2,000.00 | $2,400.00 |
| 0050 | Flowable fill (2275000000-E) | CY | 3 | $1,625.00 | $700.00 | $1,962.78 | $1,010.00 | $1,200.00 | $710.00 |
| 0051 | Masonry drainage structures (2286000000-N) | EACH | 59 | $7,175.00 | $5,200.00 | $3,847.14 | $3,600.00 | $6,000.00 | $4,630.00 |
| 0052 | Masonry drainage structures (2308000000-E) | LF | 16.80 | $1,515.00 | $1,200.00 | $870.89 | $950.00 | $850.00 | $57.00 |
| 0053 | Frame with two grates, STD 840.16 (2364000000-N) | EACH | 15 | $2,575.00 | $1,600.00 | $1,374.37 | $1,250.00 | $1,500.00 | $749.00 |
| 0054 | Frame with two grates, STD 840.22 (2365000000-N) | EACH | 3 | $2,375.00 | $1,600.00 | $1,289.02 | $1,200.00 | $1,500.00 | $672.00 |
| 0055 | Frame-GRT-HD 840.03 ** - (E) (2374000000-N) | EACH | 5 | $2,695.00 | $1,700.00 | $1,475.95 | $1,250.00 | $1,500.00 | $840.00 |
| 0056 | Frame-GRT-HD 840.03 ** - (F) (2374000000-N) | EACH | 15 | $2,695.00 | $1,700.00 | $1,731.49 | $1,300.00 | $1,500.00 | $885.00 |
| 0057 | Frame-GRT-HD 840.03 ** - (G) (2374000000-N) | EACH | 19 | $2,695.00 | $1,700.00 | $1,524.95 | $1,300.00 | $1,500.00 | $885.00 |
| 0058 | Frame with cover, STD 840.54 (2396000000-N) | EACH | 2 | $2,125.00 | $1,200.00 | $1,109.56 | $900.00 | $1,500.00 | $510.00 |
| 0059 | Concrete transitional section for drop inlet (2451000000-N) | EACH | 1 | $1,117.00 | $1,100.00 | $1,395.13 | $1,100.00 | $3,025.00 | $1,470.00 |
| 0060 | **"X**" concrete curb - (8" X 18") (2535000000-E) | LF | 285 | $41.80 | $47.85 | $60.69 | $50.00 | $36.30 | $37.00 |
| 0061 | 2'-6" concrete curb & gutter (2549000000-E) | LF | 6,950 | $40.40 | $31.00 | $42.81 | $37.00 | $39.60 | $32.90 |
| 0062 | 4" concrete sidewalk (2591000000-E) | SY | 3,835 | $71.75 | $60.00 | $80.54 | $68.00 | $88.00 | $64.65 |
| 0063 | Concrete curb ramps (2605000000-N) | EACH | 28 | $2,737.00 | $2,650.00 | $3,361.03 | $2,900.00 | $3,025.00 | $2,880.00 |
| 0064 | 6" concrete driveway (2612000000-E) | SY | 560 | $100.50 | $111.25 | $141.10 | $120.00 | $147.40 | $106.00 |
| 0065 | 4" concrete paved ditch (2619000000-E) | SY | 72 | $128.50 | $185.00 | $234.64 | $200.00 | $214.50 | $135.00 |
| 0066 | 5" monolithic concrete islands (keyed in) (2655000000-E) | SY | 250 | $95.50 | $105.60 | $133.93 | $115.00 | $165.00 | $100.00 |
| 0067 | Generic paving item 848 (SY) - 6" jointed concrete with wire mesh (4X4 W3XW3) (2761000000-E) | SY | 140 | $117.25 | $129.35 | $164.06 | $145.00 | $203.50 | $101.00 |
| 0068 | Steel beam guardrail (3030000000-E) | LF | 437.50 | $31.70 | $28.50 | $36.15 | $28.50 | $31.35 | $33.40 |
| 0069 | Steel beam guardrail, shop curved (3045000000-E) | LF | 62.50 | $29.00 | $26.00 | $32.98 | $26.00 | $28.60 | $37.45 |
| 0070 | Additional guardrail posts (3150000000-N) | EACH | 5 | $1.10 | $1.00 | $1.26 | $1.00 | $1.10 | $102.00 |
| 0071 | Guardrail end units, type at-1 (3195000000-N) | EACH | 2 | $949.75 | $850.00 | $1,078.07 | $850.00 | $935.00 | $1,775.00 |
| 0072 | Guardrail end units, type cat-1 (3210000000-N) | EACH | 2 | $1,061.00 | $950.00 | $1,204.89 | $950.00 | $1,045.00 | $1,975.00 |
| 0073 | Guardrail end units, type TL-3 (3287000000-N) | EACH | 1 | $3,575.00 | $3,200.00 | $4,058.59 | $3,200.00 | $3,520.00 | $4,135.00 |
| 0074 | Guardrail end units, type TL-2 (3288000000-N) | EACH | 1 | $3,463.00 | $3,100.00 | $3,931.75 | $3,100.00 | $3,410.00 | $3,875.00 |
| 0075 | Generic fencing item 866 (EA) - vinyl coated metal line posts for 72" chain link fence (3579000000-N) | EACH | 23 | $111.75 | $125.00 | $191.51 | $125.00 | $137.50 | $114.00 |
| 0076 | Generic fencing item 866 (EA) - vinyl coated metal terminal posts for 72" chain link fence (3579000000-N) | EACH | 7 | $223.50 | $450.00 | $689.44 | $450.00 | $495.00 | $228.00 |
| 0077 | Generic fencing item 866 (LF) - vinyl coated chain link fence, 72" fabric (3580000000-E) | LF | 280 | $22.25 | $30.00 | $45.96 | $30.00 | $33.00 | $22.80 |
| 0078 | Rip rap, class II (3635000000-E) | TON | 38 | $252.00 | $100.00 | $150.69 | $85.00 | $80.00 | $110.00 |
| 0079 | Rip rap, class B (3649000000-E) | TON | 189 | $185.00 | $90.00 | $84.60 | $75.00 | $70.00 | $110.00 |
| 0080 | Geotextile for drainage (3656000000-E) | SY | 1,617 | $6.75 | $8.00 | $4.76 | $5.00 | $5.00 | $4.25 |
| 0081 | Supports, 3-LB steel U-channel (4072000000-E) | LF | 463 | $7.00 | $10.75 | $7.74 | $10.00 | $9.35 | $6.95 |
| 0082 | Sign erection, type D (4096000000-N) | EACH | 1 | $344.75 | $325.00 | $380.49 | $100.00 | $137.50 | $342.00 |
| 0083 | Sign erection, type E (4102000000-N) | EACH | 25 | $287.25 | $135.00 | $317.08 | $95.00 | $104.50 | $285.00 |
| 0084 | Sign erection, type F (4108000000-N) | EACH | 6 | $275.85 | $185.00 | $304.39 | $95.00 | $137.50 | $273.60 |
| 0085 | Disposal of sign system, U-channel (4155000000-N) | EACH | 31 | $17.25 | $20.00 | $19.02 | $28.00 | $16.50 | $17.10 |
| 0086 | Generic signing item (LS) - disposal of flasher system (4370000000-N) | LS | 1 | $55.75 | $2,000.00 | $634.13 | $750.00 | $5,500.00 | $6.30 |
| 0087 | Work zone signs (stationary) (4400000000-E) | SF | 1,188 | $12.50 | $6.75 | $6.98 | $6.50 | $8.80 | $6.30 |
| 0088 | Work zone signs (portable) (4405000000-E) | SF | 112 | $18.25 | $16.50 | $10.34 | $25.00 | $18.70 | $9.30 |
| 0089 | Work zone signs (barricade mounted) (4410000000-E) | SF | 206 | $11.25 | $7.00 | $6.15 | $7.50 | $9.35 | $5.60 |
| 0090 | Portable changeable message sign (4420000000-N) | EACH | 2 | $19,800 | $10,000 | $12,049 | $10,000 | $15,000 | $10,830 |
| 0091 | Drums (4430000000-N) | EACH | 353 | $95.25 | $65.00 | $55.17 | $95.00 | $90.00 | $55.00 |
| 0092 | Cones (4435000000-N) | EACH | 100 | $41.75 | $45.00 | $24.10 | $65.00 | $55.00 | $28.00 |
| 0093 | Barricades (type III) (4445000000-E) | LF | 160 | $52.25 | $24.00 | $29.81 | $30.00 | $40.70 | $30.50 |
| 0094 | Pedestrian channelizing devices (4447000000-E) | LF | 32 | $62.00 | $15.00 | $35.50 | $31.00 | $41.80 | $32.00 |
| 0095 | Flagger (4455000000-N) | DAY | 540 | $615.00 | $415.00 | $547.19 | $600.00 | $575.00 | $450.00 |
| 0096 | Temporary crash cushions (4465000000-N) | EACH | 2 | $11,170 | $5,600.00 | $7,419.64 | $5,600.00 | $18,000 | $6,700.00 |
| 0097 | Portable concrete barrier (anchored) (4490000000-E) | LF | 360 | $86.75 | $56.00 | $71.03 | $60.00 | $104.50 | $94.00 |
| 0098 | Law enforcement (4510000000-N) | HR | 80 | $111.75 | $90.00 | $88.78 | $70.00 | $100.00 | $80.00 |
| 0099 | Skinny drum (4516000000-N) | EACH | 100 | $80.00 | $75.00 | $45.72 | $45.00 | $65.00 | $25.00 |
| 0100 | Generic traffic control item (EA) - audible warning devices (4600000000-N) | EACH | 3 | $645.75 | $595.00 | $733.08 | $600.00 | $385.00 | $658.00 |
| 0101 | Generic traffic control item (EA) - pedestrian transport service (4600000000-N) | EACH | 100 | $55.75 | $150.00 | $350.00 | $320.00 | $400.00 | $175.00 |
| 0102 | Temporary raised pavement markers (4650000000-N) | EACH | 109 | $24.75 | $6.25 | $25.37 | $6.25 | $6.88 | $22.80 |
| 0103 | Thermoplastic pavement marking lines (4", 90 mils) (4685000000-E) | LF | 18,495 | $1.00 | $0.47 | $0.98 | $0.47 | $0.52 | $0.90 |
| 0104 | Thermoplastic pavement marking lines (8", 90 mils) (4695000000-E) | LF | 258 | $4.80 | $2.85 | $4.95 | $2.85 | $3.14 | $4.45 |
| 0105 | Thermoplastic pavement marking lines (12", 90 mils) (4700000000-E) | LF | 85 | $7.40 | $4.25 | $7.61 | $4.25 | $4.68 | $6.85 |
| 0106 | Thermoplastic pavement marking lines (24", 90 mils) (4709000000-E) | LF | 722 | $24.75 | $10.00 | $25.37 | $10.00 | $11.00 | $22.80 |
| 0107 | Thermoplastic pavement marking symbol (90 mils) (4725000000-E) | EACH | 46 | $265.75 | $100.00 | $272.69 | $100.00 | $110.00 | $245.10 |
| 0108 | Paint pavement marking lines (4") (4810000000-E) | LF | 51,684 | $0.25 | $0.31 | $0.25 | $0.31 | $0.34 | $0.25 |
| 0109 | Paint pavement marking lines (8") (4820000000-E) | LF | 1,180 | $0.90 | $0.70 | $0.89 | $0.70 | $0.77 | $0.80 |
| 0110 | Paint pavement marking lines (24") (4835000000-E) | LF | 822 | $6.75 | $3.00 | $6.98 | $3.00 | $3.30 | $6.30 |
| 0111 | Paint pavement marking symbol (4845000000-N) | EACH | 41 | $136.00 | $45.00 | $139.51 | $45.00 | $49.50 | $125.40 |
| 0112 | Removal of pavement marking lines (4") (4850000000-E) | LF | 15,685 | $0.75 | $1.00 | $0.76 | $1.00 | $1.10 | $0.70 |
| 0113 | Removal of pavement marking lines (8") (4860000000-E) | LF | 600 | $3.70 | $2.00 | $3.80 | $2.00 | $2.20 | $3.45 |
| 0114 | Removal of pavement marking lines (24") (4870000000-E) | LF | 300 | $21.00 | $5.00 | $21.56 | $5.00 | $5.50 | $19.40 |
| 0115 | Removal of pavement marking symbols & characters (4875000000-N) | EACH | 10 | $265.75 | $65.00 | $272.69 | $65.00 | $71.50 | $245.00 |
| 0116 | Generic pavement marking item (EA) - polycarbonate H-shaped markers (4895000000-N) | EACH | 228 | $71.75 | $50.00 | $73.56 | $50.00 | $55.00 | $66.00 |
| 0117 | 2" water line (5325200000-E) | LF | 131 | $57.60 | $130.00 | $69.76 | $90.00 | $181.50 | $72.50 |
| 0118 | 6" water line (5325600000-E) | LF | 834 | $161.00 | $160.00 | $139.51 | $130.00 | $159.50 | $115.00 |
| 0119 | 8" water line (5325800000-E) | LF | 980 | $205.00 | $190.00 | $171.22 | $150.00 | $170.50 | $140.00 |
| 0120 | 12" water line (5326200000-E) | LF | 1,938 | $216.00 | $265.00 | $260.00 | $185.00 | $203.50 | $147.00 |
| 0121 | DI H2O pipe fittings (5329000000-E) | LB | 8,750 | $14.50 | $17.00 | $21.56 | $13.00 | $16.72 | $42.30 |
| 0122 | 2" valve (5536000000-E) | EACH | 1 | $1,960.00 | $3,000.00 | $4,534.20 | $1,450.00 | $2,035.00 | $5,100.00 |
| 0123 | 6" valve (5540000000-E) | EACH | 6 | $2,765.00 | $3,600.00 | $5,009.84 | $2,850.00 | $3,135.00 | $4,700.00 |
| 0124 | 8" valve (5546000000-E) | EACH | 3 | $4,035.00 | $5,050.00 | $6,658.64 | $3,800.00 | $6,050.00 | $5,125.00 |
| 0125 | 12" valve (5558000000-E) | EACH | 7 | $6,570.00 | $8,800.00 | $8,814.78 | $6,700.00 | $9,350.00 | $7,450.00 |
| 0126 | 2" air release valve (5589200000-E) | EACH | 1 | $14,100 | $8,200.00 | $18,708 | $9,900.00 | $20,350 | $4,910.00 |
| 0127 | **" blow off - (1") (5600000000-E) | EACH | 1 | $7,490.00 | $6,400.00 | $6,278.14 | $3,600.00 | $3,850.00 | $4,160.00 |
| 0128 | 3/4" water meter (5643100000-E) | EACH | 46 | $2,535.00 | $4,200.00 | $4,629.35 | $2,800.00 | $2,750.00 | $2,190.00 |
| 0129 | Reconnect water meter (5649000000-N) | EACH | 13 | $2,305.00 | $2,600.00 | $3,487.86 | $950.00 | $1,650.00 | $2,190.00 |
| 0130 | Fire hydrant (5666000000-N) | EACH | 4 | $6,915.00 | $9,500.00 | $9,448.94 | $6,300.00 | $14,850 | $8,700.00 |
| 0131 | Relocate fire hydrant (5672000000-N) | EACH | 1 | $5,670.00 | $3,400.00 | $6,658.63 | $2,500.00 | $8,250.00 | $8,725.00 |
| 0132 | Fire hydrant leg (5673000000-E) | LF | 144 | $161.00 | $160.00 | $228.30 | $140.00 | $115.50 | $90.00 |
| 0133 | **" water service line - (2") (5686000000-E) | LF | 85 | $115.00 | $140.00 | $177.56 | $135.00 | $93.50 | $90.00 |
| 0134 | Water service line (<2") (5686500000-E) | LF | 2,023 | $46.00 | $120.00 | $101.47 | $110.00 | $49.50 | $90.00 |
| 0135 | 8" sanitary gravity sewer (5691300000-E) | LF | 2,344 | $241.00 | $200.00 | $202.93 | $180.00 | $269.50 | $196.00 |
| 0136 | 4" force main sewer (5709200000-E) | LF | 47 | $322.00 | $200.00 | $380.49 | $245.00 | $181.50 | $143.00 |
| 0137 | Sanitary sewer clean-out (5768000000-N) | EACH | 21 | $1,152.00 | $2,700.00 | $2,092.72 | $6,400.00 | $1,815.00 | $2,210.00 |
| 0138 | Sewer service line (5768500000-E) | LF | 342 | $86.50 | $130.00 | $101.47 | $110.00 | $137.50 | $150.00 |
| 0139 | 4' dia utility manhole (5775000000-E) | EACH | 28 | $11,522 | $9,100.00 | $10,781 | $4,400.00 | $9,350.00 | $7,350.00 |
| 0140 | Utility manhole wall 4' dia (5781000000-E) | LF | 38 | $230.00 | $2,600.00 | $1,236.61 | $1,350.00 | $1,320.00 | $1,260.00 |
| 0141 | Abandon 8" utility pipe (5801000000-E) | LF | 3,686 | $23.00 | $25.00 | $22.83 | $16.00 | $22.00 | $30.00 |
| 0142 | Abandon 12" utility pipe (5804000000-E) | LF | 1,847 | $26.50 | $30.00 | $25.37 | $17.00 | $27.50 | $30.00 |
| 0143 | Remove water meter (5815000000-N) | EACH | 46 | $576.00 | $1,000.00 | $2,092.72 | $1,200.00 | $935.00 | $600.00 |
| 0144 | Remove fire hydrant (5815500000-N) | EACH | 4 | $1,385.00 | $2,700.00 | $4,375.68 | $2,100.00 | $2,750.00 | $600.00 |
| 0145 | Abandon utility manhole (5816000000-N) | EACH | 12 | $2,535.00 | $2,000.00 | $4,122.02 | $1,800.00 | $3,850.00 | $1,450.00 |
| 0146 | 18" encasement pipe (5835800000-E) | LF | 133 | $185.00 | $290.00 | $266.35 | $220.00 | $275.00 | $300.00 |
| 0147 | 24" encasement pipe (5836000000-E) | LF | 134 | $205.00 | $360.00 | $323.42 | $240.00 | $357.50 | $340.00 |
| 0148 | Bore & jack **" - (18") (5872500000-E) | LF | 113 | $1,950.00 | $2,200.00 | $2,473.21 | $2,800.00 | $3,025.00 | $2,465.00 |
| 0149 | Bore & jack **" - (24") (5872500000-E) | LF | 74 | $2,115.00 | $2,400.00 | $2,980.54 | $2,950.00 | $4,235.00 | $2,975.00 |
| 0150 | Temporary silt fence (6000000000-E) | LF | 8,510 | $3.10 | $2.75 | $3.49 | $3.00 | $4.00 | $3.20 |
| 0151 | Stone for erosion control, class A (6006000000-E) | TON | 810 | $56.25 | $85.00 | $83.70 | $65.00 | $35.00 | $74.00 |
| 0152 | Stone for erosion control, class B (6009000000-E) | TON | 1,710 | $61.00 | $85.00 | $84.33 | $75.00 | $35.00 | $82.00 |
| 0153 | Sediment control stone (6012000000-E) | TON | 1,365 | $47.25 | $70.00 | $62.87 | $55.00 | $35.00 | $57.00 |
| 0154 | Temporary mulching (6015000000-E) | ACRE | 28.50 | $1,447.00 | $1,295.00 | $1,642.47 | $1,700.00 | $1,500.00 | $1,400.00 |
| 0155 | Seed for temporary seeding (6018000000-E) | LB | 1,900 | $2.80 | $2.50 | $3.17 | $2.00 | $5.00 | $2.85 |
| 0156 | Fertilizer for temporary seeding (6021000000-E) | TON | 10 | $1,112.00 | $995.00 | $1,261.97 | $1,000.00 | $1,500.00 | $1,130.00 |
| 0157 | Temporary slope drains (6024000000-E) | LF | 435 | $46.00 | $45.00 | $20.38 | $32.00 | $20.00 | $55.00 |
| 0158 | Safety fence (6029000000-E) | LF | 580 | $4.45 | $2.50 | $3.72 | $3.00 | $5.00 | $3.00 |
| 0159 | Silt excavation (6030000000-E) | CY | 4,100 | $15.00 | $20.00 | $10.74 | $5.00 | $15.00 | $23.00 |
| 0160 | Matting for erosion control (6036000000-E) | SY | 13,000 | $2.00 | $1.80 | $2.28 | $1.65 | $2.00 | $2.00 |
| 0161 | Coir fiber mat (6037000000-E) | SY | 100 | $6.75 | $6.00 | $7.61 | $7.00 | $3.00 | $8.00 |
| 0162 | 1/4" hardware cloth (6042000000-E) | LF | 2,575 | $6.75 | $6.00 | $7.61 | $6.00 | $15.00 | $4.80 |
| 0163 | Low permeability geotextile (6043000000-E) | SY | 100 | $9.50 | $14.59 | $7.61 | $6.00 | $10.00 | $10.00 |
| 0164 | **" temporary pipe - (42") (6045000000-E) | LF | 136 | $100.50 | $1.00 | $114.15 | $125.00 | $80.00 | $245.00 |
| 0165 | Special stilling basins (6070000000-N) | EACH | 1 | $1,117.00 | $1,000.00 | $1,609.14 | $450.00 | $1,000.00 | $1,470.00 |
| 0166 | Flocculant (6071002000-E) | LB | 345 | $8.95 | $8.00 | $10.15 | $5.00 | $15.00 | $10.00 |
| 0167 | Coir fiber wattle (6071012000-E) | LF | 60 | $14.00 | $12.50 | $15.85 | $9.00 | $15.00 | $8.00 |
| 0168 | Coir fiber baffle (6071030000-E) | LF | 425 | $10.75 | $9.50 | $12.05 | $10.00 | $20.00 | $6.00 |
| 0169 | **" skimmer - (1-1/2") (6071050000-E) | EACH | 3 | $1,695.00 | $1,500.00 | $1,020.83 | $2,050.00 | $1,500.00 | $3,000.00 |
| 0170 | Seeding and mulching (6084000000-E) | ACRE | 27 | $3,017.00 | $2,700.00 | $3,424.45 | $2,700.00 | $4,000.00 | $3,050.00 |
| 0171 | Mowing (6087000000-E) | ACRE | 18 | $307.25 | $275.00 | $348.79 | $250.00 | $200.00 | $315.00 |
| 0172 | Seed for repair seeding (6090000000-E) | LB | 300 | $7.25 | $6.50 | $8.24 | $4.25 | $5.00 | $7.00 |
| 0173 | Fertilizer for repair seeding (6093000000-E) | TON | 1 | $1,788.00 | $1,600.00 | $2,029.29 | $1,100.00 | $1,500.00 | $1,824.00 |
| 0174 | Seed for supplemental seeding (6096000000-E) | LB | 650 | $5.60 | $5.00 | $6.34 | $4.25 | $5.00 | $5.00 |
| 0175 | Fertilizer topdressing (6108000000-E) | TON | 19.50 | $1,397.00 | $1,250.00 | $1,585.39 | $950.00 | $1,500.00 | $1,425.00 |
| 0176 | Impervious dike (6111000000-E) | LF | 55 | $190.00 | $125.00 | $372.50 | $120.00 | $90.00 | $150.00 |
| 0177 | Specialized hand mowing (6114500000-N) | MHR | 10 | $83.75 | $75.00 | $95.12 | $150.00 | $300.00 | $86.00 |
| 0178 | Manual litter removal (6114800000-N) | MHR | 10 | $67.00 | $60.00 | $76.10 | $150.00 | $200.00 | $70.00 |
| 0179 | Litter disposal (6114900000-E) | TON | 1 | $447.00 | $400.00 | $507.32 | $200.00 | $500.00 | $456.00 |
| 0180 | Response for erosion control (6117000000-N) | EACH | 25 | $279.25 | $250.00 | $317.08 | $150.00 | $1.00 | $285.00 |
| 0181 | Concrete washout structure (6117500000-N) | EACH | 3 | $3,485.00 | $1,000.00 | $2,641.72 | $1,400.00 | $1,000.00 | $515.00 |
| 0182 | Generic erosion control item (EA) - fabric insert inlet protection cleanout (6132000000-N) | EACH | 249 | $44.75 | $40.00 | $50.73 | $450.00 | $100.00 | $103.00 |
| 0183 | Generic erosion control item (EA) - fabric insert inlet protection, type 1 (6132000000-N) | EACH | 83 | $234.50 | $210.00 | $266.35 | $450.00 | $100.00 | $103.00 |
| 0184 | Generic erosion control item (EA) - prefabricated concrete washout (6132000000-N) | EACH | 15 | $1,175.00 | $250.00 | $721.49 | $550.00 | $750.00 | $150.00 |
| 0185 | Pedestrian signal head (16", 1 section W/countdown) (7048500000-E) | EACH | 8 | $1,361.00 | $1,200.00 | $1,521.97 | $1,200.00 | $1,320.00 | $1,200.00 |
| 0186 | Signal cable (7060000000-E) | LF | 6,300 | $6.80 | $6.00 | $7.61 | $6.00 | $6.60 | $5.00 |
| 0187 | Vehicle signal head (12", 3 section) (7120000000-E) | EACH | 29 | $1,475.00 | $1,300.00 | $1,648.81 | $1,300.00 | $1,430.00 | $1,560.00 |
| 0188 | Vehicle signal head (12", 4 section) (7132000000-E) | EACH | 10 | $1,815.00 | $1,600.00 | $2,029.30 | $1,600.00 | $1,760.00 | $1,880.00 |
| 0189 | Vehicle signal head (12", 5 section) (7144000000-E) | EACH | 1 | $2,155.00 | $1,900.00 | $2,409.78 | $1,900.00 | $2,090.00 | $2,500.00 |
| 0190 | Messenger cable (1/4") (7252000000-E) | LF | 2,800 | $6.80 | $6.00 | $7.61 | $6.00 | $6.60 | $6.00 |
| 0191 | Messenger cable (3/8") (7264000000-E) | LF | 1,400 | $5.65 | $5.00 | $6.34 | $5.00 | $5.50 | $11.00 |
| 0192 | Tracer wire (7279000000-E) | LF | 3,000 | $2.35 | $2.00 | $2.54 | $2.00 | $2.20 | $1.15 |
| 0193 | Paved trench (***********) - (1, 2") (7288000000-E) | LF | 100 | $29.50 | $26.00 | $32.98 | $26.00 | $28.60 | $80.00 |
| 0194 | Unpaved trench (***********) - (1, 2") (7300000000-E) | LF | 1,450 | $22.75 | $20.00 | $25.37 | $20.00 | $22.00 | $16.00 |
| 0195 | Direct drill (***********) - (1, 2") (7301000000-E) | LF | 75 | $56.75 | $50.00 | $63.42 | $50.00 | $55.00 | $30.00 |
| 0196 | Direct drill (***********) - (2, 2") (7301000000-E) | LF | 2,425 | $56.75 | $50.00 | $63.42 | $50.00 | $55.00 | $35.00 |
| 0197 | Junction box (standard size) (7324000000-N) | EACH | 20 | $680.50 | $600.00 | $760.99 | $600.00 | $660.00 | $780.00 |
| 0198 | Junction box (over-sized, heavy duty) (7348000000-N) | EACH | 14 | $1,361.00 | $1,200.00 | $1,521.98 | $1,200.00 | $1,320.00 | $1,600.00 |
| 0199 | Wood pole (7360000000-N) | EACH | 4 | $1,588.00 | $1,400.00 | $1,775.64 | $1,400.00 | $1,540.00 | $2,500.00 |
| 0200 | Guy assembly (7372000000-N) | EACH | 25 | $703.25 | $620.00 | $786.35 | $620.00 | $682.00 | $1,175.00 |
| 0201 | 1" riser with weatherhead (7408000000-E) | EACH | 1 | $567.00 | $500.00 | $634.13 | $500.00 | $550.00 | $700.00 |
| 0202 | 2" riser with weatherhead (7420000000-E) | EACH | 4 | $760.00 | $670.00 | $849.77 | $670.00 | $737.00 | $1,220.00 |
| 0203 | 2" riser with heat shrink tubing (7432000000-E) | EACH | 7 | $1,055.00 | $930.00 | $1,179.53 | $930.00 | $1,023.00 | $1,430.00 |
| 0204 | Inductive loop sawcut (7444000000-E) | LF | 1,175 | $14.80 | $13.00 | $16.49 | $13.00 | $14.30 | $22.00 |
| 0205 | Lead-in cable (14-2) (7456100000-E) | LF | 4,075 | $3.45 | $3.00 | $3.80 | $3.00 | $3.30 | $3.45 |
| 0206 | Site survey (7481000000-N) | EACH | 2 | $1,735.00 | $1,530.00 | $1,940.51 | $1,530.00 | $1,683.00 | $4,500.00 |
| 0207 | Luminaire arm for video system (7481200000-N) | EACH | 3 | $1,475.00 | $1,300.00 | $1,648.81 | $1,300.00 | $1,430.00 | $1,090.00 |
| 0208 | Camera without internal loop emulator processing unit (7481240000-N) | EACH | 4 | $10,210 | $9,000.00 | $11,415 | $9,000.00 | $9,900.00 | $2,720.00 |
| 0209 | External loop emulator processing unit (7481260000-N) | EACH | 2 | $6,125.00 | $5,400.00 | $6,848.90 | $5,400.00 | $5,940.00 | $16,150 |
| 0210 | Communications cable (** fiber) - (24) (7516000000-E) | LF | 6,275 | $6.80 | $6.00 | $7.61 | $6.00 | $6.60 | $5.00 |
| 0211 | Drop cable (7528000000-E) | LF | 860 | $6.80 | $6.00 | $7.61 | $6.00 | $6.60 | $4.50 |
| 0212 | Splice enclosure (7540000000-N) | EACH | 3 | $3,743.00 | $3,300.00 | $4,185.44 | $3,300.00 | $3,630.00 | $3,200.00 |
| 0213 | Interconnect center (7552000000-N) | EACH | 3 | $4,197.00 | $3,700.00 | $4,692.76 | $3,700.00 | $4,070.00 | $3,500.00 |
| 0214 | Delineator marker (7566000000-N) | EACH | 14 | $226.75 | $200.00 | $253.66 | $200.00 | $220.00 | $190.00 |
| 0215 | Remove existing communications cable (7575160000-E) | LF | 675 | $3.45 | $3.00 | $3.80 | $3.00 | $3.30 | $2.30 |
| 0216 | Back pull fiber optic cable (7575170000-E) | LF | 180 | $5.65 | $5.00 | $6.34 | $5.00 | $5.50 | $5.00 |
| 0217 | Metal strain signal pole (7576000000-N) | EACH | 8 | $14,750 | $13,000 | $16,488 | $13,000 | $14,300 | $16,500 |
| 0218 | Soil test (7613000000-N) | EACH | 8 | $4,310.00 | $3,800.00 | $4,819.59 | $3,800.00 | $4,180.00 | $2,100.00 |
| 0219 | Drilled pier foundation (7614100000-E) | CY | 120 | $1,475.00 | $1,300.00 | $1,648.81 | $1,300.00 | $1,430.00 | $2,620.00 |
| 0220 | Sign for signals (7636000000-N) | EACH | 2 | $692.00 | $610.00 | $773.67 | $610.00 | $671.00 | $1,040.00 |
| 0221 | Type II pedestal with foundation (7642200000-N) | EACH | 6 | $3,630.00 | $3,200.00 | $4,058.60 | $3,200.00 | $3,520.00 | $4,300.00 |
| 0222 | Signal cabinet foundation (7684000000-N) | EACH | 2 | $1,475.00 | $1,300.00 | $1,648.81 | $1,300.00 | $1,430.00 | $3,100.00 |
| 0223 | Contlrs with CBNT (**************) - (2070LX, base mounted) (7696000000-N) | EACH | 2 | $29,490 | $26,000 | $32,976 | $26,000 | $28,600 | $29,000 |
| 0224 | Detector card (type 170) (7744000000-N) | EACH | 8 | $249.50 | $220.00 | $279.03 | $220.00 | $242.00 | $240.00 |
| 0225 | Cabinet base extender (7901000000-N) | EACH | 2 | $737.25 | $650.00 | $824.41 | $650.00 | $715.00 | $810.00 |
| 0226 | Traffic signal removal (7948000000-N) | EACH | 1 | $4,764.00 | $4,200.00 | $5,326.91 | $4,200.00 | $4,620.00 | $3,000.00 |
| 0227 | Metal pole foundation removal (7960000000-N) | EACH | 1 | $2,836.00 | $2,500.00 | $3,170.78 | $2,500.00 | $2,750.00 | $7,600.00 |
| 0228 | Metal pole removal (7972000000-N) | EACH | 1 | $2,382.00 | $2,100.00 | $2,663.46 | $2,100.00 | $2,310.00 | $2,740.00 |
| 0229 | Generic signal item (EA) - ethernet edge switch (7980000000-N) | EACH | 2 | $2,382.00 | $2,100.00 | $2,663.46 | $2,100.00 | $2,310.00 | $2,100.00 |
| 0230 | Generic signal item (EA) - relocate temporary camera sensor unit (7980000000-N) | EACH | 2 | $907.50 | $800.00 | $1,014.65 | $800.00 | $880.00 | $875.00 |
| 0231 | Remv exist STR ****** culv (402) - (43+75.50 -L-) (8056000000-N) | LS | 1 | $50,280 | $100,000 | $57,074 | $45,000 | $91,500 | $39,000 |
| 0232 | Box culv excav @ ******** - (43+75.50 -L-) (8130000000-N) | LS | 1 | $72,620 | $100,000 | $82,440 | $30,000 | $84,750 | $13,900 |
| 0233 | Foundation conditioning material, box culvert (8133000000-E) | TON | 81 | $106.25 | $95.00 | $120.49 | $65.00 | $88.00 | $110.00 |
| 0234 | Class A concrete (culvert) (8196000000-E) | CY | 126.80 | $1,452.00 | $1,300.00 | $1,648.81 | $875.00 | $1,512.50 | $1,740.00 |
| 0235 | Reinforcing steel (culvert) (8245000000-E) | LB | 12,599 | $2.50 | $2.25 | $2.85 | $2.50 | $5.00 | $1.85 |
| 0236 | MSE retain wall no ** - (1) (8801000000-E) | SF | 1,000 | $88.00 | $142.00 | $126.83 | $110.00 | $161.78 | $110.00 |
| 0237 | MSE retain wall no ** - (2) (8801000000-E) | SF | 844 | $55.75 | $139.00 | $133.17 | $115.00 | $142.76 | $110.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
Every contract let that day: NCDOT letting of June 16, 2026. Compiled by Mirage Metrics.