Truerock Construction LLC: NCDOT bid record
Truerock Construction LLC submitted 21 bids on North Carolina DOT contracts in the data, from 20 FEB 2024 to 20 OCT 2026, and was the low bidder on 9 of them (43%). When it was not low, its total sat a median +11% above the low bid.
- Owner
- North Carolina DOT
- Low bid volume
- $43,075,102
- Latest bid
- 20 OCT 2026
- Data through
- 20 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2024 | 9 | 3 | 33% |
| 2025 | 7 | 4 | 57% |
| 2026 | 5 | 2 | 40% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Randolph | 8 | 4 | 50% |
| Union | 4 | 3 | 75% |
| Alamance | 3 | 1 | 33% |
| Chatham | 2 | 0 | 0% |
| Mecklenburg | 2 | 1 | 50% |
| Alamance, Guilford | 1 | 0 | 0% |
| Moore | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Paint pavement marking symbol | 4845000000-N | EACH | 14 | 12 (86%) | $45.00 | $50.00 |
| Asphalt binder for plant mix | 1575000000-E | TON | 21 | 11 (52%) | $570.00 | $595.00 |
| Thermoplastic pavement marking lines (24", 90 mils) | 4709000000-E | LF | 19 | 11 (58%) | $10.75 | $13.50 |
| Thermoplastic pavement marking symbol (90 mils) | 4725000000-E | EACH | 18 | 11 (61%) | $100.00 | $135.00 |
| Thermoplastic pavement marking lines (4", 90 mils) | 4685000000-E | LF | 13 | 10 (77%) | $0.52 | $0.75 |
| Paint pavement marking lines (4") | 4810000000-E | LF | 16 | 9 (56%) | $0.16 | $0.27 |
| Work zone advance/general warning signing | 4413000000-E | SF | 16 | 9 (56%) | $6.72 | $6.33 |
| Paint pavement marking lines (24") | 4835000000-E | LF | 15 | 9 (60%) | $3.50 | $3.50 |
| Thermoplastic pavement marking lines (6", 90 mils) | 4688000000-E | LF | 14 | 8 (57%) | $0.80 | $0.95 |
| Thermoplastic pavement marking character (90 mils) | 4720000000-E | EACH | 14 | 8 (57%) | $85.00 | $116.50 |
| Inductive loop sawcut | 7444000000-E | LF | 9 | 8 (89%) | $14.00 | $7.25 |
| Patching existing pavement | 1704000000-E | TON | 15 | 7 (47%) | $135.00 | $125.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Blythe Construction Inc | 15 | 3 of 15 |
| Apac - Atlantic, Inc. Thompson Arthur Division | 11 | 7 of 11 |
| FSC II LLC DBA Fred Smith Company | 11 | 6 of 11 |
| Vecellio & Grogan Inc DBA Sharpe Brothers | 10 | 5 of 10 |
| J. T. Russell & Sons, Inc. | 4 | 2 of 4 |
| NJR Group Inc | 4 | 4 of 4 |
| Blythe Development Co. | 3 | 1 of 3 |
| Sunrock Industries LLC DBA Carolina Sunrock LLC | 3 | 2 of 3 |
| S T Wooten Corporation | 2 | 1 of 2 |
| Sealand Contractors Corp | 2 | 0 of 2 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 20 OCT 2026 | C205236 | Union | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 2 SECTIONS OF US-74 EAST, 1 SECTION OF NC-84, AND 15 SECTIONS OF SECONDARY ROADS | 1 of 3 | $6,942,196 | Low, 8.0% under the second |
| 16 JUN 2026 | C205157 | Randolph | GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. NC-42/SR-2194 (DUBLIN SQUARE RD) FROM SR-2237 (E SALISBURY ST) TO N OF US-64/NC-49 (DIXI | 10 of 11 | $16,967,664 | +37% |
| 19 MAY 2026 | C205197 | Randolph | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 11 SECTIONS OF SECONDARY ROADS, AND 1 SECTION OF NC-49 | 4 of 5 | $5,957,058 | +3.0% |
| 21 APR 2026 | C205193 | Randolph | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF NC-134, 1 SECTION OF NC-159, 1 SECTION OF NC-109, AND 12 SECTIONS OF SECONDA | 4 of 5 | $6,088,259 | +6.0% |
| 17 MAR 2026 | C205179 | Union | RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF NC-205, AND 9 SECTIONS OF SECONDARY ROADS | 1 of 2 | $5,426,762 | Low, 13% under the second |
| 18 NOV 2025 | C205154 | Union | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-74, 1 SECTION OF NC-207, AND 9 SECTIONS OF SECONDARY ROADS | 1 of 2 | $5,048,584 | Low, 8.0% under the second |
| 18 NOV 2025 | C205118 | Mecklenburg | GRADING, DRAINAGE, AND PAVING. SR-2042 (OAKDALE RD), SR-2108 (SUNSET RD), SR-2025 (MIRANDA RD), AND SR-2040 (LAWING RD) | 1 of 6 | $6,839,336 | Low, 15% under the second |
| 16 SEP 2025 | C205042 | Moore | GRADING, DRAINAGE, PAVING, AND SIGNALS. NC-24/NC-27 FROM WEST OF NC-22 (MCNEILL ST) TO US-15/US-501 | 3 of 3 | $7,493,396 | +51% |
| 19 AUG 2025 | C205039 | Mecklenburg | GRADING, DRAINAGE, AND PAVING. SR-3174 (IDLEWILD RD) FROM SR-3175 (STALLINGS RD) TO I-485 | 3 of 7 | $9,129,469 | +5.0% |
| 15 JUL 2025 | C205115 | Alamance | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 41 SECTIONS OF SECONDARY ROADS | 1 of 3 | $5,495,482 | Low, 8.0% under the second |
| 20 MAY 2025 | C205102 | Randolph | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-64, 2 SECTIONS OF NC-22, AND 1 SECTION OF NC-42 | 2 of 5 | $4,253,026 | +6.0% |
| 20 MAY 2025 | C205089 | Randolph | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 10 SECTIONS OF SECONDARY ROADS | 1 of 5 | $3,696,610 | Low, 2.0% under the second |
| 17 DEC 2024 | C205003 | Alamance | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 15 SECTIONS OF SECONDARY ROADS | 5 of 5 | $5,567,905 | +25% |
| 17 DEC 2024 | C205008 | Chatham | MILLING AND RESURFACING. 1 SECTION OF US-1 N WITH 6 RAMPS, 1 SECTION OF US-64 BUSINESS, AND 1 SECTION OF NC-42 | 4 of 4 | $4,184,890 | +16% |
| 17 DEC 2024 | C205005 | Chatham | MILLING, RESURFSCING, AND SHOULDER RECONSTRUCTION. 11 SECTIONS OF SECONDARY ROADS | 2 of 3 | $5,741,930 | +1.0% |
| 19 NOV 2024 | C204998 | Alamance | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF NC-49/NC-54/NC-87 AND 3 SECTIONS OF SECONDARY ROADS | 4 of 4 | $6,904,737 | +20% |
| 28 MAY 2024 | C204959 | Alamance, Guilford | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 29 SECTIONS OF SECONDARY ROADS | 4 of 4 | $5,328,630 | +5.0% |
| 19 MAR 2024 | C204916 | Randolph | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 8 SECTIONS OF SECONDARY ROADS | 1 of 5 | $3,108,600 | Low, 1.0% under the second |
| 19 MAR 2024 | C204822 | Union | GRADING, DRAINAGE, PAVING, AND SIGNALS. SR-1364 (PLEASANT PLAINS ROAD) AT SR-1357 (POTTERS ROAD) | 4 of 4 | $10,818,331 | +19% |
| 20 FEB 2024 | C204915 | Randolph | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION EACH OF NC-42, NC-42 SOUTH, NC-22, AND 13 SECTIONS OF SECONDARY ROADS | 1 of 5 | $4,348,488 | Low, 4.0% under the second |
| 20 FEB 2024 | C204492 | Randolph | RESURFACING AND SHOULDER RECONSTRUCTION. 6 SECTIONS OF SECONDARY ROADS | 1 of 5 | $2,169,043 | Low, 6.0% under the second |
How this record was read
NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; NCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.