NCDOT letting results, April 21, 2026
8 contracts let by North Carolina DOT on April 21, 2026, $106,262,222 in low bids, a median of 4.5 bidders per contract.
- Owner
- North Carolina DOT
- Contracts
- 8
- Low bids, total
- $106,262,222
- Data through
- 20 OCT 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| C205178 | GRADING, DRAINAGE, AND PAVING., GRADING, DRAINAGE, PAVING, AND STRUCTURES., GRADING, DRAINAGE, PAVING, AND STRUCTURES., GRADING, DRAINAGE,PAVING . AND STRUCTUR | Polk | 3 | Site Development Corporation | $23,172,286 | $24,843,910 | +7.0% | NCDOT |
| C205130 | GRADING, DRAINAGE PAVING, AND SIGNALS. SR-1556 (WAYNE MEMORIAL DR) FROM SR-1003 (NEW HOPE RD) TO I-42 | Wayne | 5 | Branch Civil Inc | $19,750,585 | $20,118,811 | +2.0% | NCDOT |
| C205180 | GRADING, DRAINAGE, PAVING, AND CULVERT., GRADING, DRAINAGE, PAVING, AND RETAINING WALL., GRADING, DRAINAGE, PAVING, AND RETAINING WALLS. SITES 821, 925, 670, 64 | Henderson | 2 | Mountain Creek Contractors Inc | $19,403,469 | $23,879,538 | +23% | NCDOT |
| C205088 | PAVEMENT REHABILITATION. I-87/US-64/US-264 FROM SR-1003 TO NASH COUNTY LINE | Wake, Franklin | 4 | FSC II LLC DBA Fred Smith Company | $15,727,427 | $16,864,740 | +7.0% | NCDOT |
| C204857 | GRADING, DRAINAGE, PAVING, AND SIGNALS. SR-1700 (COVERED BRIDGE RD) FROM WEST OF SR-2685 (HELENA LN) TO EAST OF SR-1003 (BUFFALO RD) | Johnston | 7 | Sunrock Industries LLC DBA Carolina Sunrock LLC | $12,325,526 | $13,247,007 | +7.0% | NCDOT |
| C205192 | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 2 SECTIONS OF US-421, 1 SECTION OF US-701, AND 7 SECTIONS OF SECONDARY ROADS | Sampson | 3 | S T Wooten Corporation | $6,148,138 | $6,314,516 | +3.0% | NCDOT |
| C205193 | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF NC-134, 1 SECTION OF NC-159, 1 SECTION OF NC-109, AND 12 SECTIONS OF SECONDARY ROADS | Randolph | 5 | Vecellio & Grogan Inc DBA Sharpe Brothers | $5,736,346 | $5,921,206 | +3.0% | NCDOT |
| C205190 | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 40 SECTIONS OF SECONDARY ROADS | Wake | 6 | Blythe Construction Inc | $3,998,445 | $4,110,576 | +3.0% | NCDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than NCDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.