NCDOT contract C205088 bid tabulation
PAVEMENT REHABILITATION. I-87/US-64/US-264 FROM SR-1003 TO NASH COUNTY LINE. Let by North Carolina DOT on April 21, 2026, Wake, Franklin. 4 bids received; low bid $15,727,427 by FSC II LLC DBA Fred Smith Company.
- Owner
- North Carolina DOT
- Letting
- 21 APR 2026
- Pay items
- 119
- Data through
- 20 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | FSC II LLC DBA Fred Smith Company | $15,727,427 | Low |
| 2 | S T Wooten Corporation | $16,864,740 | +7.0% |
| 3 | Sunrock Industries LLC DBA Carolina Sunrock LLC | $17,329,084 | +10% |
| 4 | Blythe Construction Inc | $20,756,165 | +32% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. FSC II LLC DBA Fred Smith Company | 2. S T Wooten Corporation | 3. Sunrock Industries LLC DBA Carolina Sunrock LLC | 4. Blythe Construction Inc |
|---|---|---|---|---|---|---|---|
| 0001 | Mobilization (0000100000-N) | LS | 1 | $750,000 | $840,000 | $816,018 | $1,000,000 |
| 0002 | Construction surveying (0000400000-N) | LS | 1 | $22,275 | $25,000 | $150,000 | $30,000 |
| 0003 | Grading (0043000000-N) | LS | 1 | $60,000 | $255,000 | $1,447,250 | $785,000 |
| 0004 | Foundation conditioning material, minor structures (0318000000-E) | TON | 10 | $125.00 | $187.00 | $74.50 | $100.00 |
| 0005 | FND condit geotextile (4A) (0321000000-E) | SY | 20 | $10.00 | $72.40 | $53.00 | $6.00 |
| 0006 | **" caa pipe CLVT *****" - (18", 0.075") (0546000000-E) | LF | 4 | $625.00 | $441.00 | $707.00 | $1,000.00 |
| 0007 | **" caa pipe CLVT *****" - (24", 0.075") (0546000000-E) | LF | 40 | $315.00 | $337.00 | $723.00 | $350.00 |
| 0008 | **" caa pipe CLVT *****" - (36", 0.075") (0546000000-E) | LF | 12 | $300.00 | $410.00 | $822.00 | $650.00 |
| 0009 | Pipe removal (0995000000-E) | LF | 38 | $150.00 | $142.35 | $39.00 | $35.00 |
| 0010 | Incidental stone base (1220000000-E) | TON | 1,521 | $30.00 | $70.00 | $74.00 | $65.00 |
| 0011 | Shoulder reconstruction (1245000000-E) | SMI | 61.45 | $2,200.00 | $5,000.00 | $2,605.00 | $2,900.00 |
| 0012 | Aggregate shoulder borrow (1260000000-E) | TON | 5,612 | $40.00 | $42.00 | $26.00 | $50.00 |
| 0013 | Ditching (1264000000-E) | LF | 7,300 | $14.00 | $5.75 | $23.00 | $9.50 |
| 0014 | Mill asp PVMT *****" DTH - (1-1/2") (1297000000-E) | SY | 448,246 | $2.00 | $2.40 | $2.90 | $1.95 |
| 0015 | Mill asp PVMT *****" DTH - (2-1/2") (1297000000-E) | SY | 7,050 | $5.00 | $5.79 | $5.00 | $3.95 |
| 0016 | Mill asp PVMT *****" DTH - (2-1/4") (1297000000-E) | SY | 193,274 | $2.30 | $2.55 | $3.40 | $2.10 |
| 0017 | Incidental milling (1330000000-E) | SY | 12,715 | $10.00 | $7.05 | $7.10 | $5.95 |
| 0018 | Asphalt conc base course, type B25.0C (1491000000-E) | TON | 1,968 | $90.00 | $100.00 | $64.00 | $160.00 |
| 0019 | Asphalt conc intermediate course, type I19.0C (1503000000-E) | TON | 1,054 | $86.00 | $120.00 | $56.00 | $120.00 |
| 0020 | Asphalt conc surface course, type S9.5D (1524200000-E) | TON | 60,674 | $65.00 | $61.75 | $51.00 | $115.00 |
| 0021 | Asphalt binder for plant mix (1575000000-E) | TON | 149 | $550.00 | $400.00 | $500.00 | $575.00 |
| 0022 | Polymer modified asphalt binder for plant mix (1577000000-E) | TON | 4,412 | $670.00 | $650.00 | $600.00 | $685.00 |
| 0023 | Patching existing pavement (1704000000-E) | TON | 8 | $500.00 | $1,750.00 | $124.00 | $500.00 |
| 0024 | Ultra-thin bonded wearing course (1839140000-E) | TON | 17,810 | $105.65 | $112.50 | $106.00 | $150.00 |
| 0025 | Generic paving item (LF) 665 - milled rumble strips (asphalt concrete), (16") (1841000000-E) | LF | 283,067 | $0.27 | $0.25 | $0.30 | $0.25 |
| 0026 | Pipe collars (2253000000-E) | CY | 0.56 | $1,000.00 | $7,150.00 | $3,325.00 | $2,000.00 |
| 0027 | Masonry drainage structures (2286000000-N) | EACH | 2 | $8,500.00 | $10,365 | $6,205.00 | $5,500.00 |
| 0028 | Masonry drainage structures (2308000000-E) | LF | 10.65 | $1,500.00 | $650.00 | $919.00 | $2,000.00 |
| 0029 | Frame with cover, STD 840.54 (2396000000-N) | EACH | 2 | $2,000.00 | $1,200.00 | $1,685.00 | $1,850.00 |
| 0030 | Generic drainage item (EA) - drainage structure clean out (2473000000-N) | EACH | 20 | $1,100.00 | $2,010.00 | $2,960.00 | $2,000.00 |
| 0031 | Generic drainage item (EA) - reset flared end section (2473000000-N) | EACH | 1 | $8,000.00 | $3,500.00 | $4,465.00 | $2,750.00 |
| 0032 | Generic drainage item (EA) - shoulder drain clean out (2473000000-N) | EACH | 134 | $650.00 | $1,390.00 | $783.50 | $1,900.00 |
| 0033 | Generic drainage item (LF) - clear existing shoulder berm gutter (2484000000-E) | LF | 9,855 | $4.00 | $3.55 | $9.70 | $3.50 |
| 0034 | Generic drainage item (LF) - concrete ditch clean out (2484000000-E) | LF | 14,500 | $4.00 | $3.65 | $18.50 | $5.00 |
| 0035 | Generic drainage item (SY) - remove and replace concrete apron for drop inlet (2489000000-E) | SY | 22.50 | $250.00 | $890.00 | $231.00 | $400.00 |
| 0036 | Impact attenuator units, type TL-3 (3001000000-N) | EACH | 6 | $8,600.00 | $8,600.00 | $8,600.00 | $8,600.00 |
| 0037 | Steel beam guardrail (3030000000-E) | LF | 41,650 | $22.80 | $22.80 | $22.80 | $23.00 |
| 0038 | Additional guardrail posts (3150000000-N) | EACH | 10 | $55.00 | $55.00 | $55.00 | $55.00 |
| 0039 | Guardrail end units, type cat-1 (3210000000-N) | EACH | 37 | $800.00 | $800.00 | $800.00 | $800.00 |
| 0040 | Guardrail anchor units, type III (3215000000-N) | EACH | 16 | $2,300.00 | $2,300.00 | $2,300.00 | $2,300.00 |
| 0041 | Guardrail end units, type TL-3 (3287000000-N) | EACH | 46 | $3,100.00 | $3,100.00 | $3,100.00 | $3,100.00 |
| 0042 | Guardrail anchor units, type B-83 (3319000000-N) | EACH | 3 | $2,480.00 | $2,480.00 | $2,480.00 | $2,480.00 |
| 0043 | Remove existing guardrail (3360000000-E) | LF | 43,954 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0044 | Rip rap, class I (3628000000-E) | TON | 106 | $160.00 | $109.00 | $63.50 | $100.00 |
| 0045 | Rip rap, class II (3635000000-E) | TON | 478 | $160.00 | $110.00 | $115.00 | $125.00 |
| 0046 | Geotextile for drainage (3656000000-E) | SY | 1,200 | $4.00 | $6.35 | $8.10 | $5.00 |
| 0047 | Supports, 3-LB steel U-channel (4072000000-E) | LF | 1,200 | $9.00 | $9.00 | $17.00 | $9.00 |
| 0048 | Sign erection, type E (4102000000-N) | EACH | 29 | $75.00 | $75.00 | $85.00 | $75.00 |
| 0049 | Sign erection, type F (4108000000-N) | EACH | 5 | $100.00 | $100.00 | $90.00 | $100.00 |
| 0050 | Sign erection, type *** (ovrhd) - (A) (4109000000-N) | EACH | 11 | $1,500.00 | $1,500.00 | $1,300.00 | $1,500.00 |
| 0051 | Sign erection, type *** (ovrhd) - (B) (4109000000-N) | EACH | 10 | $650.00 | $650.00 | $775.00 | $650.00 |
| 0052 | Sign erection, type *** (GRD MTD) - (A) (4110000000-N) | EACH | 29 | $850.00 | $850.00 | $800.00 | $850.00 |
| 0053 | Sign erection, type *** (GRD MTD) - (B) (4110000000-N) | EACH | 14 | $350.00 | $350.00 | $300.00 | $350.00 |
| 0054 | Sign erection, milemarkers (4114000000-N) | EACH | 26 | $75.00 | $75.00 | $23.50 | $75.00 |
| 0055 | Sign erect, reloc ** GRD MTD - (D) (4116100000-N) | EACH | 1 | $200.00 | $200.00 | $245.00 | $200.00 |
| 0056 | Disposal of support, U-channel (4192000000-N) | EACH | 87 | $2.00 | $2.00 | $5.00 | $2.00 |
| 0057 | Disposal of sign, A or B (overhead) (4234000000-N) | EACH | 21 | $150.00 | $150.00 | $800.00 | $150.00 |
| 0058 | Disposal of sign, A & B (ground mounted) (4236000000-N) | EACH | 43 | $50.00 | $50.00 | $625.00 | $50.00 |
| 0059 | Disposal of sign, D, E or F (4238000000-N) | EACH | 36 | $2.00 | $2.00 | $10.00 | $2.00 |
| 0060 | Disposal of sign, milemarker (4238500000-N) | EACH | 7 | $2.00 | $2.00 | $5.00 | $2.00 |
| 0061 | Disposal of lighting system (4251000000-N) | EACH | 11 | $300.00 | $300.00 | $400.00 | $300.00 |
| 0062 | Disposal of walkway (4263000000-N) | EACH | 11 | $300.00 | $300.00 | $800.00 | $300.00 |
| 0063 | Generic signing item (EA) - cutting of sign hangers, overhead (4360000000-N) | EACH | 11 | $1,000.00 | $1,000.00 | $120.00 | $1,000.00 |
| 0064 | Work zone signs (stationary) (4400000000-E) | SF | 928 | $6.38 | $8.04 | $6.85 | $8.00 |
| 0065 | Work zone digital speed limit signs (4423000000-N) | EACH | 5 | $5,000.00 | $3,212.14 | $3,400.00 | $3,000.00 |
| 0066 | Sequential flashing warning lights (4434000000-N) | EACH | 12 | $130.00 | $107.25 | $110.00 | $105.00 |
| 0067 | Law enforcement (4510000000-N) | HR | 8,326 | $80.00 | $100.00 | $100.00 | $50.00 |
| 0068 | Generic traffic control item (EA) - connected lane closure system (4600000000-N) | EACH | 2 | $1,930.50 | $852.64 | $1,800.00 | $800.00 |
| 0069 | Generic traffic control item (EA) - double lane closure (4600000000-N) | EACH | 4 | $2,000.00 | $1,957.31 | $1,750.00 | $1,850.00 |
| 0070 | Generic traffic control item (EA) - ramp/loop closures (4600000000-N) | EACH | 24 | $1,180.00 | $852.64 | $1,100.00 | $800.00 |
| 0071 | Generic traffic control item (EA) - single lane closure (4600000000-N) | EACH | 261 | $1,800.00 | $1,769.63 | $1,525.00 | $1,750.00 |
| 0072 | Generic traffic control item (EA) - triple lane closure (4600000000-N) | EACH | 3 | $2,100.00 | $2,139.64 | $1,950.00 | $2,000.00 |
| 0073 | Thermoplastic pavement marking lines (4", 90 mils) (4685000000-E) | LF | 790 | $0.72 | $0.72 | $0.72 | $0.75 |
| 0074 | Thermoplastic pavement marking lines (6", 90 mils) (4688000000-E) | LF | 388,330 | $0.81 | $0.81 | $0.81 | $0.81 |
| 0075 | Thermoplastic pavement marking lines (12", 90 mils) (4700000000-E) | LF | 16,770 | $1.75 | $1.75 | $1.75 | $1.75 |
| 0076 | Thermoplastic pavement marking lines (24", 90 mils) (4709000000-E) | LF | 260 | $10.00 | $10.00 | $10.00 | $10.00 |
| 0077 | Thermoplastic pavement marking symbol (90 mils) (4725000000-E) | EACH | 63 | $175.00 | $175.00 | $175.00 | $175.00 |
| 0078 | 6" cold appl plstic lines type ** - (II) (4775000000-E) | LF | 2,500 | $3.00 | $3.00 | $3.00 | $3.00 |
| 0079 | Paint pavement marking lines (4") (4810000000-E) | LF | 790 | $0.25 | $0.25 | $0.25 | $0.25 |
| 0080 | Paint pavement marking lines (6") (4815000000-E) | LF | 388,330 | $0.26 | $0.26 | $0.26 | $0.30 |
| 0081 | Paint pavement marking lines (12") (4825000000-E) | LF | 16,770 | $0.55 | $0.55 | $0.55 | $0.55 |
| 0082 | Paint pavement marking lines (24") (4835000000-E) | LF | 260 | $4.00 | $4.00 | $4.00 | $4.00 |
| 0083 | Paint pavement marking symbol (4845000000-N) | EACH | 63 | $40.00 | $40.00 | $40.00 | $40.00 |
| 0084 | Removal of pavement marking lines (4") (4850000000-E) | LF | 3,967 | $0.55 | $0.55 | $0.55 | $0.55 |
| 0085 | Removal of pavement marking lines (8") (4860000000-E) | LF | 570 | $2.00 | $2.00 | $2.00 | $2.00 |
| 0086 | Removal of pavement marking lines (24") (4870000000-E) | LF | 224 | $4.50 | $4.50 | $4.50 | $4.50 |
| 0087 | Removal of pavement marking symbols & characters (4875000000-N) | EACH | 13 | $45.00 | $45.00 | $45.00 | $45.00 |
| 0088 | Generic pavement marking item (EA) - inlaid cradle markers (4895000000-N) | EACH | 3,860 | $26.00 | $26.00 | $26.00 | $26.00 |
| 0089 | Portable lighting (5255000000-N) | LS | 1 | $25,000 | $380,952 | $200,900 | $100,000 |
| 0090 | Temporary silt fence (6000000000-E) | LF | 815 | $2.00 | $3.44 | $3.00 | $3.50 |
| 0091 | Stone for erosion control, class A (6006000000-E) | TON | 115 | $50.00 | $97.00 | $87.50 | $75.00 |
| 0092 | Stone for erosion control, class B (6009000000-E) | TON | 50 | $105.00 | $99.35 | $91.00 | $75.00 |
| 0093 | Sediment control stone (6012000000-E) | TON | 105 | $50.00 | $90.90 | $62.50 | $75.00 |
| 0094 | Temporary mulching (6015000000-E) | ACRE | 0.50 | $1,500.00 | $1,850.00 | $2,500.00 | $2,000.00 |
| 0095 | Seed for temporary seeding (6018000000-E) | LB | 100 | $3.00 | $2.00 | $3.00 | $2.00 |
| 0096 | Fertilizer for temporary seeding (6021000000-E) | TON | 0.50 | $763.00 | $1,092.00 | $600.00 | $1,000.00 |
| 0097 | Temporary slope drains (6024000000-E) | LF | 200 | $13.00 | $27.80 | $34.00 | $25.00 |
| 0098 | Safety fence (6029000000-E) | LF | 395 | $3.10 | $2.85 | $2.00 | $3.50 |
| 0099 | Silt excavation (6030000000-E) | CY | 80 | $40.00 | $30.00 | $25.00 | $50.00 |
| 0100 | Matting for erosion control (6036000000-E) | SY | 2,000 | $2.90 | $1.99 | $1.95 | $2.00 |
| 0101 | Coir fiber mat (6037000000-E) | SY | 100 | $3.62 | $4.36 | $5.75 | $8.00 |
| 0102 | 1/4" hardware cloth (6042000000-E) | LF | 115 | $3.58 | $3.75 | $16.50 | $6.00 |
| 0103 | Special stilling basins (6070000000-N) | EACH | 3 | $2,500.00 | $815.00 | $1,360.00 | $2,500.00 |
| 0104 | Wattle barrier (6071013000-E) | LF | 260 | $16.00 | $11.50 | $20.50 | $12.00 |
| 0105 | Seeding and mulching (6084000000-E) | ACRE | 0.50 | $4,250.00 | $4,950.00 | $6,000.00 | $6,000.00 |
| 0106 | Mowing (6087000000-E) | ACRE | 0.50 | $1,500.00 | $295.00 | $200.00 | $600.00 |
| 0107 | Seed for repair seeding (6090000000-E) | LB | 50 | $3.06 | $4.15 | $6.00 | $4.50 |
| 0108 | Fertilizer for repair seeding (6093000000-E) | TON | 0.25 | $763.00 | $1,092.00 | $600.00 | $1,100.00 |
| 0109 | Seed for supplemental seeding (6096000000-E) | LB | 50 | $3.06 | $4.98 | $6.00 | $4.50 |
| 0110 | Fertilizer topdressing (6108000000-E) | TON | 0.25 | $763.00 | $1,092.00 | $600.00 | $950.00 |
| 0111 | Impervious dike (6111000000-E) | LF | 38 | $418.51 | $204.00 | $142.00 | $250.00 |
| 0112 | Specialized hand mowing (6114500000-N) | MHR | 10 | $100.00 | $75.00 | $55.00 | $175.00 |
| 0113 | Manual litter removal (6114800000-N) | MHR | 1 | $100.00 | $125.00 | $55.00 | $175.00 |
| 0114 | Litter disposal (6114900000-E) | TON | 19 | $500.00 | $750.00 | $300.00 | $200.00 |
| 0115 | Response for erosion control (6117000000-N) | EACH | 25 | $50.94 | $400.00 | $500.00 | $250.00 |
| 0116 | Concrete washout structure (6117500000-N) | EACH | 1 | $3,600.00 | $1,300.00 | $808.00 | $1,500.00 |
| 0117 | Generic erosion control item (EA) - prefabricated concrete washout (6132000000-N) | EACH | 5 | $1,200.00 | $1,300.00 | $966.00 | $750.00 |
| 0118 | Inductive loop sawcut (7444000000-E) | LF | 2,112 | $12.00 | $12.00 | $12.00 | $12.00 |
| 0119 | Lead-in cable (14-2) (7456100000-E) | LF | 525 | $3.50 | $3.50 | $3.50 | $3.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
Every contract let that day: NCDOT letting of April 21, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.