NCDOT contract C205130 bid tabulation
GRADING, DRAINAGE PAVING, AND SIGNALS. SR-1556 (WAYNE MEMORIAL DR) FROM SR-1003 (NEW HOPE RD) TO I-42. Let by North Carolina DOT on April 21, 2026, Wayne. 5 bids received; low bid $19,750,585 by Branch Civil Inc.
- Owner
- North Carolina DOT
- Letting
- 21 APR 2026
- Pay items
- 212
- Data through
- 20 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Branch Civil Inc | $19,750,585 | Low |
| 2 | FSC II LLC DBA Fred Smith Company | $20,118,811 | +2.0% |
| 3 | Barnhill Contracting Company | $20,945,781 | +6.0% |
| 4 | Blythe Construction Inc | $21,974,635 | +11% |
| 5 | Conti Civil LLC | $23,931,442 | +21% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Branch Civil Inc | 2. FSC II LLC DBA Fred Smith Company | 3. Barnhill Contracting Company | 4. Blythe Construction Inc | 5. Conti Civil LLC |
|---|---|---|---|---|---|---|---|---|
| 0001 | Mobilization (0000100000-N) | LS | 1 | $835,224 | $1,105,000 | $1,047,050 | $1,094,450 | $1,180,000 |
| 0002 | Construction surveying (0000400000-N) | LS | 1 | $413,900 | $216,026 | $1,800,000 | $313,452 | $350,000 |
| 0003 | Sealing abandoned wells (0015000000-N) | EACH | 3 | $5,507.00 | $5,000.00 | $2,500.00 | $15,477 | $2,625.00 |
| 0004 | Grading (0043000000-N) | LS | 1 | $1,450,900 | $3,647,505 | $2,196,215 | $1,800,000 | $4,074,439 |
| 0005 | Supplementary clearing & grubbing (0050000000-E) | ACRE | 1 | $11,600 | $1.00 | $1.00 | $10,000 | $1,000.00 |
| 0006 | Undercut excavation (0057000000-E) | CY | 700 | $30.25 | $27.00 | $50.00 | $10.00 | $125.00 |
| 0007 | Drainage ditch excavation (0134000000-E) | CY | 480 | $30.50 | $15.00 | $39.20 | $44.78 | $25.00 |
| 0008 | Select granular material (0195000000-E) | CY | 600 | $25.50 | $25.00 | $50.00 | $129.58 | $100.00 |
| 0009 | Geotextile for soil stabilization (0196000000-E) | SY | 600 | $4.15 | $6.00 | $3.65 | $8.69 | $5.00 |
| 0010 | Generic grading item (TON) - hauling and disposal of petroleum contaminated soil (0255000000-E) | TON | 200 | $89.00 | $165.00 | $167.80 | $253.23 | $175.00 |
| 0011 | Foundation conditioning material, minor structures (0318000000-E) | TON | 2,061 | $79.00 | $42.00 | $45.00 | $115.85 | $75.00 |
| 0012 | FND condit geotextile (4A) (0321000000-E) | SY | 8,060 | $2.10 | $4.50 | $5.00 | $6.50 | $5.00 |
| 0013 | 15" drainage pipe (0335200000-E) | LF | 708 | $72.25 | $60.00 | $92.65 | $143.05 | $140.00 |
| 0014 | 18" drainage pipe (0335300000-E) | LF | 112 | $86.00 | $70.00 | $106.20 | $148.97 | $160.00 |
| 0015 | 24" drainage pipe (0335400000-E) | LF | 36 | $86.00 | $90.00 | $126.85 | $215.46 | $215.00 |
| 0016 | 30" drainage pipe (0335500000-E) | LF | 80 | $144.00 | $130.00 | $167.45 | $248.79 | $290.00 |
| 0017 | 36" drainage pipe (0335600000-E) | LF | 64 | $192.00 | $160.00 | $207.10 | $310.89 | $350.00 |
| 0018 | 15" RC pipe culverts, class IV (0448200000-E) | LF | 5,844 | $107.00 | $67.00 | $96.25 | $143.53 | $145.00 |
| 0019 | 18" RC pipe culverts, class IV (0448300000-E) | LF | 1,936 | $137.00 | $78.00 | $112.70 | $167.28 | $155.00 |
| 0020 | 24" RC pipe culverts, class IV (0448400000-E) | LF | 2,636 | $158.00 | $100.00 | $142.75 | $225.68 | $195.00 |
| 0021 | 30" RC pipe culverts, class IV (0448500000-E) | LF | 596 | $208.00 | $130.00 | $190.60 | $328.45 | $250.00 |
| 0022 | 36" RC pipe culverts, class IV (0448600000-E) | LF | 172 | $317.00 | $285.00 | $370.95 | $437.55 | $405.00 |
| 0023 | Pipe removal (0995000000-E) | LF | 3,169 | $54.00 | $33.00 | $26.20 | $100.00 | $53.00 |
| 0024 | Shallow undercut (1099500000-E) | CY | 2,850 | $20.75 | $27.00 | $30.30 | $18.39 | $115.00 |
| 0025 | Class IV subgrade stabilization (1099700000-E) | TON | 7,175 | $51.00 | $39.00 | $40.00 | $85.95 | $58.00 |
| 0026 | Class IV aggregate stabilization (1111000000-E) | TON | 250 | $37.00 | $42.00 | $80.35 | $90.49 | $58.00 |
| 0027 | Geotextile for subgrade stabilization (1112000000-E) | SY | 11,025 | $5.00 | $6.50 | $5.20 | $4.58 | $5.00 |
| 0028 | Aggregate base course (1121000000-E) | TON | 177 | $60.25 | $55.00 | $61.90 | $667.13 | $81.00 |
| 0029 | Incidental stone base (1220000000-E) | TON | 100 | $61.25 | $95.00 | $150.00 | $85.15 | $118.00 |
| 0030 | Mill asp PVMT *****" DTH - (1-1/2") (1297000000-E) | SY | 27,710 | $2.70 | $3.10 | $2.30 | $3.03 | $1.50 |
| 0031 | Incidental milling (1330000000-E) | SY | 2,920 | $15.00 | $16.00 | $7.00 | $14.01 | $10.00 |
| 0032 | Asphalt conc base course, type B25.0C (1491000000-E) | TON | 9,520 | $108.75 | $125.00 | $116.00 | $116.00 | $105.00 |
| 0033 | Asphalt conc intermediate course, type I19.0C (1503000000-E) | TON | 7,460 | $107.50 | $122.00 | $125.00 | $125.00 | $103.95 |
| 0034 | Asphalt conc surface course, type S9.5B (1519000000-E) | TON | 1,300 | $107.50 | $125.00 | $170.00 | $170.00 | $103.95 |
| 0035 | Asphalt conc surface course, type S9.5C (1523000000-E) | TON | 9,400 | $101.00 | $100.00 | $123.00 | $123.00 | $97.65 |
| 0036 | Asphalt binder for plant mix (1575000000-E) | TON | 1,435 | $421.50 | $640.00 | $550.00 | $550.00 | $420.00 |
| 0037 | Asphalt plant mix, pavement repair (1693000000-E) | TON | 2,142 | $235.00 | $175.00 | $125.00 | $268.88 | $400.00 |
| 0038 | Subdrain excavation (2022000000-E) | CY | 3,297.30 | $31.50 | $35.00 | $35.00 | $26.00 | $90.00 |
| 0039 | Geotextile for subsurface drains (2026000000-E) | SY | 14,720 | $5.50 | $12.00 | $12.00 | $4.00 | $1.20 |
| 0040 | Subdrain coarse aggregate (2036000000-E) | CY | 2,473 | $131.00 | $80.00 | $80.00 | $65.00 | $84.00 |
| 0041 | 6" perforated subdrain pipe (2044000000-E) | LF | 14,720 | $11.75 | $17.00 | $17.00 | $16.00 | $12.50 |
| 0042 | Subdrain pipe outlet (2070000000-N) | EACH | 30 | $1,056.00 | $400.00 | $400.00 | $495.00 | $500.00 |
| 0043 | 6" outlet pipe (2077000000-E) | LF | 180 | $50.50 | $40.00 | $40.00 | $35.00 | $38.00 |
| 0044 | Temporary steel plate covers for masonry drainage structure (2190000000-N) | EACH | 55 | $273.00 | $1,750.00 | $1,705.00 | $2,011.21 | $1,400.00 |
| 0045 | Endwalls (2209000000-E) | CY | 3.40 | $2,672.00 | $2,150.00 | $1,573.90 | $4,204.25 | $2,500.00 |
| 0046 | Flowable fill (2275000000-E) | CY | 15 | $953.00 | $450.00 | $450.00 | $930.23 | $450.00 |
| 0047 | Masonry drainage structures (2286000000-N) | EACH | 126 | $4,438.00 | $2,850.00 | $2,694.00 | $4,819.49 | $3,300.00 |
| 0048 | Masonry drainage structures (2308000000-E) | LF | 9.50 | $1,983.00 | $275.00 | $515.75 | $1,519.29 | $890.00 |
| 0049 | Frame with two grates, STD 840.16 (2364000000-N) | EACH | 31 | $2,937.00 | $925.00 | $1,090.00 | $3,012.80 | $2,000.00 |
| 0050 | Frame with two grates, STD 840.24 (2366000000-N) | EACH | 2 | $4,393.00 | $625.00 | $1,003.00 | $2,860.08 | $1,850.00 |
| 0051 | Frame with two grates, STD 840.29 (2367000000-N) | EACH | 10 | $1,690.00 | $625.00 | $1,003.00 | $2,860.08 | $1,900.00 |
| 0052 | Frame-GRT-HD 840.03 ** - (E) (2374000000-N) | EACH | 9 | $1,891.00 | $950.00 | $1,163.00 | $3,134.53 | $2,150.00 |
| 0053 | Frame-GRT-HD 840.03 ** - (F) (2374000000-N) | EACH | 32 | $1,891.00 | $950.00 | $1,163.00 | $3,134.53 | $2,150.00 |
| 0054 | Frame-GRT-HD 840.03 ** - (G) (2374000000-N) | EACH | 41 | $1,891.00 | $950.00 | $1,163.00 | $3,134.53 | $2,150.00 |
| 0055 | Frame with cover, STD 840.54 (2396000000-N) | EACH | 1 | $1,478.00 | $750.00 | $1,150.00 | $2,570.16 | $1,750.00 |
| 0056 | Concrete transitional section for drop inlet (2451000000-N) | EACH | 19 | $1,196.00 | $784.19 | $1,950.00 | $1,475.00 | $1,725.00 |
| 0057 | **'-**" concrete curb & gutter - (2'-9") (2538000000-E) | LF | 920 | $36.50 | $46.00 | $36.00 | $34.20 | $36.00 |
| 0058 | 1'-6" concrete curb & gutter (2542000000-E) | LF | 5,250 | $29.25 | $22.00 | $26.00 | $23.70 | $32.00 |
| 0059 | 2'-6" concrete curb & gutter (2549000000-E) | LF | 12,150 | $36.00 | $25.00 | $27.00 | $30.00 | $34.00 |
| 0060 | 4" concrete sidewalk (2591000000-E) | SY | 3,160 | $69.75 | $47.25 | $50.00 | $55.40 | $86.00 |
| 0061 | Concrete curb ramps (2605000000-N) | EACH | 26 | $2,866.00 | $1,500.00 | $2,400.00 | $2,345.00 | $3,900.00 |
| 0062 | 6" concrete driveway (2612000000-E) | SY | 820 | $93.00 | $74.25 | $90.00 | $105.00 | $115.00 |
| 0063 | 5" monolithic concrete islands (keyed in) (2655000000-E) | SY | 1,430 | $95.25 | $74.50 | $70.00 | $84.90 | $89.00 |
| 0064 | Steel beam guardrail (3030000000-E) | LF | 612.50 | $27.00 | $24.00 | $24.00 | $24.00 | $25.20 |
| 0065 | Additional guardrail posts (3150000000-N) | EACH | 5 | $49.75 | $44.00 | $44.00 | $44.00 | $46.20 |
| 0066 | Guardrail end units, type cat-1 (3210000000-N) | EACH | 2 | $1,243.00 | $1,100.00 | $1,100.00 | $1,100.00 | $1,155.00 |
| 0067 | Guardrail end units, type TL-3 (3287000000-N) | EACH | 2 | $3,672.00 | $3,250.00 | $3,250.00 | $3,250.00 | $3,412.50 |
| 0068 | Remove & reset existing guardrail (3345000000-E) | LF | 325 | $8.00 | $7.00 | $7.00 | $7.00 | $7.35 |
| 0069 | Woven wire fence, 47" fabric (3503000000-E) | LF | 560 | $9.50 | $8.00 | $8.50 | $8.50 | $8.93 |
| 0070 | 4" timber fence posts, 7'-6" long (3509000000-E) | EACH | 26 | $50.75 | $50.00 | $45.00 | $45.00 | $47.25 |
| 0071 | 5" timber fence posts, 8'-0" long (3515000000-E) | EACH | 25 | $52.00 | $80.00 | $46.00 | $46.00 | $48.30 |
| 0072 | Chain link fence reset (3572000000-E) | LF | 375 | $22.50 | $15.00 | $20.00 | $20.00 | $21.00 |
| 0073 | Rip rap, class B (3649000000-E) | TON | 55 | $133.00 | $105.00 | $107.50 | $158.86 | $100.00 |
| 0074 | Geotextile for drainage (3656000000-E) | SY | 590 | $7.90 | $6.50 | $3.00 | $6.62 | $3.50 |
| 0075 | Supports, 3-LB steel U-channel (4072000000-E) | LF | 801 | $8.25 | $7.05 | $9.00 | $7.05 | $7.40 |
| 0076 | Sign erection, type D (4096000000-N) | EACH | 2 | $233.00 | $200.00 | $125.00 | $200.00 | $210.00 |
| 0077 | Sign erection, type E (4102000000-N) | EACH | 65 | $192.00 | $165.00 | $65.00 | $165.00 | $173.25 |
| 0078 | Sign erection, type F (4108000000-N) | EACH | 2 | $204.00 | $175.00 | $125.00 | $175.00 | $183.75 |
| 0079 | Disposal of sign system, U-channel (4155000000-N) | EACH | 27 | $5.75 | $5.00 | $2.00 | $5.00 | $5.25 |
| 0080 | Work zone signs (stationary) (4400000000-E) | SF | 1,900 | $10.25 | $5.75 | $5.75 | $6.25 | $6.56 |
| 0081 | Work zone signs (portable) (4405000000-E) | SF | 169 | $10.50 | $35.00 | $28.50 | $8.25 | $17.00 |
| 0082 | Work zone signs (barricade mounted) (4410000000-E) | SF | 471 | $13.50 | $9.00 | $17.05 | $6.45 | $6.75 |
| 0083 | Flashing arrow board (4415000000-N) | EACH | 4 | $2,100.00 | $2,750.00 | $3,570.00 | $1,900.00 | $7,500.00 |
| 0084 | Portable changeable message sign (4420000000-N) | EACH | 9 | $8,400.00 | $5,000.00 | $8,698.00 | $7,600.00 | $12,000 |
| 0085 | Drums (4430000000-N) | EACH | 535 | $85.25 | $25.00 | $66.85 | $52.50 | $100.00 |
| 0086 | Barricades (type III) (4445000000-E) | LF | 336 | $26.75 | $25.00 | $44.00 | $16.50 | $18.00 |
| 0087 | Pedestrian channelizing devices (4447000000-E) | LF | 150 | $55.25 | $62.00 | $82.30 | $34.00 | $50.00 |
| 0088 | Flagger (4455000000-N) | DAY | 419 | $488.00 | $850.00 | $484.00 | $817.82 | $665.00 |
| 0089 | TMA (4480000000-N) | EACH | 4 | $21,000 | $5,000.00 | $12,000 | $19,000 | $30,000 |
| 0090 | Law enforcement (4510000000-N) | HR | 208 | $111.00 | $85.00 | $60.00 | $65.00 | $42.00 |
| 0091 | Generic traffic control item (EA) - ramp/loop closures (4600000000-N) | EACH | 3 | $5,589.00 | $3,500.00 | $1,964.00 | $950.00 | $3,000.00 |
| 0092 | Thermoplastic pavement marking lines (4", 90 mils) (4685000000-E) | LF | 47,323 | $0.55 | $0.46 | $0.46 | $0.46 | $0.48 |
| 0093 | Thermoplastic pavement marking lines (6", 90 mils) (4688000000-E) | LF | 69 | $2.45 | $2.00 | $2.00 | $2.00 | $2.10 |
| 0094 | Thermoplastic pavement marking lines (8", 90 mils) (4695000000-E) | LF | 6,988 | $1.20 | $1.00 | $1.00 | $1.00 | $1.05 |
| 0095 | Thermoplastic pavement marking lines (12", 90 mils) (4700000000-E) | LF | 515 | $4.90 | $4.00 | $4.00 | $4.00 | $4.20 |
| 0096 | Thermoplastic pavement marking lines (24", 90 mils) (4709000000-E) | LF | 644 | $15.00 | $12.25 | $12.25 | $12.25 | $12.86 |
| 0097 | Thermoplastic pavement marking character (90 mils) (4720000000-E) | EACH | 32 | $146.00 | $120.00 | $120.00 | $120.00 | $126.00 |
| 0098 | Thermoplastic pavement marking symbol (90 mils) (4725000000-E) | EACH | 100 | $146.00 | $120.00 | $120.00 | $120.00 | $126.00 |
| 0099 | Paint pavement marking lines (4") (4810000000-E) | LF | 42,755 | $0.35 | $0.26 | $0.26 | $0.26 | $0.27 |
| 0100 | Paint pavement marking lines (12") (4825000000-E) | LF | 1,151 | $1.75 | $1.43 | $1.43 | $1.43 | $1.50 |
| 0101 | Paint pavement marking lines (24") (4835000000-E) | LF | 488 | $9.50 | $7.70 | $7.70 | $7.70 | $8.09 |
| 0102 | Paint pavement marking character (4840000000-N) | EACH | 14 | $77.00 | $63.00 | $63.00 | $63.00 | $66.15 |
| 0103 | Paint pavement marking symbol (4845000000-N) | EACH | 72 | $77.00 | $63.00 | $63.00 | $63.00 | $66.15 |
| 0104 | Removal of pavement marking lines (4") (4850000000-E) | LF | 3,539 | $1.25 | $1.00 | $1.00 | $1.00 | $1.05 |
| 0105 | Removal of pavement marking lines (8") (4860000000-E) | LF | 129 | $2.45 | $2.00 | $2.00 | $2.00 | $2.10 |
| 0106 | Removal of pavement marking symbols & characters (4875000000-N) | EACH | 12 | $146.00 | $120.00 | $120.00 | $120.00 | $126.00 |
| 0107 | Generic pavement marking item (LF) - yield line paint pavement marking (24") (4890000000-E) | LF | 16 | $15.25 | $12.50 | $12.50 | $12.50 | $13.13 |
| 0108 | Generic pavement marking item (LF) - yield line thermoplastic pavement marking (24", 90 mils) (4890000000-E) | LF | 16 | $42.75 | $36.00 | $35.00 | $35.00 | $36.75 |
| 0109 | Generic pavement marking item (EA) - polycarbonate H-shaped markers (4895000000-N) | EACH | 867 | $55.75 | $45.75 | $45.75 | $45.75 | $48.04 |
| 0110 | 4" water line (5325400000-E) | LF | 47 | $129.00 | $74.00 | $116.00 | $105.00 | $230.00 |
| 0111 | 6" water line (5325600000-E) | LF | 3,096 | $94.50 | $60.00 | $85.00 | $85.00 | $118.00 |
| 0112 | 8" water line (5325800000-E) | LF | 759 | $139.00 | $63.75 | $125.00 | $130.00 | $158.00 |
| 0113 | 12" water line (5326200000-E) | LF | 3,935 | $195.00 | $165.00 | $175.00 | $160.00 | $200.00 |
| 0114 | 16" water line (5326600000-E) | LF | 1,967 | $354.00 | $214.00 | $318.00 | $320.00 | $295.00 |
| 0115 | DI H2O pipe fittings (5329000000-E) | LB | 22,150 | $15.50 | $19.50 | $14.00 | $18.00 | $14.50 |
| 0116 | 2" valve (5536000000-E) | EACH | 1 | $3,061.00 | $1,800.00 | $2,750.00 | $2,850.00 | $1,750.00 |
| 0117 | 4" valve (5538000000-E) | EACH | 1 | $4,341.00 | $2,200.00 | $3,900.00 | $3,600.00 | $2,175.00 |
| 0118 | 6" valve (5540000000-E) | EACH | 18 | $5,008.00 | $2,850.00 | $4,500.00 | $4,000.00 | $2,900.00 |
| 0119 | 8" valve (5546000000-E) | EACH | 2 | $6,678.00 | $3,600.00 | $6,000.00 | $4,750.00 | $4,050.00 |
| 0120 | 12" valve (5558000000-E) | EACH | 13 | $10,460 | $6,850.00 | $9,400.00 | $7,900.00 | $7,050.00 |
| 0121 | 16" valve (5558600000-E) | EACH | 3 | $31,160 | $16,500 | $28,000 | $21,500 | $13,000 |
| 0122 | Relocate water meter (5648000000-N) | EACH | 22 | $1,669.00 | $3,600.00 | $1,500.00 | $4,200.00 | $3,025.00 |
| 0123 | Reconnect water meter (5649000000-N) | EACH | 4 | $2,226.00 | $3,000.00 | $2,000.00 | $3,750.00 | $1,825.00 |
| 0124 | Relc **" RPZ backflow prevnt A - (1") (5656100000-E) | EACH | 2 | $4,452.00 | $5,500.00 | $4,000.00 | $6,200.00 | $7,000.00 |
| 0125 | Relocate fire hydrant (5672000000-N) | EACH | 12 | $5,008.00 | $12,500 | $4,500.00 | $4,200.00 | $3,100.00 |
| 0126 | Fire hydrant leg (5673000000-E) | LF | 169 | $156.00 | $120.00 | $140.00 | $235.00 | $225.00 |
| 0127 | **" water service line - (2") (5686000000-E) | LF | 23 | $289.00 | $135.00 | $260.00 | $225.00 | $125.00 |
| 0128 | Water service line (<2") (5686500000-E) | LF | 1,139 | $66.75 | $85.00 | $60.00 | $75.00 | $65.00 |
| 0129 | **" sanitary gravity sewer - (14") (5691000000-E) | LF | 220 | $401.00 | $270.00 | $360.00 | $285.00 | $375.00 |
| 0130 | **" sanitary gravity sewer - (15") (5691000000-E) | LF | 2,394 | $384.00 | $280.00 | $345.00 | $190.00 | $400.00 |
| 0131 | 6" force main sewer (5709300000-E) | LF | 1,033 | $156.00 | $75.00 | $140.00 | $120.00 | $118.00 |
| 0132 | Sanitary sewer clean-out (5768000000-N) | EACH | 2 | $2,226.00 | $1,500.00 | $2,000.00 | $1,450.00 | $1,400.00 |
| 0133 | Sewer service line (5768500000-E) | LF | 58 | $111.00 | $135.00 | $100.00 | $150.00 | $118.00 |
| 0134 | Ductile iron sewer pipe fittings (5769000000-E) | LB | 840 | $33.50 | $19.50 | $30.00 | $21.00 | $21.50 |
| 0135 | 5' dia utility manhole (5776000000-E) | EACH | 13 | $14,800 | $8,500.00 | $13,300 | $13,000 | $11,000 |
| 0136 | Utility manhole wall 5' dia (5782000000-E) | LF | 97 | $612.00 | $500.00 | $550.00 | $950.00 | $600.00 |
| 0137 | Abandon **" utility pipe - (15") (5798000000-E) | LF | 2,104 | $21.25 | $30.00 | $19.00 | $26.00 | $29.25 |
| 0138 | Abandon 6" utility pipe (5800000000-E) | LF | 7,827 | $3.35 | $25.00 | $3.00 | $20.00 | $15.50 |
| 0139 | Abandon 8" utility pipe (5801000000-E) | LF | 1,368 | $9.00 | $42.00 | $8.00 | $22.00 | $18.00 |
| 0140 | Abandon 12" utility pipe (5804000000-E) | LF | 3,536 | $13.25 | $30.00 | $12.00 | $24.00 | $22.00 |
| 0141 | Abandon 16" utility pipe (5810000000-E) | LF | 1,963 | $22.25 | $35.00 | $20.00 | $28.00 | $29.00 |
| 0142 | Abandon utility manhole (5816000000-N) | EACH | 15 | $3,228.00 | $1,500.00 | $2,900.00 | $2,250.00 | $3,150.00 |
| 0143 | 12" encasement pipe (5835600000-E) | LF | 20 | $189.00 | $85.00 | $170.00 | $220.00 | $212.00 |
| 0144 | 24" encasement pipe (5836000000-E) | LF | 347 | $278.00 | $100.00 | $250.00 | $415.00 | $438.00 |
| 0145 | 30" encasement pipe (5836200000-E) | LF | 252 | $467.00 | $120.00 | $420.00 | $635.00 | $670.00 |
| 0146 | Bore & jack **" - (12") (5872500000-E) | LF | 20 | $1,781.00 | $550.00 | $1,600.00 | $950.00 | $825.00 |
| 0147 | Bore & jack **" - (24") (5872500000-E) | LF | 283 | $501.00 | $580.00 | $450.00 | $520.00 | $480.00 |
| 0148 | Bore & jack **" - (30") (5872500000-E) | LF | 205 | $523.00 | $645.00 | $470.00 | $875.00 | $785.00 |
| 0149 | Temporary silt fence (6000000000-E) | LF | 21,995 | $3.15 | $3.10 | $2.35 | $2.85 | $3.75 |
| 0150 | Stone for erosion control, class A (6006000000-E) | TON | 225 | $84.00 | $55.00 | $94.60 | $130.81 | $100.00 |
| 0151 | Stone for erosion control, class B (6009000000-E) | TON | 795 | $69.00 | $50.00 | $80.00 | $128.75 | $105.00 |
| 0152 | Sediment control stone (6012000000-E) | TON | 1,550 | $76.00 | $33.00 | $50.00 | $118.43 | $92.00 |
| 0153 | Temporary mulching (6015000000-E) | ACRE | 10.50 | $1,781.00 | $2,000.00 | $1,800.00 | $1,600.00 | $1,680.00 |
| 0154 | Seed for temporary seeding (6018000000-E) | LB | 700 | $2.25 | $2.50 | $6.00 | $2.00 | $2.10 |
| 0155 | Fertilizer for temporary seeding (6021000000-E) | TON | 3.50 | $946.00 | $850.00 | $2,250.00 | $850.00 | $892.50 |
| 0156 | Temporary slope drains (6024000000-E) | LF | 375 | $29.75 | $22.00 | $36.00 | $25.74 | $29.00 |
| 0157 | Safety fence (6029000000-E) | LF | 60 | $4.15 | $5.00 | $2.00 | $3.75 | $4.20 |
| 0158 | Silt excavation (6030000000-E) | CY | 1,230 | $35.50 | $1.00 | $0.10 | $7.30 | $30.00 |
| 0159 | Matting for erosion control (6036000000-E) | SY | 10,500 | $1.90 | $1.70 | $1.90 | $1.70 | $1.79 |
| 0160 | 1/4" hardware cloth (6042000000-E) | LF | 6,500 | $6.75 | $5.10 | $3.50 | $12.38 | $6.59 |
| 0161 | Flocculant (6071002000-E) | LB | 325 | $5.50 | $1.00 | $11.00 | $5.00 | $5.25 |
| 0162 | Coir fiber wattle (6071012000-E) | LF | 800 | $9.00 | $7.10 | $18.15 | $8.00 | $8.40 |
| 0163 | Coir fiber baffle (6071030000-E) | LF | 40 | $3.75 | $5.35 | $8.00 | $8.00 | $8.40 |
| 0164 | Seeding and mulching (6084000000-E) | ACRE | 12 | $2,894.00 | $2,600.00 | $1,800.00 | $2,600.00 | $2,730.00 |
| 0165 | Mowing (6087000000-E) | ACRE | 9 | $167.00 | $150.00 | $85.00 | $150.00 | $157.50 |
| 0166 | Seed for repair seeding (6090000000-E) | LB | 150 | $4.45 | $4.00 | $9.00 | $4.00 | $4.20 |
| 0167 | Fertilizer for repair seeding (6093000000-E) | TON | 0.25 | $1,113.00 | $1,000.00 | $2,150.00 | $1,000.00 | $1,050.00 |
| 0168 | Seed for supplemental seeding (6096000000-E) | LB | 250 | $4.45 | $4.00 | $6.00 | $4.00 | $4.20 |
| 0169 | Fertilizer topdressing (6108000000-E) | TON | 7.50 | $1,002.00 | $750.00 | $1,800.00 | $900.00 | $945.00 |
| 0170 | Specialized hand mowing (6114500000-N) | MHR | 10 | $11.25 | $250.00 | $65.00 | $150.00 | $157.50 |
| 0171 | Response for erosion control (6117000000-N) | EACH | 25 | $278.00 | $250.00 | $375.00 | $250.00 | $262.50 |
| 0172 | Concrete washout structure (6117500000-N) | EACH | 1 | $1,275.00 | $2,250.00 | $10,897 | $1,880.45 | $1,500.00 |
| 0173 | Generic erosion control item (EA) - fabric insert inlet protection cleanout (6132000000-N) | EACH | 72 | $382.00 | $250.00 | $116.00 | $405.36 | $367.50 |
| 0174 | Generic erosion control item (EA) - fabric insert inlet protection, type 1 (6132000000-N) | EACH | 24 | $382.00 | $300.00 | $174.00 | $405.36 | $367.50 |
| 0175 | Generic erosion control item (EA) - prefabricated concrete washout (6132000000-N) | EACH | 6 | $539.00 | $2,000.00 | $2,355.00 | $1,352.11 | $210.00 |
| 0176 | Pedestrian signal head (16", 1 section W/countdown) (7048500000-E) | EACH | 16 | $1,572.00 | $1,100.00 | $1,050.00 | $1,050.00 | $1,482.73 |
| 0177 | Signal cable (7060000000-E) | LF | 7,770 | $5.75 | $5.00 | $5.00 | $5.00 | $5.41 |
| 0178 | Vehicle signal head (12", 3 section) (7120000000-E) | EACH | 58 | $1,610.00 | $1,375.00 | $1,375.00 | $1,375.00 | $1,518.79 |
| 0179 | Vehicle signal head (12", 4 section) (7132000000-E) | EACH | 11 | $2,042.00 | $1,675.00 | $1,676.00 | $1,676.00 | $1,926.06 |
| 0180 | Vehicle signal head (12", 5 section) (7144000000-E) | EACH | 2 | $2,406.00 | $2,150.00 | $2,159.00 | $2,159.00 | $2,269.70 |
| 0181 | Messenger cable (1/4") (7252000000-E) | LF | 3,100 | $5.50 | $5.00 | $5.00 | $5.00 | $5.09 |
| 0182 | Messenger cable (3/8") (7264000000-E) | LF | 3,000 | $6.25 | $10.00 | $10.00 | $10.00 | $5.94 |
| 0183 | Tracer wire (7279000000-E) | LF | 160 | $1.85 | $3.00 | $2.00 | $2.00 | $1.75 |
| 0184 | Unpaved trench (***********) - (1, 2") (7300000000-E) | LF | 331 | $15.50 | $16.00 | $14.00 | $14.00 | $14.58 |
| 0185 | Junction box (standard size) (7324000000-N) | EACH | 7 | $945.00 | $802.00 | $802.00 | $802.00 | $891.97 |
| 0186 | Junction box (over-sized, heavy duty) (7348000000-N) | EACH | 6 | $1,729.00 | $1,500.00 | $1,517.00 | $1,517.00 | $1,631.21 |
| 0187 | Wood pole (7360000000-N) | EACH | 9 | $2,978.00 | $2,400.00 | $2,390.00 | $2,390.00 | $2,809.55 |
| 0188 | Guy assembly (7372000000-N) | EACH | 23 | $1,202.00 | $975.00 | $976.00 | $976.00 | $1,133.79 |
| 0189 | 2" riser with weatherhead (7420000000-E) | EACH | 2 | $1,302.00 | $1,100.00 | $1,082.00 | $1,082.00 | $1,228.18 |
| 0190 | 2" riser with heat shrink tubing (7432000000-E) | EACH | 3 | $1,476.00 | $1,275.00 | $1,267.00 | $1,267.00 | $1,392.58 |
| 0191 | Lead-in cable (14-2) (7456100000-E) | LF | 170 | $4.40 | $4.00 | $4.00 | $4.00 | $4.14 |
| 0192 | Communications cable (** fiber) - (24) (7516000000-E) | LF | 5,150 | $5.50 | $5.00 | $5.00 | $5.00 | $5.25 |
| 0193 | Drop cable (7528000000-E) | LF | 800 | $5.25 | $5.00 | $5.00 | $5.00 | $5.04 |
| 0194 | Splice enclosure (7540000000-N) | EACH | 3 | $2,649.00 | $2,425.00 | $2,435.00 | $2,435.00 | $2,498.79 |
| 0195 | Interconnect center (7552000000-N) | EACH | 3 | $2,943.00 | $2,700.00 | $2,706.00 | $2,706.00 | $2,776.67 |
| 0196 | Delineator marker (7566000000-N) | EACH | 6 | $184.00 | $175.00 | $170.00 | $170.00 | $173.94 |
| 0197 | Remove existing communications cable (7575160000-E) | LF | 3,355 | $1.85 | $2.00 | $2.00 | $2.00 | $1.75 |
| 0198 | Back pull fiber optic cable (7575170000-E) | LF | 730 | $4.10 | $4.00 | $4.00 | $4.00 | $3.87 |
| 0199 | Cable transfer (7575180000-N) | EACH | 1 | $582.00 | $525.00 | $536.00 | $536.00 | $549.39 |
| 0200 | Metal strain signal pole (7576000000-N) | EACH | 9 | $18,140 | $17,275 | $17,286 | $17,286 | $17,116 |
| 0201 | Soil test (7613000000-N) | EACH | 18 | $4,428.00 | $1,800.00 | $1,809.00 | $1,809.00 | $4,177.73 |
| 0202 | Drilled pier foundation (7614100000-E) | CY | 108 | $2,433.00 | $2,715.00 | $2,713.00 | $2,713.00 | $2,295.15 |
| 0203 | Sign for signals (7636000000-N) | EACH | 8 | $861.00 | $765.00 | $769.00 | $769.00 | $812.43 |
| 0204 | Type I post with foundation (7642100000-N) | EACH | 8 | $3,144.00 | $2,965.00 | $2,962.00 | $2,962.00 | $2,966.52 |
| 0205 | Type II pedestal with foundation (7642200000-N) | EACH | 12 | $4,672.00 | $3,850.00 | $3,850.00 | $3,850.00 | $4,407.88 |
| 0206 | Signal cabinet foundation (7684000000-N) | EACH | 3 | $4,478.00 | $3,000.00 | $2,978.00 | $2,978.00 | $4,224.40 |
| 0207 | Contlrs with CBNT (**************) - (2070LX, base mounted) (7696000000-N) | EACH | 3 | $30,050 | $31,000 | $31,000 | $31,000 | $28,351 |
| 0208 | Cabinet base extender (7901000000-N) | EACH | 3 | $688.00 | $775.00 | $777.00 | $777.00 | $649.09 |
| 0209 | Metal pole foundation removal (7960000000-N) | EACH | 5 | $2,564.00 | $6,750.00 | $6,733.00 | $6,733.00 | $2,419.24 |
| 0210 | Metal pole removal (7972000000-N) | EACH | 5 | $1,429.00 | $2,350.00 | $2,349.00 | $2,349.00 | $1,348.03 |
| 0211 | Generic signal item (EA) - ethernet edge switch (7980000000-N) | EACH | 1 | $3,012.00 | $1,925.00 | $1,933.00 | $1,933.00 | $2,841.36 |
| 0212 | Generic signal item (EA) - microwave vehicle detection system - multiple zones (7980000000-N) | EACH | 18 | $17,260 | $15,000 | $15,000 | $15,000 | $16,282 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
Every contract let that day: NCDOT letting of April 21, 2026. Compiled by Mirage Metrics.