Lynches River Contracting Inc submitted 21 bids on North Carolina DOT contracts in the data, from 17 MAR 2015 to 16 JAN 2024, and was the low bidder on 11 of them (52%). When it was not low, its total sat a median +12% above the low bid.
- Owner
- North Carolina DOT
- Low bid volume
- $57,725,321
- Latest bid
- 16 JAN 2024
- Data through
- 20 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2015 | 4 | 2 | 50% |
| 2016 | 3 | 2 | 67% |
| 2017 | 3 | 2 | 67% |
| 2018 | 3 | 1 | 33% |
| 2019 | 3 | 2 | 67% |
| 2020 | 1 | 0 | 0% |
| 2021 | 2 | 2 | 100% |
| 2022 | 1 | 0 | 0% |
| 2024 | 1 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Union | 11 | 9 | 82% |
| Anson | 3 | 1 | 33% |
| Mecklenburg | 2 | 0 | 0% |
| Chatham | 1 | 0 | 0% |
| Davidson, Randolph | 1 | 0 | 0% |
| Cabarrus | 1 | 0 | 0% |
| Stanly, Anson | 1 | 0 | 0% |
| Union, Mecklenburg | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Borrow excavation | 0106000000-E | CY | 18 | 15 (83%) | $23.75 | $18.00 |
| Asphalt binder for plant mix | 1575000000-E | TON | 19 | 14 (74%) | $430.00 | $595.00 |
| Work zone advance/general warning signing | 4413000000-E | SF | 19 | 12 (63%) | $6.15 | $6.33 |
| Polyacrylamide (pam) | 6071020000-E | LB | 16 | 12 (75%) | $10.00 | $10.00 |
| Temporary silt fence | 6000000000-E | LF | 18 | 11 (61%) | $2.50 | $2.63 |
| Thermoplastic pavement marking lines (8", 90 mils) | 4695000000-E | LF | 15 | 11 (73%) | $2.15 | $2.25 |
| Thermoplastic pavement marking symbol (90 mils) | 4725000000-E | EACH | 17 | 10 (59%) | $150.00 | $135.00 |
| Sediment control stone | 6012000000-E | TON | 16 | 10 (63%) | $31.00 | $42.00 |
| Portland cement for soil cement base | 1187000000-E | TON | 12 | 10 (83%) | $153.50 | $177.00 |
| Incidental milling | 1330000000-E | SY | 20 | 9 (45%) | $9.05 | $12.00 |
| 6" concrete driveway | 2612000000-E | SY | 17 | 9 (53%) | $90.00 | $85.00 |
| Stone for erosion control, class B | 6009000000-E | TON | 16 | 9 (56%) | $35.00 | $49.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Blythe Construction Inc | 15 | 5 of 15 |
| J. T. Russell & Sons, Inc. | 13 | 4 of 13 |
| Blythe Brothers Asphalt Co LLC | 6 | 2 of 6 |
| The Lane Construction Corp | 4 | 1 of 4 |
| Barnhill Contracting Company | 3 | 2 of 3 |
| Hudson Paving, Inc. | 2 | 1 of 2 |
| FSC II LLC DBA Fred Smith Company | 1 | 1 of 1 |
| S T Wooten Corporation | 1 | 1 of 1 |
| Carolina Sunrock LLC | 1 | 0 of 1 |
| Vecellio & Grogan Inc DBA Sharpe Brothers | 1 | 1 of 1 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 16 JAN 2024 | C204903 | Chatham | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF US-421 N AND S, 1 SECTION OF US-15, AND 16 SECTIONS OF SECONDARY ROADS | 3 of 4 | $5,739,291 | +10% |
| 19 APR 2022 | C204703 | Davidson, Randolph | Pavement rehabilitation and bridge rehabilitiation. I-85 FROM NC-109 IN THOMASVILLE TO SR-1009 (SOUTH MAIN STREET) IN ARCHDALE. | 4 of 5 | $16,699,997 | +25% |
| 16 MAR 2021 | C204614 | Union | Milling, resurfacing, and shoulder grading. 12 SECTIONS OF SECONDARY ROADS. | 1 of 4 | $1,765,276 | Low, 4.0% under the second |
| 16 MAR 2021 | C204615 | Union | Milling, resurfacing, and shoulder grading. 2 SECTIONS OF NC-207 AND 19 SECTIONS OF SECONDARY ROADS. | 1 of 3 | $3,971,313 | Low, 10% under the second |
| 15 DEC 2020 | C204580 | Mecklenburg | Milling, resurfacing, and shoulder grading. 2 SECTIONS OF US-21, 3 SECTIONS OF NC-16, 1 SECTION OF NC-24/27, AND 15 SECTIONS OF SECONDARY RO | 5 of 5 | $5,075,373 | +30% |
| 19 MAR 2019 | C204313 | Union | Widening, milling,resurfacing, and shoulder reconstruction. 1 SECTION OF US-74, 1 SECTION OF NC-75, AND 22 SECTIONS OF SECONDARY ROADS. | 1 of 1 | $7,017,351 | Low |
| 19 MAR 2019 | C204320 | Union | Milling, resurfacing, and shoulder reconstruction. 40 SECTION OF SECONDARY ROADS. | 2 of 2 | $4,182,106 | +1.0% |
| 19 FEB 2019 | C204293 | Anson | Milling, resurfacing, and shoulder reconstruction. 1 SECTION OF US-52 NORTH, 1 SECTION OF US-74, AND 6 SECTIONS OF SECONDARY ROADS. | 1 of 3 | $3,581,606 | Low, 4.0% under the second |
| 15 MAY 2018 | C204166 | Union | Milling, resurfacing, and shoulder reconstruction. 28 SECTIONS OF SECONDARY ROADS. | 2 of 2 | $3,457,974 | +15% |
| 17 APR 2018 | C204159 | Mecklenburg | Milling, resurfacing, and shoulder reconstruction. 7 SECTIONS OF NC-51 AND 11 SECTIONS OF SECONDARY ROADS. | 2 of 4 | $6,579,120 | +9.0% |
| 17 APR 2018 | C204162 | Union | Milling, resurfacing, and shoulder reconstruction. 2 SECTIONS OF NC-75, 1 SECTION OF NC-200, AND 32 SECTIONS OF SECONDARY ROADS. | 1 of 2 | $9,744,183 | Low, 15% under the second |
| 21 MAR 2017 | C203997 | Union | Milling, resurfacing, widening, and shoulder reconstruction. US-601 FROM SR-1612 TO MILEPOST 22.4, US-601 FROM CABARRUS COUNTY LINE TO SR-15 | 1 of 4 | $4,290,360 | Low, 20% under the second |
| 21 MAR 2017 | C204000 | Union, Mecklenburg | Mill, resurf, widen, fd reclamation & shld reconstruction. 1 SECTION OF NC-75 AND 12 SECTIONS OF SECONDARY ROADS. | 1 of 3 | $5,914,791 | Low, 4.0% under the second |
| 17 JAN 2017 | C203966 | Anson | Milling, resurfacing, and shoulder reconstruction. 2 SECTIONS OF US-74, 1 SECTION OF NC-218, AND 6 SECTIONS OF SECONDARY ROADS. | 2 of 4 | $3,256,539 | +2.0% |
| 17 MAY 2016 | C203851 | Union | Milling, resurfacing, widening, shld reconst and const. 1 SECTION OF NC-16 AND 26 SECTIONS OF SECONDARY ROADS. | 1 of 4 | $3,945,494 | Low, 1.0% under the second |
| 19 APR 2016 | C203850 | Union | Milling,resurfacing, and shoulder reconstruction. 1 SECTION OF US-74, 1 SECTION OF NC-205, AND 20 SECTIONS OF SECONDARY ROADS. | 1 of 3 | $5,998,703 | Low, 11% under the second |
| 16 FEB 2016 | C203815 | Anson | Milling, resurfacing, shld reconstruction, and shld const. 1 SECTION OF US-52, 4 SECTIONS OF US-74, AND 23 SECTIONS OF SR ROADS. | 4 of 4 | $7,658,815 | +20% |
| 16 JUN 2015 | C203704 | Stanly, Anson | Milling, resurfacing, and shoulder reconstruction. 3 SECTIONS OF US-52, AND 8 SECTIONS OF SECONDARY ROADS. | 2 of 2 | $3,974,064 | +4.0% |
| 16 JUN 2015 | C203707 | Union | Milling, resurfacing, and shoulder reconstruction. SR-1005 FROM US-601S TO SR-1003 AND SR-1937 FROM SR-1003 TO 780' SOUTH OF SR-1947. | 1 of 2 | $2,676,550 | Low, 5.0% under the second |
| 21 APR 2015 | C203684 | Cabarrus | Milling, resurfacing, and shoulder reconstruction. NC-3 FROM SR-1691 TO SR-1008, US-29 FROM NC-73 TO SR-1414, AND 15 SECTIONS OF SECONDARY R | 4 of 5 | $5,782,950 | +14% |
| 17 MAR 2015 | C203644 | Union | Milling, widening, resurfacing & shoulder reconstruction. 5 SECTIONS OF US-74, 2 SECTIONS OF NC-200, 1 SECTION OF NC-207 AND 30 SECTIONS OF | 1 of 4 | $8,819,695 | Low, 13% under the second |
How this record was read
NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; NCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.