NCDOT letting results, November 21, 2023
13 contracts let by North Carolina DOT on November 21, 2023, $253,607,651 in low bids, a median of 4 bidders per contract.
- Owner
- North Carolina DOT
- Contracts
- 13
- Low bids, total
- $253,607,651
- Data through
- 20 OCT 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| C204471 | Grading, drainage, paving, signals and structures., grading, drainage, paving, signals, and structures. US-421 FROM EAST OF NC-16 TO US-421 BUS. | Wilkes | 2 | Branch Civil Inc | $81,185,000 | $81,293,350 | 0.0% | NCDOT |
| C204873 | Grading, drainage, paving, signals, and structures. I-95 AND US-70 BUSINESS (MARKET STREET), EXIT 95 INTERCHANGE FROM OUTLET CENTER DRIVE TO WEST OF YELVERTON G | Johnston | 5 | Zachry Construction Corporation | $38,317,295 | $38,403,357 | 0.0% | NCDOT |
| C204852 | Widening, grading, drainage, paving, and structures. SR-1100 (BRAWLEY SCHOOL RD) FROM I-77 TO US-21 | Iredell | 5 | The Lane Construction Corp | $34,788,496 | $39,603,731 | +14% | NCDOT |
| C204879 | Grading, drainage, paving, signals, and retaining walls., grading, drainage, paving, signals, and retaining walls. NC-66 (OLD HOLLOW ROAD) FROM HARLEY DRIVE TO | Forsyth | 5 | Yates Construction Co., Inc. | $27,921,302 | $28,485,000 | +2.0% | NCDOT |
| C204904 | Grading, drainage, paving, signals, and culvert. INTERSECTIONS OF US-64 / US-276 (HENDERSONVILLE HWY), AND US-64 / NC-280 (ASHEVILLE HWY). | Transylvania | 4 | Mountain Creek Contractors Inc | $20,388,187 | $22,245,056 | +9.0% | NCDOT |
| C204880 | Grading, drainage, paving, signals, and culverts. NEW ROAD WITH BICYCLE/PEDESTRIAN ACCOMMODATIONS FROM SR-1969 (PINEY GROVE ROAD) TO NC-150 (NORTH MAIN STREET). | Forsyth | 8 | Triangle Grading & Paving Inc | $10,745,693 | $11,688,215 | +9.0% | NCDOT |
| C204866 | Pavement rehabilitation and bridge preservation. I-140 FROM US-17 TO NORTH OF US-74. | Brunswick | 4 | Highland Paving Co LLC | $9,551,459 | $9,791,223 | +3.0% | NCDOT |
| C204906 | Milling, resurfacing, and shoulder reconstruction. 1 SECTION OF NC 109, 2 SECTIONS OF NC 8 AND 11 SECTIONS OF SECONDARY ROADS | Davidson | 2 | J. T. Russell & Sons, Inc. | $7,681,070 | $8,547,890 | +11% | NCDOT |
| C204902 | Bridge preservation. CAPE FEAR MEMORIAL BRIDGE. | New Hanover | 3 | Southern Road & Bridge LLC | $7,130,416 | $7,416,978 | +4.0% | NCDOT |
| C204907 | Milling, resurfacing, and shoulder reconstruction. 1 SECTION OF NC-54, 2 SECTIONS OF NC-98, AND 31 SECTIONS OF SECONDARY ROADS. | Durham, Person | 2 | Carolina Sunrock LLC | $4,642,321 | $4,891,926 | +5.0% | NCDOT |
| C204881 | Milling, resurfacing, and shoulder reconstruction. 1 SECTION EACH OF US-421, US-1, NC-87, AND NC-87 BYPASS, 4 SECTIONS OF RAMPS, AND 6 SECTIONS OF SECONDARY ROA | Lee | 4 | S T Wooten Corporation | $4,154,260 | $4,381,154 | +5.0% | NCDOT |
| C204905 | Milling, resurfacing, and shoulder reconstruction. 10 SECTIONS OF SECONDARY ROADS. | Alamance, Orange | 3 | Carolina Sunrock LLC | $3,783,925 | $3,849,238 | +2.0% | NCDOT |
| C204896 | Milling and resurfacing. 4 SECTIONS OF SECONDARY ROADS. | Wake | 4 | Carolina Sunrock LLC | $3,318,226 | $3,393,620 | +2.0% | NCDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than NCDOT received, the others did not match their published totals and are left out.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.