Thalle Construction Co., Inc.: NCDOT bid record
Thalle Construction Co., Inc. submitted 29 bids on North Carolina DOT contracts in the data, from 21 JAN 2014 to 15 JUL 2025, and was the low bidder on 4 of them (14%). When it was not low, its total sat a median +18% above the low bid.
- Owner
- North Carolina DOT
- Low bid volume
- $146,922,403
- Latest bid
- 15 JUL 2025
- Data through
- 20 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2014 | 3 | 0 | 0% |
| 2015 | 4 | 1 | 25% |
| 2016 | 3 | 0 | 0% |
| 2017 | 2 | 1 | 50% |
| 2018 | 5 | 1 | 20% |
| 2019 | 5 | 1 | 20% |
| 2022 | 2 | 0 | 0% |
| 2023 | 4 | 0 | 0% |
| 2025 | 1 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Guilford | 4 | 0 | 0% |
| Wake | 3 | 0 | 0% |
| Johnston | 2 | 0 | 0% |
| Alamance | 2 | 2 | 100% |
| Halifax | 2 | 0 | 0% |
| New Hanover, Pender | 1 | 0 | 0% |
| Beaufort, Martin | 1 | 0 | 0% |
| Brunswick | 1 | 0 | 0% |
| Lenoir | 1 | 1 | 100% |
| Carteret | 1 | 0 | 0% |
| Dare | 1 | 0 | 0% |
| Forsyth | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Temporary raised pavement markers | 4650000000-N | EACH | 25 | 16 (64%) | $7.00 | $9.00 |
| Thermoplastic pavement marking symbol (90 mils) | 4725000000-E | EACH | 25 | 15 (60%) | $135.00 | $135.00 |
| Paint pavement marking symbol | 4845000000-N | EACH | 22 | 15 (68%) | $52.50 | $50.00 |
| Barricades (type III) | 4445000000-E | LF | 29 | 14 (48%) | $25.00 | $24.30 |
| Paint pavement marking lines (4") | 4810000000-E | LF | 26 | 14 (54%) | $0.25 | $0.27 |
| Additional guardrail posts | 3150000000-N | EACH | 26 | 14 (54%) | $25.00 | $13.00 |
| Disposal of sign system, U-channel | 4155000000-N | EACH | 24 | 14 (58%) | $2.00 | $5.00 |
| Work zone signs (barricade mounted) | 4410000000-E | SF | 29 | 13 (45%) | $7.00 | $7.50 |
| Sign erection, type D | 4096000000-N | EACH | 24 | 13 (54%) | $125.00 | $125.00 |
| Asphalt conc surface course, type S9.5C | 1523000000-E | TON | 21 | 13 (62%) | $55.00 | $64.72 |
| Thermoplastic pavement marking lines (8", 90 mils) | 4695000000-E | LF | 19 | 13 (68%) | $2.00 | $2.25 |
| Specialized hand mowing | 6114500000-N | MHR | 29 | 12 (41%) | $60.00 | $64.75 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| W C English Incorporated | 15 | 4 of 15 |
| S T Wooten Corporation | 10 | 7 of 10 |
| Flatiron Constructors Inc | 10 | 6 of 10 |
| Barnhill Contracting Company | 9 | 7 of 9 |
| Branch Civil Inc | 8 | 5 of 8 |
| Blythe Construction Inc | 8 | 2 of 8 |
| FSC II LLC DBA Fred Smith Company | 8 | 4 of 8 |
| Conti Enterprises, Inc | 8 | 1 of 8 |
| Zachry Construction Corporation | 7 | 5 of 7 |
| Vecellio & Grogan Inc | 6 | 4 of 6 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 15 JUL 2025 | C205072 | New Hanover, Pender | GRADING, DRAINAGE, PAVING, AND STRUCTURES. US-17 (HAMPSTEAD BYPASS) FROM US-17 BYPASS SOUTH OF HAMPSTEAD TO NC-210 | 6 of 7 | $217,410,825 | +19% |
| 19 SEP 2023 | C204785 | Harnett | Grading, drainage, paving, signals, and culverts. NC-55 FROM SOUTH OF SR-1532 (OAK GROVE CHURCH RD) TO NC-210. | 5 of 5 | $60,703,368 | +25% |
| 15 AUG 2023 | C204872 | Chatham | Grading, drainage, and paving. CHATHAM PARKWAY FROM NORTH OF US-64 TO NORTH OF PROPOSED GRANT DRIVE. | 7 of 8 | $17,995,320 | +32% |
| 18 JUL 2023 | C204786 | Wake | Grading, drainage, paving, signals, and structures. US-401 AT SR-2044 (LIGON MILL RD)/SR-2224 (MITCHELL MILL RD) AND SR-2006 (PERRY CREEK RD | 2 of 4 | $51,571,558 | +14% |
| 16 MAY 2023 | C204570 | Columbus | Grading, drainage, paving, and structures. NC-87 AT NC-11 CONSTRUCT INTERCHANGE. | 6 of 6 | $51,865,465 | +44% |
| 21 JUN 2022 | C204110 | Cumberland | Grading, drainage, paving, signing, signals, and structures. FAYETTEVILLE OUTER LOOP FROM SOUTH OF SR-1003 (CAMDEN ROAD) TO SOUTH OF US-401. | 4 of 6 | $163,150,000 | +7.0% |
| 19 APR 2022 | C204498 | Beaufort, Martin | Grading, drainage, paving, and structure. US-17 FROM WASHINGTON BYPASS NORTH OF NC-171 TO MULTI-LANES SOUTH OF WILLIAMSTON. | 4 of 4 | $106,880,613 | +24% |
| 17 DEC 2019 | C204378 | Sampson | Grading, drainage, paving, signals, and structures. NC-24 FROM US-421/701 AND SR-1296 (SUNSET AVE) TO EAST OF SR-1935 (CECIL ODIE RD). | 4 of 8 | $29,297,192 | +19% |
| 19 NOV 2019 | C204351 | Wake | Grading, drainage, paving, its, and structures. I-40 AND SR-3015 (AIRPORT BLVD) INTERCHANGE AND I-40 WESTBOUND FROM SR-3015 (AIRPORT BLVD) T | 3 of 6 | $38,481,583 | +10% |
| 15 OCT 2019 | C204368 | Richmond | Grading, drainage, paving, and structures. I-73/74 FROM US-74 BYPASS WEST OF ROCKINGHAM AT SR-1109 (ZION CHURCH RD) TO NORTH OF SR-1304 (HAR | 5 of 5 | $172,132,633 | +18% |
| 16 JUL 2019 | C204210 | Northampton | Grading, drainage, paving, and structures. US-158/NC-46 FROM I-95/NC-46 IN ROANOKE RAPIDS TO SR-1312 (ST JOHN CHURCH ST). | 1 of 4 | $81,907,374 | Low, 8.0% under the second |
| 16 APR 2019 | C204078 | Orange | Grading, drainage, paving, and structure. BRIDGE #46 OVER ENO RIVER ON US-70 BYPASS. | 6 of 7 | $6,587,508 | +35% |
| 02 OCT 2018 | C204149 | Halifax | Grading, drainage, paving, signals, and structures. NC-125 FROM I-95 TO OLD FARM RD SOUTH; SR-1627 (THREE BRIDGE RD) FROM NC-125 TO PREMIER | 3 of 5 | $25,261,130 | +3.0% |
| 17 JUL 2018 | C204106 | Alamance | Grading, drainage, paving, and structure. NC-119 RELOCATION NORTH OF SR-1921 (MEBANE ROGERS RD) TO SOUTH OF SR-1918 (MRS WHITE RD). | 1 of 8 | $8,151,661 | Low, 9.0% under the second |
| 19 JUN 2018 | C204103 | Guilford | Grading, drainage, paving, signals, and structures. SR-1486/SR-4121 (GREENSBORO/HIGH POINT RD) FROM PROPOSED US-311 BYPASS TO WEST OF SR-148 | 5 of 7 | $62,128,773 | +11% |
| 20 MAR 2018 | C204096 | Guilford | Grading, drainage, paving, signals, its, and structures. GREENSBORO EASTERN LOOP FROM US-29 NORTH OF GREENSBORO TO SR-2303 (LAWNDALE DR). | 4 of 8 | $147,761,650 | +9.0% |
| 20 FEB 2018 | C204069 | Wake | Grading, drainage, paving, its, and structures. I-40 AND SR-1002 (AVIATION PARKWAY) INTERCHANGE. | 3 of 7 | $22,572,471 | +5.0% |
| 21 NOV 2017 | C203979 | Forsyth | Widen, grading, paving, drainage, signing, signals & strs. WINSTON-SALEM NORTHERN BELTWAY (EASTERN SECTION) FROM US-311 TO US-158 (FUTURE I- | 7 of 10 | $39,192,897 | +18% |
| 16 MAY 2017 | C203844 | Alamance | Grading, drainage, paving, signals & structures. NC-119 RELOCATION FROM I-40/85 TO SR-1921 (MEBANE ROGERS RD/ STAGE COACH RD). | 1 of 10 | $45,389,069 | Low, 3.0% under the second |
| 18 OCT 2016 | C203921 | Johnston | Grading, drainage, paving, and structure. NOVO NORDISK ACCESS ROAD FROM SR-1913 (GORDON ROAD) TO PROPOSED NOVO NORDISK SITE. | 5 of 9 | $6,734,252 | +10% |
| 20 SEP 2016 | C203792 | Guilford | Grading, drainage, paving, its, signals & structures. GREENSBORO WESTERN LOOP - FROM US-220 (BATTLEGROUND AVENUE) TO SR-2303 (LAWNDALE DRIVE | 5 of 8 | $67,449,297 | +16% |
| 19 JUL 2016 | C203749 | Halifax | Grading, drainage, paving, & structure. BRIDGE #29 OVER LITTLE FISHING CREEK ON NC-561. | 6 of 6 | $2,989,146 | +17% |
| 17 NOV 2015 | C203658 | Johnston | Grading, drainage, paving, structure, & signals. BRIDGES #114 AND 116 OVER LITTLE RIVER ON I-95. | 5 of 8 | $14,632,914 | +19% |
| 20 OCT 2015 | C203756 | Dare | Grading, drainage, paving & structure. NC-12 - SHORT-TERM IMPROVEMENTS AT PEA ISLAND (PHASE II). | 7 of 8 | $26,498,111 | +58% |
| 21 APR 2015 | C203563 | Carteret | Grading, drainage, paving, and structures. BRIDGE #33 OVER NORTH RIVER ON US-70. | 2 of 6 | $17,910,125 | +26% |
How this record was read
NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; NCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.