NCDOT contract C205072 bid tabulation
GRADING, DRAINAGE, PAVING, AND STRUCTURES. US-17 (HAMPSTEAD BYPASS) FROM US-17 BYPASS SOUTH OF HAMPSTEAD TO NC-210. Let by North Carolina DOT on July 15, 2025, New Hanover, Pender. 7 bids received; low bid $182,389,503 by S T Wooten Corporation.
- Owner
- North Carolina DOT
- Letting
- 15 JUL 2025
- Pay items
- 306
- Data through
- 20 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | S T Wooten Corporation | $182,389,503 | Low |
| 2 | Branch Civil Inc | $186,385,000 | +2.0% |
| 3 | Balfour Beatty Infrastructure Inc | $196,998,911 | +8.0% |
| 4 | Conti Civil LLC | $203,895,442 | +12% |
| 5 | Flatiron Dragados Constructors Inc | $208,288,505 | +14% |
| 6 | Thalle Construction Co., Inc. | $217,410,825 | +19% |
| 7 | Webber LLC | $232,738,441 | +28% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. S T Wooten Corporation | 2. Branch Civil Inc | 3. Balfour Beatty Infrastructure Inc | 4. Conti Civil LLC | 5. Flatiron Dragados Constructors Inc | 6. Thalle Construction Co., Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Mobilization (0000100000-N) | LS | 1 | $9,125,000 | $9,000,000 | $9,879,030 | $10,150,000 | $10,416,000 | $11,220,410 |
| 0002 | Construction surveying (0000400000-N) | LS | 1 | $6,450,000 | $2,500,000 | $7,880,246 | $2,575,000 | $394,000 | $1,000,000 |
| 0003 | Clearing & grubbing (0001000000-E) | LS | 1 | $37,000,000 | $18,000,000 | $44,295,878 | $69,004,789 | $69,000,000 | $4,905,000 |
| 0004 | Supplementary clearing & grubbing (0008000000-E) | ACRE | 5 | $9,000.00 | $15,900 | $15,000 | $9,000.00 | $9,500.00 | $12,000 |
| 0005 | Unclassified excavation (0022000000-E) | CY | 59,000 | $20.00 | $20.00 | $3.22 | $10.50 | $25.00 | $33.00 |
| 0006 | Undercut excavation (0036000000-E) | CY | 63,517 | $8.52 | $10.00 | $40.62 | $24.00 | $25.00 | $10.00 |
| 0007 | Wick drains (0084000000-E) | LF | 165,000 | $0.64 | $1.25 | $0.68 | $0.67 | $1.40 | $1.40 |
| 0008 | Borrow excavation (0106000000-E) | CY | 3,348,000 | $0.01 | $9.50 | $0.01 | $0.01 | $0.01 | $13.25 |
| 0009 | Embankment settlement gauges (0127000000-N) | EACH | 38 | $2,500.00 | $2,600.00 | $1,064.40 | $850.00 | $650.00 | $7,000.00 |
| 0010 | Drainage ditch excavation (0134000000-E) | CY | 39,550 | $5.00 | $5.75 | $6.90 | $16.00 | $20.00 | $20.00 |
| 0011 | Removal of existing asphalt pavement (0156000000-E) | SY | 15,600 | $4.00 | $7.50 | $7.47 | $7.75 | $7.50 | $12.00 |
| 0012 | Breaking of existing asphalt pavement (0177000000-E) | SY | 5,700 | $4.00 | $4.50 | $6.84 | $3.90 | $5.00 | $8.00 |
| 0013 | Proof rolling (0192000000-N) | HR | 90 | $450.00 | $170.00 | $380.83 | $165.00 | $500.00 | $400.00 |
| 0014 | Select granular material, class III (0194000000-E) | CY | 111,750 | $0.01 | $26.00 | $0.01 | $0.25 | $0.01 | $200.00 |
| 0015 | Geotextile for soil stabilization (0196000000-E) | SY | 66,450 | $3.00 | $2.50 | $3.31 | $3.90 | $3.00 | $5.00 |
| 0016 | Temporary shoring (0199000000-E) | SF | 6,420 | $60.00 | $90.50 | $85.66 | $82.00 | $95.00 | $100.00 |
| 0017 | Generic grading item (SY) - geotextile for wick drain (0241000000-E) | SY | 7,500 | $4.50 | $1.25 | $2.67 | $3.60 | $3.00 | $4.00 |
| 0018 | Generic grading item (LS) - type 1 bridge approach fill, station 225+92.26 -L1- (0248000000-N) | LS | 1 | $120,000 | $200,000 | $186,812 | $103,000 | $120,000 | $150,000 |
| 0019 | Generic grading item (LS) - type 1 bridge approach fill, station 23+28.17 -Y35- (0248000000-N) | LS | 1 | $91,000 | $150,000 | $112,816 | $90,000 | $65,000 | $115,000 |
| 0020 | Generic grading item (LS) - type 1 bridge approach fill, station 232+80.54 -L1- LT (0248000000-N) | LS | 1 | $111,000 | $175,000 | $161,589 | $61,500 | $100,000 | $145,000 |
| 0021 | Generic grading item (LS) - type 1 bridge approach fill, station 232+80.54 -L1- RT (0248000000-N) | LS | 1 | $106,000 | $175,000 | $143,598 | $71,000 | $90,000 | $135,000 |
| 0022 | Generic grading item (LS) - type 1 bridge approach fill, station 24+28.73 -Y34- (0248000000-N) | LS | 1 | $117,000 | $200,000 | $168,968 | $80,000 | $100,000 | $145,000 |
| 0023 | Generic grading item (LS) - type 1 bridge approach fill, station 31+84.73 -Y33RPCA- (0248000000-N) | LS | 1 | $134,000 | $150,000 | $92,619 | $105,000 | $115,000 | $120,000 |
| 0024 | Generic grading item (LS) - type 1 bridge approach fill, station 384+20.26 -L1- LT (0248000000-N) | LS | 1 | $121,600 | $200,000 | $180,598 | $55,000 | $115,000 | $155,000 |
| 0025 | Generic grading item (LS) - type 1 bridge approach fill, station 384+20.26 -L1- RT (0248000000-N) | LS | 1 | $131,000 | $200,000 | $179,367 | $43,000 | $120,000 | $155,000 |
| 0026 | Generic grading item (LS) - type 1 bridge approach fill, station 427+46.10 -L1- LT (0248000000-N) | LS | 1 | $125,000 | $200,000 | $194,637 | $45,000 | $120,000 | $160,000 |
| 0027 | Generic grading item (LS) - type 1 bridge approach fill, station 427+46.16 -L1- RT (0248000000-N) | LS | 1 | $117,500 | $200,000 | $184,361 | $38,000 | $100,000 | $156,000 |
| 0028 | Generic grading item (TON) - select material for wick drain (0255000000-E) | TON | 9,800 | $25.00 | $14.25 | $20.94 | $20.00 | $45.00 | $110.00 |
| 0029 | Foundation conditioning material, minor structures (0318000000-E) | TON | 2,650 | $50.00 | $101.00 | $99.79 | $6.40 | $110.00 | $120.00 |
| 0030 | FND condit geotextile (4A) (0321000000-E) | SY | 8,340 | $6.00 | $3.25 | $4.47 | $3.20 | $3.50 | $4.00 |
| 0031 | 15" drainage pipe (0335200000-E) | LF | 88 | $80.00 | $68.00 | $73.55 | $48.00 | $135.00 | $75.00 |
| 0032 | 18" drainage pipe (0335300000-E) | LF | 2,060 | $80.00 | $59.50 | $71.70 | $53.25 | $140.00 | $75.00 |
| 0033 | 24" drainage pipe (0335400000-E) | LF | 272 | $145.00 | $66.50 | $123.60 | $70.35 | $145.00 | $100.00 |
| 0034 | **" drainage pipe elbow - (18") (0335850000-E) | EACH | 44 | $535.00 | $265.00 | $894.18 | $448.00 | $400.00 | $600.00 |
| 0035 | **" drainage pipe elbow - (24") (0335850000-E) | EACH | 2 | $930.00 | $473.00 | $1,339.34 | $533.00 | $550.00 | $700.00 |
| 0036 | ***" RCP culv class IV - (48") (0448000000-E) | LF | 1,444 | $325.00 | $322.00 | $351.96 | $316.00 | $450.00 | $400.00 |
| 0037 | ***" RCP culv class IV - (54") (0448000000-E) | LF | 1,348 | $450.00 | $453.00 | $472.16 | $435.00 | $550.00 | $500.00 |
| 0038 | ***" RCP culv class IV - (60") (0448000000-E) | LF | 400 | $520.00 | $532.00 | $580.19 | $531.00 | $750.00 | $650.00 |
| 0039 | ***" RCP culv class IV - (72") (0448000000-E) | LF | 352 | $750.00 | $772.00 | $1,053.34 | $767.50 | $999.00 | $1,000.00 |
| 0040 | 15" RC pipe culverts, class IV (0448200000-E) | LF | 580 | $73.15 | $80.50 | $77.80 | $66.50 | $110.00 | $85.00 |
| 0041 | 18" RC pipe culverts, class IV (0448300000-E) | LF | 8,892 | $91.00 | $92.50 | $94.06 | $78.00 | $140.00 | $120.00 |
| 0042 | 24" RC pipe culverts, class IV (0448400000-E) | LF | 3,380 | $116.00 | $126.00 | $113.55 | $108.25 | $195.00 | $150.00 |
| 0043 | 30" RC pipe culverts, class IV (0448500000-E) | LF | 744 | $152.00 | $170.00 | $155.50 | $146.00 | $275.00 | $200.00 |
| 0044 | 36" RC pipe culverts, class IV (0448600000-E) | LF | 4,668 | $197.00 | $204.00 | $216.73 | $202.00 | $300.00 | $250.00 |
| 0045 | 42" RC pipe culverts, class IV (0448700000-E) | LF | 368 | $253.00 | $257.00 | $279.68 | $251.00 | $380.00 | $300.00 |
| 0046 | **" RC pipe culv class V - (24") (0449000000-E) | LF | 396 | $133.00 | $137.00 | $99.36 | $122.50 | $195.00 | $150.00 |
| 0047 | **"WLD STL pipe grad B in soil - (24", 0.500") (0973100000-E) | LF | 52 | $1,400.00 | $1,200.00 | $817.79 | $850.00 | $1,800.00 | $700.00 |
| 0048 | **"WLD STL pipe grad B in soil - (60", 0.875") (0973100000-E) | LF | 92 | $4,500.00 | $3,500.00 | $2,461.83 | $2,800.00 | $3,850.00 | $2,800.00 |
| 0049 | **"WLD STL pipe grad B not in soil - (24", 0.500") (0973300000-E) | LF | 52 | $0.01 | $0.01 | $92.80 | $1.00 | $0.01 | $1,900.00 |
| 0050 | **"WLD STL pipe grad B not in soil - (60", 0.875") (0973300000-E) | LF | 92 | $0.01 | $0.01 | $76.84 | $1.00 | $0.01 | $7,600.00 |
| 0051 | Pipe removal (0995000000-E) | LF | 1,479 | $25.00 | $28.00 | $48.88 | $30.00 | $25.00 | $31.00 |
| 0052 | 6" slope protection (1000000000-E) | SY | 680 | $155.00 | $378.00 | $189.53 | $281.53 | $265.00 | $210.00 |
| 0053 | Fine grading (1011000000-N) | LS | 1 | $21,750,000 | $11,500,000 | $1,527,534 | $2,920,000 | $3,136,000 | $3,250,000 |
| 0054 | Shallow undercut (1099500000-E) | CY | 1,000 | $30.00 | $14.75 | $18.35 | $34.41 | $25.00 | $38.00 |
| 0055 | Class IV subgrade stabilization (1099700000-E) | TON | 1,950 | $70.00 | $77.00 | $70.51 | $50.00 | $85.00 | $80.00 |
| 0056 | Class IV aggregate stabilization (1111000000-E) | TON | 8,500 | $65.00 | $79.50 | $74.28 | $50.00 | $83.00 | $83.00 |
| 0057 | Geotextile for subgrade stabilization (1112000000-E) | SY | 3,000 | $5.00 | $4.25 | $4.79 | $4.70 | $3.50 | $2.50 |
| 0058 | Aggregate base course (1121000000-E) | TON | 125,000 | $70.00 | $70.00 | $71.76 | $80.50 | $80.00 | $100.00 |
| 0059 | Incidental stone base (1220000000-E) | TON | 10,000 | $75.00 | $72.00 | $91.95 | $97.75 | $80.00 | $80.00 |
| 0060 | Shoulder reconstruction (1245000000-E) | SMI | 10 | $9,000.00 | $7,700.00 | $6,097.68 | $7,300.00 | $6,500.00 | $4,100.00 |
| 0061 | Mill asp PVMT *****" DTH - (1-1/2") (1297000000-E) | SY | 32,250 | $1.75 | $1.75 | $1.72 | $3.70 | $2.75 | $2.75 |
| 0062 | Mill asp PVMT *****" DTH - (3") (1297000000-E) | SY | 2,300 | $4.50 | $4.75 | $4.27 | $9.55 | $6.00 | $5.60 |
| 0063 | Incidental milling (1330000000-E) | SY | 2,000 | $8.00 | $8.00 | $6.95 | $19.00 | $8.50 | $6.25 |
| 0064 | Asphalt conc base course, type B25.0C (1491000000-E) | TON | 73,500 | $96.00 | $77.00 | $70.00 | $74.25 | $71.00 | $71.00 |
| 0065 | Asphalt conc intermediate course, type I19.0C (1503000000-E) | TON | 83,000 | $92.00 | $79.00 | $73.00 | $77.50 | $74.00 | $74.00 |
| 0066 | Asphalt conc surface course, type S9.5B (1519000000-E) | TON | 5,000 | $108.00 | $100.00 | $92.00 | $97.50 | $93.00 | $93.00 |
| 0067 | Asphalt conc surface course, type S9.5C (1523000000-E) | TON | 70,000 | $95.00 | $90.00 | $82.00 | $87.00 | $85.00 | $83.00 |
| 0068 | Asphalt binder for plant mix (1575000000-E) | TON | 11,750 | $450.00 | $660.00 | $610.00 | $647.00 | $617.00 | $616.00 |
| 0069 | Asphalt plant mix, pavement repair (1693000000-E) | TON | 800 | $300.00 | $295.00 | $348.53 | $191.00 | $182.00 | $180.00 |
| 0070 | Generic paving item (LF) 665 - milled rumble strips (asphalt concrete), 16" (1841000000-E) | LF | 141,425 | $0.26 | $0.45 | $0.16 | $0.30 | $0.38 | $0.31 |
| 0071 | Subdrain excavation (2022000000-E) | CY | 1,646 | $35.00 | $41.00 | $36.38 | $60.00 | $34.23 | $12.00 |
| 0072 | Geotextile for subsurface drains (2026000000-E) | SY | 4,900 | $12.00 | $14.00 | $2.30 | $0.65 | $5.70 | $2.50 |
| 0073 | Subdrain coarse aggregate (2036000000-E) | CY | 823 | $85.00 | $99.50 | $187.12 | $125.00 | $77.58 | $150.00 |
| 0074 | 6" perforated subdrain pipe (2044000000-E) | LF | 4,900 | $17.00 | $20.00 | $14.45 | $6.50 | $17.11 | $10.00 |
| 0075 | Subdrain pipe outlet (2070000000-N) | EACH | 10 | $400.00 | $469.00 | $1,693.58 | $400.00 | $330.88 | $650.00 |
| 0076 | 6" outlet pipe (2077000000-E) | LF | 60 | $40.00 | $47.00 | $46.07 | $23.00 | $54.77 | $60.00 |
| 0077 | Endwalls (2209000000-E) | CY | 77.10 | $1,400.00 | $1,600.00 | $2,175.44 | $1,280.00 | $1,500.00 | $2,200.00 |
| 0078 | Reinforced endwalls (2220000000-E) | CY | 57.40 | $2,600.00 | $1,200.00 | $1,863.45 | $2,025.00 | $2,500.00 | $1,300.00 |
| 0079 | Flowable fill (2275000000-E) | CY | 20 | $100.00 | $1,200.00 | $409.65 | $510.00 | $350.00 | $550.00 |
| 0080 | Masonry drainage structures (2286000000-N) | EACH | 158 | $4,000.00 | $6,400.00 | $4,358.27 | $2,850.00 | $4,500.00 | $3,400.00 |
| 0081 | Masonry drainage structures (2297000000-E) | CY | 11.61 | $3,000.00 | $5,000.00 | $3,607.52 | $2,985.00 | $3,500.00 | $2,200.00 |
| 0082 | Masonry drainage structures (2308000000-E) | LF | 109.10 | $1,000.00 | $470.00 | $353.41 | $533.00 | $850.00 | $375.00 |
| 0083 | Frame with two grates, STD 840.16 (2364000000-N) | EACH | 1 | $1,400.00 | $998.00 | $1,071.77 | $1,098.00 | $1,500.00 | $1,100.00 |
| 0084 | Frame with two grates, STD 840.20 (2364200000-N) | EACH | 42 | $1,300.00 | $1,100.00 | $977.85 | $986.00 | $1,400.00 | $1,350.00 |
| 0085 | Frame with two grates, STD 840.22 (2365000000-N) | EACH | 71 | $1,385.00 | $1,100.00 | $3,960.03 | $2,400.00 | $1,400.00 | $1,350.00 |
| 0086 | Frame with two grates, STD 840.24 (2366000000-N) | EACH | 6 | $1,375.00 | $1,200.00 | $996.45 | $2,400.00 | $1,500.00 | $1,350.00 |
| 0087 | Frame with two grates, STD 840.29 (2367000000-N) | EACH | 26 | $1,400.00 | $1,100.00 | $2,468.94 | $985.00 | $1,400.00 | $1,350.00 |
| 0088 | Frame-GRT-HD 840.03 ** - (E) (2374000000-N) | EACH | 1 | $1,410.00 | $1,300.00 | $1,183.56 | $1,330.00 | $1,750.00 | $1,350.00 |
| 0089 | Frame with cover, STD 840.54 (2396000000-N) | EACH | 9 | $761.00 | $954.00 | $780.42 | $850.00 | $1,250.00 | $1,200.00 |
| 0090 | Steel frame with two grates, STD 840.37 (2407000000-N) | EACH | 5 | $3,700.00 | $3,500.00 | $3,643.76 | $3,035.00 | $3,800.00 | $3,500.00 |
| 0091 | Generic drainage item (EA) - 30" pipe endwall with load carrying grate (2473000000-N) | EACH | 1 | $12,000 | $11,700 | $16,227 | $12,045 | $15,000 | $21,100 |
| 0092 | Generic drainage item (EA) - 36" pipe endwall with load carrying grate (2473000000-N) | EACH | 21 | $17,000 | $14,600 | $20,439 | $14,925 | $17,000 | $26,000 |
| 0093 | Generic drainage item (EA) - 48" pipe endwall with load carrying grate (2473000000-N) | EACH | 1 | $29,000 | $20,200 | $35,602 | $24,450 | $25,000 | $45,000 |
| 0094 | 2'-6" concrete curb & gutter (2549000000-E) | LF | 1,500 | $30.00 | $33.50 | $32.13 | $34.75 | $40.00 | $30.00 |
| 0095 | Shoulder berm gutter (2556000000-E) | LF | 16,700 | $30.25 | $34.00 | $32.40 | $35.00 | $35.00 | $31.00 |
| 0096 | Precast reinforced concrete barrier, single faced (2724000000-E) | LF | 560 | $275.00 | $150.00 | $163.97 | $214.00 | $250.00 | $101.00 |
| 0097 | Impact attenuator units, type TL-3 (3001000000-N) | EACH | 8 | $10,400 | $16,700 | $22,750 | $24,375 | $10,505 | $26,550 |
| 0098 | Steel beam guardrail (3030000000-E) | LF | 31,075 | $22.25 | $25.50 | $22.00 | $23.50 | $22.47 | $23.00 |
| 0099 | Steel beam guardrail terminal sections (3105000000-N) | EACH | 4 | $75.00 | $278.00 | $250.00 | $265.00 | $75.76 | $260.00 |
| 0100 | Additional guardrail posts (3150000000-N) | EACH | 10 | $55.00 | $72.00 | $50.00 | $53.50 | $55.56 | $52.00 |
| 0101 | Guardrail end units, type cat-1 (3210000000-N) | EACH | 36 | $950.00 | $1,100.00 | $900.00 | $965.00 | $960.00 | $950.00 |
| 0102 | Guardrail end units, type TL-3 (3287000000-N) | EACH | 50 | $3,100.00 | $3,600.00 | $3,100.00 | $3,320.00 | $3,132.00 | $3,300.00 |
| 0103 | Guardrail end units, type TL-2 (3288000000-N) | EACH | 2 | $3,000.00 | $3,400.00 | $3,050.00 | $3,265.00 | $3,030.00 | $3,200.00 |
| 0104 | Guardrail anchor units, type B-77 (3317000000-N) | EACH | 56 | $2,480.00 | $2,700.00 | $2,700.00 | $2,890.00 | $2,505.00 | $2,900.00 |
| 0105 | Remove & reset existing guardrail (3345000000-E) | LF | 405 | $4.50 | $13.25 | $8.00 | $8.55 | $4.55 | $8.20 |
| 0106 | Remove existing guardrail (3360000000-E) | LF | 67.50 | $2.00 | $1.00 | $4.00 | $4.25 | $2.00 | $4.10 |
| 0107 | Remove existing guiderail (3365000000-E) | LF | 992 | $1.00 | $4.50 | $2.00 | $2.10 | $1.00 | $2.10 |
| 0108 | Cable guiderail (3389200000-E) | LF | 33,200 | $12.75 | $14.86 | $12.25 | $13.10 | $12.88 | $13.00 |
| 0109 | Additional guiderail posts (3389500000-N) | EACH | 10 | $88.00 | $111.00 | $65.00 | $69.50 | $88.89 | $66.50 |
| 0110 | Cable guiderail anchor units (3389600000-N) | EACH | 46 | $2,500.00 | $3,300.00 | $3,800.00 | $4,070.00 | $2,525.25 | $4,100.00 |
| 0111 | Woven wire fence, 47" fabric (3503000000-E) | LF | 74,375 | $5.50 | $6.00 | $5.50 | $5.30 | $5.10 | $6.10 |
| 0112 | 4" timber fence posts, 7'-6" long (3509000000-E) | EACH | 5,010 | $39.00 | $44.00 | $39.00 | $45.00 | $43.00 | $40.00 |
| 0113 | 5" timber fence posts, 8'-0" long (3515000000-E) | EACH | 580 | $49.00 | $55.00 | $49.00 | $51.50 | $49.00 | $50.00 |
| 0114 | Rip rap, class I (3628000000-E) | TON | 3,325 | $105.00 | $151.00 | $132.41 | $144.00 | $155.00 | $150.00 |
| 0115 | Rip rap, class II (3635000000-E) | TON | 300 | $106.00 | $184.00 | $132.41 | $133.00 | $185.00 | $150.00 |
| 0116 | Rip rap, class B (3649000000-E) | TON | 4,000 | $101.00 | $151.00 | $124.73 | $128.50 | $135.00 | $140.00 |
| 0117 | Geotextile for drainage (3656000000-E) | SY | 18,255 | $5.00 | $2.50 | $3.56 | $3.05 | $4.00 | $6.00 |
| 0118 | Reinforced concrete sign foundations (4048000000-E) | CY | 34 | $1,000.00 | $1,100.00 | $1,000.00 | $1,080.00 | $1,127.00 | $1,035.00 |
| 0119 | Plain concrete sign foundations (4054000000-E) | CY | 3 | $10.00 | $11.25 | $10.00 | $10.80 | $12.00 | $10.50 |
| 0120 | Overhead footing (4057000000-E) | CY | 418 | $150.00 | $170.00 | $150.00 | $162.25 | $170.00 | $155.00 |
| 0121 | Supports, breakaway steel beam (4060000000-E) | LB | 33,005 | $6.50 | $7.50 | $6.50 | $7.00 | $7.40 | $6.70 |
| 0122 | Supports, simple steel beam (4066000000-E) | LB | 2,855 | $8.50 | $9.75 | $8.50 | $9.20 | $9.60 | $9.00 |
| 0123 | Supports, 3-LB steel U-channel (4072000000-E) | LF | 3,518 | $12.00 | $13.75 | $12.00 | $13.00 | $13.50 | $13.00 |
| 0124 | Sign erection, type D (4096000000-N) | EACH | 5 | $200.00 | $227.00 | $200.00 | $216.50 | $226.00 | $210.00 |
| 0125 | Sign erection, type E (4102000000-N) | EACH | 106 | $75.00 | $85.00 | $75.00 | $81.20 | $85.00 | $78.00 |
| 0126 | Sign erection, type F (4108000000-N) | EACH | 23 | $200.00 | $227.00 | $200.00 | $216.50 | $226.00 | $210.00 |
| 0127 | Sign erection, type *** (ovrhd) - (A) (4109000000-N) | EACH | 46 | $2,200.00 | $2,500.00 | $2,200.00 | $2,380.00 | $2,480.00 | $2,300.00 |
| 0128 | Sign erection, type *** (ovrhd) - (B) (4109000000-N) | EACH | 18 | $1,000.00 | $1,100.00 | $1,000.00 | $1,082.50 | $1,127.00 | $1,035.00 |
| 0129 | Sign erection, type *** (GRD MTD) - (A) (4110000000-N) | EACH | 39 | $1,000.00 | $1,100.00 | $1,000.00 | $1,082.50 | $1,127.00 | $1,035.00 |
| 0130 | Sign erection, type *** (GRD MTD) - (B) (4110000000-N) | EACH | 16 | $500.00 | $568.00 | $500.00 | $541.25 | $565.00 | $516.00 |
| 0131 | Sign erection, milemarkers (4114000000-N) | EACH | 50 | $100.00 | $114.00 | $100.00 | $108.25 | $113.00 | $104.00 |
| 0132 | Sign erection, overlay (overhead) (4115000000-N) | EACH | 12 | $500.00 | $568.00 | $500.00 | $541.25 | $564.00 | $520.00 |
| 0133 | Sign erection, overlay (ground mounted) (4116000000-N) | EACH | 1 | $500.00 | $568.00 | $500.00 | $541.25 | $564.00 | $520.00 |
| 0134 | Sign erect, reloc ** GRD MTD - (D) (4116100000-N) | EACH | 1 | $350.00 | $398.00 | $350.00 | $378.75 | $395.00 | $365.00 |
| 0135 | Support, ovrhd sign STR ***** - (100+00 -Y33-) (4130000000-N) | LS | 1 | $210,000 | $239,000 | $210,000 | $227,000 | $236,650 | $220,000 |
| 0136 | Support, ovrhd sign STR ***** - (150+00 -L-) (4130000000-N) | LS | 1 | $172,000 | $195,000 | $172,000 | $186,000 | $193,630 | $180,000 |
| 0137 | Support, ovrhd sign STR ***** - (18+36 -Y33RPCA-) (4130000000-N) | LS | 1 | $210,000 | $239,000 | $210,000 | $227,000 | $236,652 | $220,000 |
| 0138 | Support, ovrhd sign STR ***** - (201+77 -L-) (4130000000-N) | LS | 1 | $255,000 | $290,000 | $255,000 | $276,000 | $267,364 | $300,000 |
| 0139 | Support, ovrhd sign STR ***** - (222+94 -L1-) (4130000000-N) | LS | 1 | $196,000 | $223,000 | $196,000 | $212,000 | $220,875 | $220,000 |
| 0140 | Support, ovrhd sign STR ***** - (246+00 -L1-) (4130000000-N) | LS | 1 | $234,000 | $266,000 | $234,000 | $253,000 | $263,698 | $250,000 |
| 0141 | Support, ovrhd sign STR ***** - (246+70 -L1-) (4130000000-N) | LS | 1 | $194,000 | $220,000 | $194,000 | $210,000 | $218,621 | $200,000 |
| 0142 | Support, ovrhd sign STR ***** - (259+88 -L1-) (4130000000-N) | LS | 1 | $173,000 | $197,000 | $173,000 | $187,000 | $194,956 | $181,000 |
| 0143 | Support, ovrhd sign STR ***** - (36+80 -Y33-) (4130000000-N) | LS | 1 | $173,000 | $197,000 | $173,000 | $187,000 | $194,956 | $180,000 |
| 0144 | Support, ovrhd sign STR ***** - (48+15 -Y33-) (4130000000-N) | LS | 1 | $184,000 | $209,000 | $184,000 | $199,000 | $207,352 | $190,000 |
| 0145 | Support, ovrhd sign STR ***** - (52+00 -Y33-) (4130000000-N) | LS | 1 | $94,000 | $107,000 | $94,000 | $102,000 | $105,930 | $100,000 |
| 0146 | Disposal of sign system, steel beam (4152000000-N) | EACH | 16 | $500.00 | $568.00 | $500.00 | $540.00 | $564.00 | $520.00 |
| 0147 | Disposal of sign system, U-channel (4155000000-N) | EACH | 20 | $1.00 | $1.25 | $1.00 | $1.05 | $1.00 | $2.00 |
| 0148 | Disposal of sign system, wood (4158000000-N) | EACH | 2 | $1.00 | $1.25 | $1.00 | $1.05 | $1.00 | $2.00 |
| 0149 | Disposal of support, U-channel (4192000000-N) | EACH | 1 | $1.00 | $1.25 | $1.00 | $1.05 | $1.00 | $2.00 |
| 0150 | Disposal of sign, A or B (overhead) (4234000000-N) | EACH | 41 | $100.00 | $114.00 | $100.00 | $108.25 | $113.00 | $105.00 |
| 0151 | Disposal of sign, D, E or F (4238000000-N) | EACH | 3 | $1.00 | $1.25 | $1.00 | $1.05 | $1.00 | $2.00 |
| 0152 | Disposal of sign, milemarker (4238500000-N) | EACH | 20 | $1.00 | $1.25 | $1.00 | $1.05 | $1.00 | $2.00 |
| 0153 | Disposal of lighting system (4251000000-N) | EACH | 4 | $2,000.00 | $2,300.00 | $2,000.00 | $8,700.00 | $2,254.00 | $2,100.00 |
| 0154 | Generic signing item (EA) - vertical panel type 3 object marker - OM3-C (4360000000-N) | EACH | 1 | $600.00 | $682.00 | $600.00 | $650.00 | $677.00 | $620.00 |
| 0155 | Work zone signs (stationary) (4400000000-E) | SF | 608 | $9.00 | $9.00 | $6.35 | $6.75 | $7.10 | $7.00 |
| 0156 | Work zone signs (portable) (4405000000-E) | SF | 404 | $26.00 | $9.25 | $29.06 | $21.20 | $12.65 | $13.00 |
| 0157 | Work zone signs (barricade mounted) (4410000000-E) | SF | 192 | $8.50 | $9.00 | $6.75 | $7.20 | $7.10 | $7.00 |
| 0158 | Flashing arrow board (4415000000-N) | EACH | 2 | $2,900.00 | $2,600.00 | $4,622.38 | $3,000.00 | $2,500.00 | $2,050.00 |
| 0159 | Portable changeable message sign (4420000000-N) | EACH | 5 | $11,225 | $10,100 | $26,840 | $10,500 | $8,000.00 | $7,700.00 |
| 0160 | Drums (4430000000-N) | EACH | 350 | $55.00 | $49.50 | $67.40 | $57.00 | $44.00 | $42.00 |
| 0161 | Barricades (type III) (4445000000-E) | LF | 592 | $23.50 | $24.50 | $36.53 | $23.50 | $27.00 | $26.00 |
| 0162 | Flagger (4455000000-N) | DAY | 90 | $500.00 | $1,600.00 | $517.77 | $450.12 | $1,400.00 | $332.00 |
| 0163 | Temporary crash cushions (4465000000-N) | EACH | 8 | $16,000 | $10,600 | $9,532.82 | $10,100 | $9,650.00 | $2,245.00 |
| 0164 | Remove & reset temporary crash cushion (4470000000-N) | EACH | 3 | $3,545.00 | $3,900.00 | $3,512.09 | $3,725.00 | $3,550.00 | $1,800.00 |
| 0165 | TMA (4480000000-N) | EACH | 3 | $35,000 | $13,500 | $20,400 | $33,500 | $35,000 | $30,650 |
| 0166 | Portable concrete barrier (4485000000-E) | LF | 6,700 | $57.00 | $62.00 | $55.85 | $59.20 | $57.00 | $60.00 |
| 0167 | Remove and reset portable concrete barrier (4500000000-E) | LF | 2,600 | $7.00 | $7.50 | $6.72 | $7.10 | $6.80 | $7.00 |
| 0168 | Temporary raised pavement markers (4650000000-N) | EACH | 1,220 | $7.00 | $8.25 | $7.00 | $7.50 | $7.15 | $7.15 |
| 0169 | Thermoplastic pavement marking lines (4", 90 mils) (4685000000-E) | LF | 35,612 | $0.76 | $1.00 | $0.76 | $0.80 | $0.77 | $0.80 |
| 0170 | Thermoplastic pavement marking lines (6", 90 mils) (4688000000-E) | LF | 243,975 | $0.81 | $1.00 | $0.81 | $0.85 | $0.82 | $0.85 |
| 0171 | Thermoplastic pavement marking lines (12", 90 mils) (4700000000-E) | LF | 14,912 | $1.85 | $2.25 | $1.85 | $1.95 | $1.88 | $1.90 |
| 0172 | Thermoplastic pavement marking lines (24", 90 mils) (4709000000-E) | LF | 155 | $12.00 | $14.25 | $12.00 | $12.80 | $12.18 | $12.25 |
| 0173 | Thermoplastic pavement marking character (90 mils) (4720000000-E) | EACH | 12 | $120.00 | $141.00 | $120.00 | $128.00 | $121.83 | $122.50 |
| 0174 | Thermoplastic pavement marking symbol (90 mils) (4725000000-E) | EACH | 47 | $245.00 | $289.00 | $245.00 | $261.00 | $248.73 | $250.00 |
| 0175 | Paint pavement marking lines (4") (4810000000-E) | LF | 85,700 | $0.25 | $0.30 | $0.25 | $0.27 | $0.25 | $0.26 |
| 0176 | Paint pavement marking lines (24") (4835000000-E) | LF | 260 | $5.00 | $6.00 | $5.00 | $5.30 | $5.08 | $5.10 |
| 0177 | Paint pavement marking character (4840000000-N) | EACH | 16 | $70.00 | $82.50 | $70.00 | $74.50 | $71.07 | $72.00 |
| 0178 | Paint pavement marking symbol (4845000000-N) | EACH | 30 | $70.00 | $82.50 | $70.00 | $74.50 | $71.07 | $72.00 |
| 0179 | Polyurea lines (**", *** mils) - (12", 30 mils) (4846000000-E) | LF | 64 | $10.00 | $11.75 | $10.00 | $10.50 | $10.15 | $10.20 |
| 0180 | Polyurea lines (**", *** mils) - (4", 30 mils) (4846000000-E) | LF | 2,150 | $2.85 | $3.25 | $2.85 | $3.00 | $2.89 | $3.00 |
| 0181 | Polyurea lines (**", *** mils) - (6", 30 mils) (4846000000-E) | LF | 7,656 | $3.50 | $4.00 | $3.50 | $3.70 | $3.55 | $3.60 |
| 0182 | Generic pavement marking item (EA) - polycarbonate H-shaped markers (4895000000-N) | EACH | 2,750 | $50.00 | $59.00 | $50.00 | $53.30 | $50.76 | $52.00 |
| 0183 | Permanent raised pavement markers (4900000000-N) | EACH | 26 | $20.00 | $23.50 | $20.00 | $21.30 | $20.30 | $20.50 |
| 0184 | Portable lighting (5255000000-N) | LS | 1 | $1,500,000 | $40,800 | $15,309 | $55,000 | $50,000 | $400,000 |
| 0185 | 6" water line (5325600000-E) | LF | 1,604.90 | $110.00 | $140.00 | $53.00 | $56.50 | $116.00 | $100.00 |
| 0186 | 8" water line (5325800000-E) | LF | 162.40 | $25.00 | $110.00 | $50.00 | $53.30 | $210.00 | $58.00 |
| 0187 | DI H2O pipe fittings (5329000000-E) | LB | 2,075 | $19.55 | $14.00 | $17.00 | $18.10 | $17.00 | $20.00 |
| 0188 | 6" valve (5540000000-E) | EACH | 2 | $2,500.00 | $3,600.00 | $2,550.00 | $2,720.00 | $3,572.00 | $3,000.00 |
| 0189 | Relocate water meter (5648000000-N) | EACH | 1 | $1,210.00 | $1,700.00 | $2,800.00 | $3,000.00 | $2,296.00 | $3,200.00 |
| 0190 | Fire hydrant (5666000000-N) | EACH | 2 | $5,500.00 | $9,400.00 | $8,000.00 | $8,525.00 | $8,164.00 | $9,000.00 |
| 0191 | Fire hydrant leg (5673000000-E) | LF | 16.10 | $223.00 | $136.00 | $60.00 | $64.00 | $143.00 | $250.00 |
| 0192 | **" water service line - (1-1/2") (5686000000-E) | LF | 12.20 | $68.50 | $86.50 | $25.00 | $26.65 | $87.00 | $90.00 |
| 0193 | Abandon 6" utility pipe (5800000000-E) | LF | 1,609.60 | $15.25 | $19.75 | $15.00 | $16.00 | $25.00 | $16.00 |
| 0194 | Remove fire hydrant (5815500000-N) | EACH | 1 | $1,000.00 | $3,600.00 | $1,000.00 | $1,065.00 | $2,143.00 | $675.00 |
| 0195 | 12" encasement pipe (5835600000-E) | LF | 378.70 | $160.00 | $330.00 | $100.00 | $106.50 | $184.00 | $150.00 |
| 0196 | Bore & jack **" - (12") (5872500000-E) | LF | 62.80 | $610.00 | $830.00 | $700.00 | $746.00 | $971.00 | $600.00 |
| 0197 | Direct drill **" - (8") (5872600000-E) | LF | 162.40 | $70.00 | $200.00 | $100.00 | $107.00 | $327.00 | $260.00 |
| 0198 | Temporary silt fence (6000000000-E) | LF | 361,220 | $1.00 | $3.50 | $2.60 | $3.25 | $2.65 | $2.65 |
| 0199 | Stone for erosion control, class A (6006000000-E) | TON | 4,620 | $99.00 | $110.00 | $107.94 | $139.00 | $120.00 | $120.00 |
| 0200 | Stone for erosion control, class B (6009000000-E) | TON | 37,430 | $50.00 | $0.01 | $0.01 | $130.00 | $75.00 | $120.00 |
| 0201 | Sediment control stone (6012000000-E) | TON | 18,785 | $50.00 | $0.01 | $0.01 | $119.00 | $95.00 | $120.00 |
| 0202 | Temporary mulching (6015000000-E) | ACRE | 677 | $1,550.00 | $1,700.00 | $1,550.00 | $1,660.00 | $1,582.00 | $1,600.00 |
| 0203 | Seed for temporary seeding (6018000000-E) | LB | 18,300 | $2.00 | $2.23 | $2.00 | $2.10 | $2.00 | $2.05 |
| 0204 | Fertilizer for temporary seeding (6021000000-E) | TON | 93 | $800.00 | $899.00 | $800.00 | $855.00 | $815.00 | $820.00 |
| 0205 | Temporary slope drains (6024000000-E) | LF | 54,420 | $7.00 | $0.01 | $3.49 | $21.00 | $0.01 | $28.00 |
| 0206 | Safety fence (6029000000-E) | LF | 62,440 | $2.00 | $3.00 | $2.00 | $2.35 | $2.00 | $2.00 |
| 0207 | Silt excavation (6030000000-E) | CY | 115,000 | $2.00 | $0.01 | $2.45 | $4.00 | $0.01 | $6.00 |
| 0208 | Matting for erosion control (6036000000-E) | SY | 417,550 | $1.50 | $1.75 | $1.50 | $1.60 | $1.53 | $1.60 |
| 0209 | Coir fiber mat (6037000000-E) | SY | 47,750 | $4.50 | $5.00 | $4.50 | $4.80 | $4.59 | $5.00 |
| 0210 | 1/4" hardware cloth (6042000000-E) | LF | 10,520 | $2.25 | $6.75 | $4.25 | $4.85 | $4.34 | $4.50 |
| 0211 | Low permeability geotextile (6043000000-E) | SY | 6,400 | $6.00 | $4.25 | $5.50 | $5.90 | $5.61 | $6.00 |
| 0212 | **" temporary pipe - (36") (6045000000-E) | LF | 170 | $86.00 | $157.00 | $118.58 | $275.00 | $180.00 | $140.00 |
| 0213 | **" temporary pipe - (60") (6045000000-E) | LF | 50 | $117.00 | $522.00 | $247.52 | $530.00 | $300.00 | $500.00 |
| 0214 | Temporary pipe for stream crossing (6046000000-E) | LF | 350 | $75.00 | $75.50 | $161.29 | $285.00 | $250.00 | $210.00 |
| 0215 | Floating turbidity curtain (6048000000-E) | SY | 185 | $86.00 | $54.50 | $70.00 | $55.50 | $25.00 | $77.00 |
| 0216 | Stilling basins (6069000000-E) | CY | 3,310 | $35.00 | $10.50 | $24.45 | $36.00 | $25.00 | $15.00 |
| 0217 | Special stilling basins (6070000000-N) | EACH | 7 | $700.00 | $2,500.00 | $305.27 | $400.00 | $850.00 | $1,800.00 |
| 0218 | Flocculant (6071002000-E) | LB | 52,365 | $0.25 | $0.01 | $4.50 | $4.00 | $4.50 | $9.50 |
| 0219 | Coir fiber wattle (6071012000-E) | LF | 46,600 | $9.00 | $14.50 | $9.00 | $9.60 | $9.18 | $9.20 |
| 0220 | Coir fiber wattle barrier (6071014000-E) | LF | 25,680 | $12.00 | $14.50 | $12.00 | $12.85 | $12.24 | $12.25 |
| 0221 | Coir fiber baffle (6071030000-E) | LF | 30,900 | $2.00 | $7.00 | $7.00 | $7.50 | $7.14 | $7.20 |
| 0222 | **" skimmer - (1-1/2") (6071050000-E) | EACH | 88 | $8,000.00 | $889.00 | $999.15 | $1,600.00 | $1,250.00 | $1,800.00 |
| 0223 | **" skimmer - (2") (6071050000-E) | EACH | 7 | $12,000 | $1,100.00 | $1,272.07 | $1,830.00 | $1,400.00 | $2,000.00 |
| 0224 | **" skimmer - (2-1/2") (6071050000-E) | EACH | 3 | $15,000 | $1,400.00 | $1,591.04 | $2,100.00 | $1,750.00 | $2,200.00 |
| 0225 | Seeding and mulching (6084000000-E) | ACRE | 553 | $2,550.00 | $2,900.00 | $2,550.00 | $2,735.00 | $2,600.00 | $2,610.00 |
| 0226 | Mowing (6087000000-E) | ACRE | 585 | $150.00 | $169.00 | $150.00 | $161.00 | $150.00 | $155.00 |
| 0227 | Seed for repair seeding (6090000000-E) | LB | 6,750 | $4.25 | $4.75 | $4.25 | $4.55 | $4.34 | $4.50 |
| 0228 | Fertilizer for repair seeding (6093000000-E) | TON | 25 | $1,250.00 | $1,400.00 | $1,250.00 | $1,340.00 | $1,275.00 | $1,300.00 |
| 0229 | Seed for supplemental seeding (6096000000-E) | LB | 8,875 | $4.25 | $4.75 | $4.25 | $4.55 | $4.34 | $4.50 |
| 0230 | Fertilizer topdressing (6108000000-E) | TON | 266.25 | $825.00 | $928.00 | $825.00 | $885.00 | $840.00 | $850.00 |
| 0231 | Impervious dike (6111000000-E) | LF | 2,110 | $150.00 | $121.00 | $110.00 | $52.50 | $600.00 | $300.00 |
| 0232 | Specialized hand mowing (6114500000-N) | MHR | 85 | $120.00 | $135.00 | $120.00 | $128.50 | $120.00 | $125.00 |
| 0233 | Manual litter removal (6114800000-N) | MHR | 325 | $120.00 | $57.00 | $99.25 | $128.50 | $120.00 | $125.00 |
| 0234 | Litter disposal (6114900000-E) | TON | 18 | $200.00 | $341.00 | $99.24 | $215.00 | $205.00 | $205.00 |
| 0235 | Response for erosion control (6117000000-N) | EACH | 250 | $10.00 | $511.00 | $100.00 | $107.00 | $105.00 | $500.00 |
| 0236 | Concrete washout structure (6117500000-N) | EACH | 4 | $1,575.00 | $1,400.00 | $1,111.87 | $1,480.00 | $1,650.00 | $2,000.00 |
| 0237 | Culvert diversion channel (6120000000-E) | CY | 2,575 | $50.50 | $43.00 | $40.00 | $40.00 | $20.00 | $25.00 |
| 0238 | Generic erosion control item (EA) - prefabricated concrete washout (6132000000-N) | EACH | 16 | $2,075.00 | $1,600.00 | $1,111.87 | $525.00 | $2,500.00 | $3,000.00 |
| 0239 | Generic erosion control item (SY) - permanent soil reinforcement mat, type 1 (6141000000-E) | SY | 1,485 | $4.50 | $5.00 | $2.96 | $4.80 | $4.50 | $5.00 |
| 0240 | Box culv excav @ ******** - (253+30.00 -L1-) (8130000000-N) | LS | 1 | $135,000 | $116,000 | $105,000 | $110,000 | $58,000 | $105,000 |
| 0241 | Box culv excav @ ******** - (283+45.00 -L1-) (8130000000-N) | LS | 1 | $150,000 | $132,000 | $120,000 | $105,800 | $58,000 | $100,000 |
| 0242 | Box culv excav @ ******** - (305+99.00 -L1-) (8130000000-N) | LS | 1 | $105,000 | $85,900 | $78,000 | $43,500 | $20,000 | $41,000 |
| 0243 | Box culv excav @ ******** - (443+00.00 -L1-) (8130000000-N) | LS | 1 | $125,000 | $105,000 | $95,000 | $53,750 | $20,000 | $50,000 |
| 0244 | Box culv excav @ ******** - (49+88.00 -Y33RPCA-) (8130000000-N) | LS | 1 | $750,000 | $161,000 | $146,500 | $111,250 | $200,000 | $105,000 |
| 0245 | Box culv excav @ ******** - (523+48.57 -L1REV-) (8130000000-N) | LS | 1 | $155,000 | $140,000 | $127,500 | $74,000 | $58,000 | $70,000 |
| 0246 | Box culv excav @ ******** - (567+53.70 -L1-) (8130000000-N) | LS | 1 | $137,000 | $121,000 | $110,000 | $151,500 | $50,000 | $150,000 |
| 0247 | Foundation conditioning material, box culvert (8133000000-E) | TON | 5,809 | $90.00 | $93.50 | $90.00 | $105.00 | $100.00 | $100.00 |
| 0248 | Class A concrete (culvert) (8196000000-E) | CY | 4,083.30 | $550.00 | $715.00 | $650.00 | $752.00 | $1,150.00 | $1,000.00 |
| 0249 | Reinforcing steel (culvert) (8245000000-E) | LB | 654,781 | $2.20 | $2.50 | $2.20 | $2.45 | $1.50 | $2.30 |
| 0250 | Generic culvert item (SY) - foundation conditioning geotextile (8822000000-E) | SY | 4,082 | $4.10 | $4.50 | $4.10 | $6.25 | $50.00 | $6.00 |
| 0251 | MSE retain wall no ** - (1) (8801000000-E) | SF | 1,070 | $300.00 | $279.00 | $177.41 | $242.00 | $250.00 | $170.00 |
| 0252 | CM&R temp access *********** - (384+20.26 -L1-) (8017000000-N) | LS | 1 | $265,000 | $435,000 | $9,282,220 | $1,102,000 | $750,000 | $500,000 |
| 0253 | CM&R temp access *********** - (427+46.10 -L1-) (8017000000-N) | LS | 1 | $465,000 | $995,000 | $9,282,220 | $650,000 | $1,200,000 | $976,300 |
| 0254 | FND excav B** sta ******* - (1, 225+92.26 -L1-) (8091000000-N) | LS | 1 | $30,000 | $51,700 | $19,431 | $19,250 | $45,000 | $100,000 |
| 0255 | FND excav B** sta ******* - (1, 23+28.17 -Y35-) (8091000000-N) | LS | 1 | $15,000 | $29,800 | $14,402 | $9,055.00 | $6,000.00 | $30,000 |
| 0256 | FND excav B** sta ******* - (1, 24+28.73 -Y34-) (8091000000-N) | LS | 1 | $15,000 | $29,800 | $14,140 | $5,900.00 | $3,000.00 | $30,000 |
| 0257 | FND excav B** sta ******* - (1, 31+84.73 -Y33RPCA-) (8091000000-N) | LS | 1 | $30,000 | $15,600 | $17,569 | $28,850 | $25,000 | $75,000 |
| 0258 | FND excav B** sta ******* - (2, 31+84.73 -Y33RPCA-) (8091000000-N) | LS | 1 | $30,000 | $19,300 | $78,289 | $20,250 | $33,000 | $50,000 |
| 0259 | FND excav B** sta ******* - (3, 31+84.73 -Y33RPCA--) (8091000000-N) | LS | 1 | $30,000 | $19,300 | $78,289 | $17,450 | $33,000 | $50,000 |
| 0260 | FND excav B** sta ******* - (4, 31+84.73 -Y33RPCA-) (8091000000-N) | LS | 1 | $30,000 | $19,300 | $67,467 | $17,450 | $33,000 | $50,000 |
| 0261 | FND excav B** sta ******* - (5, 31+84.73 -Y33RPCA-) (8091000000-N) | LS | 1 | $30,000 | $19,600 | $78,289 | $17,450 | $33,000 | $50,000 |
| 0262 | FND excav B** sta ******* - (6, 31+84.73 -Y33RPCA-) (8091000000-N) | LS | 1 | $30,000 | $23,100 | $17,569 | $26,100 | $25,000 | $70,000 |
| 0263 | FND excav B** sta ******* - (7, 31+84.73 -Y33RPCA-) (8091000000-N) | LS | 1 | $40,000 | $23,900 | $18,594 | $28,835 | $33,000 | $70,000 |
| 0264 | FND excav B** sta ******* - (8, 31+84.73 -Y33RPCA-) (8091000000-N) | LS | 1 | $45,000 | $20,200 | $18,862 | $28,600 | $29,000 | $70,000 |
| 0265 | Reinforced concrete deck slab (8147000000-E) | SF | 137,150 | $57.00 | $53.00 | $62.88 | $51.00 | $65.00 | $65.00 |
| 0266 | Grooving bridge floors (8161000000-E) | SF | 133,375 | $0.70 | $1.25 | $0.76 | $0.70 | $1.40 | $0.64 |
| 0267 | Class AA concrete (bridge) (8175000000-E) | CY | 2,221.70 | $916.00 | $1,275.00 | $1,236.39 | $1,226.00 | $1,100.00 | $2,500.00 |
| 0268 | Class A concrete (bridge) (8182000000-E) | CY | 618.40 | $905.00 | $1,275.00 | $1,239.11 | $1,415.00 | $1,300.00 | $2,500.00 |
| 0269 | BRG appr slab *********** - (225+92.26 -L1-) (8210000000-N) | LS | 1 | $70,000 | $72,600 | $79,529 | $98,800 | $80,000 | $120,000 |
| 0270 | BRG appr slab *********** - (23+28.17 -Y35-) (8210000000-N) | LS | 1 | $45,000 | $52,100 | $40,387 | $60,000 | $40,000 | $90,000 |
| 0271 | BRG appr slab *********** - (232+80.54 -L1- LT) (8210000000-N) | LS | 1 | $75,000 | $84,600 | $90,085 | $107,500 | $95,000 | $115,000 |
| 0272 | BRG appr slab *********** - (232+80.54 -L1- RT) (8210000000-N) | LS | 1 | $70,000 | $77,800 | $79,554 | $109,500 | $80,000 | $115,000 |
| 0273 | BRG appr slab *********** - (24+28.73 -Y34-) (8210000000-N) | LS | 1 | $50,000 | $55,900 | $51,029 | $72,500 | $55,000 | $100,000 |
| 0274 | BRG appr slab *********** - (31+84.73 -Y33RPCA-) (8210000000-N) | LS | 1 | $70,000 | $82,100 | $85,043 | $89,300 | $92,000 | $125,000 |
| 0275 | BRG appr slab *********** - (384+20.26 -L1- LT) (8210000000-N) | LS | 1 | $70,000 | $83,100 | $76,797 | $105,600 | $75,000 | $125,000 |
| 0276 | BRG appr slab *********** - (384+20.26 -L1- RT) (8210000000-N) | LS | 1 | $70,000 | $83,100 | $76,797 | $97,000 | $75,000 | $125,000 |
| 0277 | BRG appr slab *********** - (427+46.10 -L1- LT) (8210000000-N) | LS | 1 | $70,000 | $90,300 | $82,505 | $101,000 | $80,000 | $125,000 |
| 0278 | BRG appr slab *********** - (427+46.16 -L1- RT) (8210000000-N) | LS | 1 | $70,000 | $85,700 | $76,183 | $96,600 | $75,000 | $125,000 |
| 0279 | Reinforcing steel (bridge) (8217000000-E) | LB | 408,486 | $1.40 | $1.75 | $1.51 | $1.85 | $1.50 | $1.50 |
| 0280 | Epoxy coated reinforcing steel (bridge) (8224000000-E) | LB | 76,404 | $2.00 | $2.00 | $1.68 | $2.10 | $1.75 | $3.00 |
| 0281 | Spiral column reinforcing steel (bridge) (8238000000-E) | LB | 3,583 | $6.00 | $4.00 | $3.32 | $3.60 | $3.15 | $3.00 |
| 0282 | Modified 72" prestressed conc girders (8277000000-E) | LF | 6,290.33 | $400.00 | $485.00 | $500.82 | $414.00 | $575.00 | $475.00 |
| 0283 | Structural steel (8280000000-E) | LS | 1 | $10,450,000 | $10,906,289 | $14,840,328 | $13,761,000 | $14,500,000 | $10,000,000 |
| 0284 | Pile DRV equip setup * prestr conc piles - (16") (8328000000-E) | EACH | 128 | $1,000.00 | $4,000.00 | $20,000 | $1,914.00 | $4,000.00 | $4,500.00 |
| 0285 | Pile DRV equip setup * prestr conc piles - (24") (8328000000-E) | EACH | 15 | $5,000.00 | $4,700.00 | $20,000 | $5,900.00 | $12,500 | $5,500.00 |
| 0286 | Pile DRV equip setup ** steel piles - (HP 12 X 53) (8328200000-E) | EACH | 63 | $560.00 | $1,600.00 | $10,000 | $800.00 | $3,800.00 | $1,600.00 |
| 0287 | Pile DRV equip setup ** steel piles - (HP 14 X 73) (8328200000-E) | EACH | 148 | $570.00 | $2,400.00 | $10,000 | $1,775.00 | $3,700.00 | $3,300.00 |
| 0288 | Pile DRV equip setup ** galv steel piles - (PP 24 X 0.75) (8328400000-E) | EACH | 14 | $2,200.00 | $6,200.00 | $20,000 | $4,130.00 | $7,500.00 | $5,800.00 |
| 0289 | 16" prestressed concrete piles (8333000000-E) | LF | 5,990 | $112.00 | $78.00 | $80.00 | $112.00 | $85.00 | $63.00 |
| 0290 | 24" prestressed concrete piles (8350000000-E) | LF | 675 | $240.00 | $184.00 | $170.00 | $143.25 | $175.00 | $140.00 |
| 0291 | HP 12 X 53 steel piles (8364000000-E) | LF | 3,135 | $70.00 | $58.00 | $70.04 | $80.25 | $60.00 | $50.00 |
| 0292 | HP 14 X 73 steel piles (8384000000-E) | LF | 7,990 | $130.00 | $123.00 | $142.87 | $86.50 | $125.00 | $100.00 |
| 0293 | PP**X**** galv STL pile - (24 X 0.75) (8385200000-E) | LF | 630 | $350.00 | $521.00 | $348.84 | $344.50 | $325.00 | $230.00 |
| 0294 | Steel pile points (8391000000-N) | EACH | 102 | $180.00 | $570.00 | $330.26 | $190.50 | $400.00 | $380.00 |
| 0295 | Predrilling for piles (8392500000-E) | LF | 1,611.40 | $340.00 | $132.00 | $65.00 | $420.50 | $315.00 | $367.00 |
| 0296 | Pile redrives (8393000000-N) | EACH | 190 | $140.00 | $1.00 | $50.00 | $887.50 | $700.00 | $1.00 |
| 0297 | Dynamic pile testing (8394000000-N) | EACH | 14 | $5,000.00 | $5,200.00 | $5,528.02 | $2,415.00 | $2,429.44 | $2,500.00 |
| 0298 | Concrete barrier rail (8503000000-E) | LF | 6,357.96 | $138.00 | $175.00 | $136.98 | $144.00 | $140.00 | $160.00 |
| 0299 | 4" slope protection (8531000000-E) | SY | 5,033 | $135.00 | $183.00 | $174.33 | $147.50 | $150.00 | $180.00 |
| 0300 | Rip rap class II (2'-0" thick) (8608000000-E) | TON | 2,078 | $120.00 | $138.00 | $136.86 | $135.00 | $130.00 | $105.00 |
| 0301 | Geotextile for drainage (8622000000-E) | SY | 2,361 | $4.00 | $5.75 | $3.09 | $4.40 | $2.75 | $6.00 |
| 0302 | Disc bearings (8654000000-N) | LS | 1 | $370,000 | $491,000 | $490,432 | $533,500 | $725,000 | $450,000 |
| 0303 | Elastomeric bearings (8657000000-N) | LS | 1 | $35,000 | $41,000 | $49,466 | $134,250 | $225,000 | $36,660 |
| 0304 | Expansion joint seals (8706000000-N) | LS | 1 | $80,000 | $89,800 | $102,721 | $84,500 | $100,000 | $140,000 |
| 0305 | Modular expansion joint seals (8713000000-N) | LS | 1 | $190,000 | $226,000 | $231,279 | $115,500 | $250,000 | $270,000 |
| 0306 | Generic structure item (LF) - modified 56" prestressed concrete girders (8867000000-E) | LF | 2,075.70 | $350.00 | $470.00 | $453.82 | $381.00 | $525.00 | $450.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
Every contract let that day: NCDOT letting of July 15, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.