NCDOT contract C205093 bid tabulation

GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. NEW ROUTE FROM SR-1630 (BALTIMORE RD) TO I-40. Let by North Carolina DOT on October 21, 2025, Davie. 10 bids received; low bid $32,185,000 by Branch Civil Inc.

Owner
North Carolina DOT
Letting
21 OCT 2025
Pay items
303
Data through
20 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Branch Civil Inc$32,185,000Low
2Flatiron Dragados Constructors Inc$34,186,422+6.0%
3Apac Atlantic Inc Smith Rowe LLC JV$35,507,781+10%
4Ames Construction Inc$36,738,039+14%
5Triangle Grading & Paving Inc$36,991,776+15%
6Zachry Construction Corporation$37,220,364+16%
7Blythe Construction Inc$38,599,114+20%
8K West Group LLC DBA Kwest Group LLC$41,991,538+30%
9W C English Incorporated$45,711,640+42%
10Webber LLC$47,250,000+47%
NCDOT contract C205093: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Branch Civil Inc2. Flatiron Dragados Constructors Inc3. Apac Atlantic Inc Smith Rowe LLC JV4. Ames Construction Inc5. Triangle Grading & Paving Inc6. Zachry Construction Corporation
0001Mobilization (0000100000-N)LS1$1,600,000$1,709,000$1,750,000$1,836,000$1,800,000$1,850,000
0002Construction surveying (0000400000-N)LS1$361,000$600,000$450,000$380,000$425,000$500,000
0003Field office (0000720000-N)MO36$5,000.00$7,500.00$6,300.00$5,000.00$3,800.00$2,100.00
0004Generic miscellaneous item (LS) - surveying for mitigation (0000900000-N)LS1$22,700$11,237$30,000$60,000$20,000$500,000
0005Clearing & grubbing (0001000000-E)LS1$2,664,505$4,571,000$4,000,000$2,762,000$2,790,000$5,000,000
0006Supplementary clearing & grubbing (0008000000-E)ACRE2$11,100$15,100$1.00$17,000$3,000.00$15,500
0007Unclassified excavation (0022000000-E)CY228,500$11.00$7.00$11.89$13.00$14.50$8.00
0008Undercut excavation (0036000000-E)CY9,000$9.75$10.00$12.00$16.00$9.00$17.16
0009Borrow excavation (0106000000-E)CY214,000$0.01$0.01$0.01$1.00$9.50$8.26
0010Drainage ditch excavation (0134000000-E)CY18,950$4.25$18.00$8.92$8.00$10.00$7.19
0011Berm ditch construction (0141000000-E)LF2,620$8.51$10.00$8.77$15.00$8.00$8.63
0012Removal of existing asphalt pavement (0156000000-E)SY600$21.00$9.00$8.92$20.00$14.00$13.31
0013Breaking of existing asphalt pavement (0177000000-E)SY1,130$6.25$6.00$3.97$4.00$4.00$6.42
0014Proof rolling (0192000000-N)HR20$189.00$200.00$394.55$140.00$250.00$416.26
0015Select granular material (0195000000-E)CY8,220$11.50$55.00$0.01$48.00$26.00$50.70
0016Geotextile for soil stabilization (0196000000-E)SY11,220$3.75$4.00$5.25$3.00$3.50$2.73
0017Generic grading item (SY) - culvert load transfer mat (0241000000-E)SY4,360$56.00$70.00$0.01$35.00$48.00$38.77
0018Generic grading item (SY) - geotextile for embankment stabilization, type 5A (0241000000-E)SY22,540$4.50$8.00$3.83$3.50$4.50$3.15
0019Generic grading item (LS) - site grading for mitigation (0248000000-N)LS1$170,000$89,000$155,000$180,000$150,000$154,000
0020Generic grading item (LS) - type 1 bridge approach fill, station 70+91.84 -L- (0248000000-N)LS1$9,410.00$107,000$97,680$60,000$125,000$60,790
0021Foundation conditioning material, minor structures (0318000000-E)TON1,250$87.00$55.00$61.00$70.00$65.00$50.00
0022FND condit geotextile (4A) (0321000000-E)SY3,940$3.50$5.00$6.10$2.00$5.00$3.82
0023**" side drain pipe - (30") (0342000000-E)LF568$103.00$145.00$129.69$185.00$145.00$119.30
0024**" side drain pipe - (36") (0342000000-E)LF764$167.00$151.00$164.51$215.00$156.00$153.92
002515" side drain pipe (0343000000-E)LF1,904$77.00$93.00$76.97$129.00$110.00$47.00
002618" side drain pipe (0344000000-E)LF300$78.00$90.00$91.44$138.00$113.00$62.96
002724" side drain pipe (0345000000-E)LF736$84.00$115.00$93.76$159.00$120.00$72.55
0028**" side drain pipe elbow - (15") (0348000000-E)EACH22$643.00$400.00$542.65$532.00$850.00$439.63
0029**" side drain pipe elbow - (18") (0348000000-E)EACH10$750.00$550.00$662.50$620.00$1,050.00$476.26
0030**" side drain pipe elbow - (30") (0348000000-E)EACH2$1,020.00$1,250.00$1,293.80$1,250.00$1,500.00$773.43
0031***" RCP culv class IV - (48") (0448000000-E)LF140$400.00$400.00$334.63$505.00$450.00$366.94
0032***" RCP culv class IV - (54") (0448000000-E)LF28$917.00$900.00$884.82$929.00$550.00$547.81
003315" RC pipe culverts, class IV (0448200000-E)LF3,940$106.00$90.00$105.13$136.00$110.00$87.37
003418" RC pipe culverts, class IV (0448300000-E)LF1,296$109.00$129.00$106.27$154.00$118.00$107.38
003524" RC pipe culverts, class IV (0448400000-E)LF368$150.00$190.00$122.89$198.00$180.00$136.68
003630" RC pipe culverts, class IV (0448500000-E)LF1,216$180.00$215.00$158.48$244.00$215.00$190.48
003736" RC pipe culverts, class IV (0448600000-E)LF332$326.00$265.00$227.58$381.00$240.00$234.81
003842" RC pipe culverts, class IV (0448700000-E)LF200$309.00$305.00$264.73$442.00$375.00$324.12
0039**" CS pipe culv *****" - (36", 0.079") (0576000000-E)LF28$177.00$260.00$214.95$224.00$125.00$109.42
0040**"WLD STL pipe grad B in soil - (18", 0.250") (0973100000-E)LF58$1,050.00$700.00$1,995.00$915.00$590.00$860.09
0041**"WLD STL pipe grad B in soil - (24", 0.375") (0973100000-E)LF54$1,150.00$800.00$2,079.70$995.00$725.00$1,025.31
0042**"WLD STL pipe grad B in soil - (30", 0.500") (0973100000-E)LF58$1,300.00$1,150.00$2,341.03$1,125.00$840.00$1,367.31
0043**"WLD STL pipe grad B in soil - (66", 0.938") (0973100000-E)LF200$3,070.00$3,500.00$4,778.00$2,740.00$3,500.00$1,221.04
0044**"WLD STL pipe grad B not in soil - (18", 0.250") (0973300000-E)LF58$0.01$0.01$1.00$915.00$1,900.00$2,329.99
0045**"WLD STL pipe grad B not in soil - (24", 0.375") (0973300000-E)LF54$0.01$0.01$1.00$995.00$2,850.00$3,402.56
0046**"WLD STL pipe grad B not in soil - (30", 0.500") (0973300000-E)LF58$0.01$0.01$1.00$1,125.00$3,550.00$4,435.39
0047**"WLD STL pipe grad B not in soil - (66", 0.938") (0973300000-E)LF200$0.01$0.01$1.00$2,740.00$7,000.00$1,780.70
0048Pipe removal (0995000000-E)LF1,740$25.25$30.00$16.43$29.00$17.00$48.00
0049Fine grading (1011000000-N)LS1$1,800,000$450,000$4,248,003$1,000,000$1,400,000$474,359
0050Lime treated soil (slurry method) (1044000000-E)SY23,950$3.50$3.25$4.10$3.20$5.20$3.25
0051Lime for lime treated soil used based on county (1066000000-E)TON290$357.00$322.00$437.15$317.00$325.00$322.00
0052#57 stone (1077000000-E)TON225$68.00$103.00$60.00$60.00$60.00$54.97
0053Shallow undercut (1099500000-E)CY500$15.50$30.00$28.90$34.00$17.00$24.36
0054Class IV subgrade stabilization (1099700000-E)TON1,000$54.00$75.00$57.08$52.00$44.00$50.47
0055Stabilizer aggregate (1110000000-E)TON500$54.00$50.00$52.45$72.00$47.00$59.22
0056Geotextile for subgrade stabilization (1112000000-E)SY29,690$4.25$3.00$4.20$4.00$4.20$2.76
0057Aggregate base course (1121000000-E)TON24,000$38.00$45.00$47.50$51.00$48.00$49.73
0058Soil cement base (1176000000-E)SY23,950$3.50$3.10$3.95$3.10$4.99$3.20
0059Portland cement for soil cement base (1187000000-E)TON671$308.00$257.00$263.00$267.00$261.50$272.00
0060Asphalt curing seal (1209000000-E)GAL7,190$5.75$5.08$4.60$5.00$3.50$5.10
0061Incidental stone base (1220000000-E)TON200$64.00$175.00$80.85$79.30$60.00$41.00
0062Prime coat (1275000000-E)GAL680$7.75$3.50$5.30$10.00$10.00$5.00
0063Mill asp PVMT *****" DTH - (1-1/2") (1297000000-E)SY41,100$2.50$1.85$1.60$1.20$4.10$4.00
0064Incidental milling (1330000000-E)SY1,010$13.25$12.00$9.00$8.95$23.00$16.00
0065Asphalt conc base course, type B25.0C (1491000000-E)TON5,070$95.00$93.84$87.00$87.00$92.00$88.00
0066Asphalt conc intermediate course, type I19.0C (1503000000-E)TON14,560$90.00$84.27$82.00$82.00$87.00$83.00
0067Asphalt conc surface course, type S9.5C (1523000000-E)TON11,100$92.00$83.44$85.00$85.00$90.00$86.00
0068Asphalt conc surface course, type S9.5D (1524200000-E)TON7,090$94.00$101.61$87.00$87.00$92.00$88.00
0069Asphalt binder for plant mix (1575000000-E)TON1,585$760.00$642.80$705.00$705.00$705.00$706.00
0070Polymer modified asphalt binder for plant mix (1577000000-E)TON415$860.00$749.47$800.00$800.00$800.00$801.00
0071Asphalt plant mix, pavement repair (1693000000-E)TON270$475.00$250.00$312.00$300.00$300.00$301.00
0072Generic paving item (LF) 665 - milled rumble strips (asphalt concrete), (16") (1841000000-E)LF7,030$0.80$0.78$1.02$0.60$1.02$1.05
0073Right-of-way markers (2000000000-N)EACH122$351.00$300.00$310.00$390.00$310.00$362.26
0074Control-of-access markers (2020000000-N)EACH12$351.00$350.00$310.00$390.00$310.00$362.26
0075Subdrain excavation (2022000000-E)CY340$42.00$35.00$19.92$15.00$19.00$11.12
0076Geotextile for subsurface drains (2026000000-E)SY1,000$10.50$6.00$4.15$3.00$9.00$2.23
0077Subdrain coarse aggregate (2036000000-E)CY170$155.00$55.00$92.87$134.00$101.00$44.61
00786" perforated subdrain pipe (2044000000-E)LF1,000$33.00$15.00$7.79$35.00$16.00$11.92
0079Subdrain pipe outlet (2070000000-N)EACH2$1,840.00$300.00$533.00$1,340.00$500.00$274.06
00806" outlet pipe (2077000000-E)LF12$156.00$50.00$61.83$200.00$40.00$23.28
0081Shoulder drain (2099000000-E)LF2,000$20.75$19.04$14.80$23.00$20.00$21.81
00824" shoulder drain pipe (2110000000-E)LF2,000$2.75$2.53$8.24$23.00$4.50$2.90
00834" outlet pipe for shoulder drains (2121000000-E)LF100$24.25$22.10$20.55$36.00$24.00$25.31
0084Concrete pad for shoulder drain pipe outlet (2132000000-N)EACH10$611.00$557.17$514.18$1,265.00$550.00$638.23
0085Blotting sand (2143000000-E)TON20$333.00$100.00$54.65$56.00$165.00$80.19
0086Endwalls (2209000000-E)CY13$2,840.00$2,000.00$1,522.25$2,525.00$1,750.00$1,904.66
0087Reinforced endwalls (2220000000-E)CY5$3,870.00$3,500.00$2,499.44$3,015.00$1,900.00$1,935.67
0088Pipe collars (2253000000-E)CY5$1,000.00$1,850.00$4,628.71$2,040.00$950.00$2,031.72
0089Pipe plugs (2264000000-E)CY1$1,830.00$1,650.00$1,375.15$5,960.00$950.00$5,617.99
0090Flowable fill (2275000000-E)CY212$428.00$350.00$522.19$390.00$475.00$327.00
0091Masonry drainage structures (2286000000-N)EACH116$5,990.00$4,200.00$3,965.82$5,000.00$2,750.00$5,113.68
0092Masonry drainage structures (2297000000-E)CY3.83$6,000.00$3,500.00$8,595.63$4,915.00$2,500.00$504.36
0093Masonry drainage structures (2308000000-E)LF107.20$300.00$1,000.00$734.06$560.00$775.00$504.36
0094Frame with grate, STD 840.24 (2354200000-N)EACH2$751.00$1,200.00$2,585.63$1,000.00$750.00$863.59
0095Frame with two grates, STD 840.16 (2364000000-N)EACH27$1,070.00$1,400.00$2,093.36$1,200.00$1,050.00$1,115.35
0096Frame with two grates, STD 840.20 (2364200000-N)EACH18$980.00$1,300.00$1,887.36$1,200.00$950.00$1,042.20
0097Frame with two grates, STD 840.22 (2365000000-N)EACH26$980.00$1,300.00$2,758.67$1,200.00$950.00$1,042.20
0098Frame with two grates, STD 840.24 (2366000000-N)EACH7$999.00$1,300.00$2,783.72$1,200.00$975.00$863.59
0099Frame with two grates, STD 840.29 (2367000000-N)EACH22$980.00$1,300.00$1,584.48$1,200.00$975.00$1,042.20
0100Frame-GRT-HD 840.03 ** - (E) (2374000000-N)EACH1$1,190.00$1,600.00$1,420.40$1,100.00$1,200.00$2,736.42
0101Frame-GRT-HD 840.03 ** - (F) (2374000000-N)EACH1$1,240.00$1,600.00$1,420.40$1,100.00$1,300.00$2,736.42
0102Frame-GRT-HD 840.03 ** - (G) (2374000000-N)EACH7$1,240.56$1,600.00$1,420.40$1,100.00$1,300.00$2,736.42
0103Frame with cover, STD 840.54 (2396000000-N)EACH5$782.00$1,200.00$1,104.33$1,100.00$675.00$888.34
0104Concrete transitional section for drop inlet (2451000000-N)EACH13$1,390.00$1,275.51$1,250.00$950.00$1,250.00$1,460.73
01052'-6" concrete curb & gutter (2549000000-E)LF930$42.00$40.24$34.95$34.00$34.95$43.66
0106Shoulder berm gutter (2556000000-E)LF5,610$46.75$43.79$39.20$42.00$39.20$50.49
01074" concrete paved ditch (2619000000-E)SY110$146.00$153.18$131.15$80.00$131.15$160.29
01085" monolithic concrete islands (keyed in) (2655000000-E)SY1,860$94.00$86.28$84.55$115.00$84.55$98.80
0109Steel beam guardrail (3030000000-E)LF9,500$24.75$22.22$22.00$23.50$22.00$25.58
0110Steel beam guardrail, shop curved (3045000000-E)LF400$33.75$30.30$30.00$26.00$30.00$34.88
0111Additional guardrail posts (3150000000-N)EACH10$1.00$1.01$1.00$55.00$1.00$1.17
0112Guardrail end units, type cat-1 (3210000000-N)EACH6$1,010.00$909.09$900.00$850.00$900.00$1,046.56
0113Guardrail end units, type TL-3 (3287000000-N)EACH11$3,480.00$3,131.31$3,100.00$3,250.00$3,100.00$3,756.00
0114Guardrail end units, type TL-2 (3288000000-N)EACH5$3,370.00$3,030.30$3,000.00$3,200.00$3,000.00$3,488.55
0115Guardrail anchor units, type B-77 (3317000000-N)EACH4$2,700.00$2,424.24$2,400.00$2,600.00$2,400.00$2,907.12
0116Remove & reset existing guiderail (3347000000-E)LF135$7.75$7.07$7.00$15.00$7.00$8.14
0117Remove existing guardrail (3360000000-E)LF1,755$1.00$0.91$0.90$1.00$0.90$1.04
0118Additional guiderail posts (3389500000-N)EACH5$112.00$101.01$100.00$120.00$100.00$116.28
0119Cable guiderail anchor units (3389600000-N)EACH2$2,810.00$2,525.26$2,500.00$3,000.00$2,500.00$2,907.12
0120Woven wire fence, 47" fabric (3503000000-E)LF13,810$6.25$6.04$5.70$5.70$5.00$5.84
01214" timber fence posts, 7'-6" long (3509000000-E)EACH837$44.25$41.28$38.00$38.00$35.00$40.90
01225" timber fence posts, 8'-0" long (3515000000-E)EACH275$62.00$48.94$44.00$44.00$52.00$60.77
0123SGL gate **high, **wide, **open - (58", 12', 12' ) (3564000000-E)EACH7$5,100.00$4,540.87$1,250.00$1,250.00$3,900.00$4,557.45
0124Rip rap, class I (3628000000-E)TON4,235$98.00$85.00$80.25$86.00$75.00$78.92
0125Rip rap, class II (3635000000-E)TON1,015$131.00$90.00$84.20$91.00$85.00$100.00
0126Rip rap, class A (3642000000-E)TON10$68.00$75.00$112.75$165.00$65.00$75.60
0127Rip rap, class B (3649000000-E)TON1,600$90.00$140.00$82.31$92.00$70.00$76.74
0128Boulders (3651000000-E)TON430$453.00$161.20$400.00$488.00$400.00$141.12
0129Geotextile for drainage (3656000000-E)SY17,505$3.00$6.00$5.20$3.00$4.00$2.80
0130Reinforced concrete sign foundations (4048000000-E)CY4$888.00$824.74$800.00$800.00$2,173.00$2,539.32
0131Plain concrete sign foundations (4054000000-E)CY1$11.00$10.31$10.00$10.00$1,738.00$2,030.99
0132Overhead footing (4057000000-E)CY17$2,780.00$2,577.32$2,500.00$2,500.00$2,022.00$2,362.86
0133Supports, breakaway steel beam (4060000000-E)LB4,877$9.50$8.76$8.50$8.50$12.00$14.02
0134Supports, 3-LB steel U-channel (4072000000-E)LF1,636$9.50$8.76$8.50$8.50$12.50$14.61
0135Supports, 2-LB steel U-channel (4078000000-E)EACH2$56.00$51.55$50.00$50.00$463.00$541.05
0136Supports, steel square tube (4080200000-E)LF91$13.25$12.37$12.00$12.00$28.00$32.72
0137Sign erection, type D (4096000000-N)EACH3$139.00$128.87$125.00$125.00$203.00$237.22
0138Sign erection, type E (4102000000-N)EACH56$72.00$67.01$65.00$65.00$102.00$119.20
0139Sign erection, type F (4108000000-N)EACH17$139.00$128.87$125.00$125.00$406.00$474.44
0140Sign erection, type *** (ovrhd) - (A) (4109000000-N)EACH2$11.00$10.31$10.00$10.00$2,340.00$2,734.47
0141Sign erection, type *** (ovrhd) - (B) (4109000000-N)EACH2$11.00$10.31$10.00$10.00$1,560.00$1,822.98
0142Sign erection, type *** (GRD MTD) - (A) (4110000000-N)EACH7$1,050.00$979.38$950.00$950.00$1,742.00$2,035.66
0143Sign erection, type *** (GRD MTD) - (B) (4110000000-N)EACH5$555.00$515.46$500.00$500.00$871.00$1,017.84
0144Sign erection, milemarkers (4114000000-N)EACH2$111.00$103.10$100.00$100.00$186.00$217.35
0145Sign erect, reloc ** GRD MTD - (A) (4116100000-N)EACH1$1,110.00$1,030.93$1,000.00$1,000.00$2,903.00$3,392.38
0146Sign erect, reloc ** GRD MTD - (D) (4116100000-N)EACH1$278.00$257.73$250.00$250.00$1,161.00$1,356.71
0147Support, ovrhd sign STR ***** - (31+66 -Y2-) (4130000000-N)LS1$105,000$97,938$95,000$240,000$107,749$125,913
0148Disposal of support, steel beam (4138000000-N)EACH2$555.00$515.47$500.00$500.00$1,266.00$1,479.41
0149Disposal of sign system, steel beam (4152000000-N)EACH3$555.00$515.46$500.00$500.00$1,900.00$2,220.29
0150Disposal of sign system, U-channel (4155000000-N)EACH14$2.25$2.06$2.00$2.00$317.00$370.44
0151Disposal of support, U-channel (4192000000-N)EACH1$2.25$2.06$2.00$2.00$158.00$184.64
0152Generic signing item (EA) - supports, omni-directional breakaway (4360000000-N)EACH7$222.00$206.19$200.00$200.00$531.00$620.52
0153High visibility stationary signs (4402000000-E)SF610$13.75$6.89$9.68$8.88$10.50$10.37
0154High visibility portable signs (4407000000-E)SF624$14.75$9.18$10.33$18.00$29.50$11.06
0155Work zone signs (barricade mounted) (4410000000-E)SF257$13.25$8.16$9.36$8.00$12.50$10.02
0156Flashing arrow board (4415000000-N)EACH10$2,890.00$2,142.86$1.00$2,220.00$8,200.00$2,176.76
0157Portable changeable message sign (short term) (4422000000-N)DAY150$129.00$51.02$150.00$55.50$125.00$97.38
0158Work zone presence lighting (4424000000-N)EACH28$2,890.00$2,551.02$2,140.00$3,330.00$3,500.00$2,176.76
0159Drums (4430000000-N)EACH235$67.00$56.12$90.00$48.00$85.00$63.01
0160High visibility drums (4432000000-N)EACH235$84.00$56.12$100.00$59.00$95.00$50.41
0161Sequential flashing warning lights (4434000000-N)EACH48$213.00$137.76$149.80$138.00$120.00$160.40
0162Barricades (type III) (4445000000-E)LF144$38.00$20.41$26.75$29.00$43.00$28.64
0163Flagger (4455000000-N)DAY198$583.00$1,330.00$440.00$1,400.00$510.00$359.11
0164Temporary crash cushions (4465000000-N)EACH4$9,160.00$8,418.37$7,808.35$11,250$11,250$5,499.18
0165Remove & reset temporary crash cushion (4470000000-N)EACH4$3,610.00$3,316.33$2,404.93$3,250.00$3,250.00$2,864.16
0166TMA (4480000000-N)EACH7$34,400$25,510$1.00$15,410$30,000$29,071
0167Portable concrete barrier (4485000000-E)LF3,747$46.50$42.68$42.27$41.00$41.83$48.88
0168Portable concrete barrier (anchored) (4490000000-E)LF4,651$66.00$60.87$56.45$59.00$59.65$69.70
0169Remove and reset portable concrete barrier (4500000000-E)LF7,692$9.25$8.39$10.02$8.00$8.22$9.60
0170Remove & reset portable concrete barrier (anchored) (4505000000-E)LF600$26.75$24.66$25.40$24.00$24.17$28.25
0171Law enforcement (4510000000-N)HR160$89.00$85.00$75.00$70.00$75.00$91.65
0172Skinny drum (4516000000-N)EACH1,290$45.50$32.65$60.00$34.00$75.00$34.37
0173Generic traffic control item (EA) - connected lane closure device (4600000000-N)EACH2$3,340.00$2,448.98$2,354.00$2,215.00$2,500.00$2,520.46
0174Temporary raised pavement markers (4650000000-N)EACH600$4.00$3.69$3.67$6.00$3.67$8.70
0175Paint pavement marking lines (4") (4810000000-E)LF125,980$0.15$0.12$0.12$0.45$0.12$0.37
0176Paint pavement marking lines (6") (4815000000-E)LF128,440$0.20$0.18$0.18$0.50$0.18$0.43
0177Paint pavement marking lines (8") (4820000000-E)LF3,095$0.30$0.25$0.25$1.00$0.25$2.22
0178Paint pavement marking lines (12") (4825000000-E)LF8,440$0.85$0.76$0.75$2.00$0.75$2.33
0179Paint pavement marking lines (24") (4835000000-E)LF430$2.25$2.01$2.00$7.00$2.00$4.68
0180Paint pavement marking character (4840000000-N)EACH20$224.00$20.14$20.00$70.00$20.00$80.62
0181Paint pavement marking symbol (4845000000-N)EACH106$22.25$20.13$20.00$70.00$20.00$86.47
0182Generic pavement marking item (LF) - integrated multipolymer pavement marking lines, (12", 90 mils) (4890000000-E)LF4,120$5.50$5.03$5.00$6.50$5.00$7.71
0183Generic pavement marking item (LF) - integrated multipolymer pavement marking lines, (24", 90 mils) (4890000000-E)LF215$15.00$13.59$13.50$17.00$13.50$18.99
0184Generic pavement marking item (LF) - integrated multipolymer pavement marking lines, (4", 90 mils) (4890000000-E)LF45,098$1.50$1.31$1.30$1.75$1.30$1.58
0185Generic pavement marking item (LF) - integrated multipolymer pavement marking lines, (6", 90 mils) (4890000000-E)LF31,990$2.25$1.97$1.96$2.25$1.96$3.39
0186Generic pavement marking item (LF) - integrated multipolymer pavement marking lines, (8", 90 mils) (4890000000-E)LF1,547$4.00$3.52$3.50$5.00$3.50$5.43
0187Generic pavement marking item (EA) - integrated multipolymer pavement marking symbols, (90 mils) (4895000000-N)EACH46$89.00$80.54$80.00$175.00$80.00$233.71
0188Generic pavement marking item (EA) - polycarbonate H-shaped markers (4895000000-N)EACH344$70.00$63.42$63.00$55.00$63.00$79.46
01898" water line (5325800000-E)LF3,532$130.00$112.24$79.22$152.00$112.00$130.34
0190DI H2O pipe fittings (5329000000-E)LB4,175$12.25$11.22$15.77$16.00$14.00$28.77
01912" valve (5536000000-E)EACH1$2,280.00$2,244.90$2,187.91$3,560.00$1,500.00$2,739.65
01926" valve (5540000000-E)EACH4$3,060.00$3,367.35$2,917.35$5,300.00$2,250.00$4,401.29
01938" valve (5546000000-E)EACH12$4,310.00$4,489.80$5,191.78$7,015.00$3,100.00$5,651.93
0194**" comb air valve - (1") (5590000000-E)EACH1$11,900$10,204$7,564.31$11,530$8,800.00$21,108
0195Relocate water meter (5648000000-N)EACH15$2,390.00$3,673.47$1,478.65$4,850.00$1,750.00$3,471.24
0196Reconnect water meter (5649000000-N)EACH1$3,690.00$2,653.06$2,984.24$4,850.00$1,750.00$1,105.02
0197Fire hydrant (5666000000-N)EACH4$9,600.00$9,183.67$10,320$8,210.00$7,500.00$11,317
0198Fire hydrant leg (5673000000-E)LF29$234.00$153.06$104.80$545.00$220.00$164.41
0199Water service line (<2") (5686500000-E)LF640$73.00$81.63$10.15$95.00$56.00$45.80
02002" force main sewer (5709100000-E)LF123$55.00$142.86$105.19$152.00$145.00$153.84
02014" force main sewer (5709200000-E)LF919$147.00$51.02$136.51$120.00$93.00$115.67
02026" force main sewer (5709300000-E)LF2,296$130.00$102.04$74.62$130.00$97.00$106.85
0203Ductile iron sewer pipe fittings (5769000000-E)LB755$18.00$14.29$24.29$20.00$14.00$51.67
02044' dia utility manhole (5775000000-E)EACH1$6,300.00$8,163.27$8,550.83$9,250.00$3,600.00$16,088
0205Abandon **" utility pipe - (2") (5798000000-E)LF88$10.00$15.31$56.53$10.00$17.00$27.01
0206Abandon **" utility pipe - (4") (5798000000-E)LF784$3.00$18.37$14.03$10.00$20.00$14.09
0207Abandon 6" utility pipe (5800000000-E)LF2,283$14.50$18.37$8.93$10.00$22.00$11.75
0208Abandon 8" utility pipe (5801000000-E)LF3,493$2.75$20.41$10.56$10.00$24.00$12.91
0209Remove fire hydrant (5815500000-N)EACH1$972.00$2,040.82$1,168.24$1,310.00$1,550.00$3,804.74
0210Remove utility manhole (5828000000-N)EACH1$1,910.00$3,061.22$2,124.73$2,050.00$1,400.00$4,506.98
02116" encasement pipe (5835400000-E)LF85$331.00$183.67$125.43$265.00$220.00$125.66
021212" encasement pipe (5835600000-E)LF86$157.00$204.08$117.44$275.00$260.00$172.62
021318" encasement pipe (5835800000-E)LF661$256.00$204.08$200.98$325.00$275.00$293.58
0214Bore & jack **" - (18") (5872500000-E)LF202$1,070.00$1,428.57$1,619.69$900.00$750.00$1,155.76
0215Bore & jack **" - (6") (5872500000-E)LF85$777.00$612.24$622.97$750.00$575.00$859.42
0216Generic utility item (EA) - pressure regulating valve with bypass (5882000000-N)EACH1$50,900$61,224$27,092$55,000$49,000$71,245
0217Temporary silt fence (6000000000-E)LF40,620$2.75$2.79$2.50$2.50$2.50$2.92
0218Stone for erosion control, class A (6006000000-E)TON2,800$0.01$75.00$82.90$76.00$65.00$49.00
0219Stone for erosion control, class B (6009000000-E)TON10,775$0.01$105.00$0.01$80.00$70.00$50.00
0220Sediment control stone (6012000000-E)TON6,205$0.01$70.00$0.01$69.00$57.00$41.00
0221Temporary mulching (6015000000-E)ACRE144.50$1,060.00$1,491.41$1,500.00$1,950.00$1,500.00$1,500.00
0222Seed for temporary seeding (6018000000-E)LB6,200$2.25$4.20$1.50$2.60$1.50$1.75
0223Fertilizer for temporary seeding (6021000000-E)TON32.50$822.00$664.10$700.00$700.00$700.00$818.01
0224Temporary slope drains (6024000000-E)LF4,000$24.75$25.00$22.39$70.00$28.25$21.93
0225Safety fence (6029000000-E)LF2,880$5.00$11.32$2.00$2.00$2.00$2.33
0226Silt excavation (6030000000-E)CY56,000$0.01$0.01$0.01$8.50$2.50$1.00
0227Matting for erosion control (6036000000-E)SY127,135$1.75$1.50$1.50$1.50$1.50$1.75
0228Coir fiber mat (6037000000-E)SY11,575$4.50$11.35$4.00$4.00$4.00$4.68
02291/4" hardware cloth (6042000000-E)LF5,145$3.00$4.00$4.00$4.00$4.00$4.68
0230Low permeability geotextile (6043000000-E)SY900$6.75$4.25$5.80$8.37$4.25$4.96
0231**" temporary pipe - (24") (6045000000-E)LF290$90.00$70.00$85.88$145.00$80.00$51.02
0232Temporary pipe for stream crossing (6046000000-E)LF90$416.00$207.97$315.00$700.00$320.00$73.23
0233Special stilling basins (6070000000-N)EACH12$485.00$1,685.05$695.15$30,000$550.00$1,099.95
0234Flocculant (6071002000-E)LB3,090$9.50$4.00$4.00$4.50$4.00$4.68
0235Coir fiber baffle (6071030000-E)LF6,685$5.50$6.69$6.50$6.50$6.50$7.59
0236**" skimmer - (1-1/2") (6071050000-E)EACH8$1,100.00$1,250.00$1,405.97$2,150.00$1,700.00$1,110.15
0237**" skimmer - (2") (6071050000-E)EACH12$1,310.00$1,550.00$1,575.84$2,350.00$1,900.00$1,460.72
0238**" skimmer - (2-1/2") (6071050000-E)EACH4$1,600.00$1,950.00$1,812.45$2,620.00$2,200.00$1,636.01
0239**" skimmer - (3") (6071050000-E)EACH1$1,970.00$2,400.00$2,885.00$2,965.00$2,450.00$2,337.16
0240Seeding and mulching (6084000000-E)ACRE93$2,660.00$2,540.93$2,400.00$2,400.00$2,750.00$2,804.59
0241Mowing (6087000000-E)ACRE96$109.00$305.10$150.00$150.00$150.00$175.29
0242Seed for repair seeding (6090000000-E)LB1,500$8.50$11.15$4.00$4.00$4.00$4.68
0243Fertilizer for repair seeding (6093000000-E)TON5$1,330.00$1,066.68$1,200.00$1,200.00$1,200.00$1,402.29
0244Seed for supplemental seeding (6096000000-E)LB2,175$10.00$24.44$4.00$4.00$4.00$4.68
0245Fertilizer topdressing (6108000000-E)TON66$1,450.00$667.17$700.00$700.00$700.00$818.01
0246Impervious dike (6111000000-E)LF508$76.00$275.00$80.00$85.00$85.00$75.96
0247Specialized hand mowing (6114500000-N)MHR60$113.00$142.15$120.00$120.00$120.00$140.23
0248Manual litter removal (6114800000-N)MHR47$278.00$120.00$116.15$120.00$120.00$140.23
0249Litter disposal (6114900000-E)TON12$444.00$200.00$294.85$200.00$200.00$233.71
0250Mechanical litter removal (6115000000-E)SMI5$111.00$750.00$430.18$440.00$1,200.00$1,145.67
0251Response for erosion control (6117000000-N)EACH175$57.00$129.59$50.00$50.00$50.00$58.42
0252Concrete washout structure (6117500000-N)EACH3$1,220.00$1,200.00$1,500.00$5,000.00$750.00$943.53
0253Culvert diversion channel (6120000000-E)CY313$44.50$45.00$31.44$31.00$11.00$67.10
0254Generic erosion control item (EA) - prefabricated concrete washout (6132000000-N)EACH15$1,010.00$1,800.00$250.00$4,000.00$750.00$943.53
0255Generic erosion control item (LS) - diversion pumping (6133000000-N)LS1$28,300$25,787$25,000$100,000$25,000$38,462
0256Generic erosion control item (acr) - disking (6135000000-E)ACRE2.30$164.00$1,517.23$145.00$145.00$145.00$169.45
0257Generic erosion control item (acr) - ripping (6135000000-E)ACRE2.30$3,800.00$1,517.23$3,350.00$3,350.00$3,350.00$3,914.73
0258Generic erosion control item (CY) - impervious select material (6138000000-E)CY700$80.00$8.22$71.00$28.94$71.00$82.97
0259Generic erosion control item (LF) - brush toe stabilization (6147000000-E)LF604$283.00$90.35$250.00$250.00$250.00$292.15
0260Generic erosion control item (TON) - channel substrate material (6150000000-E)TON37$78.00$8.27$68.50$113.00$68.50$80.04
0261Generic planting item (EA) - live plant material - 12" diameter bundles (6645000000-N)EACH315$59.00$8.14$52.00$52.00$52.00$60.77
0262Topsoil (6900000000-E)CY60$153.00$72.60$135.00$30.00$135.00$157.76
0263Signal cable (7060000000-E)LF2,500$5.75$5.10$5.00$5.00$5.00$5.84
0264Vehicle signal head (12", 3 section) (7120000000-E)EACH5$1,470.00$1,326.53$1,300.00$1,300.00$1,300.00$5.84
0265Vehicle signal head (12", 4 section) (7132000000-E)EACH4$1,940.00$1,760.21$1,725.00$1,725.00$1,725.00$2,015.79
0266Vehicle signal head (12", 5 section) (7144000000-E)EACH3$2,510.00$2,270.41$2,225.00$2,225.00$2,225.00$2,600.08
0267Messenger cable (3/8") (7264000000-E)LF600$10.25$9.18$9.00$9.00$9.00$10.51
0268Paved trench (***********) - (1, 2") (7288000000-E)LF800$62.02$56.12$55.00$130.00$55.00$64.27
0269Unpaved trench (***********) - (1, 2") (7300000000-E)LF50$15.75$14.29$14.00$14.00$14.00$16.36
0270Direct drill (***********) - (1, 2") (7301000000-E)LF150$45.00$40.82$40.00$40.00$40.00$46.74
0271Junction box (standard size) (7324000000-N)EACH11$1,100.00$994.90$975.00$975.00$975.00$1,139.37
0272Inductive loop sawcut (7444000000-E)LF2,000$24.75$22.45$22.00$22.00$22.00$25.71
0273Lead-in cable (14-2) (7456100000-E)LF2,500$3.00$2.81$2.75$2.75$2.75$3.21
0274Metal strain signal pole (7576000000-N)EACH4$18,300$16,531$16,200$16,200$16,200$18,931
0275Soil test (7613000000-N)EACH4$2,480.00$2,244.90$2,200.00$2,200.00$2,200.00$2,570.87
0276Drilled pier foundation (7614100000-E)CY24$1,440.00$1,301.02$1,275.00$1,275.00$1,275.00$1,489.95
0277Sign for signals (7636000000-N)EACH1$902.00$816.33$800.00$800.00$800.00$934.86
0278Signal cabinet foundation (7684000000-N)EACH1$2,650.00$2,397.96$2,350.00$2,350.00$2,350.00$2,746.16
0279Contlrs with CBNT (**************) - (2070LX, base mounted) (7696000000-N)EACH1$28,200$25,510$25,000$25,000$25,000$29,214
0280Detector card (type 170) (7744000000-N)EACH9$259.00$234.69$230.00$230.00$230.00$268.78
0281Cabinet base extender (7901000000-N)EACH1$986.00$892.86$875.00$875.00$875.00$1,022.51
0282PC RCBC @ sta ********** - (66+15.50 -L-) (8063000000-N)LS1$805,000$750,000$689,130$1,000,000$610,000$811,832
0283Box culv excav @ ******** - (66+15.50 -L-) (8130000000-N)LS1$108,000$40,000$263,000$200,000$55,000$500,000
0284Foundation conditioning material, box culvert (8133000000-E)TON422$94.00$125.00$115.06$95.00$53.15$6.90
0285Class A concrete (culvert) (8196000000-E)CY62.90$3,300.00$3,500.00$2,327.60$2,260.00$800.00$1,752.84
0286Reinforcing steel (culvert) (8245000000-E)LB8,210$3.00$2.00$2.20$2.50$3.00$1.79
0287Generic structure item (SF) - architectural surface treatment (sound barrier wall no 1) (8892000000-E)SF10,686$1.75$1.48$1.48$2.50$3.00$1.34
0288Generic structure item (SF) - sound barrier wall (8892000000-E)SF6,342$62.00$75.00$52.46$40.00$65.00$78.84
0289FND excav B** sta ******* - (1, 70+91.84 -L-) (8091000000-N)LS1$18,000$22,000$47,080$100,000$45,000$500,000
0290Reinforced concrete deck slab (8147000000-E)SF12,660$56.00$65.00$63.58$50.00$54.00$46.55
0291Grooving bridge floors (8161000000-E)SF13,740$0.85$0.85$1.10$1.00$1.25$0.48
0292Class A concrete (bridge) (8182000000-E)CY181.80$1,290.00$1,500.00$1,438.80$1,400.00$900.00$1,363.97
0293BRG appr slab *********** - (70+91.84 -L-) (8210000000-N)LS1$94,700$100,000$102,080$180,000$59,000$99,364
0294Reinforcing steel (bridge) (8217000000-E)LB32,220$2.00$1.75$2.20$1.40$2.15$1.45
0295Spiral column reinforcing steel (bridge) (8238000000-E)LB1,724$4.75$3.00$3.30$4.00$3.00$2.80
0296Fib **" prestr conc girdr - (63") (8278000000-E)LF1,332.50$480.00$550.00$443.30$469.00$395.00$460.76
0297Pile DRV equip setup ** steel piles - (HP 14 X 73) (8328200000-E)EACH34$3,300.00$4,000.00$1,988.80$210.00$1,250.00$7,500.00
0298HP 14 X 73 steel piles (8384000000-E)LF2,320$76.00$70.00$104.72$90.00$90.00$90.65
0299Dynamic pile testing (8394000000-N)EACH1$5,750.00$1,950.00$5,500.00$2,000.00$2,500.00$2,291.32
0300Concrete barrier rail (8503000000-E)LF446.20$200.00$190.00$192.50$150.00$115.00$160.35
03014" slope protection (8531000000-E)SY580$186.00$150.00$220.00$200.00$170.00$99.95
0302Elastomeric bearings (8657000000-N)LS1$8,850.00$15,000$77,000$30,000$15,600$18,295
0303Box culv excav @ ******** - (30+32.50 -Y2-) (8130000000-N)LS1$72,200$10,000$60,720$100,000$30,000$29,592
NCDOT contract C205093: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.

Every contract let that day: NCDOT letting of October 21, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy