NCDOT contract C205093 bid tabulation
GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. NEW ROUTE FROM SR-1630 (BALTIMORE RD) TO I-40. Let by North Carolina DOT on October 21, 2025, Davie. 10 bids received; low bid $32,185,000 by Branch Civil Inc.
- Owner
- North Carolina DOT
- Letting
- 21 OCT 2025
- Pay items
- 303
- Data through
- 20 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Branch Civil Inc | $32,185,000 | Low |
| 2 | Flatiron Dragados Constructors Inc | $34,186,422 | +6.0% |
| 3 | Apac Atlantic Inc Smith Rowe LLC JV | $35,507,781 | +10% |
| 4 | Ames Construction Inc | $36,738,039 | +14% |
| 5 | Triangle Grading & Paving Inc | $36,991,776 | +15% |
| 6 | Zachry Construction Corporation | $37,220,364 | +16% |
| 7 | Blythe Construction Inc | $38,599,114 | +20% |
| 8 | K West Group LLC DBA Kwest Group LLC | $41,991,538 | +30% |
| 9 | W C English Incorporated | $45,711,640 | +42% |
| 10 | Webber LLC | $47,250,000 | +47% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Branch Civil Inc | 2. Flatiron Dragados Constructors Inc | 3. Apac Atlantic Inc Smith Rowe LLC JV | 4. Ames Construction Inc | 5. Triangle Grading & Paving Inc | 6. Zachry Construction Corporation |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Mobilization (0000100000-N) | LS | 1 | $1,600,000 | $1,709,000 | $1,750,000 | $1,836,000 | $1,800,000 | $1,850,000 |
| 0002 | Construction surveying (0000400000-N) | LS | 1 | $361,000 | $600,000 | $450,000 | $380,000 | $425,000 | $500,000 |
| 0003 | Field office (0000720000-N) | MO | 36 | $5,000.00 | $7,500.00 | $6,300.00 | $5,000.00 | $3,800.00 | $2,100.00 |
| 0004 | Generic miscellaneous item (LS) - surveying for mitigation (0000900000-N) | LS | 1 | $22,700 | $11,237 | $30,000 | $60,000 | $20,000 | $500,000 |
| 0005 | Clearing & grubbing (0001000000-E) | LS | 1 | $2,664,505 | $4,571,000 | $4,000,000 | $2,762,000 | $2,790,000 | $5,000,000 |
| 0006 | Supplementary clearing & grubbing (0008000000-E) | ACRE | 2 | $11,100 | $15,100 | $1.00 | $17,000 | $3,000.00 | $15,500 |
| 0007 | Unclassified excavation (0022000000-E) | CY | 228,500 | $11.00 | $7.00 | $11.89 | $13.00 | $14.50 | $8.00 |
| 0008 | Undercut excavation (0036000000-E) | CY | 9,000 | $9.75 | $10.00 | $12.00 | $16.00 | $9.00 | $17.16 |
| 0009 | Borrow excavation (0106000000-E) | CY | 214,000 | $0.01 | $0.01 | $0.01 | $1.00 | $9.50 | $8.26 |
| 0010 | Drainage ditch excavation (0134000000-E) | CY | 18,950 | $4.25 | $18.00 | $8.92 | $8.00 | $10.00 | $7.19 |
| 0011 | Berm ditch construction (0141000000-E) | LF | 2,620 | $8.51 | $10.00 | $8.77 | $15.00 | $8.00 | $8.63 |
| 0012 | Removal of existing asphalt pavement (0156000000-E) | SY | 600 | $21.00 | $9.00 | $8.92 | $20.00 | $14.00 | $13.31 |
| 0013 | Breaking of existing asphalt pavement (0177000000-E) | SY | 1,130 | $6.25 | $6.00 | $3.97 | $4.00 | $4.00 | $6.42 |
| 0014 | Proof rolling (0192000000-N) | HR | 20 | $189.00 | $200.00 | $394.55 | $140.00 | $250.00 | $416.26 |
| 0015 | Select granular material (0195000000-E) | CY | 8,220 | $11.50 | $55.00 | $0.01 | $48.00 | $26.00 | $50.70 |
| 0016 | Geotextile for soil stabilization (0196000000-E) | SY | 11,220 | $3.75 | $4.00 | $5.25 | $3.00 | $3.50 | $2.73 |
| 0017 | Generic grading item (SY) - culvert load transfer mat (0241000000-E) | SY | 4,360 | $56.00 | $70.00 | $0.01 | $35.00 | $48.00 | $38.77 |
| 0018 | Generic grading item (SY) - geotextile for embankment stabilization, type 5A (0241000000-E) | SY | 22,540 | $4.50 | $8.00 | $3.83 | $3.50 | $4.50 | $3.15 |
| 0019 | Generic grading item (LS) - site grading for mitigation (0248000000-N) | LS | 1 | $170,000 | $89,000 | $155,000 | $180,000 | $150,000 | $154,000 |
| 0020 | Generic grading item (LS) - type 1 bridge approach fill, station 70+91.84 -L- (0248000000-N) | LS | 1 | $9,410.00 | $107,000 | $97,680 | $60,000 | $125,000 | $60,790 |
| 0021 | Foundation conditioning material, minor structures (0318000000-E) | TON | 1,250 | $87.00 | $55.00 | $61.00 | $70.00 | $65.00 | $50.00 |
| 0022 | FND condit geotextile (4A) (0321000000-E) | SY | 3,940 | $3.50 | $5.00 | $6.10 | $2.00 | $5.00 | $3.82 |
| 0023 | **" side drain pipe - (30") (0342000000-E) | LF | 568 | $103.00 | $145.00 | $129.69 | $185.00 | $145.00 | $119.30 |
| 0024 | **" side drain pipe - (36") (0342000000-E) | LF | 764 | $167.00 | $151.00 | $164.51 | $215.00 | $156.00 | $153.92 |
| 0025 | 15" side drain pipe (0343000000-E) | LF | 1,904 | $77.00 | $93.00 | $76.97 | $129.00 | $110.00 | $47.00 |
| 0026 | 18" side drain pipe (0344000000-E) | LF | 300 | $78.00 | $90.00 | $91.44 | $138.00 | $113.00 | $62.96 |
| 0027 | 24" side drain pipe (0345000000-E) | LF | 736 | $84.00 | $115.00 | $93.76 | $159.00 | $120.00 | $72.55 |
| 0028 | **" side drain pipe elbow - (15") (0348000000-E) | EACH | 22 | $643.00 | $400.00 | $542.65 | $532.00 | $850.00 | $439.63 |
| 0029 | **" side drain pipe elbow - (18") (0348000000-E) | EACH | 10 | $750.00 | $550.00 | $662.50 | $620.00 | $1,050.00 | $476.26 |
| 0030 | **" side drain pipe elbow - (30") (0348000000-E) | EACH | 2 | $1,020.00 | $1,250.00 | $1,293.80 | $1,250.00 | $1,500.00 | $773.43 |
| 0031 | ***" RCP culv class IV - (48") (0448000000-E) | LF | 140 | $400.00 | $400.00 | $334.63 | $505.00 | $450.00 | $366.94 |
| 0032 | ***" RCP culv class IV - (54") (0448000000-E) | LF | 28 | $917.00 | $900.00 | $884.82 | $929.00 | $550.00 | $547.81 |
| 0033 | 15" RC pipe culverts, class IV (0448200000-E) | LF | 3,940 | $106.00 | $90.00 | $105.13 | $136.00 | $110.00 | $87.37 |
| 0034 | 18" RC pipe culverts, class IV (0448300000-E) | LF | 1,296 | $109.00 | $129.00 | $106.27 | $154.00 | $118.00 | $107.38 |
| 0035 | 24" RC pipe culverts, class IV (0448400000-E) | LF | 368 | $150.00 | $190.00 | $122.89 | $198.00 | $180.00 | $136.68 |
| 0036 | 30" RC pipe culverts, class IV (0448500000-E) | LF | 1,216 | $180.00 | $215.00 | $158.48 | $244.00 | $215.00 | $190.48 |
| 0037 | 36" RC pipe culverts, class IV (0448600000-E) | LF | 332 | $326.00 | $265.00 | $227.58 | $381.00 | $240.00 | $234.81 |
| 0038 | 42" RC pipe culverts, class IV (0448700000-E) | LF | 200 | $309.00 | $305.00 | $264.73 | $442.00 | $375.00 | $324.12 |
| 0039 | **" CS pipe culv *****" - (36", 0.079") (0576000000-E) | LF | 28 | $177.00 | $260.00 | $214.95 | $224.00 | $125.00 | $109.42 |
| 0040 | **"WLD STL pipe grad B in soil - (18", 0.250") (0973100000-E) | LF | 58 | $1,050.00 | $700.00 | $1,995.00 | $915.00 | $590.00 | $860.09 |
| 0041 | **"WLD STL pipe grad B in soil - (24", 0.375") (0973100000-E) | LF | 54 | $1,150.00 | $800.00 | $2,079.70 | $995.00 | $725.00 | $1,025.31 |
| 0042 | **"WLD STL pipe grad B in soil - (30", 0.500") (0973100000-E) | LF | 58 | $1,300.00 | $1,150.00 | $2,341.03 | $1,125.00 | $840.00 | $1,367.31 |
| 0043 | **"WLD STL pipe grad B in soil - (66", 0.938") (0973100000-E) | LF | 200 | $3,070.00 | $3,500.00 | $4,778.00 | $2,740.00 | $3,500.00 | $1,221.04 |
| 0044 | **"WLD STL pipe grad B not in soil - (18", 0.250") (0973300000-E) | LF | 58 | $0.01 | $0.01 | $1.00 | $915.00 | $1,900.00 | $2,329.99 |
| 0045 | **"WLD STL pipe grad B not in soil - (24", 0.375") (0973300000-E) | LF | 54 | $0.01 | $0.01 | $1.00 | $995.00 | $2,850.00 | $3,402.56 |
| 0046 | **"WLD STL pipe grad B not in soil - (30", 0.500") (0973300000-E) | LF | 58 | $0.01 | $0.01 | $1.00 | $1,125.00 | $3,550.00 | $4,435.39 |
| 0047 | **"WLD STL pipe grad B not in soil - (66", 0.938") (0973300000-E) | LF | 200 | $0.01 | $0.01 | $1.00 | $2,740.00 | $7,000.00 | $1,780.70 |
| 0048 | Pipe removal (0995000000-E) | LF | 1,740 | $25.25 | $30.00 | $16.43 | $29.00 | $17.00 | $48.00 |
| 0049 | Fine grading (1011000000-N) | LS | 1 | $1,800,000 | $450,000 | $4,248,003 | $1,000,000 | $1,400,000 | $474,359 |
| 0050 | Lime treated soil (slurry method) (1044000000-E) | SY | 23,950 | $3.50 | $3.25 | $4.10 | $3.20 | $5.20 | $3.25 |
| 0051 | Lime for lime treated soil used based on county (1066000000-E) | TON | 290 | $357.00 | $322.00 | $437.15 | $317.00 | $325.00 | $322.00 |
| 0052 | #57 stone (1077000000-E) | TON | 225 | $68.00 | $103.00 | $60.00 | $60.00 | $60.00 | $54.97 |
| 0053 | Shallow undercut (1099500000-E) | CY | 500 | $15.50 | $30.00 | $28.90 | $34.00 | $17.00 | $24.36 |
| 0054 | Class IV subgrade stabilization (1099700000-E) | TON | 1,000 | $54.00 | $75.00 | $57.08 | $52.00 | $44.00 | $50.47 |
| 0055 | Stabilizer aggregate (1110000000-E) | TON | 500 | $54.00 | $50.00 | $52.45 | $72.00 | $47.00 | $59.22 |
| 0056 | Geotextile for subgrade stabilization (1112000000-E) | SY | 29,690 | $4.25 | $3.00 | $4.20 | $4.00 | $4.20 | $2.76 |
| 0057 | Aggregate base course (1121000000-E) | TON | 24,000 | $38.00 | $45.00 | $47.50 | $51.00 | $48.00 | $49.73 |
| 0058 | Soil cement base (1176000000-E) | SY | 23,950 | $3.50 | $3.10 | $3.95 | $3.10 | $4.99 | $3.20 |
| 0059 | Portland cement for soil cement base (1187000000-E) | TON | 671 | $308.00 | $257.00 | $263.00 | $267.00 | $261.50 | $272.00 |
| 0060 | Asphalt curing seal (1209000000-E) | GAL | 7,190 | $5.75 | $5.08 | $4.60 | $5.00 | $3.50 | $5.10 |
| 0061 | Incidental stone base (1220000000-E) | TON | 200 | $64.00 | $175.00 | $80.85 | $79.30 | $60.00 | $41.00 |
| 0062 | Prime coat (1275000000-E) | GAL | 680 | $7.75 | $3.50 | $5.30 | $10.00 | $10.00 | $5.00 |
| 0063 | Mill asp PVMT *****" DTH - (1-1/2") (1297000000-E) | SY | 41,100 | $2.50 | $1.85 | $1.60 | $1.20 | $4.10 | $4.00 |
| 0064 | Incidental milling (1330000000-E) | SY | 1,010 | $13.25 | $12.00 | $9.00 | $8.95 | $23.00 | $16.00 |
| 0065 | Asphalt conc base course, type B25.0C (1491000000-E) | TON | 5,070 | $95.00 | $93.84 | $87.00 | $87.00 | $92.00 | $88.00 |
| 0066 | Asphalt conc intermediate course, type I19.0C (1503000000-E) | TON | 14,560 | $90.00 | $84.27 | $82.00 | $82.00 | $87.00 | $83.00 |
| 0067 | Asphalt conc surface course, type S9.5C (1523000000-E) | TON | 11,100 | $92.00 | $83.44 | $85.00 | $85.00 | $90.00 | $86.00 |
| 0068 | Asphalt conc surface course, type S9.5D (1524200000-E) | TON | 7,090 | $94.00 | $101.61 | $87.00 | $87.00 | $92.00 | $88.00 |
| 0069 | Asphalt binder for plant mix (1575000000-E) | TON | 1,585 | $760.00 | $642.80 | $705.00 | $705.00 | $705.00 | $706.00 |
| 0070 | Polymer modified asphalt binder for plant mix (1577000000-E) | TON | 415 | $860.00 | $749.47 | $800.00 | $800.00 | $800.00 | $801.00 |
| 0071 | Asphalt plant mix, pavement repair (1693000000-E) | TON | 270 | $475.00 | $250.00 | $312.00 | $300.00 | $300.00 | $301.00 |
| 0072 | Generic paving item (LF) 665 - milled rumble strips (asphalt concrete), (16") (1841000000-E) | LF | 7,030 | $0.80 | $0.78 | $1.02 | $0.60 | $1.02 | $1.05 |
| 0073 | Right-of-way markers (2000000000-N) | EACH | 122 | $351.00 | $300.00 | $310.00 | $390.00 | $310.00 | $362.26 |
| 0074 | Control-of-access markers (2020000000-N) | EACH | 12 | $351.00 | $350.00 | $310.00 | $390.00 | $310.00 | $362.26 |
| 0075 | Subdrain excavation (2022000000-E) | CY | 340 | $42.00 | $35.00 | $19.92 | $15.00 | $19.00 | $11.12 |
| 0076 | Geotextile for subsurface drains (2026000000-E) | SY | 1,000 | $10.50 | $6.00 | $4.15 | $3.00 | $9.00 | $2.23 |
| 0077 | Subdrain coarse aggregate (2036000000-E) | CY | 170 | $155.00 | $55.00 | $92.87 | $134.00 | $101.00 | $44.61 |
| 0078 | 6" perforated subdrain pipe (2044000000-E) | LF | 1,000 | $33.00 | $15.00 | $7.79 | $35.00 | $16.00 | $11.92 |
| 0079 | Subdrain pipe outlet (2070000000-N) | EACH | 2 | $1,840.00 | $300.00 | $533.00 | $1,340.00 | $500.00 | $274.06 |
| 0080 | 6" outlet pipe (2077000000-E) | LF | 12 | $156.00 | $50.00 | $61.83 | $200.00 | $40.00 | $23.28 |
| 0081 | Shoulder drain (2099000000-E) | LF | 2,000 | $20.75 | $19.04 | $14.80 | $23.00 | $20.00 | $21.81 |
| 0082 | 4" shoulder drain pipe (2110000000-E) | LF | 2,000 | $2.75 | $2.53 | $8.24 | $23.00 | $4.50 | $2.90 |
| 0083 | 4" outlet pipe for shoulder drains (2121000000-E) | LF | 100 | $24.25 | $22.10 | $20.55 | $36.00 | $24.00 | $25.31 |
| 0084 | Concrete pad for shoulder drain pipe outlet (2132000000-N) | EACH | 10 | $611.00 | $557.17 | $514.18 | $1,265.00 | $550.00 | $638.23 |
| 0085 | Blotting sand (2143000000-E) | TON | 20 | $333.00 | $100.00 | $54.65 | $56.00 | $165.00 | $80.19 |
| 0086 | Endwalls (2209000000-E) | CY | 13 | $2,840.00 | $2,000.00 | $1,522.25 | $2,525.00 | $1,750.00 | $1,904.66 |
| 0087 | Reinforced endwalls (2220000000-E) | CY | 5 | $3,870.00 | $3,500.00 | $2,499.44 | $3,015.00 | $1,900.00 | $1,935.67 |
| 0088 | Pipe collars (2253000000-E) | CY | 5 | $1,000.00 | $1,850.00 | $4,628.71 | $2,040.00 | $950.00 | $2,031.72 |
| 0089 | Pipe plugs (2264000000-E) | CY | 1 | $1,830.00 | $1,650.00 | $1,375.15 | $5,960.00 | $950.00 | $5,617.99 |
| 0090 | Flowable fill (2275000000-E) | CY | 212 | $428.00 | $350.00 | $522.19 | $390.00 | $475.00 | $327.00 |
| 0091 | Masonry drainage structures (2286000000-N) | EACH | 116 | $5,990.00 | $4,200.00 | $3,965.82 | $5,000.00 | $2,750.00 | $5,113.68 |
| 0092 | Masonry drainage structures (2297000000-E) | CY | 3.83 | $6,000.00 | $3,500.00 | $8,595.63 | $4,915.00 | $2,500.00 | $504.36 |
| 0093 | Masonry drainage structures (2308000000-E) | LF | 107.20 | $300.00 | $1,000.00 | $734.06 | $560.00 | $775.00 | $504.36 |
| 0094 | Frame with grate, STD 840.24 (2354200000-N) | EACH | 2 | $751.00 | $1,200.00 | $2,585.63 | $1,000.00 | $750.00 | $863.59 |
| 0095 | Frame with two grates, STD 840.16 (2364000000-N) | EACH | 27 | $1,070.00 | $1,400.00 | $2,093.36 | $1,200.00 | $1,050.00 | $1,115.35 |
| 0096 | Frame with two grates, STD 840.20 (2364200000-N) | EACH | 18 | $980.00 | $1,300.00 | $1,887.36 | $1,200.00 | $950.00 | $1,042.20 |
| 0097 | Frame with two grates, STD 840.22 (2365000000-N) | EACH | 26 | $980.00 | $1,300.00 | $2,758.67 | $1,200.00 | $950.00 | $1,042.20 |
| 0098 | Frame with two grates, STD 840.24 (2366000000-N) | EACH | 7 | $999.00 | $1,300.00 | $2,783.72 | $1,200.00 | $975.00 | $863.59 |
| 0099 | Frame with two grates, STD 840.29 (2367000000-N) | EACH | 22 | $980.00 | $1,300.00 | $1,584.48 | $1,200.00 | $975.00 | $1,042.20 |
| 0100 | Frame-GRT-HD 840.03 ** - (E) (2374000000-N) | EACH | 1 | $1,190.00 | $1,600.00 | $1,420.40 | $1,100.00 | $1,200.00 | $2,736.42 |
| 0101 | Frame-GRT-HD 840.03 ** - (F) (2374000000-N) | EACH | 1 | $1,240.00 | $1,600.00 | $1,420.40 | $1,100.00 | $1,300.00 | $2,736.42 |
| 0102 | Frame-GRT-HD 840.03 ** - (G) (2374000000-N) | EACH | 7 | $1,240.56 | $1,600.00 | $1,420.40 | $1,100.00 | $1,300.00 | $2,736.42 |
| 0103 | Frame with cover, STD 840.54 (2396000000-N) | EACH | 5 | $782.00 | $1,200.00 | $1,104.33 | $1,100.00 | $675.00 | $888.34 |
| 0104 | Concrete transitional section for drop inlet (2451000000-N) | EACH | 13 | $1,390.00 | $1,275.51 | $1,250.00 | $950.00 | $1,250.00 | $1,460.73 |
| 0105 | 2'-6" concrete curb & gutter (2549000000-E) | LF | 930 | $42.00 | $40.24 | $34.95 | $34.00 | $34.95 | $43.66 |
| 0106 | Shoulder berm gutter (2556000000-E) | LF | 5,610 | $46.75 | $43.79 | $39.20 | $42.00 | $39.20 | $50.49 |
| 0107 | 4" concrete paved ditch (2619000000-E) | SY | 110 | $146.00 | $153.18 | $131.15 | $80.00 | $131.15 | $160.29 |
| 0108 | 5" monolithic concrete islands (keyed in) (2655000000-E) | SY | 1,860 | $94.00 | $86.28 | $84.55 | $115.00 | $84.55 | $98.80 |
| 0109 | Steel beam guardrail (3030000000-E) | LF | 9,500 | $24.75 | $22.22 | $22.00 | $23.50 | $22.00 | $25.58 |
| 0110 | Steel beam guardrail, shop curved (3045000000-E) | LF | 400 | $33.75 | $30.30 | $30.00 | $26.00 | $30.00 | $34.88 |
| 0111 | Additional guardrail posts (3150000000-N) | EACH | 10 | $1.00 | $1.01 | $1.00 | $55.00 | $1.00 | $1.17 |
| 0112 | Guardrail end units, type cat-1 (3210000000-N) | EACH | 6 | $1,010.00 | $909.09 | $900.00 | $850.00 | $900.00 | $1,046.56 |
| 0113 | Guardrail end units, type TL-3 (3287000000-N) | EACH | 11 | $3,480.00 | $3,131.31 | $3,100.00 | $3,250.00 | $3,100.00 | $3,756.00 |
| 0114 | Guardrail end units, type TL-2 (3288000000-N) | EACH | 5 | $3,370.00 | $3,030.30 | $3,000.00 | $3,200.00 | $3,000.00 | $3,488.55 |
| 0115 | Guardrail anchor units, type B-77 (3317000000-N) | EACH | 4 | $2,700.00 | $2,424.24 | $2,400.00 | $2,600.00 | $2,400.00 | $2,907.12 |
| 0116 | Remove & reset existing guiderail (3347000000-E) | LF | 135 | $7.75 | $7.07 | $7.00 | $15.00 | $7.00 | $8.14 |
| 0117 | Remove existing guardrail (3360000000-E) | LF | 1,755 | $1.00 | $0.91 | $0.90 | $1.00 | $0.90 | $1.04 |
| 0118 | Additional guiderail posts (3389500000-N) | EACH | 5 | $112.00 | $101.01 | $100.00 | $120.00 | $100.00 | $116.28 |
| 0119 | Cable guiderail anchor units (3389600000-N) | EACH | 2 | $2,810.00 | $2,525.26 | $2,500.00 | $3,000.00 | $2,500.00 | $2,907.12 |
| 0120 | Woven wire fence, 47" fabric (3503000000-E) | LF | 13,810 | $6.25 | $6.04 | $5.70 | $5.70 | $5.00 | $5.84 |
| 0121 | 4" timber fence posts, 7'-6" long (3509000000-E) | EACH | 837 | $44.25 | $41.28 | $38.00 | $38.00 | $35.00 | $40.90 |
| 0122 | 5" timber fence posts, 8'-0" long (3515000000-E) | EACH | 275 | $62.00 | $48.94 | $44.00 | $44.00 | $52.00 | $60.77 |
| 0123 | SGL gate **high, **wide, **open - (58", 12', 12' ) (3564000000-E) | EACH | 7 | $5,100.00 | $4,540.87 | $1,250.00 | $1,250.00 | $3,900.00 | $4,557.45 |
| 0124 | Rip rap, class I (3628000000-E) | TON | 4,235 | $98.00 | $85.00 | $80.25 | $86.00 | $75.00 | $78.92 |
| 0125 | Rip rap, class II (3635000000-E) | TON | 1,015 | $131.00 | $90.00 | $84.20 | $91.00 | $85.00 | $100.00 |
| 0126 | Rip rap, class A (3642000000-E) | TON | 10 | $68.00 | $75.00 | $112.75 | $165.00 | $65.00 | $75.60 |
| 0127 | Rip rap, class B (3649000000-E) | TON | 1,600 | $90.00 | $140.00 | $82.31 | $92.00 | $70.00 | $76.74 |
| 0128 | Boulders (3651000000-E) | TON | 430 | $453.00 | $161.20 | $400.00 | $488.00 | $400.00 | $141.12 |
| 0129 | Geotextile for drainage (3656000000-E) | SY | 17,505 | $3.00 | $6.00 | $5.20 | $3.00 | $4.00 | $2.80 |
| 0130 | Reinforced concrete sign foundations (4048000000-E) | CY | 4 | $888.00 | $824.74 | $800.00 | $800.00 | $2,173.00 | $2,539.32 |
| 0131 | Plain concrete sign foundations (4054000000-E) | CY | 1 | $11.00 | $10.31 | $10.00 | $10.00 | $1,738.00 | $2,030.99 |
| 0132 | Overhead footing (4057000000-E) | CY | 17 | $2,780.00 | $2,577.32 | $2,500.00 | $2,500.00 | $2,022.00 | $2,362.86 |
| 0133 | Supports, breakaway steel beam (4060000000-E) | LB | 4,877 | $9.50 | $8.76 | $8.50 | $8.50 | $12.00 | $14.02 |
| 0134 | Supports, 3-LB steel U-channel (4072000000-E) | LF | 1,636 | $9.50 | $8.76 | $8.50 | $8.50 | $12.50 | $14.61 |
| 0135 | Supports, 2-LB steel U-channel (4078000000-E) | EACH | 2 | $56.00 | $51.55 | $50.00 | $50.00 | $463.00 | $541.05 |
| 0136 | Supports, steel square tube (4080200000-E) | LF | 91 | $13.25 | $12.37 | $12.00 | $12.00 | $28.00 | $32.72 |
| 0137 | Sign erection, type D (4096000000-N) | EACH | 3 | $139.00 | $128.87 | $125.00 | $125.00 | $203.00 | $237.22 |
| 0138 | Sign erection, type E (4102000000-N) | EACH | 56 | $72.00 | $67.01 | $65.00 | $65.00 | $102.00 | $119.20 |
| 0139 | Sign erection, type F (4108000000-N) | EACH | 17 | $139.00 | $128.87 | $125.00 | $125.00 | $406.00 | $474.44 |
| 0140 | Sign erection, type *** (ovrhd) - (A) (4109000000-N) | EACH | 2 | $11.00 | $10.31 | $10.00 | $10.00 | $2,340.00 | $2,734.47 |
| 0141 | Sign erection, type *** (ovrhd) - (B) (4109000000-N) | EACH | 2 | $11.00 | $10.31 | $10.00 | $10.00 | $1,560.00 | $1,822.98 |
| 0142 | Sign erection, type *** (GRD MTD) - (A) (4110000000-N) | EACH | 7 | $1,050.00 | $979.38 | $950.00 | $950.00 | $1,742.00 | $2,035.66 |
| 0143 | Sign erection, type *** (GRD MTD) - (B) (4110000000-N) | EACH | 5 | $555.00 | $515.46 | $500.00 | $500.00 | $871.00 | $1,017.84 |
| 0144 | Sign erection, milemarkers (4114000000-N) | EACH | 2 | $111.00 | $103.10 | $100.00 | $100.00 | $186.00 | $217.35 |
| 0145 | Sign erect, reloc ** GRD MTD - (A) (4116100000-N) | EACH | 1 | $1,110.00 | $1,030.93 | $1,000.00 | $1,000.00 | $2,903.00 | $3,392.38 |
| 0146 | Sign erect, reloc ** GRD MTD - (D) (4116100000-N) | EACH | 1 | $278.00 | $257.73 | $250.00 | $250.00 | $1,161.00 | $1,356.71 |
| 0147 | Support, ovrhd sign STR ***** - (31+66 -Y2-) (4130000000-N) | LS | 1 | $105,000 | $97,938 | $95,000 | $240,000 | $107,749 | $125,913 |
| 0148 | Disposal of support, steel beam (4138000000-N) | EACH | 2 | $555.00 | $515.47 | $500.00 | $500.00 | $1,266.00 | $1,479.41 |
| 0149 | Disposal of sign system, steel beam (4152000000-N) | EACH | 3 | $555.00 | $515.46 | $500.00 | $500.00 | $1,900.00 | $2,220.29 |
| 0150 | Disposal of sign system, U-channel (4155000000-N) | EACH | 14 | $2.25 | $2.06 | $2.00 | $2.00 | $317.00 | $370.44 |
| 0151 | Disposal of support, U-channel (4192000000-N) | EACH | 1 | $2.25 | $2.06 | $2.00 | $2.00 | $158.00 | $184.64 |
| 0152 | Generic signing item (EA) - supports, omni-directional breakaway (4360000000-N) | EACH | 7 | $222.00 | $206.19 | $200.00 | $200.00 | $531.00 | $620.52 |
| 0153 | High visibility stationary signs (4402000000-E) | SF | 610 | $13.75 | $6.89 | $9.68 | $8.88 | $10.50 | $10.37 |
| 0154 | High visibility portable signs (4407000000-E) | SF | 624 | $14.75 | $9.18 | $10.33 | $18.00 | $29.50 | $11.06 |
| 0155 | Work zone signs (barricade mounted) (4410000000-E) | SF | 257 | $13.25 | $8.16 | $9.36 | $8.00 | $12.50 | $10.02 |
| 0156 | Flashing arrow board (4415000000-N) | EACH | 10 | $2,890.00 | $2,142.86 | $1.00 | $2,220.00 | $8,200.00 | $2,176.76 |
| 0157 | Portable changeable message sign (short term) (4422000000-N) | DAY | 150 | $129.00 | $51.02 | $150.00 | $55.50 | $125.00 | $97.38 |
| 0158 | Work zone presence lighting (4424000000-N) | EACH | 28 | $2,890.00 | $2,551.02 | $2,140.00 | $3,330.00 | $3,500.00 | $2,176.76 |
| 0159 | Drums (4430000000-N) | EACH | 235 | $67.00 | $56.12 | $90.00 | $48.00 | $85.00 | $63.01 |
| 0160 | High visibility drums (4432000000-N) | EACH | 235 | $84.00 | $56.12 | $100.00 | $59.00 | $95.00 | $50.41 |
| 0161 | Sequential flashing warning lights (4434000000-N) | EACH | 48 | $213.00 | $137.76 | $149.80 | $138.00 | $120.00 | $160.40 |
| 0162 | Barricades (type III) (4445000000-E) | LF | 144 | $38.00 | $20.41 | $26.75 | $29.00 | $43.00 | $28.64 |
| 0163 | Flagger (4455000000-N) | DAY | 198 | $583.00 | $1,330.00 | $440.00 | $1,400.00 | $510.00 | $359.11 |
| 0164 | Temporary crash cushions (4465000000-N) | EACH | 4 | $9,160.00 | $8,418.37 | $7,808.35 | $11,250 | $11,250 | $5,499.18 |
| 0165 | Remove & reset temporary crash cushion (4470000000-N) | EACH | 4 | $3,610.00 | $3,316.33 | $2,404.93 | $3,250.00 | $3,250.00 | $2,864.16 |
| 0166 | TMA (4480000000-N) | EACH | 7 | $34,400 | $25,510 | $1.00 | $15,410 | $30,000 | $29,071 |
| 0167 | Portable concrete barrier (4485000000-E) | LF | 3,747 | $46.50 | $42.68 | $42.27 | $41.00 | $41.83 | $48.88 |
| 0168 | Portable concrete barrier (anchored) (4490000000-E) | LF | 4,651 | $66.00 | $60.87 | $56.45 | $59.00 | $59.65 | $69.70 |
| 0169 | Remove and reset portable concrete barrier (4500000000-E) | LF | 7,692 | $9.25 | $8.39 | $10.02 | $8.00 | $8.22 | $9.60 |
| 0170 | Remove & reset portable concrete barrier (anchored) (4505000000-E) | LF | 600 | $26.75 | $24.66 | $25.40 | $24.00 | $24.17 | $28.25 |
| 0171 | Law enforcement (4510000000-N) | HR | 160 | $89.00 | $85.00 | $75.00 | $70.00 | $75.00 | $91.65 |
| 0172 | Skinny drum (4516000000-N) | EACH | 1,290 | $45.50 | $32.65 | $60.00 | $34.00 | $75.00 | $34.37 |
| 0173 | Generic traffic control item (EA) - connected lane closure device (4600000000-N) | EACH | 2 | $3,340.00 | $2,448.98 | $2,354.00 | $2,215.00 | $2,500.00 | $2,520.46 |
| 0174 | Temporary raised pavement markers (4650000000-N) | EACH | 600 | $4.00 | $3.69 | $3.67 | $6.00 | $3.67 | $8.70 |
| 0175 | Paint pavement marking lines (4") (4810000000-E) | LF | 125,980 | $0.15 | $0.12 | $0.12 | $0.45 | $0.12 | $0.37 |
| 0176 | Paint pavement marking lines (6") (4815000000-E) | LF | 128,440 | $0.20 | $0.18 | $0.18 | $0.50 | $0.18 | $0.43 |
| 0177 | Paint pavement marking lines (8") (4820000000-E) | LF | 3,095 | $0.30 | $0.25 | $0.25 | $1.00 | $0.25 | $2.22 |
| 0178 | Paint pavement marking lines (12") (4825000000-E) | LF | 8,440 | $0.85 | $0.76 | $0.75 | $2.00 | $0.75 | $2.33 |
| 0179 | Paint pavement marking lines (24") (4835000000-E) | LF | 430 | $2.25 | $2.01 | $2.00 | $7.00 | $2.00 | $4.68 |
| 0180 | Paint pavement marking character (4840000000-N) | EACH | 20 | $224.00 | $20.14 | $20.00 | $70.00 | $20.00 | $80.62 |
| 0181 | Paint pavement marking symbol (4845000000-N) | EACH | 106 | $22.25 | $20.13 | $20.00 | $70.00 | $20.00 | $86.47 |
| 0182 | Generic pavement marking item (LF) - integrated multipolymer pavement marking lines, (12", 90 mils) (4890000000-E) | LF | 4,120 | $5.50 | $5.03 | $5.00 | $6.50 | $5.00 | $7.71 |
| 0183 | Generic pavement marking item (LF) - integrated multipolymer pavement marking lines, (24", 90 mils) (4890000000-E) | LF | 215 | $15.00 | $13.59 | $13.50 | $17.00 | $13.50 | $18.99 |
| 0184 | Generic pavement marking item (LF) - integrated multipolymer pavement marking lines, (4", 90 mils) (4890000000-E) | LF | 45,098 | $1.50 | $1.31 | $1.30 | $1.75 | $1.30 | $1.58 |
| 0185 | Generic pavement marking item (LF) - integrated multipolymer pavement marking lines, (6", 90 mils) (4890000000-E) | LF | 31,990 | $2.25 | $1.97 | $1.96 | $2.25 | $1.96 | $3.39 |
| 0186 | Generic pavement marking item (LF) - integrated multipolymer pavement marking lines, (8", 90 mils) (4890000000-E) | LF | 1,547 | $4.00 | $3.52 | $3.50 | $5.00 | $3.50 | $5.43 |
| 0187 | Generic pavement marking item (EA) - integrated multipolymer pavement marking symbols, (90 mils) (4895000000-N) | EACH | 46 | $89.00 | $80.54 | $80.00 | $175.00 | $80.00 | $233.71 |
| 0188 | Generic pavement marking item (EA) - polycarbonate H-shaped markers (4895000000-N) | EACH | 344 | $70.00 | $63.42 | $63.00 | $55.00 | $63.00 | $79.46 |
| 0189 | 8" water line (5325800000-E) | LF | 3,532 | $130.00 | $112.24 | $79.22 | $152.00 | $112.00 | $130.34 |
| 0190 | DI H2O pipe fittings (5329000000-E) | LB | 4,175 | $12.25 | $11.22 | $15.77 | $16.00 | $14.00 | $28.77 |
| 0191 | 2" valve (5536000000-E) | EACH | 1 | $2,280.00 | $2,244.90 | $2,187.91 | $3,560.00 | $1,500.00 | $2,739.65 |
| 0192 | 6" valve (5540000000-E) | EACH | 4 | $3,060.00 | $3,367.35 | $2,917.35 | $5,300.00 | $2,250.00 | $4,401.29 |
| 0193 | 8" valve (5546000000-E) | EACH | 12 | $4,310.00 | $4,489.80 | $5,191.78 | $7,015.00 | $3,100.00 | $5,651.93 |
| 0194 | **" comb air valve - (1") (5590000000-E) | EACH | 1 | $11,900 | $10,204 | $7,564.31 | $11,530 | $8,800.00 | $21,108 |
| 0195 | Relocate water meter (5648000000-N) | EACH | 15 | $2,390.00 | $3,673.47 | $1,478.65 | $4,850.00 | $1,750.00 | $3,471.24 |
| 0196 | Reconnect water meter (5649000000-N) | EACH | 1 | $3,690.00 | $2,653.06 | $2,984.24 | $4,850.00 | $1,750.00 | $1,105.02 |
| 0197 | Fire hydrant (5666000000-N) | EACH | 4 | $9,600.00 | $9,183.67 | $10,320 | $8,210.00 | $7,500.00 | $11,317 |
| 0198 | Fire hydrant leg (5673000000-E) | LF | 29 | $234.00 | $153.06 | $104.80 | $545.00 | $220.00 | $164.41 |
| 0199 | Water service line (<2") (5686500000-E) | LF | 640 | $73.00 | $81.63 | $10.15 | $95.00 | $56.00 | $45.80 |
| 0200 | 2" force main sewer (5709100000-E) | LF | 123 | $55.00 | $142.86 | $105.19 | $152.00 | $145.00 | $153.84 |
| 0201 | 4" force main sewer (5709200000-E) | LF | 919 | $147.00 | $51.02 | $136.51 | $120.00 | $93.00 | $115.67 |
| 0202 | 6" force main sewer (5709300000-E) | LF | 2,296 | $130.00 | $102.04 | $74.62 | $130.00 | $97.00 | $106.85 |
| 0203 | Ductile iron sewer pipe fittings (5769000000-E) | LB | 755 | $18.00 | $14.29 | $24.29 | $20.00 | $14.00 | $51.67 |
| 0204 | 4' dia utility manhole (5775000000-E) | EACH | 1 | $6,300.00 | $8,163.27 | $8,550.83 | $9,250.00 | $3,600.00 | $16,088 |
| 0205 | Abandon **" utility pipe - (2") (5798000000-E) | LF | 88 | $10.00 | $15.31 | $56.53 | $10.00 | $17.00 | $27.01 |
| 0206 | Abandon **" utility pipe - (4") (5798000000-E) | LF | 784 | $3.00 | $18.37 | $14.03 | $10.00 | $20.00 | $14.09 |
| 0207 | Abandon 6" utility pipe (5800000000-E) | LF | 2,283 | $14.50 | $18.37 | $8.93 | $10.00 | $22.00 | $11.75 |
| 0208 | Abandon 8" utility pipe (5801000000-E) | LF | 3,493 | $2.75 | $20.41 | $10.56 | $10.00 | $24.00 | $12.91 |
| 0209 | Remove fire hydrant (5815500000-N) | EACH | 1 | $972.00 | $2,040.82 | $1,168.24 | $1,310.00 | $1,550.00 | $3,804.74 |
| 0210 | Remove utility manhole (5828000000-N) | EACH | 1 | $1,910.00 | $3,061.22 | $2,124.73 | $2,050.00 | $1,400.00 | $4,506.98 |
| 0211 | 6" encasement pipe (5835400000-E) | LF | 85 | $331.00 | $183.67 | $125.43 | $265.00 | $220.00 | $125.66 |
| 0212 | 12" encasement pipe (5835600000-E) | LF | 86 | $157.00 | $204.08 | $117.44 | $275.00 | $260.00 | $172.62 |
| 0213 | 18" encasement pipe (5835800000-E) | LF | 661 | $256.00 | $204.08 | $200.98 | $325.00 | $275.00 | $293.58 |
| 0214 | Bore & jack **" - (18") (5872500000-E) | LF | 202 | $1,070.00 | $1,428.57 | $1,619.69 | $900.00 | $750.00 | $1,155.76 |
| 0215 | Bore & jack **" - (6") (5872500000-E) | LF | 85 | $777.00 | $612.24 | $622.97 | $750.00 | $575.00 | $859.42 |
| 0216 | Generic utility item (EA) - pressure regulating valve with bypass (5882000000-N) | EACH | 1 | $50,900 | $61,224 | $27,092 | $55,000 | $49,000 | $71,245 |
| 0217 | Temporary silt fence (6000000000-E) | LF | 40,620 | $2.75 | $2.79 | $2.50 | $2.50 | $2.50 | $2.92 |
| 0218 | Stone for erosion control, class A (6006000000-E) | TON | 2,800 | $0.01 | $75.00 | $82.90 | $76.00 | $65.00 | $49.00 |
| 0219 | Stone for erosion control, class B (6009000000-E) | TON | 10,775 | $0.01 | $105.00 | $0.01 | $80.00 | $70.00 | $50.00 |
| 0220 | Sediment control stone (6012000000-E) | TON | 6,205 | $0.01 | $70.00 | $0.01 | $69.00 | $57.00 | $41.00 |
| 0221 | Temporary mulching (6015000000-E) | ACRE | 144.50 | $1,060.00 | $1,491.41 | $1,500.00 | $1,950.00 | $1,500.00 | $1,500.00 |
| 0222 | Seed for temporary seeding (6018000000-E) | LB | 6,200 | $2.25 | $4.20 | $1.50 | $2.60 | $1.50 | $1.75 |
| 0223 | Fertilizer for temporary seeding (6021000000-E) | TON | 32.50 | $822.00 | $664.10 | $700.00 | $700.00 | $700.00 | $818.01 |
| 0224 | Temporary slope drains (6024000000-E) | LF | 4,000 | $24.75 | $25.00 | $22.39 | $70.00 | $28.25 | $21.93 |
| 0225 | Safety fence (6029000000-E) | LF | 2,880 | $5.00 | $11.32 | $2.00 | $2.00 | $2.00 | $2.33 |
| 0226 | Silt excavation (6030000000-E) | CY | 56,000 | $0.01 | $0.01 | $0.01 | $8.50 | $2.50 | $1.00 |
| 0227 | Matting for erosion control (6036000000-E) | SY | 127,135 | $1.75 | $1.50 | $1.50 | $1.50 | $1.50 | $1.75 |
| 0228 | Coir fiber mat (6037000000-E) | SY | 11,575 | $4.50 | $11.35 | $4.00 | $4.00 | $4.00 | $4.68 |
| 0229 | 1/4" hardware cloth (6042000000-E) | LF | 5,145 | $3.00 | $4.00 | $4.00 | $4.00 | $4.00 | $4.68 |
| 0230 | Low permeability geotextile (6043000000-E) | SY | 900 | $6.75 | $4.25 | $5.80 | $8.37 | $4.25 | $4.96 |
| 0231 | **" temporary pipe - (24") (6045000000-E) | LF | 290 | $90.00 | $70.00 | $85.88 | $145.00 | $80.00 | $51.02 |
| 0232 | Temporary pipe for stream crossing (6046000000-E) | LF | 90 | $416.00 | $207.97 | $315.00 | $700.00 | $320.00 | $73.23 |
| 0233 | Special stilling basins (6070000000-N) | EACH | 12 | $485.00 | $1,685.05 | $695.15 | $30,000 | $550.00 | $1,099.95 |
| 0234 | Flocculant (6071002000-E) | LB | 3,090 | $9.50 | $4.00 | $4.00 | $4.50 | $4.00 | $4.68 |
| 0235 | Coir fiber baffle (6071030000-E) | LF | 6,685 | $5.50 | $6.69 | $6.50 | $6.50 | $6.50 | $7.59 |
| 0236 | **" skimmer - (1-1/2") (6071050000-E) | EACH | 8 | $1,100.00 | $1,250.00 | $1,405.97 | $2,150.00 | $1,700.00 | $1,110.15 |
| 0237 | **" skimmer - (2") (6071050000-E) | EACH | 12 | $1,310.00 | $1,550.00 | $1,575.84 | $2,350.00 | $1,900.00 | $1,460.72 |
| 0238 | **" skimmer - (2-1/2") (6071050000-E) | EACH | 4 | $1,600.00 | $1,950.00 | $1,812.45 | $2,620.00 | $2,200.00 | $1,636.01 |
| 0239 | **" skimmer - (3") (6071050000-E) | EACH | 1 | $1,970.00 | $2,400.00 | $2,885.00 | $2,965.00 | $2,450.00 | $2,337.16 |
| 0240 | Seeding and mulching (6084000000-E) | ACRE | 93 | $2,660.00 | $2,540.93 | $2,400.00 | $2,400.00 | $2,750.00 | $2,804.59 |
| 0241 | Mowing (6087000000-E) | ACRE | 96 | $109.00 | $305.10 | $150.00 | $150.00 | $150.00 | $175.29 |
| 0242 | Seed for repair seeding (6090000000-E) | LB | 1,500 | $8.50 | $11.15 | $4.00 | $4.00 | $4.00 | $4.68 |
| 0243 | Fertilizer for repair seeding (6093000000-E) | TON | 5 | $1,330.00 | $1,066.68 | $1,200.00 | $1,200.00 | $1,200.00 | $1,402.29 |
| 0244 | Seed for supplemental seeding (6096000000-E) | LB | 2,175 | $10.00 | $24.44 | $4.00 | $4.00 | $4.00 | $4.68 |
| 0245 | Fertilizer topdressing (6108000000-E) | TON | 66 | $1,450.00 | $667.17 | $700.00 | $700.00 | $700.00 | $818.01 |
| 0246 | Impervious dike (6111000000-E) | LF | 508 | $76.00 | $275.00 | $80.00 | $85.00 | $85.00 | $75.96 |
| 0247 | Specialized hand mowing (6114500000-N) | MHR | 60 | $113.00 | $142.15 | $120.00 | $120.00 | $120.00 | $140.23 |
| 0248 | Manual litter removal (6114800000-N) | MHR | 47 | $278.00 | $120.00 | $116.15 | $120.00 | $120.00 | $140.23 |
| 0249 | Litter disposal (6114900000-E) | TON | 12 | $444.00 | $200.00 | $294.85 | $200.00 | $200.00 | $233.71 |
| 0250 | Mechanical litter removal (6115000000-E) | SMI | 5 | $111.00 | $750.00 | $430.18 | $440.00 | $1,200.00 | $1,145.67 |
| 0251 | Response for erosion control (6117000000-N) | EACH | 175 | $57.00 | $129.59 | $50.00 | $50.00 | $50.00 | $58.42 |
| 0252 | Concrete washout structure (6117500000-N) | EACH | 3 | $1,220.00 | $1,200.00 | $1,500.00 | $5,000.00 | $750.00 | $943.53 |
| 0253 | Culvert diversion channel (6120000000-E) | CY | 313 | $44.50 | $45.00 | $31.44 | $31.00 | $11.00 | $67.10 |
| 0254 | Generic erosion control item (EA) - prefabricated concrete washout (6132000000-N) | EACH | 15 | $1,010.00 | $1,800.00 | $250.00 | $4,000.00 | $750.00 | $943.53 |
| 0255 | Generic erosion control item (LS) - diversion pumping (6133000000-N) | LS | 1 | $28,300 | $25,787 | $25,000 | $100,000 | $25,000 | $38,462 |
| 0256 | Generic erosion control item (acr) - disking (6135000000-E) | ACRE | 2.30 | $164.00 | $1,517.23 | $145.00 | $145.00 | $145.00 | $169.45 |
| 0257 | Generic erosion control item (acr) - ripping (6135000000-E) | ACRE | 2.30 | $3,800.00 | $1,517.23 | $3,350.00 | $3,350.00 | $3,350.00 | $3,914.73 |
| 0258 | Generic erosion control item (CY) - impervious select material (6138000000-E) | CY | 700 | $80.00 | $8.22 | $71.00 | $28.94 | $71.00 | $82.97 |
| 0259 | Generic erosion control item (LF) - brush toe stabilization (6147000000-E) | LF | 604 | $283.00 | $90.35 | $250.00 | $250.00 | $250.00 | $292.15 |
| 0260 | Generic erosion control item (TON) - channel substrate material (6150000000-E) | TON | 37 | $78.00 | $8.27 | $68.50 | $113.00 | $68.50 | $80.04 |
| 0261 | Generic planting item (EA) - live plant material - 12" diameter bundles (6645000000-N) | EACH | 315 | $59.00 | $8.14 | $52.00 | $52.00 | $52.00 | $60.77 |
| 0262 | Topsoil (6900000000-E) | CY | 60 | $153.00 | $72.60 | $135.00 | $30.00 | $135.00 | $157.76 |
| 0263 | Signal cable (7060000000-E) | LF | 2,500 | $5.75 | $5.10 | $5.00 | $5.00 | $5.00 | $5.84 |
| 0264 | Vehicle signal head (12", 3 section) (7120000000-E) | EACH | 5 | $1,470.00 | $1,326.53 | $1,300.00 | $1,300.00 | $1,300.00 | $5.84 |
| 0265 | Vehicle signal head (12", 4 section) (7132000000-E) | EACH | 4 | $1,940.00 | $1,760.21 | $1,725.00 | $1,725.00 | $1,725.00 | $2,015.79 |
| 0266 | Vehicle signal head (12", 5 section) (7144000000-E) | EACH | 3 | $2,510.00 | $2,270.41 | $2,225.00 | $2,225.00 | $2,225.00 | $2,600.08 |
| 0267 | Messenger cable (3/8") (7264000000-E) | LF | 600 | $10.25 | $9.18 | $9.00 | $9.00 | $9.00 | $10.51 |
| 0268 | Paved trench (***********) - (1, 2") (7288000000-E) | LF | 800 | $62.02 | $56.12 | $55.00 | $130.00 | $55.00 | $64.27 |
| 0269 | Unpaved trench (***********) - (1, 2") (7300000000-E) | LF | 50 | $15.75 | $14.29 | $14.00 | $14.00 | $14.00 | $16.36 |
| 0270 | Direct drill (***********) - (1, 2") (7301000000-E) | LF | 150 | $45.00 | $40.82 | $40.00 | $40.00 | $40.00 | $46.74 |
| 0271 | Junction box (standard size) (7324000000-N) | EACH | 11 | $1,100.00 | $994.90 | $975.00 | $975.00 | $975.00 | $1,139.37 |
| 0272 | Inductive loop sawcut (7444000000-E) | LF | 2,000 | $24.75 | $22.45 | $22.00 | $22.00 | $22.00 | $25.71 |
| 0273 | Lead-in cable (14-2) (7456100000-E) | LF | 2,500 | $3.00 | $2.81 | $2.75 | $2.75 | $2.75 | $3.21 |
| 0274 | Metal strain signal pole (7576000000-N) | EACH | 4 | $18,300 | $16,531 | $16,200 | $16,200 | $16,200 | $18,931 |
| 0275 | Soil test (7613000000-N) | EACH | 4 | $2,480.00 | $2,244.90 | $2,200.00 | $2,200.00 | $2,200.00 | $2,570.87 |
| 0276 | Drilled pier foundation (7614100000-E) | CY | 24 | $1,440.00 | $1,301.02 | $1,275.00 | $1,275.00 | $1,275.00 | $1,489.95 |
| 0277 | Sign for signals (7636000000-N) | EACH | 1 | $902.00 | $816.33 | $800.00 | $800.00 | $800.00 | $934.86 |
| 0278 | Signal cabinet foundation (7684000000-N) | EACH | 1 | $2,650.00 | $2,397.96 | $2,350.00 | $2,350.00 | $2,350.00 | $2,746.16 |
| 0279 | Contlrs with CBNT (**************) - (2070LX, base mounted) (7696000000-N) | EACH | 1 | $28,200 | $25,510 | $25,000 | $25,000 | $25,000 | $29,214 |
| 0280 | Detector card (type 170) (7744000000-N) | EACH | 9 | $259.00 | $234.69 | $230.00 | $230.00 | $230.00 | $268.78 |
| 0281 | Cabinet base extender (7901000000-N) | EACH | 1 | $986.00 | $892.86 | $875.00 | $875.00 | $875.00 | $1,022.51 |
| 0282 | PC RCBC @ sta ********** - (66+15.50 -L-) (8063000000-N) | LS | 1 | $805,000 | $750,000 | $689,130 | $1,000,000 | $610,000 | $811,832 |
| 0283 | Box culv excav @ ******** - (66+15.50 -L-) (8130000000-N) | LS | 1 | $108,000 | $40,000 | $263,000 | $200,000 | $55,000 | $500,000 |
| 0284 | Foundation conditioning material, box culvert (8133000000-E) | TON | 422 | $94.00 | $125.00 | $115.06 | $95.00 | $53.15 | $6.90 |
| 0285 | Class A concrete (culvert) (8196000000-E) | CY | 62.90 | $3,300.00 | $3,500.00 | $2,327.60 | $2,260.00 | $800.00 | $1,752.84 |
| 0286 | Reinforcing steel (culvert) (8245000000-E) | LB | 8,210 | $3.00 | $2.00 | $2.20 | $2.50 | $3.00 | $1.79 |
| 0287 | Generic structure item (SF) - architectural surface treatment (sound barrier wall no 1) (8892000000-E) | SF | 10,686 | $1.75 | $1.48 | $1.48 | $2.50 | $3.00 | $1.34 |
| 0288 | Generic structure item (SF) - sound barrier wall (8892000000-E) | SF | 6,342 | $62.00 | $75.00 | $52.46 | $40.00 | $65.00 | $78.84 |
| 0289 | FND excav B** sta ******* - (1, 70+91.84 -L-) (8091000000-N) | LS | 1 | $18,000 | $22,000 | $47,080 | $100,000 | $45,000 | $500,000 |
| 0290 | Reinforced concrete deck slab (8147000000-E) | SF | 12,660 | $56.00 | $65.00 | $63.58 | $50.00 | $54.00 | $46.55 |
| 0291 | Grooving bridge floors (8161000000-E) | SF | 13,740 | $0.85 | $0.85 | $1.10 | $1.00 | $1.25 | $0.48 |
| 0292 | Class A concrete (bridge) (8182000000-E) | CY | 181.80 | $1,290.00 | $1,500.00 | $1,438.80 | $1,400.00 | $900.00 | $1,363.97 |
| 0293 | BRG appr slab *********** - (70+91.84 -L-) (8210000000-N) | LS | 1 | $94,700 | $100,000 | $102,080 | $180,000 | $59,000 | $99,364 |
| 0294 | Reinforcing steel (bridge) (8217000000-E) | LB | 32,220 | $2.00 | $1.75 | $2.20 | $1.40 | $2.15 | $1.45 |
| 0295 | Spiral column reinforcing steel (bridge) (8238000000-E) | LB | 1,724 | $4.75 | $3.00 | $3.30 | $4.00 | $3.00 | $2.80 |
| 0296 | Fib **" prestr conc girdr - (63") (8278000000-E) | LF | 1,332.50 | $480.00 | $550.00 | $443.30 | $469.00 | $395.00 | $460.76 |
| 0297 | Pile DRV equip setup ** steel piles - (HP 14 X 73) (8328200000-E) | EACH | 34 | $3,300.00 | $4,000.00 | $1,988.80 | $210.00 | $1,250.00 | $7,500.00 |
| 0298 | HP 14 X 73 steel piles (8384000000-E) | LF | 2,320 | $76.00 | $70.00 | $104.72 | $90.00 | $90.00 | $90.65 |
| 0299 | Dynamic pile testing (8394000000-N) | EACH | 1 | $5,750.00 | $1,950.00 | $5,500.00 | $2,000.00 | $2,500.00 | $2,291.32 |
| 0300 | Concrete barrier rail (8503000000-E) | LF | 446.20 | $200.00 | $190.00 | $192.50 | $150.00 | $115.00 | $160.35 |
| 0301 | 4" slope protection (8531000000-E) | SY | 580 | $186.00 | $150.00 | $220.00 | $200.00 | $170.00 | $99.95 |
| 0302 | Elastomeric bearings (8657000000-N) | LS | 1 | $8,850.00 | $15,000 | $77,000 | $30,000 | $15,600 | $18,295 |
| 0303 | Box culv excav @ ******** - (30+32.50 -Y2-) (8130000000-N) | LS | 1 | $72,200 | $10,000 | $60,720 | $100,000 | $30,000 | $29,592 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
Every contract let that day: NCDOT letting of October 21, 2025. Compiled by Mirage Metrics.