NCDOT contract C204505 bid tabulation
GRADING, DRAINAGE, PAVING, SIGNALS, AND RETAINING WALLS. SR-2195 (TORRENCE CHAPEL RD) AND SR-5544 (WEST CATAWBA AVE) IN CORNELIUS. Let by North Carolina DOT on November 18, 2025, Mecklenburg. 4 bids received; low bid $21,341,243 by K West Group LLC DBA Kwest Group LLC.
- Owner
- North Carolina DOT
- Letting
- 18 NOV 2025
- Pay items
- 251
- Data through
- 20 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | K West Group LLC DBA Kwest Group LLC | $21,341,243 | Low |
| 2 | Blythe Construction Inc | $21,705,204 | +2.0% |
| 3 | Sealand Contractors Corp | $21,835,000 | +2.0% |
| 4 | Blythe Development Co. | $24,349,660 | +14% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. K West Group LLC DBA Kwest Group LLC | 2. Blythe Construction Inc | 3. Sealand Contractors Corp | 4. Blythe Development Co. |
|---|---|---|---|---|---|---|---|
| 0001 | Mobilization (0000100000-N) | LS | 1 | $1,065,000 | $1,065,000 | $1,091,750 | $1,217,000 |
| 0002 | Construction surveying (0000400000-N) | LS | 1 | $200,000 | $300,000 | $350,000 | $410,000 |
| 0003 | Grading (0043000000-N) | LS | 1 | $6,100,000 | $4,310,000 | $4,070,828 | $7,194,530 |
| 0004 | Supplementary clearing & grubbing (0050000000-E) | ACRE | 1 | $10,000 | $5,000.00 | $20,000 | $14,200 |
| 0005 | Undercut excavation (0057000000-E) | CY | 450 | $50.00 | $40.00 | $100.00 | $78.00 |
| 0006 | Geotextile for soil stabilization (0196000000-E) | SY | 200 | $5.00 | $5.00 | $5.00 | $3.25 |
| 0007 | Generic grading item (TON) - hauling and disposal of petroleum contaminated soil (0255000000-E) | TON | 50 | $100.00 | $210.00 | $250.00 | $120.00 |
| 0008 | Foundation conditioning material, minor structures (0318000000-E) | TON | 1,179 | $25.00 | $65.00 | $90.00 | $52.00 |
| 0009 | FND condit geotextile (4A) (0321000000-E) | SY | 4,662 | $1.00 | $5.00 | $2.50 | $3.20 |
| 0010 | 12" RC pipe culverts, class III (0360000000-E) | LF | 92 | $125.00 | $150.00 | $190.00 | $130.00 |
| 0011 | 15" RC pipe culverts, class III (0366000000-E) | LF | 3,400 | $125.00 | $150.00 | $135.00 | $174.00 |
| 0012 | 18" RC pipe culverts, class III (0372000000-E) | LF | 684 | $130.00 | $140.00 | $165.00 | $212.00 |
| 0013 | 24" RC pipe culverts, class III (0378000000-E) | LF | 284 | $160.00 | $170.00 | $230.00 | $192.00 |
| 0014 | 30" RC pipe culverts, class III (0384000000-E) | LF | 712 | $190.00 | $200.00 | $280.00 | $245.00 |
| 0015 | 36" RC pipe culverts, class III (0390000000-E) | LF | 276 | $275.00 | $250.00 | $345.00 | $420.00 |
| 0016 | 42" RC pipe culverts, class III (0396000000-E) | LF | 28 | $295.00 | $375.00 | $425.00 | $385.00 |
| 0017 | 15" RC pipe culverts, class IV (0448200000-E) | LF | 1,420 | $125.00 | $140.00 | $140.00 | $163.00 |
| 0018 | 18" RC pipe culverts, class IV (0448300000-E) | LF | 156 | $130.00 | $115.00 | $180.00 | $163.00 |
| 0019 | 24" RC pipe culverts, class IV (0448400000-E) | LF | 144 | $175.00 | $100.00 | $235.00 | $260.00 |
| 0020 | 30" RC pipe culverts, class IV (0448500000-E) | LF | 200 | $255.00 | $185.00 | $300.00 | $391.00 |
| 0021 | **" RC pipe culv class V - (15") (0449000000-E) | LF | 348 | $155.00 | $162.00 | $155.00 | $210.00 |
| 0022 | **" pipe end section - (24") (0453000000-E) | EACH | 1 | $1,850.00 | $2,000.00 | $6,500.00 | $1,650.00 |
| 0023 | **" CS pipe culv *****" - (12", 0.064") (0576000000-E) | LF | 8 | $125.00 | $380.00 | $265.00 | $325.00 |
| 0024 | Pipe removal (0995000000-E) | LF | 1,637 | $10.00 | $40.00 | $40.00 | $80.00 |
| 0025 | Shallow undercut (1099500000-E) | CY | 2,100 | $10.00 | $30.00 | $45.00 | $48.00 |
| 0026 | Class IV subgrade stabilization (1099700000-E) | TON | 4,400 | $25.00 | $50.00 | $45.00 | $51.00 |
| 0027 | Stabilizer aggregate (1110000000-E) | TON | 250 | $20.00 | $60.00 | $80.00 | $51.00 |
| 0028 | Geotextile for subgrade stabilization (1112000000-E) | SY | 6,950 | $1.50 | $5.00 | $3.50 | $3.25 |
| 0029 | Aggregate base course (1121000000-E) | TON | 229 | $55.00 | $120.00 | $90.00 | $51.00 |
| 0030 | Incidental stone base (1220000000-E) | TON | 250 | $75.00 | $150.00 | $80.00 | $73.00 |
| 0031 | Mill asp PVMT *****" DTH - (1-1/2") (1297000000-E) | SY | 13,270 | $5.00 | $5.00 | $15.00 | $5.00 |
| 0032 | Mill asp PVMT *****" DTH - (3") (1297000000-E) | SY | 1,970 | $10.00 | $10.00 | $20.00 | $10.00 |
| 0033 | Milln asphalt PVMT ***** - ***** - (0" to 1-1/2") (1308000000-E) | SY | 1,080 | $12.00 | $20.00 | $40.00 | $12.00 |
| 0034 | Milln asphalt PVMT ***** - ***** - (0" to 3") (1308000000-E) | SY | 900 | $12.00 | $20.00 | $35.00 | $12.00 |
| 0035 | Asphalt conc base course, type B25.0C (1491000000-E) | TON | 8,700 | $99.50 | $134.00 | $115.00 | $99.50 |
| 0036 | Asphalt conc intermediate course, type I19.0C (1503000000-E) | TON | 7,500 | $95.50 | $132.00 | $115.00 | $95.50 |
| 0037 | Asphalt conc surface course, type S9.5C (1523000000-E) | TON | 9,000 | $120.00 | $129.00 | $115.00 | $100.00 |
| 0038 | Asphalt binder for plant mix (1575000000-E) | TON | 1,285 | $560.00 | $700.00 | $650.00 | $560.00 |
| 0039 | Asphalt plant mix, pavement repair (1693000000-E) | TON | 370 | $325.00 | $196.38 | $250.00 | $200.00 |
| 0040 | Generic paving item (TON) - asphalt cap, type S9.5C (1880000000-E) | TON | 40 | $250.00 | $400.00 | $210.00 | $250.00 |
| 0041 | Generic paving item (SY) - stamped asphalt (1891000000-E) | SY | 660 | $50.00 | $200.00 | $220.00 | $222.00 |
| 0042 | Subdrain excavation (2022000000-E) | CY | 114 | $15.00 | $35.00 | $45.00 | $21.50 |
| 0043 | Geotextile for subsurface drains (2026000000-E) | SY | 508.94 | $1.00 | $12.00 | $3.00 | $3.25 |
| 0044 | Subdrain coarse aggregate (2036000000-E) | CY | 85.50 | $60.00 | $85.00 | $145.00 | $125.00 |
| 0045 | 6" perforated subdrain pipe (2044000000-E) | LF | 508.94 | $10.00 | $17.00 | $25.00 | $33.00 |
| 0046 | Subdrain pipe outlet (2070000000-N) | EACH | 2 | $500.00 | $400.00 | $300.00 | $750.00 |
| 0047 | 6" outlet pipe (2077000000-E) | LF | 12 | $30.00 | $40.00 | $50.00 | $46.00 |
| 0048 | Endwalls (2209000000-E) | CY | 5 | $1,500.00 | $1,200.00 | $1,700.00 | $1,500.00 |
| 0049 | Pipe collars (2253000000-E) | CY | 3 | $2,000.00 | $2,200.00 | $1,900.00 | $865.00 |
| 0050 | Pipe plugs (2264000000-E) | CY | 2 | $1,500.00 | $3,800.00 | $1,700.00 | $865.00 |
| 0051 | Flowable fill (2275000000-E) | CY | 163 | $300.00 | $250.00 | $525.00 | $680.00 |
| 0052 | Masonry drainage structures (2286000000-N) | EACH | 98 | $2,500.00 | $3,000.00 | $3,600.00 | $4,100.00 |
| 0053 | Masonry drainage structures (2308000000-E) | LF | 68.30 | $375.00 | $700.00 | $825.00 | $500.00 |
| 0054 | Frame with two grates, STD 840.16 (2364000000-N) | EACH | 7 | $950.00 | $1,500.00 | $1,500.00 | $1,200.00 |
| 0055 | Frame with two grates, STD 840.24 (2366000000-N) | EACH | 5 | $1,000.00 | $1,500.00 | $1,350.00 | $1,150.00 |
| 0056 | Frame with two grates, STD 840.29 (2367000000-N) | EACH | 3 | $1,150.00 | $1,500.00 | $1,350.00 | $1,100.00 |
| 0057 | Frame-GRT-HD 840.03 ** - (E) (2374000000-N) | EACH | 15 | $1,300.00 | $1,500.00 | $1,750.00 | $1,125.00 |
| 0058 | Frame-GRT-HD 840.03 ** - (F) (2374000000-N) | EACH | 28 | $1,350.00 | $1,500.00 | $1,850.00 | $1,175.00 |
| 0059 | Frame-GRT-HD 840.03 ** - (G) (2374000000-N) | EACH | 29 | $1,350.00 | $1,500.00 | $1,850.00 | $1,175.00 |
| 0060 | Frame with cover, STD 840.54 (2396000000-N) | EACH | 11 | $850.00 | $1,500.00 | $1,000.00 | $775.00 |
| 0061 | Concrete transitional section for catch basin (2440000000-N) | EACH | 2 | $3,000.00 | $3,000.00 | $1,500.00 | $1,250.00 |
| 0062 | Concrete transitional section for drop inlet (2451000000-N) | EACH | 9 | $3,000.00 | $3,000.00 | $1,500.00 | $1,250.00 |
| 0063 | **"X**" concrete curb - (8" X 18") (2535000000-E) | LF | 1,800 | $28.00 | $36.00 | $34.00 | $40.00 |
| 0064 | **"X**" concrete curb - (9" X 18") (2535000000-E) | LF | 110 | $70.00 | $55.00 | $45.00 | $42.50 |
| 0065 | 1'-6" concrete curb & gutter (2542000000-E) | LF | 1,990 | $23.35 | $36.00 | $35.00 | $48.00 |
| 0066 | 2'-6" concrete curb & gutter (2549000000-E) | LF | 13,320 | $24.85 | $38.00 | $36.00 | $44.00 |
| 0067 | 4" concrete sidewalk (2591000000-E) | SY | 8,330 | $53.28 | $68.50 | $55.00 | $77.00 |
| 0068 | Concrete curb ramps (2605000000-N) | EACH | 130 | $1,075.00 | $3,000.00 | $1,250.00 | $1,950.00 |
| 0069 | 6" concrete driveway (2612000000-E) | SY | 90 | $115.00 | $200.00 | $130.00 | $95.00 |
| 0070 | 5" monolithic concrete islands (surface mounted) (2647000000-E) | SY | 1,100 | $68.75 | $124.50 | $96.00 | $130.00 |
| 0071 | 5" monolithic concrete islands (keyed in) (2655000000-E) | SY | 520 | $74.00 | $136.00 | $96.00 | $120.00 |
| 0072 | Generic paving item (SY) - 12" concrete truck apron, class AA concrete (2738000000-E) | SY | 3,560 | $115.00 | $216.00 | $170.00 | $130.00 |
| 0073 | Generic paving item (SY) - temporary concrete sidewalk (2738000000-E) | SY | 168.80 | $58.80 | $90.50 | $95.00 | $90.00 |
| 0074 | Generic paving item (LF) - 1'-6" concrete curb and gutter, class AA concrete (2752000000-E) | LF | 1,610 | $23.95 | $40.50 | $38.00 | $50.00 |
| 0075 | Adjustment of catch basins (2800000000-N) | EACH | 1 | $1,500.00 | $893.71 | $800.00 | $700.00 |
| 0076 | Adjustment of meter boxes or valve boxes (2845000000-N) | EACH | 4 | $1,500.00 | $657.76 | $400.00 | $1,800.00 |
| 0077 | Convert existing catch basin to drop inlet (2875000000-N) | EACH | 1 | $3,500.00 | $800.00 | $3,600.00 | $3,350.00 |
| 0078 | Convert existing catch basin to junction box with manhole (2893000000-N) | EACH | 1 | $3,500.00 | $2,600.00 | $3,600.00 | $3,450.00 |
| 0079 | Convert existing drop inlet to junction box with manhole (2938000000-N) | EACH | 1 | $3,500.00 | $2,600.00 | $3,600.00 | $3,450.00 |
| 0080 | Steel beam guardrail (3030000000-E) | LF | 712.50 | $23.50 | $23.50 | $25.50 | $24.00 |
| 0081 | Steel beam guardrail terminal sections (3105000000-N) | EACH | 2 | $85.00 | $85.00 | $92.50 | $90.00 |
| 0082 | EX length GR post ** STL - (8") (3145000000-E) | EACH | 66 | $45.00 | $45.00 | $49.00 | $47.00 |
| 0083 | Additional guardrail posts (3150000000-N) | EACH | 5 | $45.00 | $45.00 | $49.00 | $47.00 |
| 0084 | Guardrail end units, type cat-1 (3210000000-N) | EACH | 2 | $1,000.00 | $1,000.00 | $1,075.00 | $1,050.00 |
| 0085 | Guardrail end units, type TL-2 (3288000000-N) | EACH | 5 | $3,350.00 | $3,350.00 | $3,600.00 | $3,425.00 |
| 0086 | Guardrail anchor units, type B-77 (3317000000-N) | EACH | 1 | $2,650.00 | $2,650.00 | $3,200.00 | $2,700.00 |
| 0087 | Generic fencing item (LF) - bicycle/pedestrian safety rail (3575000000-E) | LF | 550 | $272.00 | $285.00 | $310.00 | $290.00 |
| 0088 | Rip rap, class B (3649000000-E) | TON | 77 | $150.00 | $90.00 | $110.00 | $95.00 |
| 0089 | Geotextile for drainage (3656000000-E) | SY | 965 | $3.00 | $5.00 | $3.00 | $3.25 |
| 0090 | Contr furn, type ***sign - (A) (4025000000-E) | SF | 202 | $32.00 | $32.00 | $34.00 | $38.00 |
| 0091 | Contr furn, type ***sign - (E) (4025000000-E) | SF | 878 | $18.00 | $18.00 | $19.00 | $21.00 |
| 0092 | Contr furn, type ***sign - (F) (4025000000-E) | SF | 27 | $18.00 | $18.00 | $19.00 | $21.00 |
| 0093 | Reinforced concrete sign foundations (4048000000-E) | CY | 2 | $10.00 | $10.00 | $10.75 | $11.00 |
| 0094 | Supports, breakaway steel beam (4060000000-E) | LB | 1,387 | $9.60 | $9.60 | $10.50 | $10.50 |
| 0095 | Supports, 3-LB steel U-channel (4072000000-E) | LF | 1,360 | $8.00 | $8.00 | $8.50 | $8.80 |
| 0096 | Sign erection, type E (4102000000-N) | EACH | 187 | $75.00 | $75.00 | $80.00 | $82.00 |
| 0097 | Sign erection, type F (4108000000-N) | EACH | 3 | $75.00 | $75.00 | $80.00 | $82.00 |
| 0098 | Sign erection, type *** (GRD MTD) - (A) (4110000000-N) | EACH | 2 | $1,200.00 | $1,200.00 | $1,300.00 | $1,300.00 |
| 0099 | Sign erect, reloc ** GRD MTD - (D) (4116100000-N) | EACH | 3 | $250.00 | $250.00 | $265.00 | $275.00 |
| 0100 | Disposal of sign system, steel beam (4152000000-N) | EACH | 2 | $500.00 | $500.00 | $525.00 | $550.00 |
| 0101 | Disposal of sign system, U-channel (4155000000-N) | EACH | 75 | $2.00 | $2.00 | $2.15 | $2.20 |
| 0102 | Disposal of support, U-channel (4192000000-N) | EACH | 2 | $2.00 | $2.00 | $2.15 | $2.20 |
| 0103 | Work zone signs (stationary) (4400000000-E) | SF | 1,278 | $9.00 | $6.25 | $9.00 | $9.75 |
| 0104 | Work zone signs (portable) (4405000000-E) | SF | 512 | $10.00 | $8.45 | $30.00 | $11.00 |
| 0105 | Work zone signs (barricade mounted) (4410000000-E) | SF | 318 | $9.00 | $8.95 | $9.00 | $10.00 |
| 0106 | Flashing arrow board (4415000000-N) | EACH | 2 | $5,275.00 | $2,600.00 | $3,000.00 | $2,750.00 |
| 0107 | Portable changeable message sign (4420000000-N) | EACH | 2 | $18,250 | $8,100.00 | $11,000 | $13,800 |
| 0108 | Drums (4430000000-N) | EACH | 130 | $150.00 | $48.15 | $55.00 | $57.00 |
| 0109 | Barricades (type III) (4445000000-E) | LF | 248 | $45.00 | $25.00 | $32.00 | $27.00 |
| 0110 | Pedestrian channelizing devices (4447000000-E) | LF | 723 | $80.00 | $45.00 | $22.00 | $100.00 |
| 0111 | Flagger (4455000000-N) | DAY | 568 | $400.00 | $362.53 | $450.00 | $940.00 |
| 0112 | TMA (4480000000-N) | EACH | 1 | $50,000 | $49,500 | $45,000 | $200,000 |
| 0113 | Water filled barrier (4507000000-E) | LF | 285 | $200.00 | $75.00 | $74.00 | $85.00 |
| 0114 | Law enforcement (4510000000-N) | HR | 100 | $75.00 | $65.00 | $70.00 | $150.00 |
| 0115 | Skinny drum (4516000000-N) | EACH | 21 | $125.00 | $40.00 | $55.00 | $42.00 |
| 0116 | Temporary raised pavement markers (4650000000-N) | EACH | 749 | $6.00 | $6.00 | $6.50 | $10.50 |
| 0117 | Thermoplastic pavement marking lines (4", 90 mils) (4685000000-E) | LF | 27,842 | $0.58 | $0.58 | $0.80 | $0.70 |
| 0118 | Thermoplastic pavement marking lines (8", 90 mils) (4695000000-E) | LF | 2,111 | $2.75 | $2.75 | $2.40 | $6.30 |
| 0119 | Thermoplastic pavement marking lines (24", 90 mils) (4709000000-E) | LF | 2,858 | $10.00 | $10.00 | $10.50 | $8.40 |
| 0120 | Thermoplastic pavement marking character (90 mils) (4720000000-E) | EACH | 8 | $225.00 | $225.00 | $135.00 | $315.00 |
| 0121 | Thermoplastic pavement marking symbol (90 mils) (4725000000-E) | EACH | 123 | $135.00 | $135.00 | $165.00 | $130.00 |
| 0122 | Heated-in-place thermoplastic pavement marking symbol (90 mils) (4726110000-E) | EACH | 66 | $252.00 | $252.00 | $320.00 | $370.00 |
| 0123 | Paint pavement marking lines (4") (4810000000-E) | LF | 93,405 | $0.51 | $0.51 | $0.16 | $0.15 |
| 0124 | Paint pavement marking lines (8") (4820000000-E) | LF | 6,474 | $1.80 | $1.80 | $0.48 | $0.32 |
| 0125 | Paint pavement marking lines (24") (4835000000-E) | LF | 8,406 | $3.85 | $3.85 | $1.88 | $1.05 |
| 0126 | Paint pavement marking character (4840000000-N) | EACH | 24 | $67.00 | $67.00 | $37.50 | $68.00 |
| 0127 | Paint pavement marking symbol (4845000000-N) | EACH | 480 | $88.00 | $88.00 | $37.50 | $52.50 |
| 0128 | Removal of pavement marking lines (4") (4850000000-E) | LF | 26,336 | $0.43 | $0.43 | $0.48 | $0.52 |
| 0129 | Removal of pavement marking lines (8") (4860000000-E) | LF | 1,128 | $1.65 | $1.65 | $1.05 | $1.05 |
| 0130 | Removal of pavement marking lines (24") (4870000000-E) | LF | 2,510 | $4.05 | $4.05 | $3.75 | $1.05 |
| 0131 | Removal of pavement marking symbols & characters (4875000000-N) | EACH | 84 | $80.00 | $80.00 | $58.50 | $63.00 |
| 0132 | Generic pavement marking item (LF) - yield line paint pavement marking (24") (4890000000-E) | LF | 217 | $8.15 | $8.15 | $6.00 | $21.00 |
| 0133 | Generic pavement marking item (LF) - yield line thermoplastic pavement marking (24", 90 mils) (4890000000-E) | LF | 218 | $35.00 | $35.00 | $17.00 | $63.00 |
| 0134 | Generic pavement marking item (EA) - polycarbonate H-shaped markers (4895000000-N) | EACH | 476 | $63.00 | $63.00 | $60.00 | $54.00 |
| 0135 | Object markers (type **) - (1) (4957000000-N) | EACH | 10 | $180.00 | $180.00 | $195.00 | $190.00 |
| 0136 | Portable lighting (5255000000-N) | LS | 1 | $500,000 | $100,000 | $835,000 | $250,000 |
| 0137 | 6" water line (5325600000-E) | LF | 20 | $1,000.00 | $275.58 | $375.00 | $133.00 |
| 0138 | 8" water line (5325800000-E) | LF | 146 | $500.00 | $300.64 | $245.00 | $195.00 |
| 0139 | 12" water line (5326200000-E) | LF | 3,794 | $300.00 | $250.53 | $255.00 | $172.00 |
| 0140 | 16" water line (5326600000-E) | LF | 130 | $600.00 | $450.96 | $495.00 | $390.00 |
| 0141 | DI H2O pipe fittings (5329000000-E) | LB | 10,320 | $20.00 | $10.02 | $10.00 | $12.00 |
| 0142 | **" valve - (3") (5534000000-E) | EACH | 1 | $2,000.00 | $2,505.31 | $2,400.00 | $2,700.00 |
| 0143 | 6" valve (5540000000-E) | EACH | 5 | $2,500.00 | $3,507.43 | $3,000.00 | $3,700.00 |
| 0144 | 8" valve (5546000000-E) | EACH | 5 | $3,000.00 | $4,534.61 | $4,100.00 | $4,600.00 |
| 0145 | 12" valve (5558000000-E) | EACH | 6 | $6,500.00 | $7,666.24 | $6,900.00 | $7,300.00 |
| 0146 | **" comb air valve - (2") (5590000000-E) | EACH | 1 | $50,000 | $35,074 | $40,000 | $32,000 |
| 0147 | Relocate water meter (5648000000-N) | EACH | 14 | $3,000.00 | $2,755.84 | $2,800.00 | $4,100.00 |
| 0148 | Reconnect water meter (5649000000-N) | EACH | 10 | $3,000.00 | $3,006.37 | $2,800.00 | $1,650.00 |
| 0149 | Fire hydrant (5666000000-N) | EACH | 2 | $7,500.00 | $10,021 | $8,000.00 | $11,000 |
| 0150 | Relocate fire hydrant (5672000000-N) | EACH | 3 | $2,000.00 | $18,489 | $3,300.00 | $22,000 |
| 0151 | Fire hydrant leg (5673000000-E) | LF | 84 | $150.00 | $225.48 | $200.00 | $140.00 |
| 0152 | 6" line stop with bypass (5684400000-E) | EACH | 2 | $25,000 | $53,864 | $80,000 | $18,000 |
| 0153 | 16" line stop with bypass (5685200000-E) | EACH | 1 | $45,000 | $125,817 | $82,500 | $45,000 |
| 0154 | **" water service line - (2") (5686000000-E) | LF | 121 | $125.00 | $165.35 | $150.00 | $345.00 |
| 0155 | **" water service line - (3") (5686000000-E) | LF | 106 | $150.00 | $245.52 | $185.00 | $330.00 |
| 0156 | **" water service line - (6") (5686000000-E) | LF | 185 | $150.00 | $225.48 | $190.00 | $210.00 |
| 0157 | **" water service line - (8") (5686000000-E) | LF | 60 | $157.54 | $235.50 | $195.00 | $226.00 |
| 0158 | Water service line (<2") (5686500000-E) | LF | 1,045 | $75.00 | $100.21 | $105.00 | $112.00 |
| 0159 | 8" sanitary gravity sewer (5691300000-E) | LF | 767 | $350.00 | $325.69 | $225.00 | $239.00 |
| 0160 | 6" force main sewer (5709300000-E) | LF | 971 | $250.00 | $195.41 | $235.00 | $210.00 |
| 0161 | Ductile iron sewer pipe fittings (5769000000-E) | LB | 910 | $20.00 | $10.02 | $10.00 | $11.00 |
| 0162 | 4' dia utility manhole (5775000000-E) | EACH | 2 | $6,000.00 | $10,597 | $10,500 | $7,300.00 |
| 0163 | Utility manhole wall 4' dia (5781000000-E) | LF | 12 | $400.00 | $826.75 | $1,100.00 | $480.00 |
| 0164 | Abandon 6" utility pipe (5800000000-E) | LF | 1,073 | $15.00 | $40.08 | $14.00 | $15.25 |
| 0165 | Abandon 8" utility pipe (5801000000-E) | LF | 903 | $15.00 | $45.10 | $19.00 | $27.00 |
| 0166 | Abandon 12" utility pipe (5804000000-E) | LF | 1,330 | $20.00 | $50.11 | $20.00 | $60.00 |
| 0167 | Abandon 16" utility pipe (5810000000-E) | LF | 115 | $30.00 | $75.16 | $35.00 | $188.00 |
| 0168 | Remove fire hydrant (5815500000-N) | EACH | 2 | $750.00 | $4,509.56 | $1,500.00 | $1,500.00 |
| 0169 | Remove utility manhole (5828000000-N) | EACH | 2 | $3,000.00 | $5,010.62 | $2,000.00 | $4,300.00 |
| 0170 | 18" encasement pipe (5835800000-E) | LF | 178 | $350.00 | $320.68 | $325.00 | $180.00 |
| 0171 | 20" encasement pipe (5835900000-E) | LF | 517 | $350.00 | $325.69 | $325.00 | $180.00 |
| 0172 | Generic utility item (EA) - relocate 2" water meter (5882000000-N) | EACH | 1 | $3,000.00 | $7,891.72 | $14,500 | $13,000 |
| 0173 | Generic utility item (EA) - relocate 3" water meter (5882000000-N) | EACH | 2 | $7,500.00 | $18,614 | $28,000 | $32,000 |
| 0174 | Generic utility item (EA) - relocate 6" water meter (5882000000-N) | EACH | 3 | $10,000 | $28,059 | $34,000 | $49,000 |
| 0175 | Generic utility item (LF) - 4" PVC conduit (5888000000-E) | LF | 395 | $50.00 | $20.64 | $25.00 | $59.00 |
| 0176 | Temporary silt fence (6000000000-E) | LF | 11,195 | $3.00 | $2.90 | $3.25 | $4.60 |
| 0177 | Stone for erosion control, class A (6006000000-E) | TON | 480 | $25.00 | $75.00 | $105.00 | $90.00 |
| 0178 | Stone for erosion control, class B (6009000000-E) | TON | 990 | $25.00 | $75.00 | $105.00 | $94.50 |
| 0179 | Sediment control stone (6012000000-E) | TON | 1,430 | $25.00 | $65.00 | $80.00 | $74.00 |
| 0180 | Temporary mulching (6015000000-E) | ACRE | 8 | $1,150.00 | $1,800.00 | $1,225.00 | $1,200.00 |
| 0181 | Seed for temporary seeding (6018000000-E) | LB | 500 | $3.00 | $2.00 | $3.20 | $3.15 |
| 0182 | Fertilizer for temporary seeding (6021000000-E) | TON | 3.50 | $1,225.00 | $1,000.00 | $1,300.00 | $1,280.00 |
| 0183 | Temporary slope drains (6024000000-E) | LF | 200 | $35.00 | $10.00 | $28.00 | $33.00 |
| 0184 | Safety fence (6029000000-E) | LF | 1,302 | $2.00 | $3.00 | $2.15 | $4.60 |
| 0185 | Silt excavation (6030000000-E) | CY | 1,780 | $5.00 | $25.00 | $36.00 | $36.00 |
| 0186 | Matting for erosion control (6036000000-E) | SY | 14,272 | $1.50 | $1.65 | $1.60 | $1.60 |
| 0187 | Coir fiber mat (6037000000-E) | SY | 100 | $4.75 | $6.00 | $5.15 | $5.00 |
| 0188 | 1/4" hardware cloth (6042000000-E) | LF | 4,790 | $5.00 | $4.50 | $5.45 | $5.25 |
| 0189 | Low permeability geotextile (6043000000-E) | SY | 100 | $10.00 | $6.00 | $4.50 | $10.50 |
| 0190 | Special stilling basins (6070000000-N) | EACH | 2 | $500.00 | $350.00 | $1,000.00 | $600.00 |
| 0191 | Flocculant (6071002000-E) | LB | 140 | $10.00 | $5.00 | $10.75 | $10.50 |
| 0192 | Coir fiber wattle (6071012000-E) | LF | 20 | $12.00 | $9.50 | $13.00 | $12.75 |
| 0193 | Coir fiber baffle (6071030000-E) | LF | 85 | $7.00 | $10.00 | $7.50 | $9.50 |
| 0194 | **" skimmer - (1-1/2") (6071050000-E) | EACH | 1 | $3,000.00 | $1,000.00 | $1,200.00 | $900.00 |
| 0195 | Seeding and mulching (6084000000-E) | ACRE | 9 | $2,350.00 | $2,800.00 | $2,500.00 | $2,475.00 |
| 0196 | Mowing (6087000000-E) | ACRE | 6 | $165.00 | $225.00 | $180.00 | $175.00 |
| 0197 | Seed for repair seeding (6090000000-E) | LB | 100 | $8.00 | $4.00 | $8.50 | $8.40 |
| 0198 | Fertilizer for repair seeding (6093000000-E) | TON | 0.25 | $1,900.00 | $1,600.00 | $2,000.00 | $2,000.00 |
| 0199 | Seed for supplemental seeding (6096000000-E) | LB | 175 | $7.00 | $4.00 | $7.50 | $7.35 |
| 0200 | Fertilizer topdressing (6108000000-E) | TON | 5 | $1,400.00 | $1,000.00 | $1,500.00 | $1,470.00 |
| 0201 | Impervious dike (6111000000-E) | LF | 80 | $100.00 | $200.00 | $100.00 | $120.00 |
| 0202 | Specialized hand mowing (6114500000-N) | MHR | 10 | $90.00 | $175.00 | $95.00 | $95.00 |
| 0203 | Manual litter removal (6114800000-N) | MHR | 4 | $105.00 | $175.00 | $120.00 | $170.00 |
| 0204 | Litter disposal (6114900000-E) | TON | 1 | $500.00 | $200.00 | $575.00 | $400.00 |
| 0205 | Response for erosion control (6117000000-N) | EACH | 25 | $500.00 | $250.00 | $300.00 | $1,000.00 |
| 0206 | Concrete washout structure (6117500000-N) | EACH | 2 | $1,500.00 | $3,500.00 | $2,000.00 | $1,500.00 |
| 0207 | Generic erosion control item (EA) - fabric insert inlet protection cleanout (6132000000-N) | EACH | 708 | $200.00 | $200.00 | $100.00 | $105.00 |
| 0208 | Generic erosion control item (EA) - fabric insert inlet protection, type 1 (6132000000-N) | EACH | 18 | $400.00 | $200.00 | $200.00 | $205.00 |
| 0209 | Generic erosion control item (EA) - fabric insert inlet protection, type 2 (6132000000-N) | EACH | 218 | $750.00 | $200.00 | $180.00 | $180.00 |
| 0210 | Generic erosion control item (EA) - prefabricated concrete washout (6132000000-N) | EACH | 9 | $1,000.00 | $840.75 | $1,000.00 | $340.00 |
| 0211 | Pedestrian signal head (16", 1 section W/countdown) (7048500000-E) | EACH | 5 | $1,868.00 | $1,868.00 | $1,525.00 | $1,500.00 |
| 0212 | Signal cable (7060000000-E) | LF | 7,316 | $3.80 | $3.80 | $5.40 | $5.25 |
| 0213 | Vehicle signal head (12", 3 section) (7120000000-E) | EACH | 15 | $1,895.40 | $1,895.40 | $1,550.00 | $1,510.00 |
| 0214 | Vehicle signal head (12", 4 section) (7132000000-E) | EACH | 5 | $2,298.10 | $2,298.10 | $1,975.00 | $1,925.00 |
| 0215 | Messenger cable (3/8") (7264000000-E) | LF | 200 | $15.00 | $15.00 | $7.50 | $7.35 |
| 0216 | Paved trench (***********) - (2, 2") (7288000000-E) | LF | 310 | $41.65 | $41.65 | $76.00 | $76.00 |
| 0217 | Paved trench (***********) - (3, 2") (7288000000-E) | LF | 300 | $47.35 | $47.35 | $88.00 | $88.00 |
| 0218 | Unpaved trench (***********) - (1, 2") (7300000000-E) | LF | 425 | $31.50 | $31.50 | $16.00 | $16.00 |
| 0219 | Unpaved trench (***********) - (2, 2") (7300000000-E) | LF | 85 | $41.65 | $41.65 | $24.50 | $24.00 |
| 0220 | Unpaved trench (***********) - (4, 2") (7300000000-E) | LF | 10 | $104.55 | $104.55 | $65.00 | $64.00 |
| 0221 | Direct drill (***********) - (2, 2") (7301000000-E) | LF | 360 | $50.40 | $50.40 | $42.50 | $42.00 |
| 0222 | Direct drill (***********) - (3, 2") (7301000000-E) | LF | 200 | $60.55 | $60.55 | $54.50 | $54.00 |
| 0223 | Junction box (standard size) (7324000000-N) | EACH | 12 | $687.20 | $687.20 | $875.00 | $850.00 |
| 0224 | Junction box (over-sized, heavy duty) (7348000000-N) | EACH | 10 | $1,322.45 | $1,322.45 | $1,850.00 | $1,800.00 |
| 0225 | Wood pole (7360000000-N) | EACH | 4 | $3,032.95 | $3,032.95 | $2,600.00 | $2,550.00 |
| 0226 | Guy assembly (7372000000-N) | EACH | 4 | $662.70 | $662.70 | $975.00 | $950.00 |
| 0227 | 2" riser with weatherhead (7420000000-E) | EACH | 4 | $1,378.00 | $1,378.00 | $1,200.00 | $1,180.00 |
| 0228 | Inductive loop sawcut (7444000000-E) | LF | 820 | $36.40 | $36.40 | $22.50 | $22.00 |
| 0229 | Lead-in cable (14-2) (7456100000-E) | LF | 5,470 | $2.25 | $2.25 | $4.10 | $4.05 |
| 0230 | Metal pole with single mast arm (7588000000-N) | EACH | 2 | $36,292 | $36,292 | $32,500 | $32,000 |
| 0231 | Soil test (7613000000-N) | EACH | 2 | $3,272.85 | $3,272.85 | $2,800.00 | $2,700.00 |
| 0232 | Drilled pier foundation (7614100000-E) | CY | 20 | $1,983.65 | $1,983.65 | $2,200.00 | $2,200.00 |
| 0233 | Mast arm with metal pole design (7631000000-N) | EACH | 2 | $818.20 | $818.20 | $310.00 | $300.00 |
| 0234 | Sign for signals (7636000000-N) | EACH | 11 | $720.10 | $720.10 | $925.00 | $910.00 |
| 0235 | Type I post with foundation (7642100000-N) | EACH | 6 | $3,151.50 | $3,151.50 | $2,800.00 | $2,750.00 |
| 0236 | Type II pedestal with foundation (7642200000-N) | EACH | 19 | $4,085.95 | $4,085.95 | $4,200.00 | $4,100.00 |
| 0237 | Signal cabinet foundation (7684000000-N) | EACH | 1 | $2,496.05 | $2,496.05 | $4,200.00 | $4,100.00 |
| 0238 | Contlrs with CBNT (**************) - (2070LX W/ qfree maxtime, base mounted) (7696000000-N) | EACH | 2 | $46,165 | $46,195 | $33,000 | $32,000 |
| 0239 | Detector card (type 170) (7744000000-N) | EACH | 7 | $312.80 | $312.80 | $340.00 | $330.00 |
| 0240 | Cabinet base extender (7901000000-N) | EACH | 2 | $1,140.40 | $1,140.40 | $800.00 | $780.00 |
| 0241 | Metal pole foundation removal (7960000000-N) | EACH | 2 | $1,828.35 | $1,828.35 | $2,400.00 | $2,300.00 |
| 0242 | Metal pole removal (7972000000-N) | EACH | 2 | $1,518.60 | $1,518.60 | $1,975.00 | $1,950.00 |
| 0243 | Generic signal item (EA) - microwave vehicle detection system - multiple zones (7980000000-N) | EACH | 6 | $28,100 | $28,100 | $15,250 | $15,000 |
| 0244 | Generic signal item (EA) - protective coating for single mast arm pole (black) (7980000000-N) | EACH | 2 | $2,650.10 | $2,650.10 | $2,250.00 | $2,250.00 |
| 0245 | Generic signal item (EA) - protective coating for type I pushbutton post (black) (7980000000-N) | EACH | 6 | $168.90 | $168.90 | $155.00 | $150.00 |
| 0246 | Generic signal item (EA) - protective coating for type II signal pedestal (black) (7980000000-N) | EACH | 19 | $212.75 | $212.75 | $230.00 | $225.00 |
| 0247 | Generic signal item (EA) - rectangular rapid flashing beacon assembly (7980000000-N) | EACH | 22 | $10,015 | $10,015 | $12,600 | $12,250 |
| 0248 | Concrete barrier rail with moment slab (8504000000-E) | LF | 443.75 | $600.00 | $750.00 | $870.00 | $880.00 |
| 0249 | MSE retain wall no ** - (4) (8801000000-E) | SF | 2,490 | $140.00 | $100.00 | $150.00 | $132.00 |
| 0250 | MSE retain wall no ** - (5) (8801000000-E) | SF | 794 | $140.00 | $130.00 | $185.00 | $110.00 |
| 0251 | Cip gravity retaining walls (8802040000-E) | SF | 712.71 | $100.00 | $180.00 | $295.00 | $220.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
Every contract let that day: NCDOT letting of November 18, 2025. Compiled by Mirage Metrics.