NCDOT letting results, April 16, 2024
8 contracts let by North Carolina DOT on April 16, 2024, $61,581,360 in low bids, a median of 3.5 bidders per contract.
- Owner
- North Carolina DOT
- Contracts
- 8
- Low bids, total
- $61,581,360
- Data through
- 20 OCT 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| C204208 | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGES #122 AND #126 OVER TOMS CREEK ON US-52 | Surry | 4 | Smith-Rowe, LLC | $13,065,362 | $14,833,476 | +14% | NCDOT |
| C204410 | GRADING, DRAINAGE, PAVING, AND STRUCTURES., GRADING, DRAINAGE, PAVING, RETAINING WALL, AND STRUCTURE. BRIDGE #69 OVER US-70 ON NC-50 (BENSON RD) | Wake | 7 | Blythe Construction Inc | $11,657,112 | $13,694,922 | +17% | NCDOT |
| C204954 | PAVEMENT REHABILITATION AND SIGNALS. I-85 FROM ORANGE COUNTY LINE TO US-15/US-501 | Durham | 2 | FSC II LLC DBA Fred Smith Company | $11,628,515 | $13,614,275 | +17% | NCDOT |
| C204921 | BRIDGE REHABILITATION AND BRIDGE PRESERVATION. I-40 EAST OF US-220 (FREEMAN MILL ROAD) TO EAST OF SR-3037/SR-4240 (EAST GATE CITY BOULEVARD) | Guilford | 3 | American Civil Constructors West Coast LLC | $7,150,000 | $9,117,325 | +28% | NCDOT |
| C204932 | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 1 SECTION OF NC-12, 1 SECTION OF NC-34, AND 14 SECTIONS OF SECONDARY ROADS | Currituck | 2 | Barnhill Contracting Company | $6,701,288 | $6,875,000 | +3.0% | NCDOT |
| C204922 | GRADING, DRAINGE, AND PAVING. SR-2700 FROM EXISTING SR-1809 TO NEW SR-1809, AND SR-1809 FROM WEST OF SR-2700 TO NEW INTERSECTION WITH SR-2700 | Chatham | 6 | FSC II LLC DBA Fred Smith Company | $5,082,805 | $5,339,262 | +5.0% | NCDOT |
| C204724 | GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #28 OVER LONG CREEK ON NC-210 | Pender | 7 | Smith-Rowe, LLC | $5,022,225 | $5,155,550 | +3.0% | NCDOT |
| C204945 | MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 4 SECTIONS OF SECONDARY ROADS | Granville | 2 | Carolina Sunrock LLC | $1,274,053 | $1,365,336 | +7.0% | NCDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than NCDOT received, the others did not match their published totals and are left out.