NCDOT contract C204338 bid tabulation
WIDENING, GRADING, DRAINAGE, PAVING, SIGNALS, & STRUCTURES. SR-2052 (ROGERS RD) GRADE SEPARATION OVER CSX RAILROAD #633905Y AT MP-142.53. Let by North Carolina DOT on October 20, 2026, Wake. 8 bids received; low bid $40,085,604 by Blythe Construction Inc.
- Owner
- North Carolina DOT
- Letting
- 20 OCT 2026
- Pay items
- 295
- Data through
- 20 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Blythe Construction Inc | $40,085,604 | Low |
| 2 | FSC II LLC DBA Fred Smith Company | $42,481,019 | +6.0% |
| 3 | Branch Civil Inc | $44,204,850 | +10% |
| 4 | Zachry Construction Corporation | $44,930,882 | +12% |
| 5 | Joseph B. Fay Co. | $46,435,539 | +16% |
| 6 | United Infrastructure Group Inc | $49,929,234 | +25% |
| 7 | Crowder Construction Company | $51,014,755 | +27% |
| 8 | S T Wooten Corporation | $54,473,489 | +36% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Blythe Construction Inc | 2. FSC II LLC DBA Fred Smith Company | 3. Branch Civil Inc | 4. Zachry Construction Corporation | 5. Joseph B. Fay Co. | 6. United Infrastructure Group Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Mobilization (0000100000-N) | LS | 1 | $2,039,000 | $2,115,000 | $1,590,419 | $2,250,000 | $2,300,000 | $2,496,462 |
| 0002 | Construction surveying (0000400000-N) | LS | 1 | $494,792 | $365,000 | $260,725 | $1,000,000 | $975,000 | $450,000 |
| 0003 | Field office (0000720000-N) | MO | 30 | $3,802.85 | $6,500.00 | $6,999.00 | $8,500.00 | $25,000 | $5,250.00 |
| 0004 | Clearing & grubbing (0001000000-E) | LS | 1 | $2,925,454 | $4,750,000 | $2,506,470 | $2,005,000 | $500,000 | $3,000,000 |
| 0005 | Supplementary clearing & grubbing (0008000000-E) | ACRE | 1 | $10,000 | $1.00 | $22,392 | $10,000 | $10,000 | $0.01 |
| 0006 | Unclassified excavation (0022000000-E) | CY | 5,970 | $10.11 | $46.00 | $17.75 | $11.19 | $35.00 | $45.00 |
| 0007 | Undercut excavation (0036000000-E) | CY | 4,920 | $25.68 | $30.00 | $33.50 | $14.72 | $20.00 | $28.00 |
| 0008 | Borrow excavation (0106000000-E) | CY | 297,320 | $10.59 | $0.01 | $10.25 | $2.50 | $1.00 | $33.00 |
| 0009 | Drainage ditch excavation (0134000000-E) | CY | 2,790 | $14.73 | $22.00 | $12.50 | $9.94 | $32.00 | $18.97 |
| 0010 | Removal of existing asphalt pavement (0156000000-E) | SY | 6,180 | $9.35 | $13.00 | $10.75 | $13.66 | $10.00 | $14.03 |
| 0011 | Breaking of existing asphalt pavement (0177000000-E) | SY | 16,740 | $1.63 | $1.30 | $4.85 | $3.48 | $4.00 | $6.05 |
| 0012 | Select granular material (0195000000-E) | CY | 4,620 | $50.73 | $15.00 | $81.75 | $44.31 | $59.00 | $54.74 |
| 0013 | Geotextile for soil stabilization (0196000000-E) | SY | 5,520 | $3.66 | $4.00 | $9.20 | $4.31 | $4.25 | $4.76 |
| 0014 | Temporary shoring (0199000000-E) | SF | 39,552 | $25.39 | $54.00 | $43.25 | $32.95 | $75.00 | $21.10 |
| 0015 | Generic grading item (LS) - type 1 bridge approach fill, station 29+90.36 -L- (0248000000-N) | LS | 1 | $48,557 | $100,000 | $113,530 | $112,790 | $298,000 | $60,000 |
| 0016 | Foundation conditioning material, minor structures (0318000000-E) | TON | 780 | $50.00 | $30.00 | $70.25 | $45.85 | $55.00 | $82.55 |
| 0017 | FND condit geotextile (4A) (0321000000-E) | SY | 2,440 | $6.00 | $3.00 | $6.40 | $4.03 | $7.50 | $3.87 |
| 0018 | 18" drainage pipe (0335300000-E) | LF | 180 | $59.27 | $115.00 | $137.00 | $104.10 | $178.00 | $113.20 |
| 0019 | ***" RC pipe culv, contr design - (15") (0350000000-E) | LF | 64 | $95.65 | $260.00 | $190.00 | $265.08 | $387.00 | $258.11 |
| 0020 | 15" RC pipe culverts, class III (0366000000-E) | LF | 2,004 | $85.52 | $88.00 | $144.50 | $96.62 | $110.00 | $102.80 |
| 0021 | 18" RC pipe culverts, class III (0372000000-E) | LF | 1,248 | $85.53 | $106.00 | $145.25 | $114.62 | $140.00 | $121.14 |
| 0022 | 24" RC pipe culverts, class III (0378000000-E) | LF | 1,652 | $116.81 | $140.00 | $198.00 | $158.54 | $200.00 | $235.44 |
| 0023 | 30" RC pipe culverts, class III (0384000000-E) | LF | 328 | $171.06 | $179.00 | $248.25 | $208.59 | $288.00 | $269.87 |
| 0024 | 36" RC pipe culverts, class III (0390000000-E) | LF | 40 | $292.93 | $240.00 | $300.75 | $267.20 | $300.00 | $353.58 |
| 0025 | 42" RC pipe culverts, class III (0396000000-E) | LF | 164 | $254.72 | $264.00 | $432.00 | $372.44 | $520.00 | $511.03 |
| 0026 | 48" RC pipe culverts, class III (0402000000-E) | LF | 12 | $411.69 | $475.00 | $640.75 | $452.18 | $600.00 | $468.04 |
| 0027 | 54" RC pipe culverts, class III (0408000000-E) | LF | 148 | $322.44 | $420.00 | $613.25 | $570.56 | $575.00 | $338.02 |
| 0028 | ***" RCP culv class IV - (48") (0448000000-E) | LF | 80 | $332.74 | $365.00 | $614.50 | $463.73 | $500.00 | $439.58 |
| 0029 | 15" RC pipe culverts, class IV (0448200000-E) | LF | 888 | $73.97 | $123.00 | $152.50 | $97.59 | $140.00 | $112.51 |
| 0030 | 18" RC pipe culverts, class IV (0448300000-E) | LF | 60 | $171.83 | $154.00 | $181.75 | $119.25 | $300.00 | $126.14 |
| 0031 | 30" RC pipe culverts, class IV (0448500000-E) | LF | 136 | $178.76 | $224.00 | $330.00 | $229.71 | $310.00 | $149.13 |
| 0032 | **" RC pipe culv class V - (36") (0449000000-E) | LF | 40 | $244.75 | $344.00 | $388.50 | $352.60 | $340.00 | $335.93 |
| 0033 | **" CS pipe culv *****" - (48", 0.109") (0576000000-E) | LF | 24 | $339.59 | $223.00 | $388.75 | $434.67 | $580.00 | $467.79 |
| 0034 | 15" CS pipe culverts, 0.064" thick (0582000000-E) | LF | 304 | $107.07 | $100.00 | $111.75 | $90.02 | $175.00 | $122.69 |
| 0035 | **" CS elbow *****" thick - (15", 0.064") (0636000000-E) | EACH | 8 | $440.81 | $600.00 | $1,351.00 | $1,465.20 | $650.00 | $1,896.37 |
| 0036 | **" CS elbow *****" thick - (48", 0.109") (0636000000-E) | EACH | 2 | $760.81 | $1,600.00 | $3,209.00 | $3,995.02 | $4,500.00 | $2,561.44 |
| 0037 | **"WLD STL pipe grad B in soil - (108", 1.000") (0973100000-E) | LF | 202 | $8,167.49 | $9,960.00 | $9,192.00 | $9,680.06 | $8,000.00 | $7,195.02 |
| 0038 | **"WLD STL pipe grad B in soil - (24", 0.500") (0973100000-E) | LF | 226 | $1,010.26 | $1,470.00 | $1,140.00 | $1,223.31 | $1,500.00 | $995.00 |
| 0039 | **"WLD STL pipe grad B not in soil - (108", 1.000") (0973300000-E) | LF | 202 | $1.01 | $1.00 | $1.15 | $85.66 | $8,000.00 | $7,195.02 |
| 0040 | **"WLD STL pipe grad B not in soil - (24", 0.500") (0973300000-E) | LF | 226 | $1.01 | $1.00 | $1.15 | $37.59 | $1,500.00 | $995.00 |
| 0041 | Generic pipe item (EA) - welded steel pipe sills and baffles (0992000000-E) | EACH | 24 | $1,809.41 | $2,000.00 | $2,042.00 | $2,125.79 | $2,500.00 | $0.01 |
| 0042 | Pipe removal (0995000000-E) | LF | 4,209 | $40.36 | $50.00 | $36.75 | $24.47 | $34.00 | $52.53 |
| 0043 | Fine grading (1011000000-N) | LS | 1 | $2,000,000 | $2,550,000 | $306,280 | $500,000 | $750,000 | $378,097 |
| 0044 | Aggregate base course (1121000000-E) | TON | 1,700 | $39.56 | $44.00 | $50.75 | $40.40 | $68.00 | $58.19 |
| 0045 | Incidental stone base (1220000000-E) | TON | 100 | $34.11 | $120.00 | $54.50 | $31.89 | $78.00 | $46.69 |
| 0046 | Prime coat (1275000000-E) | GAL | 595 | $9.00 | $7.00 | $7.85 | $29.52 | $11.00 | $5.00 |
| 0047 | Mill asp PVMT *****" DTH - (1-1/2") (1297000000-E) | SY | 10,280 | $3.00 | $5.70 | $2.90 | $5.25 | $6.50 | $12.00 |
| 0048 | Incidental milling (1330000000-E) | SY | 870 | $11.69 | $24.00 | $12.25 | $17.67 | $11.00 | $20.00 |
| 0049 | Asphalt conc base course, type B25.0C (1491000000-E) | TON | 7,900 | $96.00 | $79.00 | $90.25 | $120.47 | $83.00 | $83.00 |
| 0050 | Asphalt conc intermediate course, type I19.0C (1503000000-E) | TON | 6,780 | $105.00 | $81.00 | $89.25 | $132.52 | $82.00 | $82.00 |
| 0051 | Asphalt conc surface course, type S9.5B (1519000000-E) | TON | 7,035 | $115.00 | $88.00 | $97.75 | $138.54 | $90.00 | $90.00 |
| 0052 | Asphalt binder for plant mix (1575000000-E) | TON | 1,140 | $820.00 | $800.00 | $972.00 | $987.78 | $900.00 | $900.00 |
| 0053 | Asphalt plant mix, pavement repair (1693000000-E) | TON | 260 | $258.49 | $260.00 | $505.50 | $162.31 | $350.00 | $325.00 |
| 0054 | Generic paving item (TON) - aggregate base course modified (1880000000-E) | TON | 2,050 | $31.28 | $58.08 | $44.50 | $34.11 | $60.00 | $38.69 |
| 0055 | Right-of-way markers (2000000000-N) | EACH | 102 | $93.83 | $400.00 | $371.00 | $409.57 | $350.00 | $225.00 |
| 0056 | Subdrain excavation (2022000000-E) | CY | 44.80 | $35.00 | $50.00 | $53.75 | $13.80 | $32.00 | $45.96 |
| 0057 | Geotextile for subsurface drains (2026000000-E) | SY | 200 | $12.00 | $7.00 | $18.50 | $2.73 | $4.25 | $2.80 |
| 0058 | Subdrain coarse aggregate (2036000000-E) | CY | 33.60 | $80.00 | $60.00 | $123.00 | $50.56 | $242.00 | $102.46 |
| 0059 | 6" perforated subdrain pipe (2044000000-E) | LF | 200 | $17.00 | $10.00 | $26.25 | $23.27 | $13.00 | $5.48 |
| 0060 | Subdrain pipe outlet (2070000000-N) | EACH | 1 | $400.00 | $600.00 | $615.25 | $460.33 | $453.00 | $268.75 |
| 0061 | 6" outlet pipe (2077000000-E) | LF | 6 | $40.00 | $70.00 | $61.50 | $25.20 | $32.00 | $48.38 |
| 0062 | Temporary steel plate covers for masonry drainage structure (2190000000-N) | EACH | 1 | $3,025.86 | $3,200.00 | $4,840.00 | $14,480 | $2,900.00 | $3,920.39 |
| 0063 | Endwalls (2209000000-E) | CY | 3.40 | $1,811.10 | $2,100.00 | $2,320.00 | $1,785.61 | $2,900.00 | $3,348.24 |
| 0064 | Reinforced endwalls (2220000000-E) | CY | 5 | $1,657.45 | $2,280.00 | $2,573.00 | $3,718.16 | $2,700.00 | $3,807.38 |
| 0065 | Pipe collars (2253000000-E) | CY | 1.16 | $4,016.17 | $4,700.00 | $5,775.00 | $3,088.85 | $3,600.00 | $4,679.27 |
| 0066 | Flowable fill (2275000000-E) | CY | 57 | $305.10 | $1,200.00 | $570.00 | $2,000.00 | $433.00 | $508.82 |
| 0067 | Masonry drainage structures (2286000000-N) | EACH | 113 | $2,672.86 | $5,800.00 | $4,970.00 | $5,452.60 | $4,800.00 | $3,730.27 |
| 0068 | Masonry drainage structures (2297000000-E) | CY | 7.20 | $1,481.38 | $2,285.00 | $2,508.00 | $2,355.52 | $2,600.00 | $3,051.31 |
| 0069 | Masonry drainage structures (2308000000-E) | LF | 170.78 | $547.30 | $800.00 | $545.00 | $851.95 | $800.00 | $664.45 |
| 0070 | Frame with two grates, STD 840.16 (2364000000-N) | EACH | 3 | $1,465.92 | $1,425.00 | $3,836.00 | $1,226.23 | $900.00 | $1,404.56 |
| 0071 | Frame with two grates, STD 840.24 (2366000000-N) | EACH | 23 | $1,392.99 | $2,475.00 | $3,710.00 | $1,173.03 | $900.00 | $1,531.09 |
| 0072 | Frame-GRT-HD 840.03 ** - (E) (2374000000-N) | EACH | 10 | $1,541.00 | $1,525.00 | $2,127.00 | $1,314.90 | $1,300.00 | $1,531.09 |
| 0073 | Frame-GRT-HD 840.03 ** - (F) (2374000000-N) | EACH | 33 | $1,541.00 | $1,575.00 | $2,127.00 | $1,314.90 | $1,000.00 | $1,531.09 |
| 0074 | Frame-GRT-HD 840.03 ** - (G) (2374000000-N) | EACH | 30 | $1,541.00 | $1,575.00 | $2,127.00 | $1,314.90 | $1,000.00 | $1,531.09 |
| 0075 | Frame with cover, STD 840.54 (2396000000-N) | EACH | 16 | $1,272.87 | $1,180.00 | $1,666.00 | $998.24 | $1,000.00 | $1,531.09 |
| 0076 | 2'-6" concrete curb & gutter (2549000000-E) | LF | 11,190 | $28.00 | $32.00 | $44.25 | $25.08 | $31.00 | $19.67 |
| 0077 | 4" concrete sidewalk (2591000000-E) | SY | 5,640 | $65.00 | $60.00 | $92.25 | $63.10 | $72.00 | $50.92 |
| 0078 | Concrete curb ramps (2605000000-N) | EACH | 31 | $2,500.00 | $3,750.00 | $5,384.00 | $2,658.20 | $2,800.00 | $2,101.53 |
| 0079 | Remove and replace concrete curb ramps (2612500000-N) | EACH | 2 | $1,000.00 | $5,100.00 | $10,094 | $2,830.84 | $1,100.00 | $3,810.91 |
| 0080 | 4" concrete paved ditch (2619000000-E) | SY | 410 | $85.00 | $100.00 | $135.75 | $70.07 | $94.00 | $55.77 |
| 0081 | 5" monolithic concrete islands (keyed in) (2655000000-E) | SY | 100 | $130.00 | $110.00 | $118.25 | $67.76 | $143.00 | $60.62 |
| 0082 | Precast reinforced concrete barrier, single faced (2724000000-E) | LF | 170 | $101.97 | $180.00 | $156.75 | $186.51 | $204.00 | $166.77 |
| 0083 | Adjustment of catch basins (2800000000-N) | EACH | 2 | $1,974.54 | $2,500.00 | $1,236.00 | $3,309.83 | $2,100.00 | $2,734.52 |
| 0084 | Convert existing catch basin to junction box with manhole (2893000000-N) | EACH | 1 | $3,865.86 | $8,500.00 | $4,073.00 | $3,436.50 | $4,700.00 | $5,307.77 |
| 0085 | Impact attenuator units, type TL-3 (3001000000-N) | EACH | 1 | $28,200 | $29,700 | $31,229 | $33,637 | $30,000 | $28,200 |
| 0086 | Steel beam guardrail (3030000000-E) | LF | 5,700 | $27.30 | $27.30 | $30.75 | $32.56 | $28.00 | $27.30 |
| 0087 | Steel beam guardrail, shop curved (3045000000-E) | LF | 487.50 | $29.00 | $29.00 | $33.50 | $34.60 | $30.00 | $29.00 |
| 0088 | Additional guardrail posts (3150000000-N) | EACH | 10 | $66.00 | $66.00 | $75.25 | $78.73 | $70.00 | $66.00 |
| 0089 | Guardrail end units, type at-1 (3195000000-N) | EACH | 6 | $950.00 | $950.00 | $1,086.00 | $1,133.16 | $980.00 | $950.00 |
| 0090 | Guardrail end units, type cat-1 (3210000000-N) | EACH | 1 | $1,000.00 | $1,000.00 | $1,143.00 | $1,192.81 | $960.00 | $1,000.00 |
| 0091 | Guardrail anchor units, type III (3215000000-N) | EACH | 4 | $2,350.00 | $2,350.00 | $2,686.00 | $2,803.09 | $2,400.00 | $2,350.01 |
| 0092 | Guardrail end units, type TL-2 (3288000000-N) | EACH | 1 | $3,850.00 | $3,850.00 | $4,400.00 | $4,592.31 | $3,400.00 | $3,850.01 |
| 0093 | Remove existing guardrail (3360000000-E) | LF | 1,640 | $1.00 | $1.00 | $1.15 | $1.19 | $1.00 | $1.00 |
| 0094 | Temporary steel beam guardrail (3380000000-E) | LF | 137.50 | $9.00 | $9.00 | $10.50 | $10.74 | $9.50 | $9.00 |
| 0095 | Generic guardrail item (EA) - remove temporary impact attenuator units, type TL-3 (3435000000-N) | EACH | 1 | $4,500.00 | $2,000.00 | $5,143.00 | $5,367.64 | $4,000.00 | $4,500.01 |
| 0096 | Generic guardrail item (EA) - temporary impact attenuator units, type TL-3 (3435000000-N) | EACH | 4 | $21,500 | $6,000.00 | $24,372 | $25,645 | $23,000 | $9,500.03 |
| 0097 | Generic fencing item 866 (EA) - vinyl coated metal line posts for 60" chain link fence (3579000000-N) | EACH | 260 | $96.50 | $96.50 | $109.25 | $113.92 | $98.00 | $96.50 |
| 0098 | Generic fencing item 866 (EA) - vinyl coated metal terminal posts for 60" chain link fence (3579000000-N) | EACH | 20 | $290.00 | $290.00 | $328.00 | $345.92 | $295.00 | $290.00 |
| 0099 | Generic fencing item 866 (LF) - vinyl coated chain link fence, 60" fabric (3580000000-E) | LF | 3,030 | $18.25 | $18.25 | $20.75 | $21.77 | $20.00 | $18.25 |
| 0100 | Rip rap, class I (3628000000-E) | TON | 1,870 | $64.15 | $93.00 | $114.00 | $73.00 | $115.00 | $94.27 |
| 0101 | Rip rap, class B (3649000000-E) | TON | 500 | $62.52 | $94.00 | $144.00 | $70.63 | $107.00 | $86.50 |
| 0102 | Geotextile for drainage (3656000000-E) | SY | 3,910 | $2.38 | $4.00 | $4.85 | $4.42 | $4.75 | $3.52 |
| 0103 | Supports, 3-LB steel U-channel (4072000000-E) | LF | 615 | $9.00 | $9.00 | $10.50 | $10.79 | $9.00 | $9.00 |
| 0104 | Sign erection, type E (4102000000-N) | EACH | 39 | $95.00 | $195.00 | $86.50 | $301.15 | $195.00 | $75.00 |
| 0105 | Disposal of sign system, U-channel (4155000000-N) | EACH | 16 | $25.00 | $50.00 | $1.15 | $6.02 | $50.00 | $1.00 |
| 0106 | Disposal of sign, D, E or F (4238000000-N) | EACH | 4 | $25.00 | $50.00 | $1.15 | $12.05 | $50.00 | $1.00 |
| 0107 | Work zone signs (stationary) (4400000000-E) | SF | 682 | $9.65 | $8.50 | $15.50 | $9.94 | $11.00 | $9.00 |
| 0108 | Work zone signs (portable) (4405000000-E) | SF | 473 | $18.17 | $20.00 | $15.50 | $12.65 | $10.00 | $10.00 |
| 0109 | Work zone signs (barricade mounted) (4410000000-E) | SF | 229 | $11.36 | $8.50 | $14.00 | $10.84 | $8.00 | $6.00 |
| 0110 | Flashing arrow board (4415000000-N) | EACH | 2 | $3,066.45 | $2,000.00 | $3,652.00 | $6,625.39 | $3,500.00 | $5,000.02 |
| 0111 | Portable changeable message sign (4420000000-N) | EACH | 2 | $12,493 | $5,000.00 | $7,390.00 | $10,239 | $8,000.00 | $15,000 |
| 0112 | Drums (4430000000-N) | EACH | 171 | $51.11 | $45.00 | $45.25 | $72.28 | $88.00 | $45.00 |
| 0113 | Cones (4435000000-N) | EACH | 175 | $29.53 | $20.00 | $95.50 | $31.18 | $44.00 | $21.00 |
| 0114 | Barricades (type III) (4445000000-E) | LF | 360 | $42.02 | $25.00 | $40.75 | $38.55 | $40.00 | $25.00 |
| 0115 | Pedestrian channelizing devices (4447000000-E) | LF | 240 | $42.02 | $19.00 | $26.00 | $54.21 | $25.00 | $45.00 |
| 0116 | Flagger (4455000000-N) | DAY | 360 | $511.14 | $825.00 | $845.50 | $381.22 | $560.00 | $500.00 |
| 0117 | Temporary crash cushions (4465000000-N) | EACH | 7 | $10,222 | $11,000 | $10,850 | $3,854.76 | $8,500.00 | $11,904 |
| 0118 | Remove & reset temporary crash cushion (4470000000-N) | EACH | 3 | $5,110.75 | $4,900.00 | $4,386.00 | $1,686.46 | $5,500.00 | $3,250.01 |
| 0119 | TMA (4480000000-N) | EACH | 2 | $104,941 | $15,000 | $48,181 | $124,005 | $40,000 | $0.01 |
| 0120 | Portable concrete barrier (4485000000-E) | LF | 3,830 | $34.07 | $38.00 | $67.00 | $38.55 | $52.00 | $62.97 |
| 0121 | Portable concrete barrier (anchored) (4490000000-E) | LF | 1,370 | $73.82 | $77.00 | $104.00 | $57.82 | $84.00 | $96.73 |
| 0122 | Remove and reset portable concrete barrier (4500000000-E) | LF | 240 | $22.71 | $25.00 | $34.75 | $16.86 | $28.00 | $25.21 |
| 0123 | Law enforcement (4510000000-N) | HR | 128 | $65.00 | $110.00 | $50.50 | $117.58 | $100.00 | $85.00 |
| 0124 | Skinny drum (4516000000-N) | EACH | 100 | $38.61 | $40.00 | $45.25 | $66.26 | $66.00 | $32.00 |
| 0125 | Generic traffic control item (EA) - audible warning devices (4600000000-N) | EACH | 6 | $312.32 | $545.00 | $577.00 | $2,168.31 | $1,500.00 | $500.00 |
| 0126 | Temporary raised pavement markers (4650000000-N) | EACH | 764 | $7.00 | $7.00 | $7.85 | $8.44 | $7.00 | $7.00 |
| 0127 | Thermoplastic pavement marking lines (4", 90 mils) (4685000000-E) | LF | 16,725 | $1.25 | $1.25 | $1.40 | $1.50 | $1.25 | $1.25 |
| 0128 | Thermoplastic pavement marking lines (8", 90 mils) (4695000000-E) | LF | 1,251 | $2.00 | $2.00 | $2.25 | $2.41 | $2.25 | $2.00 |
| 0129 | Thermoplastic pavement marking lines (12", 90 mils) (4700000000-E) | LF | 1,327 | $3.00 | $3.00 | $3.35 | $3.61 | $3.00 | $3.00 |
| 0130 | Thermoplastic pavement marking lines (24", 90 mils) (4709000000-E) | LF | 1,020 | $10.00 | $10.00 | $11.25 | $12.05 | $10.00 | $10.00 |
| 0131 | Thermoplastic pavement marking character (90 mils) (4720000000-E) | EACH | 14 | $110.00 | $110.00 | $123.25 | $132.51 | $110.00 | $110.00 |
| 0132 | Thermoplastic pavement marking symbol (90 mils) (4725000000-E) | EACH | 77 | $120.00 | $120.00 | $134.25 | $144.55 | $120.00 | $120.00 |
| 0133 | 4" cold appl plstic lines type ** - (IV) (4770000000-E) | LF | 1,517 | $2.50 | $2.50 | $2.80 | $3.01 | $2.50 | $2.50 |
| 0134 | Paint pavement marking lines (4") (4810000000-E) | LF | 90,395 | $0.25 | $0.25 | $0.30 | $0.30 | $0.25 | $0.25 |
| 0135 | Paint pavement marking lines (8") (4820000000-E) | LF | 7,212 | $0.65 | $0.65 | $0.75 | $0.79 | $0.65 | $0.65 |
| 0136 | Paint pavement marking lines (12") (4825000000-E) | LF | 218 | $1.25 | $1.25 | $1.40 | $1.50 | $1.25 | $1.25 |
| 0137 | Paint pavement marking lines (16") (4830000000-E) | LF | 160 | $4.50 | $4.50 | $5.05 | $5.43 | $4.50 | $4.50 |
| 0138 | Paint pavement marking lines (24") (4835000000-E) | LF | 1,536 | $4.50 | $4.50 | $5.05 | $5.43 | $4.50 | $4.50 |
| 0139 | Paint pavement marking character (4840000000-N) | EACH | 64 | $35.00 | $35.00 | $39.25 | $42.16 | $35.00 | $35.00 |
| 0140 | Paint pavement marking symbol (4845000000-N) | EACH | 258 | $35.00 | $35.00 | $39.25 | $42.16 | $35.00 | $35.00 |
| 0141 | Polyurea lines (**", *** mils) - (4", 20 mils) (4846000000-E) | LF | 1,071 | $3.50 | $3.50 | $3.90 | $4.22 | $3.50 | $3.50 |
| 0142 | Removal of pavement marking lines (4") (4850000000-E) | LF | 28,512 | $0.80 | $0.80 | $0.90 | $0.97 | $0.80 | $0.80 |
| 0143 | Removal of pavement marking lines (8") (4860000000-E) | LF | 1,948 | $2.00 | $2.00 | $2.25 | $2.41 | $2.00 | $2.00 |
| 0144 | Removal of pavement marking lines (12") (4865000000-E) | LF | 110 | $3.00 | $3.00 | $3.35 | $3.61 | $3.00 | $3.00 |
| 0145 | Removal of pavement marking lines (24") (4870000000-E) | LF | 303 | $5.00 | $5.00 | $5.60 | $6.02 | $5.00 | $5.00 |
| 0146 | Removal of pavement marking symbols & characters (4875000000-N) | EACH | 90 | $50.00 | $50.00 | $56.00 | $60.23 | $50.00 | $50.00 |
| 0147 | Generic pavement marking item (EA) - polycarbonate H-shaped markers (4895000000-N) | EACH | 267 | $60.00 | $60.00 | $67.25 | $72.28 | $60.00 | $60.00 |
| 0148 | Permanent raised pavement markers (4900000000-N) | EACH | 12 | $7.00 | $7.00 | $7.85 | $8.44 | $7.00 | $7.00 |
| 0149 | Elect duct BD, size ***** - (2") (5155000000-E) | LF | 8,290 | $25.00 | $26.00 | $15.25 | $23.11 | $14.00 | $13.50 |
| 0150 | Elec JB ************ - (IG25) (5240000000-N) | EACH | 62 | $700.00 | $700.00 | $2,642.00 | $2,250.39 | $1,500.00 | $2,336.01 |
| 0151 | Portable lighting (5255000000-N) | LS | 1 | $26,300 | $300,000 | $217,720 | $5,685.64 | $100,000 | $118,800 |
| 0152 | 6" water line (5325600000-E) | LF | 481 | $130.00 | $176.00 | $179.25 | $188.96 | $150.00 | $130.00 |
| 0153 | 8" water line (5325800000-E) | LF | 100 | $165.00 | $187.00 | $190.25 | $200.77 | $200.00 | $165.00 |
| 0154 | 12" water line (5326200000-E) | LF | 4,328 | $160.00 | $225.00 | $227.50 | $242.11 | $210.00 | $160.00 |
| 0155 | DI H2O pipe fittings (5329000000-E) | LB | 15,445 | $17.50 | $18.00 | $20.25 | $21.26 | $10.00 | $17.50 |
| 0156 | 6" valve (5540000000-E) | EACH | 4 | $4,250.00 | $6,600.00 | $6,718.00 | $7,085.97 | $3,600.00 | $4,250.01 |
| 0157 | 8" valve (5546000000-E) | EACH | 1 | $4,850.00 | $8,800.00 | $8,957.00 | $9,447.97 | $4,900.00 | $4,850.02 |
| 0158 | 12" valve (5558000000-E) | EACH | 11 | $8,800.00 | $13,200 | $13,435 | $14,172 | $7,500.00 | $8,800.03 |
| 0159 | 12" tapping sleeve & valve (5572200000-E) | EACH | 2 | $26,500 | $22,000 | $22,392 | $23,620 | $15,300 | $26,500 |
| 0160 | 2" air release valve (5589200000-E) | EACH | 3 | $17,265 | $27,500 | $27,990 | $29,525 | $9,600.00 | $17,265 |
| 0161 | 2" water meter (5643200000-E) | EACH | 6 | $11,550 | $12,000 | $12,315 | $12,991 | $6,100.00 | $11,550 |
| 0162 | 8" water meter (5643800000-E) | EACH | 1 | $52,000 | $75,000 | $78,371 | $82,670 | $8,000.00 | $52,000 |
| 0163 | 2" DCV backflow prevention assembly (5653200000-E) | EACH | 1 | $10,550 | $9,900.00 | $10,076 | $10,629 | $6,300.00 | $10,555 |
| 0164 | Relocate 2" DCV backflow prevention assembly (5653210000-E) | EACH | 4 | $9,200.00 | $4,400.00 | $4,478.00 | $4,723.98 | $4,800.00 | $9,200.03 |
| 0165 | 8" DCV backflow prevention assembly (5653800000-E) | EACH | 1 | $37,000 | $80,000 | $83,969 | $88,575 | $17,000 | $37,000 |
| 0166 | Relocate 8" DCV backflow prevention assembly (5653810000-E) | EACH | 1 | $14,500 | $33,000 | $33,588 | $35,430 | $4,800.00 | $14,500 |
| 0167 | Fire hydrant (5666000000-N) | EACH | 1 | $9,950.00 | $14,500 | $14,555 | $15,353 | $7,200.00 | $9,950.03 |
| 0168 | Relocate fire hydrant (5672000000-N) | EACH | 1 | $4,000.00 | $4,400.00 | $4,478.00 | $4,723.99 | $2,700.00 | $4,000.01 |
| 0169 | Fire hydrant leg (5673000000-E) | LF | 326 | $145.00 | $170.00 | $190.25 | $200.77 | $271.00 | $145.00 |
| 0170 | 12" line stop (5679000000-E) | EACH | 1 | $18,000 | $19,800 | $20,153 | $21,258 | $3,000.00 | $18,000 |
| 0171 | 6" line stop with bypass (5684400000-E) | EACH | 2 | $22,000 | $13,000 | $13,435 | $14,172 | $7,300.00 | $22,000 |
| 0172 | 12" line stop with bypass (5685000000-E) | EACH | 1 | $47,000 | $21,000 | $21,272 | $22,439 | $35,000 | $47,000 |
| 0173 | Water service line (<2") (5686500000-E) | LF | 359 | $95.00 | $130.00 | $145.50 | $153.53 | $148.00 | $95.00 |
| 0174 | 8" sanitary gravity sewer (5691300000-E) | LF | 1,095 | $265.00 | $440.00 | $445.75 | $472.40 | $200.00 | $265.00 |
| 0175 | Sanitary sewer clean-out (5768000000-N) | EACH | 2 | $3,950.00 | $11,000 | $11,196 | $11,810 | $5,300.00 | $3,950.01 |
| 0176 | Sewer service line (5768500000-E) | LF | 119 | $105.00 | $230.00 | $246.25 | $259.82 | $419.00 | $105.00 |
| 0177 | 4' dia utility manhole (5775000000-E) | EACH | 1 | $10,850 | $12,000 | $12,315 | $12,991 | $5,800.00 | $10,850 |
| 0178 | 5' dia utility manhole (5776000000-E) | EACH | 9 | $13,550 | $15,500 | $15,674 | $16,534 | $9,100.00 | $13,550 |
| 0179 | 6' dia utility manhole (5777000000-E) | EACH | 3 | $18,000 | $16,500 | $16,794 | $17,715 | $12,000 | $18,000 |
| 0180 | Utility manhole wall 4' dia (5781000000-E) | LF | 8.50 | $2,100.00 | $1,000.00 | $1,120.00 | $1,181.00 | $780.00 | $2,100.01 |
| 0181 | Utility manhole wall 5' dia (5782000000-E) | LF | 91.17 | $950.00 | $1,200.00 | $1,235.00 | $1,299.10 | $800.00 | $950.00 |
| 0182 | Utility manhole wall 6' dia (5783000000-E) | LF | 46.41 | $1,250.00 | $1,300.00 | $1,344.00 | $1,417.19 | $1,200.00 | $1,250.00 |
| 0183 | Abandon 6" utility pipe (5800000000-E) | LF | 385 | $26.00 | $17.00 | $19.00 | $20.07 | $24.00 | $26.00 |
| 0184 | Abandon 8" utility pipe (5801000000-E) | LF | 1,323 | $28.00 | $18.00 | $20.25 | $21.26 | $23.00 | $28.00 |
| 0185 | Abandon 12" utility pipe (5804000000-E) | LF | 3,120 | $30.00 | $30.00 | $33.50 | $35.43 | $22.00 | $30.00 |
| 0186 | Remove water meter (5815000000-N) | EACH | 1 | $1,100.00 | $800.00 | $895.75 | $944.80 | $2,700.00 | $1,100.00 |
| 0187 | Remove fire hydrant (5815500000-N) | EACH | 4 | $3,250.00 | $2,500.00 | $2,799.00 | $2,952.49 | $900.00 | $3,250.01 |
| 0188 | Remove utility manhole (5828000000-N) | EACH | 4 | $3,850.00 | $2,300.00 | $2,575.00 | $2,716.29 | $1,600.00 | $3,850.01 |
| 0189 | 16" encasement pipe (5835700000-E) | LF | 246 | $220.00 | $250.00 | $257.50 | $271.63 | $26.00 | $220.00 |
| 0190 | 24" encasement pipe (5836000000-E) | LF | 80 | $320.00 | $365.00 | $363.75 | $383.82 | $152.00 | $320.00 |
| 0191 | Bore & jack **" - (16") (5872500000-E) | LF | 246 | $1,915.00 | $600.00 | $615.75 | $649.54 | $1,000.00 | $1,915.01 |
| 0192 | Bore & jack **" - (24") (5872500000-E) | LF | 80 | $840.00 | $935.00 | $951.75 | $1,003.85 | $2,000.00 | $840.00 |
| 0193 | Generic utility item (EA) - remove backflow prevention assembly (5882000000-N) | EACH | 2 | $5,625.00 | $1,000.00 | $1,120.00 | $1,181.00 | $4,800.00 | $5,625.02 |
| 0194 | Temporary silt fence (6000000000-E) | LF | 25,875 | $2.70 | $2.40 | $2.70 | $3.43 | $2.50 | $2.85 |
| 0195 | Stone for erosion control, class A (6006000000-E) | TON | 1,220 | $62.42 | $34.00 | $59.25 | $68.76 | $70.00 | $54.76 |
| 0196 | Stone for erosion control, class B (6009000000-E) | TON | 3,330 | $63.42 | $34.00 | $45.75 | $70.24 | $80.00 | $56.85 |
| 0197 | Sediment control stone (6012000000-E) | TON | 3,680 | $48.83 | $24.00 | $31.75 | $44.71 | $60.00 | $47.32 |
| 0198 | Temporary mulching (6015000000-E) | ACRE | 52 | $2,000.00 | $420.00 | $1,567.00 | $2,047.84 | $2,000.00 | $1,700.01 |
| 0199 | Seed for temporary seeding (6018000000-E) | LB | 2,500 | $1.00 | $2.00 | $3.35 | $2.41 | $1.25 | $2.00 |
| 0200 | Fertilizer for temporary seeding (6021000000-E) | TON | 12.50 | $400.00 | $410.00 | $1,092.00 | $1,023.92 | $400.00 | $850.00 |
| 0201 | Temporary slope drains (6024000000-E) | LF | 2,330 | $16.45 | $5.00 | $16.75 | $26.40 | $18.00 | $28.02 |
| 0202 | Safety fence (6029000000-E) | LF | 2,860 | $1.80 | $3.00 | $3.35 | $3.61 | $3.50 | $3.00 |
| 0203 | Silt excavation (6030000000-E) | CY | 7,390 | $6.96 | $1.00 | $5.00 | $5.00 | $15.00 | $17.66 |
| 0204 | Matting for erosion control (6036000000-E) | SY | 49,725 | $1.70 | $1.00 | $1.60 | $2.05 | $1.75 | $1.70 |
| 0205 | Coir fiber mat (6037000000-E) | SY | 100 | $5.25 | $10.00 | $6.70 | $8.44 | $5.25 | $7.00 |
| 0206 | 1/4" hardware cloth (6042000000-E) | LF | 7,020 | $5.75 | $3.50 | $3.90 | $7.23 | $5.75 | $6.00 |
| 0207 | **" temporary pipe - (18") (6045000000-E) | LF | 25 | $105.96 | $140.00 | $181.75 | $69.17 | $261.00 | $125.82 |
| 0208 | **" temporary pipe - (42") (6045000000-E) | LF | 75 | $110.00 | $165.00 | $204.50 | $113.37 | $313.00 | $505.98 |
| 0209 | Special stilling basins (6070000000-N) | EACH | 2 | $320.35 | $2,500.00 | $1,607.00 | $937.15 | $1,700.00 | $2,067.33 |
| 0210 | Flocculant (6071002000-E) | LB | 1,140 | $8.00 | $3.00 | $5.60 | $6.62 | $3.75 | $5.50 |
| 0211 | Coir fiber wattle (6071012000-E) | LF | 1,600 | $13.00 | $9.20 | $10.25 | $10.84 | $9.25 | $9.00 |
| 0212 | Wattle barrier (6071013000-E) | LF | 1,231 | $13.00 | $10.00 | $11.25 | $14.46 | $11.00 | $12.00 |
| 0213 | Coir fiber baffle (6071030000-E) | LF | 1,215 | $6.50 | $4.00 | $7.30 | $9.63 | $5.00 | $8.00 |
| 0214 | Seeding and mulching (6084000000-E) | ACRE | 51 | $2,975.00 | $955.00 | $2,827.00 | $3,131.99 | $3,000.00 | $2,600.01 |
| 0215 | Mowing (6087000000-E) | ACRE | 48 | $175.00 | $200.00 | $224.00 | $301.15 | $175.00 | $250.00 |
| 0216 | Seed for repair seeding (6090000000-E) | LB | 550 | $5.00 | $5.00 | $5.60 | $5.12 | $5.00 | $4.25 |
| 0217 | Fertilizer for repair seeding (6093000000-E) | TON | 2.25 | $450.00 | $900.00 | $1,008.00 | $1,325.07 | $980.00 | $1,100.00 |
| 0218 | Seed for supplemental seeding (6096000000-E) | LB | 1,275 | $5.00 | $4.00 | $4.75 | $5.12 | $5.00 | $4.25 |
| 0219 | Fertilizer topdressing (6108000000-E) | TON | 37.75 | $450.00 | $400.00 | $979.75 | $1,144.38 | $450.00 | $950.00 |
| 0220 | Impervious dike (6111000000-E) | LF | 510 | $141.19 | $100.00 | $50.25 | $231.41 | $97.00 | $18.66 |
| 0221 | Specialized hand mowing (6114500000-N) | MHR | 25 | $55.00 | $200.00 | $224.00 | $180.69 | $55.00 | $150.00 |
| 0222 | Response for erosion control (6117000000-N) | EACH | 100 | $300.00 | $1.00 | $1.10 | $120.47 | $300.00 | $100.00 |
| 0223 | Concrete washout structure (6117500000-N) | EACH | 1 | $1,256.98 | $2,400.00 | $2,098.00 | $1,033.79 | $1,600.00 | $719.94 |
| 0224 | Culvert diversion channel (6120000000-E) | CY | 518 | $45.01 | $50.00 | $57.25 | $43.66 | $43.00 | $34.20 |
| 0225 | Reforestation (6123000000-E) | ACRE | 0.10 | $4,250.00 | $4,000.00 | $4,478.00 | $42,161 | $4,250.00 | $35,000 |
| 0226 | Generic erosion control item (EA) - prefabricated concrete washout (6132000000-N) | EACH | 3 | $427.17 | $2,300.00 | $1,729.00 | $1,483.38 | $2,000.00 | $1,500.00 |
| 0227 | Pedestrian signal head (16", 1 section W/countdown) (7048500000-E) | EACH | 9 | $1,200.00 | $1,200.00 | $1,633.00 | $2,407.31 | $1,300.00 | $1,444.00 |
| 0228 | Signal cable (7060000000-E) | LF | 5,650 | $6.00 | $6.00 | $6.20 | $6.09 | $5.50 | $5.50 |
| 0229 | Vehicle signal head (12", 3 section) (7120000000-E) | EACH | 24 | $1,400.00 | $1,400.00 | $1,687.00 | $1,387.94 | $1,400.00 | $1,492.00 |
| 0230 | Vehicle signal head (12", 4 section) (7132000000-E) | EACH | 4 | $1,800.00 | $1,800.00 | $2,178.00 | $1,856.26 | $1,700.00 | $1,926.01 |
| 0231 | Vehicle signal head (12", 5 section) (7144000000-E) | EACH | 1 | $2,200.00 | $2,200.00 | $2,556.00 | $2,663.97 | $2,200.00 | $2,260.01 |
| 0232 | Backplate (7180000000-N) | EACH | 36 | $260.00 | $260.00 | $402.50 | $329.65 | $357.00 | $356.00 |
| 0233 | Messenger cable (3/8") (7264000000-E) | LF | 925 | $6.00 | $6.00 | $6.15 | $8.82 | $5.50 | $5.45 |
| 0234 | Tracer wire (7279000000-E) | LF | 6,083 | $2.00 | $2.00 | $1.45 | $4.11 | $1.50 | $1.30 |
| 0235 | Paved trench (***********) - (1, 2") (7288000000-E) | LF | 125 | $65.00 | $65.00 | $64.00 | $85.15 | $57.00 | $56.50 |
| 0236 | Unpaved trench (***********) - (1, 2") (7300000000-E) | LF | 800 | $33.00 | $33.00 | $14.75 | $31.62 | $13.00 | $13.00 |
| 0237 | Unpaved trench (***********) - (2, 2") (7300000000-E) | LF | 4,941 | $35.00 | $35.00 | $21.50 | $31.62 | $19.00 | $19.00 |
| 0238 | Direct drill (***********) - (2, 2") (7301000000-E) | LF | 1,183 | $36.00 | $36.00 | $46.25 | $42.58 | $41.00 | $41.00 |
| 0239 | Junction box (***************) - (special oversized, heavy duty, 36" X 24" X 24") (7312000000-N) | EACH | 1 | $2,500.00 | $2,500.00 | $2,642.00 | $2,078.86 | $2,300.00 | $2,336.01 |
| 0240 | Junction box (standard size) (7324000000-N) | EACH | 8 | $710.00 | $710.00 | $1,039.00 | $1,035.18 | $880.00 | $919.00 |
| 0241 | Junction box (over-sized, heavy duty) (7348000000-N) | EACH | 16 | $1,500.00 | $1,500.00 | $1,899.00 | $1,549.73 | $1,700.00 | $1,679.01 |
| 0242 | Wood pole (7360000000-N) | EACH | 4 | $1,400.00 | $1,400.00 | $3,475.00 | $2,610.44 | $2,100.00 | $3,073.01 |
| 0243 | Guy assembly (7372000000-N) | EACH | 8 | $650.00 | $650.00 | $1,514.00 | $1,305.23 | $990.00 | $1,339.00 |
| 0244 | 1" riser with weatherhead (7408000000-E) | EACH | 1 | $600.00 | $600.00 | $729.50 | $1,155.60 | $650.00 | $645.00 |
| 0245 | 2" riser with weatherhead (7420000000-E) | EACH | 4 | $790.00 | $790.00 | $1,306.00 | $1,338.06 | $1,200.00 | $1,155.00 |
| 0246 | Inductive loop sawcut (7444000000-E) | LF | 1,725 | $16.00 | $16.00 | $26.00 | $24.33 | $23.00 | $23.00 |
| 0247 | Lead-in cable (14-2) (7456100000-E) | LF | 5,200 | $4.00 | $4.00 | $4.50 | $4.32 | $3.25 | $4.00 |
| 0248 | Site survey (7481000000-N) | EACH | 2 | $2,000.00 | $2,000.00 | $978.25 | $1,824.64 | $760.00 | $865.00 |
| 0249 | Luminaire arm for video system (7481200000-N) | EACH | 8 | $1,400.00 | $1,400.00 | $2,015.00 | $1,678.67 | $1,400.00 | $1,782.01 |
| 0250 | Camera without internal loop emulator processing unit (7481240000-N) | EACH | 10 | $4,200.00 | $4,200.00 | $11,636 | $10,109 | $10,000 | $10,289 |
| 0251 | External loop emulator processing unit (7481260000-N) | EACH | 2 | $14,000 | $14,000 | $7,437.00 | $7,179.35 | $6,600.00 | $6,576.02 |
| 0252 | Communications cable (** fiber) - (24) (7516000000-E) | LF | 7,728 | $5.00 | $5.00 | $5.35 | $5.89 | $4.75 | $4.75 |
| 0253 | Drop cable (7528000000-E) | LF | 75 | $6.00 | $6.00 | $5.65 | $5.89 | $4.75 | $5.00 |
| 0254 | Splice enclosure (7540000000-N) | EACH | 1 | $2,600.00 | $2,600.00 | $2,920.00 | $3,752.67 | $3,300.00 | $2,582.01 |
| 0255 | Modify splice enclosure (7541000000-N) | EACH | 2 | $2,000.00 | $2,000.00 | $2,171.00 | $3,752.67 | $1,900.00 | $1,920.01 |
| 0256 | Interconnect center (7552000000-N) | EACH | 1 | $3,000.00 | $3,000.00 | $3,353.00 | $3,835.40 | $3,000.00 | $2,965.01 |
| 0257 | Delineator marker (7566000000-N) | EACH | 17 | $160.00 | $160.00 | $183.25 | $262.75 | $162.00 | $162.00 |
| 0258 | Metal strain signal pole (7576000000-N) | EACH | 4 | $13,000 | $13,000 | $16,252 | $21,652 | $14,000 | $14,371 |
| 0259 | Soil test (7613000000-N) | EACH | 4 | $1,900.00 | $1,900.00 | $4,401.00 | $5,226.98 | $3,900.00 | $3,892.01 |
| 0260 | Drilled pier foundation (7614100000-E) | CY | 32 | $2,200.00 | $2,200.00 | $2,647.00 | $2,777.09 | $2,000.00 | $2,341.01 |
| 0261 | Sign for signals (7636000000-N) | EACH | 6 | $680.00 | $680.00 | $1,009.00 | $973.14 | $890.00 | $892.00 |
| 0262 | Type II pedestal with foundation (7642200000-N) | EACH | 8 | $3,600.00 | $3,600.00 | $4,874.00 | $4,782.98 | $4,300.00 | $4,310.01 |
| 0263 | Signal cabinet foundation (7684000000-N) | EACH | 1 | $1,600.00 | $1,600.00 | $4,519.00 | $4,387.66 | $2,900.00 | $3,996.01 |
| 0264 | Contlrs with CBNT (**************) - (2070LX, base mounted) (7696000000-N) | EACH | 1 | $24,000 | $24,000 | $30,605 | $36,843 | $29,000 | $27,063 |
| 0265 | Detector card (type 170) (7744000000-N) | EACH | 6 | $270.00 | $270.00 | $367.50 | $484.14 | $326.00 | $325.00 |
| 0266 | Cabinet base extender (7901000000-N) | EACH | 1 | $790.00 | $790.00 | $831.25 | $960.97 | $900.00 | $735.00 |
| 0267 | Generic signal item (EA) - ethernet edge switch (7980000000-N) | EACH | 1 | $2,900.00 | $2,900.00 | $11,148 | $4,949.64 | $3,500.00 | $9,858.03 |
| 0268 | Foundation conditioning material, box culvert (8133000000-E) | TON | 128 | $79.09 | $65.00 | $99.75 | $65.58 | $82.00 | $60.29 |
| 0269 | Class A concrete (culvert) (8196000000-E) | CY | 94.60 | $1,612.37 | $2,000.00 | $1,786.00 | $1,658.43 | $3,600.00 | $4,500.00 |
| 0270 | Reinforcing steel (culvert) (8245000000-E) | LB | 11,520 | $1.35 | $2.70 | $4.00 | $1.47 | $1.75 | $2.00 |
| 0271 | Geotextile for drainage (8622000000-E) | SY | 200 | $7.26 | $6.50 | $4.15 | $3.18 | $9.50 | $20.00 |
| 0272 | MSE retain wall no ** - (1) (8801000000-E) | SF | 23,700 | $115.69 | $126.00 | $168.25 | $182.79 | $177.00 | $130.00 |
| 0273 | MSE retain wall no ** - (2) (8801000000-E) | SF | 8,300 | $133.30 | $95.00 | $117.50 | $155.00 | $177.00 | $130.00 |
| 0274 | MSE retain wall no ** - (4) (8801000000-E) | SF | 27,100 | $106.63 | $117.00 | $148.50 | $160.00 | $177.00 | $130.00 |
| 0275 | MSE retain wall no ** - (5) (8801000000-E) | SF | 8,500 | $118.39 | $122.00 | $148.25 | $175.00 | $177.00 | $130.00 |
| 0276 | Generic ret wall item (SF) - architectural concrete surface treatment (8847000000-E) | SF | 76,400 | $1.60 | $3.00 | $1.90 | $2.64 | $1.60 | $1.60 |
| 0277 | Generic ret wall item (SF) - smse retaining wall no 3 (8847000000-E) | SF | 8,800 | $165.87 | $148.00 | $157.00 | $265.00 | $165.00 | $170.00 |
| 0278 | FND excav B** sta ******* - (1, 29+90.36 -L-) (8091000000-N) | LS | 1 | $37,795 | $290,000 | $40,409 | $75,833 | $150,000 | $30,253 |
| 0279 | FND excav B** sta ******* - (2, 29+90.36 -L-) (8091000000-N) | LS | 1 | $39,958 | $290,000 | $40,409 | $75,328 | $150,000 | $30,253 |
| 0280 | Reinforced concrete deck slab (8147000000-E) | SF | 14,573 | $59.20 | $63.00 | $73.25 | $65.05 | $95.00 | $80.00 |
| 0281 | Grooving bridge floors (8161000000-E) | SF | 14,508 | $0.98 | $1.00 | $1.25 | $0.71 | $2.00 | $1.06 |
| 0282 | Class A concrete (bridge) (8182000000-E) | CY | 423.70 | $1,363.79 | $1,150.00 | $1,116.00 | $1,500.00 | $1,800.00 | $2,000.00 |
| 0283 | BRG appr slab *********** - (29+90.36 -L-) (8210000000-N) | LS | 1 | $121,728 | $135,000 | $164,530 | $134,990 | $250,000 | $160,039 |
| 0284 | Reinforcing steel (bridge) (8217000000-E) | LB | 66,486 | $1.30 | $2.50 | $2.05 | $1.54 | $2.00 | $1.38 |
| 0285 | Spiral column reinforcing steel (bridge) (8238000000-E) | LB | 6,508 | $3.32 | $3.50 | $4.45 | $2.74 | $6.00 | $2.57 |
| 0286 | 54" prestressed concrete girders (8265000000-E) | LF | 1,486.67 | $433.83 | $540.00 | $500.00 | $495.55 | $600.00 | $320.57 |
| 0287 | Pile DRV equip setup ** steel piles - (HP 12 X 53) (8328200000-E) | EACH | 84 | $1,328.32 | $1,300.00 | $1,123.00 | $5,000.00 | $3,000.00 | $5,000.00 |
| 0288 | HP 12 X 53 steel piles (8364000000-E) | LF | 2,560 | $93.15 | $60.00 | $85.75 | $92.18 | $125.00 | $110.00 |
| 0289 | Steel pile points (8391000000-N) | EACH | 64 | $144.79 | $175.00 | $182.00 | $170.99 | $157.00 | $149.39 |
| 0290 | Two bar metal rail (8475000000-E) | LF | 360.67 | $223.00 | $250.00 | $284.00 | $294.05 | $320.00 | $224.68 |
| 0291 | 1'-**"X*****"conc parapet - (1'-2" X 3'-3") (8517000000-E) | LF | 375.67 | $184.58 | $260.00 | $276.75 | $238.16 | $450.00 | $139.61 |
| 0292 | **" chain link fence - (72") (8524000000-E) | LF | 373.33 | $210.00 | $230.00 | $290.75 | $250.49 | $222.00 | $223.24 |
| 0293 | 4" slope protection (8531000000-E) | SY | 2,230 | $57.31 | $105.00 | $170.75 | $110.03 | $86.00 | $107.87 |
| 0294 | Elastomeric bearings (8657000000-N) | LS | 1 | $48,908 | $35,000 | $18,333 | $47,527 | $100,000 | $60,657 |
| 0295 | Elec conduit sys signal ****** - (29+90.36 -L-) (8727000000-N) | LS | 1 | $135,439 | $125,000 | $106,470 | $118,609 | $250,000 | $89,940 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
Every contract let that day: NCDOT letting of October 20, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.