NCDOT contract C205017 bid tabulation
GRADING, DRAINAGE, AND PAVING., GRADING, DRAINAGE, PAVING, AND RETAINING WALL. US-64 (CHIMNEY ROCK RD) FROM SR-1613 (SLICK ROCK RD, MM 22.79) TO SR-1701 (ROCK BROAD RIVER RD, MM 25.06). Let by North Carolina DOT on January 21, 2025, Henderson. 4 bids received; low bid $32,849,409 by Blythe Construction Inc.
- Owner
- North Carolina DOT
- Letting
- 21 JAN 2025
- Pay items
- 76
- Data through
- 20 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Blythe Construction Inc | $32,849,409 | Low |
| 2 | NHM Constructors, LLC | $38,437,606 | +17% |
| 3 | Adams Contracting Co Inc | $38,737,808 | +18% |
| 4 | Crowder Construction Company | $44,158,916 | +34% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Blythe Construction Inc | 2. NHM Constructors, LLC | 3. Adams Contracting Co Inc | 4. Crowder Construction Company |
|---|---|---|---|---|---|---|---|
| 0001 | Mobilization (0000100000-N) | LS | 1 | $1,600,000 | $3,625,352 | $5,000,000 | $2,207,946 |
| 0002 | Construction surveying (0000400000-N) | LS | 1 | $805,000 | $3,598,151 | $380,000 | $463,000 |
| 0003 | Unclassified excavation (0022000000-E) | CY | 250 | $230.00 | $33.30 | $45.00 | $955.46 |
| 0004 | Drainage ditch excavation (0134000000-E) | CY | 100 | $105.00 | $29.50 | $45.00 | $172.92 |
| 0005 | Removal of existing asphalt pavement (0156000000-E) | SY | 6,420 | $26.00 | $15.70 | $20.00 | $32.88 |
| 0006 | Geotextile for soil stabilization (0196000000-E) | SY | 7,495 | $10.00 | $6.40 | $7.00 | $5.18 |
| 0007 | Temporary shoring (0199000000-E) | SF | 81,500 | $45.00 | $130.30 | $75.00 | $130.00 |
| 0008 | Rock plating (0223000000-E) | SY | 850 | $100.00 | $180.40 | $100.00 | $115.00 |
| 0009 | Generic grading item (SY) - geotextile for rock embankments, type 2 (0241000000-E) | SY | 7,950 | $10.00 | $5.50 | $7.00 | $15.00 |
| 0010 | Generic grading item (TON) - shot rock plating (0255000000-E) | TON | 18,380 | $75.00 | $81.30 | $100.00 | $97.00 |
| 0011 | Select material class ** - (VI) (0314000000-E) | TON | 1,214 | $90.00 | $86.20 | $100.00 | $106.76 |
| 0012 | Select material class ** - (VII) (0314000000-E) | TON | 74,235 | $90.00 | $77.40 | $100.00 | $91.00 |
| 0013 | 18" drainage pipe (0335300000-E) | LF | 90 | $225.00 | $164.50 | $200.00 | $191.83 |
| 0014 | 24" drainage pipe (0335400000-E) | LF | 160 | $240.00 | $179.00 | $300.00 | $164.65 |
| 0015 | Pipe clean out (0996000000-N) | EACH | 4 | $3,300.00 | $3,826.20 | $1,000.00 | $2,751.26 |
| 0016 | #57 stone (1077000000-E) | TON | 950 | $90.00 | $54.50 | $100.00 | $125.00 |
| 0017 | Stabilizer aggregate (1110000000-E) | TON | 40 | $120.00 | $51.30 | $85.00 | $137.02 |
| 0018 | Aggregate base course (1121000000-E) | TON | 1,135 | $90.00 | $51.30 | $85.00 | $84.44 |
| 0019 | Incidental stone base (1220000000-E) | TON | 50 | $120.00 | $45.90 | $85.00 | $159.74 |
| 0020 | Asphalt conc base course, type B25.0C (1491000000-E) | TON | 2,009 | $165.00 | $108.20 | $144.05 | $144.25 |
| 0021 | Asphalt conc surface course, type S9.5C (1523000000-E) | TON | 3,075 | $130.00 | $109.20 | $136.18 | $145.66 |
| 0022 | Asphalt binder for plant mix (1575000000-E) | TON | 335 | $760.00 | $753.00 | $684.00 | $1,004.08 |
| 0023 | Patching existing pavement (1704000000-E) | TON | 739 | $228.00 | $159.10 | $390.00 | $212.13 |
| 0024 | 6" perforated subdrain pipe (2044000000-E) | LF | 50 | $82.00 | $39.10 | $25.00 | $124.25 |
| 0025 | 6" outlet pipe (2077000000-E) | LF | 20 | $82.00 | $34.10 | $25.00 | $214.47 |
| 0027 | Steel beam guardrail (3030000000-E) | LF | 2,300 | $29.55 | $25.70 | $28.80 | $33.26 |
| 0028 | Guardrail end units, type TL-3 (3287000000-N) | EACH | 6 | $4,186.58 | $3,640.00 | $4,080.00 | $4,712.11 |
| 0029 | Remove existing guardrail (3360000000-E) | LF | 2,450 | $3.69 | $3.20 | $3.60 | $4.16 |
| 0030 | Rip rap, class II (3635000000-E) | TON | 345 | $80.00 | $91.40 | $100.00 | $88.66 |
| 0031 | Rip rap, class A (3642000000-E) | TON | 1,291 | $95.00 | $104.50 | $100.00 | $94.00 |
| 0032 | Rip rap, class B (3649000000-E) | TON | 2,182 | $80.00 | $81.10 | $100.00 | $85.00 |
| 0033 | Contr furn, type ***sign - (E) (4025000000-E) | SF | 71.80 | $8.62 | $76.90 | $20.00 | $20.12 |
| 0034 | Supports, 3-LB steel U-channel (4072000000-E) | LF | 163 | $9.85 | $8.20 | $12.00 | $9.38 |
| 0035 | Sign erection, type E (4102000000-N) | EACH | 14 | $92.35 | $251.60 | $100.00 | $160.37 |
| 0036 | Disposal of support, U-channel (4192000000-N) | EACH | 6 | $12.31 | $16.10 | $30.00 | $27.03 |
| 0037 | Work zone signs (stationary) (4400000000-E) | SF | 160 | $9.24 | $8.20 | $10.00 | $10.60 |
| 0038 | Work zone signs (portable) (4405000000-E) | SF | 160 | $24.32 | $9.30 | $15.00 | $27.92 |
| 0039 | Portable changeable message sign (4420000000-N) | EACH | 5 | $13,234 | $16,860 | $15,000 | $15,902 |
| 0040 | Temporary portable traffic signal system (4424500000-N) | EACH | 6 | $31,945 | $38,295 | $30,000 | $46,000 |
| 0041 | Drums (4430000000-N) | EACH | 265 | $60.28 | $72.20 | $60.00 | $64.67 |
| 0042 | Flagger (4455000000-N) | DAY | 155 | $698.23 | $453.80 | $500.00 | $2,100.00 |
| 0043 | Temporary crash cushions (4465000000-N) | EACH | 14 | $10,035 | $8,725.40 | $8,000.00 | $15,938 |
| 0044 | Remove & reset temporary crash cushion (4470000000-N) | EACH | 8 | $4,001.88 | $3,479.50 | $3,000.00 | $4,504.23 |
| 0045 | Portable concrete barrier (anchored) (4490000000-E) | LF | 2,350 | $88.52 | $77.00 | $100.00 | $99.00 |
| 0046 | Remove & reset portable concrete barrier (anchored) (4505000000-E) | LF | 3,200 | $21.25 | $18.50 | $50.00 | $23.92 |
| 0047 | Law enforcement (4510000000-N) | HR | 700 | $104.66 | $101.70 | $70.00 | $97.01 |
| 0048 | Paint pavement marking lines (4") (4810000000-E) | LF | 3,200 | $0.40 | $0.20 | $0.90 | $0.42 |
| 0049 | Paint pavement marking lines (6") (4815000000-E) | LF | 86,542 | $0.50 | $0.20 | $0.35 | $0.42 |
| 0050 | Generic pavement marking item (EA) - inlaid raised pavement markers (4895000000-N) | EACH | 170 | $100.00 | $85.60 | $100.00 | $55.44 |
| 0051 | Temporary silt fence (6000000000-E) | LF | 5,500 | $4.13 | $5.40 | $4.02 | $4.64 |
| 0052 | Stone for erosion control, class A (6006000000-E) | TON | 305 | $100.00 | $97.30 | $100.00 | $77.57 |
| 0053 | Stone for erosion control, class B (6009000000-E) | TON | 305 | $85.00 | $86.90 | $100.00 | $68.47 |
| 0054 | Sediment control stone (6012000000-E) | TON | 275 | $85.00 | $62.80 | $100.00 | $64.94 |
| 0055 | Safety fence (6029000000-E) | LF | 200 | $2.46 | $3.20 | $2.40 | $2.77 |
| 0056 | Silt excavation (6030000000-E) | CY | 180 | $75.00 | $27.00 | $30.00 | $43.72 |
| 0057 | Matting for erosion control (6036000000-E) | SY | 30,800 | $2.28 | $2.10 | $2.22 | $2.56 |
| 0058 | 1/4" hardware cloth (6042000000-E) | LF | 295 | $6.77 | $5.40 | $10.00 | $7.62 |
| 0059 | Wattle (6071010000-E) | LF | 800 | $14.16 | $16.10 | $13.80 | $15.94 |
| 0060 | Seeding and mulching (6084000000-E) | ACRE | 4.30 | $3,755.61 | $3,747.10 | $3,660.00 | $4,227.04 |
| 0061 | Impervious dike (6111000000-E) | LF | 3,190 | $125.00 | $193.80 | $250.00 | $170.00 |
| 0062 | Response for erosion control (6117000000-N) | EACH | 30 | $750.00 | $535.30 | $900.00 | $1,039.44 |
| 0063 | Concrete washout structure (6117500000-N) | EACH | 10 | $1,400.00 | $1,154.20 | $9,000.00 | $1,218.40 |
| 0064 | Generic erosion control item (CY) - vegetative debris removal and disposal (6138000000-E) | CY | 8,850 | $105.00 | $157.10 | $100.00 | $142.00 |
| 0065 | Generic ret wall item (EA) - micropile proof tests (8834000000-N) | EACH | 15 | $2,500.00 | $2,121.00 | $812.50 | $2,818.46 |
| 0066 | Generic ret wall item (EA) - micropile, average length (8834000000-N) | EACH | 447 | $4,200.00 | $2,121.00 | $1,231.25 | $3,923.11 |
| 0067 | Generic ret wall item (EA) - soil nail proof tests (8834000000-N) | EACH | 6 | $1,300.00 | $2,121.00 | $812.50 | $1,409.23 |
| 0068 | Generic ret wall item (EA) - soil nail, average length (8834000000-N) | EACH | 545 | $2,800.00 | $2,439.20 | $987.50 | $1,997.89 |
| 0069 | Generic ret wall item (EA) - wire basket forms (8834000000-N) | EACH | 6,210 | $285.00 | $228.50 | $1,050.00 | $1,300.00 |
| 0070 | Generic ret wall item (LF) - geocomposite drains (8839000000-E) | LF | 2,175 | $10.00 | $11.70 | $22.50 | $18.42 |
| 0071 | Generic ret wall item (LF) - micropile, additional length over average (8839000000-E) | LF | 20 | $230.00 | $238.60 | $123.75 | $313.92 |
| 0072 | Generic ret wall item (LF) - soil nail, additional length over average (8839000000-E) | LF | 10 | $95.00 | $159.10 | $71.25 | $214.94 |
| 0073 | Generic ret wall item (SY) - geotextile for temporary wall (8848000000-E) | SY | 33,770 | $25.00 | $8.20 | $7.00 | $4.58 |
| 0074 | Generic ret wall item (SY) - geotextile for wire form embankment, type 5A (8848000000-E) | SY | 104,520 | $25.00 | $8.20 | $7.00 | $5.45 |
| 0075 | Generic ret wall item (CY) - borrow (8853000000-E) | CY | 41,770 | $75.00 | $31.60 | $65.00 | $68.00 |
| 0076 | Generic ret wall item (CY) - shotcrete (8853000000-E) | CY | 817 | $1,375.00 | $2,130.50 | $1,100.00 | $1,639.43 |
| 0077 | Generic structure item (LB) - reinforcing steel (8889000000-E) | LB | 76,205 | $10.00 | $3.20 | $3.75 | $2.14 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
Every contract let that day: NCDOT letting of January 21, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.