NCDOT contract C205038 bid tabulation
GRADING, DRAINAGE, PAVING, AND SIGNALS. INTERSECTION OF SR-1006 (OLD STAGE RD) AND SR-2736 (ROCK SERVICE STATION RD). Let by North Carolina DOT on March 17, 2026, Wake. 6 bids received; low bid $6,939,396 by FSC II LLC DBA Fred Smith Company.
- Owner
- North Carolina DOT
- Letting
- 17 MAR 2026
- Pay items
- 170
- Data through
- 20 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | FSC II LLC DBA Fred Smith Company | $6,939,396 | Low |
| 2 | Branch Civil Inc | $7,985,000 | +15% |
| 3 | Cardinal Civil Contracting LLC | $8,176,011 | +18% |
| 4 | Blythe Construction Inc | $8,587,245 | +24% |
| 5 | Conti Civil LLC | $8,626,442 | +24% |
| 6 | Sunrock Industries LLC DBA Carolina Sunrock LLC | $9,194,585 | +32% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. FSC II LLC DBA Fred Smith Company | 2. Branch Civil Inc | 3. Cardinal Civil Contracting LLC | 4. Blythe Construction Inc | 5. Conti Civil LLC | 6. Sunrock Industries LLC DBA Carolina Sunrock LLC |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Mobilization (0000100000-N) | LS | 1 | $346,000 | $307,650 | $333,903 | $425,000 | $430,000 | $459,607 |
| 0002 | Construction surveying (0000400000-N) | LS | 1 | $75,000 | $102,710 | $89,856 | $250,300 | $120,000 | $112,591 |
| 0003 | Grading (0043000000-N) | LS | 1 | $1,392,500 | $1,312,479 | $2,065,818 | $2,000,000 | $1,885,428 | $2,601,569 |
| 0004 | Supplementary clearing & grubbing (0050000000-E) | ACRE | 1 | $1.00 | $27,765 | $0.94 | $1,000.00 | $2,100.00 | $20,000 |
| 0005 | Undercut excavation (0057000000-E) | CY | 900 | $40.00 | $16.00 | $54.41 | $13.00 | $29.00 | $34.00 |
| 0006 | Drainage ditch excavation (0134000000-E) | CY | 30 | $50.00 | $27.50 | $33.31 | $30.00 | $25.00 | $38.50 |
| 0007 | Proof rolling (0192000000-N) | HR | 10 | $300.00 | $181.50 | $247.03 | $365.00 | $320.00 | $238.00 |
| 0008 | Select granular material (0195000000-E) | CY | 800 | $12.00 | $75.00 | $50.11 | $57.00 | $69.00 | $152.00 |
| 0009 | Geotextile for soil stabilization (0196000000-E) | SY | 800 | $3.50 | $3.50 | $3.03 | $5.00 | $3.50 | $5.30 |
| 0010 | Rock plating (0223000000-E) | SY | 700 | $85.00 | $100.00 | $63.29 | $250.00 | $90.00 | $110.00 |
| 0011 | Generic grading item (TON) - hauling and disposal of petroleum contaminated soil (0255000000-E) | TON | 50 | $50.00 | $88.75 | $252.91 | $100.00 | $245.00 | $500.00 |
| 0012 | Foundation conditioning material, minor structures (0318000000-E) | TON | 780 | $10.00 | $68.75 | $37.80 | $55.00 | $60.00 | $55.00 |
| 0013 | FND condit geotextile (4A) (0321000000-E) | SY | 2,440 | $1.00 | $3.25 | $5.30 | $4.00 | $4.00 | $4.00 |
| 0014 | 12" drainage pipe (0335100000-E) | LF | 20 | $100.00 | $52.50 | $47.59 | $165.00 | $175.00 | $165.00 |
| 0015 | 15" drainage pipe (0335200000-E) | LF | 428 | $100.00 | $71.00 | $154.11 | $85.00 | $125.00 | $85.00 |
| 0016 | 15" RC pipe culverts, class III (0366000000-E) | LF | 712 | $88.00 | $151.50 | $119.67 | $105.00 | $167.00 | $105.00 |
| 0017 | 18" RC pipe culverts, class III (0372000000-E) | LF | 456 | $100.00 | $138.50 | $150.35 | $110.00 | $167.00 | $110.00 |
| 0018 | 24" RC pipe culverts, class III (0378000000-E) | LF | 132 | $155.00 | $178.50 | $124.96 | $160.00 | $215.50 | $160.00 |
| 0019 | 15" RC pipe culverts, class IV (0448200000-E) | LF | 3,912 | $80.00 | $103.50 | $90.75 | $105.00 | $115.50 | $108.00 |
| 0020 | 18" RC pipe culverts, class IV (0448300000-E) | LF | 652 | $97.00 | $120.00 | $115.36 | $120.00 | $134.50 | $120.00 |
| 0021 | 24" RC pipe culverts, class IV (0448400000-E) | LF | 752 | $135.00 | $195.00 | $181.41 | $170.00 | $181.00 | $170.00 |
| 0022 | 30" RC pipe culverts, class IV (0448500000-E) | LF | 252 | $180.00 | $240.00 | $201.32 | $235.00 | $268.00 | $235.00 |
| 0023 | Pipe removal (0995000000-E) | LF | 1,890 | $25.00 | $50.00 | $25.89 | $26.00 | $70.00 | $26.00 |
| 0024 | Pipe clean out (0996000000-N) | EACH | 1 | $2,950.00 | $5,500.00 | $1,588.07 | $4,950.00 | $1,470.00 | $4,950.00 |
| 0025 | Shallow undercut (1099500000-E) | CY | 100 | $54.00 | $14.00 | $82.35 | $30.00 | $24.00 | $46.50 |
| 0026 | Class IV subgrade stabilization (1099700000-E) | TON | 200 | $47.00 | $47.05 | $49.06 | $65.00 | $46.00 | $52.50 |
| 0027 | Class IV aggregate stabilization (1111000000-E) | TON | 200 | $5.00 | $49.25 | $49.06 | $65.00 | $49.00 | $57.00 |
| 0028 | Geotextile for subgrade stabilization (1112000000-E) | SY | 300 | $6.00 | $4.55 | $9.04 | $5.00 | $4.50 | $3.00 |
| 0029 | Aggregate base course (1121000000-E) | TON | 260 | $70.00 | $71.50 | $39.16 | $150.00 | $46.00 | $54.50 |
| 0030 | Incidental stone base (1220000000-E) | TON | 50 | $105.00 | $155.00 | $54.93 | $60.00 | $70.00 | $86.50 |
| 0031 | Milln asphalt PVMT ***** - ***** - (0" to 3") (1308000000-E) | SY | 1,750 | $11.00 | $14.75 | $11.86 | $12.77 | $9.50 | $17.50 |
| 0032 | Incidental milling (1330000000-E) | SY | 1,410 | $11.00 | $14.50 | $14.84 | $27.73 | $9.50 | $10.50 |
| 0033 | Asphalt conc base course, type B25.0C (1491000000-E) | TON | 8,430 | $79.00 | $82.50 | $92.28 | $83.00 | $80.00 | $90.00 |
| 0034 | Asphalt conc intermediate course, type I19.0C (1503000000-E) | TON | 5,780 | $77.00 | $82.75 | $67.11 | $84.00 | $80.00 | $89.00 |
| 0035 | Asphalt conc surface course, type S9.5B (1519000000-E) | TON | 5,570 | $83.00 | $89.50 | $57.31 | $85.00 | $85.00 | $74.00 |
| 0036 | Asphalt binder for plant mix (1575000000-E) | TON | 1,020 | $600.00 | $695.00 | $611.28 | $600.00 | $663.00 | $500.00 |
| 0037 | Asphalt plant mix, pavement repair (1693000000-E) | TON | 241 | $100.00 | $275.00 | $189.00 | $194.00 | $345.00 | $146.00 |
| 0038 | Right-of-way markers (2000000000-N) | EACH | 33 | $450.00 | $368.00 | $416.00 | $850.00 | $500.00 | $388.00 |
| 0039 | Control-of-access markers (2020000000-N) | EACH | 4 | $450.00 | $368.00 | $416.00 | $850.00 | $370.50 | $361.00 |
| 0040 | Subdrain excavation (2022000000-E) | CY | 100.80 | $20.00 | $20.25 | $29.39 | $65.00 | $64.00 | $35.00 |
| 0041 | Geotextile for subsurface drains (2026000000-E) | SY | 300 | $2.00 | $7.80 | $8.11 | $5.00 | $1.10 | $10.00 |
| 0042 | Subdrain coarse aggregate (2036000000-E) | CY | 50.40 | $30.00 | $87.25 | $71.25 | $55.00 | $70.10 | $75.00 |
| 0043 | 6" perforated subdrain pipe (2044000000-E) | LF | 300 | $4.00 | $17.50 | $28.08 | $15.00 | $18.00 | $16.00 |
| 0044 | Subdrain pipe outlet (2070000000-N) | EACH | 1 | $400.00 | $798.50 | $417.56 | $650.00 | $460.00 | $500.00 |
| 0045 | 6" outlet pipe (2077000000-E) | LF | 6 | $60.00 | $117.50 | $39.76 | $125.00 | $36.00 | $33.00 |
| 0046 | Masonry drainage structures (2286000000-N) | EACH | 60 | $5,500.00 | $4,722.00 | $3,495.81 | $3,950.00 | $3,520.00 | $4,175.00 |
| 0047 | Masonry drainage structures (2308000000-E) | LF | 30.70 | $600.00 | $757.50 | $706.59 | $750.00 | $557.00 | $750.00 |
| 0048 | Frame with two grates, STD 840.16 (2364000000-N) | EACH | 3 | $1,400.00 | $1,643.00 | $2,786.55 | $1,850.00 | $1,810.50 | $1,850.00 |
| 0049 | Frame with two grates, STD 840.24 (2366000000-N) | EACH | 1 | $1,350.00 | $1,567.00 | $1,396.97 | $1,850.00 | $1,745.00 | $1,850.00 |
| 0050 | Frame with two grates, STD 840.29 (2367000000-N) | EACH | 9 | $1,340.00 | $1,548.00 | $1,248.45 | $1,850.00 | $1,726.00 | $1,850.00 |
| 0051 | Frame-GRT-HD 840.03 ** - (E) (2374000000-N) | EACH | 9 | $1,500.00 | $1,756.00 | $1,468.11 | $1,225.00 | $1,950.00 | $1,225.00 |
| 0052 | Frame-GRT-HD 840.03 ** - (F) (2374000000-N) | EACH | 18 | $1,550.00 | $1,811.00 | $1,468.11 | $1,225.00 | $1,950.00 | $1,225.00 |
| 0053 | Frame-GRT-HD 840.03 ** - (G) (2374000000-N) | EACH | 18 | $1,550.00 | $1,811.00 | $1,468.11 | $1,225.00 | $1,950.00 | $1,225.00 |
| 0054 | Frame with cover, STD 840.54 (2396000000-N) | EACH | 1 | $1,175.00 | $1,349.00 | $1,691.40 | $1,225.00 | $1,550.00 | $1,225.00 |
| 0055 | Concrete transitional section for drop inlet (2451000000-N) | EACH | 9 | $1,500.00 | $1,333.00 | $1,248.00 | $1,200.00 | $540.00 | $1,500.00 |
| 0056 | **"X**" concrete curb - (8" X 18") (2535000000-E) | LF | 170 | $22.00 | $30.00 | $37.44 | $36.00 | $23.20 | $75.00 |
| 0057 | 1'-6" concrete curb & gutter (2542000000-E) | LF | 5,300 | $25.00 | $32.00 | $26.83 | $25.80 | $26.01 | $26.90 |
| 0058 | 2'-6" concrete curb & gutter (2549000000-E) | LF | 6,990 | $27.00 | $33.00 | $31.20 | $30.00 | $28.89 | $29.85 |
| 0059 | 6" concrete driveway (2612000000-E) | SY | 2,500 | $62.00 | $91.50 | $92.56 | $89.00 | $80.23 | $133.65 |
| 0060 | 5" monolithic concrete islands (keyed in) (2655000000-E) | SY | 550 | $55.00 | $83.50 | $94.64 | $91.00 | $54.34 | $115.65 |
| 0061 | Steel beam guardrail (3030000000-E) | LF | 525 | $23.00 | $25.50 | $23.92 | $23.00 | $24.15 | $23.00 |
| 0062 | Steel beam guardrail, shop curved (3045000000-E) | LF | 41 | $26.00 | $29.00 | $27.04 | $26.00 | $27.30 | $26.00 |
| 0063 | Additional guardrail posts (3150000000-N) | EACH | 5 | $44.00 | $48.75 | $45.76 | $44.00 | $46.20 | $44.00 |
| 0064 | Guardrail end units, type cat-1 (3210000000-N) | EACH | 3 | $1,000.00 | $1,111.00 | $1,040.00 | $1,000.00 | $1,050.00 | $1,000.00 |
| 0065 | Guardrail end units, type TL-3 (3287000000-N) | EACH | 2 | $3,400.00 | $3,776.00 | $3,536.00 | $3,400.00 | $3,570.00 | $3,400.00 |
| 0066 | Guardrail end units, type TL-2 (3288000000-N) | EACH | 1 | $3,250.00 | $3,609.00 | $3,380.00 | $3,250.00 | $3,412.50 | $3,250.00 |
| 0067 | Rip rap, class I (3628000000-E) | TON | 10 | $130.00 | $142.00 | $138.59 | $100.00 | $120.00 | $100.00 |
| 0068 | Rip rap, class B (3649000000-E) | TON | 85 | $90.00 | $110.00 | $82.17 | $80.00 | $120.00 | $100.00 |
| 0069 | Geotextile for drainage (3656000000-E) | SY | 745 | $3.00 | $6.25 | $3.34 | $5.00 | $3.60 | $6.00 |
| 0070 | Contr furn, type ***sign - (E) (4025000000-E) | SF | 204.25 | $20.00 | $24.00 | $13.52 | $21.00 | $21.00 | $18.50 |
| 0071 | Supports, 3-LB steel U-channel (4072000000-E) | LF | 486 | $10.00 | $8.25 | $8.32 | $7.15 | $10.50 | $10.00 |
| 0072 | Sign erection, type E (4102000000-N) | EACH | 34 | $80.00 | $179.00 | $13.52 | $155.00 | $84.00 | $200.00 |
| 0073 | Sign erect, reloc ** GRD MTD - (D) (4116100000-N) | EACH | 1 | $200.00 | $202.00 | $156.00 | $175.00 | $210.00 | $300.00 |
| 0074 | Sign erect, reloc ** GRD MTD - (E) (4116100000-N) | EACH | 1 | $200.00 | $179.00 | $130.00 | $155.00 | $210.00 | $300.00 |
| 0075 | Disposal of sign system, U-channel (4155000000-N) | EACH | 16 | $5.00 | $5.80 | $26.00 | $5.00 | $5.25 | $20.00 |
| 0076 | Disposal of support, U-channel (4192000000-N) | EACH | 1 | $5.00 | $5.80 | $26.00 | $5.00 | $5.25 | $20.00 |
| 0077 | Work zone signs (stationary) (4400000000-E) | SF | 224 | $8.00 | $8.00 | $7.80 | $7.25 | $8.98 | $8.95 |
| 0078 | Work zone signs (portable) (4405000000-E) | SF | 128 | $75.00 | $22.25 | $14.70 | $8.35 | $15.64 | $10.50 |
| 0079 | Work zone signs (barricade mounted) (4410000000-E) | SF | 54 | $8.00 | $11.25 | $8.32 | $7.65 | $9.29 | $9.80 |
| 0080 | Flashing arrow board (4415000000-N) | EACH | 2 | $750.00 | $2,000.00 | $208.00 | $1,500.00 | $3,190.00 | $2,215.00 |
| 0081 | Portable changeable message sign (4420000000-N) | EACH | 4 | $2,500.00 | $9,500.00 | $806.00 | $6,800.00 | $6,000.00 | $27,290 |
| 0082 | Drums (4430000000-N) | EACH | 400 | $35.00 | $78.50 | $76.65 | $50.00 | $30.00 | $52.50 |
| 0083 | Barricades (type III) (4445000000-E) | LF | 50 | $25.00 | $29.75 | $35.36 | $20.00 | $26.25 | $28.50 |
| 0084 | Flagger (4455000000-N) | DAY | 270 | $750.00 | $555.00 | $1,464.55 | $412.95 | $850.00 | $336.00 |
| 0085 | TMA (4480000000-N) | EACH | 2 | $1,000.00 | $27,000 | $3,016.00 | $60,000 | $35,000 | $15,400 |
| 0086 | Law enforcement (4510000000-N) | HR | 220 | $90.00 | $94.50 | $72.80 | $70.00 | $42.26 | $100.00 |
| 0087 | Temporary raised pavement markers (4650000000-N) | EACH | 125 | $7.00 | $8.35 | $7.28 | $7.00 | $7.35 | $7.00 |
| 0088 | Thermoplastic pavement marking lines (4", 90 mils) (4685000000-E) | LF | 12,640 | $0.75 | $0.90 | $0.78 | $0.75 | $0.79 | $0.75 |
| 0089 | Thermoplastic pavement marking lines (8", 90 mils) (4695000000-E) | LF | 365 | $3.00 | $3.60 | $3.12 | $3.00 | $3.15 | $3.00 |
| 0090 | Thermoplastic pavement marking lines (12", 90 mils) (4700000000-E) | LF | 180 | $4.00 | $4.75 | $4.16 | $4.00 | $4.20 | $4.00 |
| 0091 | Thermoplastic pavement marking lines (24", 90 mils) (4709000000-E) | LF | 215 | $12.00 | $14.25 | $12.48 | $12.00 | $12.60 | $12.00 |
| 0092 | Thermoplastic pavement marking character (90 mils) (4720000000-E) | EACH | 8 | $100.00 | $119.00 | $104.00 | $100.00 | $105.00 | $100.00 |
| 0093 | Thermoplastic pavement marking symbol (90 mils) (4725000000-E) | EACH | 35 | $110.00 | $131.00 | $114.40 | $110.00 | $115.50 | $110.00 |
| 0094 | Paint pavement marking lines (4") (4810000000-E) | LF | 46,520 | $0.45 | $0.55 | $0.47 | $0.45 | $0.47 | $0.45 |
| 0095 | Paint pavement marking lines (8") (4820000000-E) | LF | 625 | $1.00 | $1.20 | $1.04 | $1.00 | $1.05 | $1.00 |
| 0096 | Paint pavement marking lines (24") (4835000000-E) | LF | 150 | $8.00 | $9.55 | $8.32 | $8.00 | $8.40 | $8.00 |
| 0097 | Paint pavement marking symbol (4845000000-N) | EACH | 20 | $90.00 | $107.50 | $93.60 | $90.00 | $94.50 | $90.00 |
| 0098 | Removal of pavement marking lines (4") (4850000000-E) | LF | 14,738 | $1.25 | $1.50 | $1.30 | $1.25 | $1.31 | $1.25 |
| 0099 | Removal of pavement marking lines (8") (4860000000-E) | LF | 300 | $2.50 | $3.00 | $2.60 | $2.50 | $2.63 | $2.50 |
| 0100 | Removal of pavement marking lines (24") (4870000000-E) | LF | 80 | $8.00 | $9.55 | $8.32 | $8.00 | $8.40 | $8.00 |
| 0101 | Generic pavement marking item (EA) - polycarbonate H-shaped markers (4895000000-N) | EACH | 195 | $65.00 | $77.50 | $67.60 | $65.00 | $68.25 | $65.00 |
| 0102 | Object markers (type **) - (1) (4957000000-N) | EACH | 1 | $1,500.00 | $166.50 | $10.40 | $250.00 | $315.00 | $150.00 |
| 0103 | Generic utility item (LS) - relocate private waterline (5912000000-N) | LS | 1 | $9,838.00 | $4,890.00 | $17,081 | $9,985.00 | $8,500.00 | $9,985.00 |
| 0104 | Temporary silt fence (6000000000-E) | LF | 8,235 | $2.20 | $3.10 | $2.91 | $2.80 | $3.35 | $2.75 |
| 0105 | Stone for erosion control, class A (6006000000-E) | TON | 385 | $40.00 | $70.25 | $45.38 | $80.00 | $91.50 | $87.50 |
| 0106 | Stone for erosion control, class B (6009000000-E) | TON | 645 | $25.00 | $73.00 | $46.55 | $80.00 | $92.60 | $92.50 |
| 0107 | Sediment control stone (6012000000-E) | TON | 1,055 | $14.50 | $89.50 | $41.08 | $60.00 | $74.10 | $67.50 |
| 0108 | Temporary mulching (6015000000-E) | ACRE | 11 | $500.00 | $1,999.00 | $1,872.00 | $1,800.00 | $1,890.00 | $1,950.00 |
| 0109 | Seed for temporary seeding (6018000000-E) | LB | 600 | $1.00 | $2.20 | $2.08 | $2.00 | $2.10 | $1.00 |
| 0110 | Fertilizer for temporary seeding (6021000000-E) | TON | 3 | $500.00 | $999.50 | $936.00 | $900.00 | $945.00 | $300.00 |
| 0111 | Temporary slope drains (6024000000-E) | LF | 200 | $10.00 | $36.25 | $8.78 | $19.24 | $40.00 | $26.50 |
| 0112 | Safety fence (6029000000-E) | LF | 260 | $3.00 | $3.35 | $3.12 | $3.00 | $3.31 | $1.90 |
| 0113 | Silt excavation (6030000000-E) | CY | 1,220 | $3.00 | $20.00 | $18.70 | $35.00 | $28.00 | $27.00 |
| 0114 | Matting for erosion control (6036000000-E) | SY | 13,300 | $1.80 | $1.80 | $1.66 | $1.60 | $1.68 | $1.75 |
| 0115 | Coir fiber mat (6037000000-E) | SY | 100 | $5.00 | $6.65 | $6.24 | $6.00 | $6.30 | $5.00 |
| 0116 | 1/4" hardware cloth (6042000000-E) | LF | 4,000 | $3.50 | $6.65 | $6.24 | $6.00 | $6.40 | $19.50 |
| 0117 | Flocculant (6071002000-E) | LB | 80 | $25.00 | $5.55 | $5.20 | $5.00 | $5.25 | $6.10 |
| 0118 | Coir fiber wattle (6071012000-E) | LF | 180 | $14.00 | $10.00 | $9.36 | $9.00 | $9.45 | $9.50 |
| 0119 | Seeding and mulching (6084000000-E) | ACRE | 9 | $1,050.00 | $2,999.00 | $2,808.00 | $2,700.00 | $2,835.00 | $2,975.00 |
| 0120 | Mowing (6087000000-E) | ACRE | 9 | $500.00 | $277.50 | $260.00 | $250.00 | $262.50 | $150.00 |
| 0121 | Seed for repair seeding (6090000000-E) | LB | 150 | $4.00 | $4.45 | $4.16 | $4.00 | $4.20 | $5.00 |
| 0122 | Fertilizer for repair seeding (6093000000-E) | TON | 0.25 | $1,300.00 | $1,222.00 | $1,144.00 | $1,100.00 | $1,155.00 | $450.00 |
| 0123 | Seed for supplemental seeding (6096000000-E) | LB | 200 | $4.00 | $4.45 | $4.16 | $4.00 | $4.20 | $5.00 |
| 0124 | Fertilizer topdressing (6108000000-E) | TON | 5.75 | $500.00 | $1,055.00 | $988.00 | $950.00 | $997.50 | $450.00 |
| 0125 | Specialized hand mowing (6114500000-N) | MHR | 10 | $100.00 | $194.50 | $182.00 | $175.00 | $183.75 | $55.00 |
| 0126 | Response for erosion control (6117000000-N) | EACH | 75 | $5.00 | $277.50 | $294.09 | $250.00 | $262.50 | $300.00 |
| 0127 | Concrete washout structure (6117500000-N) | EACH | 1 | $2,000.00 | $1,401.00 | $2,413.40 | $1,230.00 | $2,000.00 | $1,235.00 |
| 0128 | Reforestation (6123000000-E) | ACRE | 0.10 | $10,000 | $27,765 | $26,000 | $25,000 | $26,250 | $8,200.00 |
| 0129 | Generic erosion control item (EA) - prefabricated concrete washout (6132000000-N) | EACH | 6 | $1,275.00 | $1,024.00 | $588.17 | $500.00 | $927.50 | $1,235.00 |
| 0130 | Signal cable (7060000000-E) | LF | 3,300 | $5.50 | $6.25 | $5.72 | $5.50 | $4.61 | $5.50 |
| 0131 | Vehicle signal head (12", 3 section) (7120000000-E) | EACH | 16 | $1,150.00 | $1,303.00 | $1,196.00 | $1,150.00 | $1,431.82 | $1,150.00 |
| 0132 | Vehicle signal head (12", 4 section) (7132000000-E) | EACH | 11 | $1,400.00 | $1,587.00 | $1,456.00 | $1,400.00 | $1,798.79 | $1,400.00 |
| 0133 | Vehicle signal head (12", 5 section) (7144000000-E) | EACH | 1 | $2,025.00 | $2,295.00 | $2,106.00 | $2,025.00 | $2,215.61 | $2,025.00 |
| 0134 | Messenger cable (1/4") (7252000000-E) | LF | 4,300 | $4.25 | $4.80 | $4.42 | $4.25 | $4.56 | $4.25 |
| 0135 | Messenger cable (3/8") (7264000000-E) | LF | 900 | $5.50 | $6.25 | $5.72 | $5.50 | $4.77 | $5.50 |
| 0136 | Tracer wire (7279000000-E) | LF | 330 | $1.40 | $1.60 | $1.46 | $1.40 | $1.48 | $1.40 |
| 0137 | Paved trench (***********) - (2, 2") (7288000000-E) | LF | 25 | $25.00 | $28.25 | $26.00 | $25.00 | $66.29 | $25.00 |
| 0138 | Unpaved trench (***********) - (2, 2") (7300000000-E) | LF | 330 | $18.00 | $20.50 | $18.72 | $18.00 | $17.50 | $18.00 |
| 0139 | Direct drill (***********) - (2, 2") (7301000000-E) | LF | 150 | $25.00 | $28.25 | $26.00 | $25.00 | $36.59 | $25.00 |
| 0140 | Junction box (standard size) (7324000000-N) | EACH | 14 | $595.00 | $674.50 | $618.80 | $595.00 | $765.76 | $595.00 |
| 0141 | Junction box (over-sized, heavy duty) (7348000000-N) | EACH | 3 | $1,400.00 | $1,587.00 | $1,456.00 | $1,400.00 | $1,414.85 | $1,400.00 |
| 0142 | Wood pole (7360000000-N) | EACH | 4 | $1,500.00 | $1,700.00 | $1,560.00 | $1,500.00 | $2,500.91 | $1,500.00 |
| 0143 | Guy assembly (7372000000-N) | EACH | 20 | $650.00 | $736.50 | $676.00 | $650.00 | $1,002.27 | $650.00 |
| 0144 | 1" riser with weatherhead (7408000000-E) | EACH | 1 | $450.00 | $510.00 | $468.00 | $450.00 | $583.34 | $450.00 |
| 0145 | 2" riser with weatherhead (7420000000-E) | EACH | 3 | $700.00 | $793.50 | $728.00 | $700.00 | $1,066.97 | $700.00 |
| 0146 | 2" riser with heat shrink tubing (7432000000-E) | EACH | 4 | $950.00 | $1,077.00 | $988.00 | $950.00 | $1,219.70 | $950.00 |
| 0147 | Inductive loop sawcut (7444000000-E) | LF | 1,300 | $10.00 | $11.25 | $10.40 | $10.00 | $20.68 | $10.00 |
| 0148 | Lead-in cable (14-2) (7456100000-E) | LF | 3,100 | $3.00 | $3.50 | $3.12 | $3.00 | $3.55 | $3.00 |
| 0149 | Site survey (7481000000-N) | EACH | 1 | $100.00 | $113.50 | $104.00 | $100.00 | $840.00 | $100.00 |
| 0150 | Luminaire arm for video system (7481200000-N) | EACH | 4 | $100.00 | $113.50 | $104.00 | $100.00 | $1,544.24 | $100.00 |
| 0151 | Camera without internal loop emulator processing unit (7481240000-N) | EACH | 4 | $2,250.00 | $2,550.00 | $2,340.00 | $2,250.00 | $10,440 | $2,250.00 |
| 0152 | External loop emulator processing unit (7481260000-N) | EACH | 1 | $4,500.00 | $5,100.00 | $4,680.00 | $4,500.00 | $6,263.94 | $4,500.00 |
| 0153 | Communications cable (** fiber) - (24) (7516000000-E) | LF | 4,460 | $4.10 | $4.65 | $4.26 | $4.10 | $4.35 | $4.10 |
| 0154 | Drop cable (7528000000-E) | LF | 1,170 | $4.00 | $4.55 | $4.16 | $4.00 | $4.35 | $4.00 |
| 0155 | Splice enclosure (7540000000-N) | EACH | 2 | $2,750.00 | $3,116.00 | $2,860.00 | $2,750.00 | $2,851.97 | $2,750.00 |
| 0156 | Modify splice enclosure (7541000000-N) | EACH | 1 | $2,150.00 | $2,437.00 | $2,236.00 | $2,150.00 | $2,211.36 | $2,150.00 |
| 0157 | Interconnect center (7552000000-N) | EACH | 2 | $2,200.00 | $2,493.00 | $2,288.00 | $2,200.00 | $2,390.61 | $2,200.00 |
| 0158 | Delineator marker (7566000000-N) | EACH | 3 | $250.00 | $283.50 | $260.00 | $250.00 | $160.15 | $250.00 |
| 0159 | Metal strain signal pole (7576000000-N) | EACH | 4 | $16,450 | $18,642 | $17,108 | $16,450 | $13,806 | $16,450 |
| 0160 | Metal pole with single mast arm (7588000000-N) | EACH | 1 | $27,500 | $31,165 | $28,600 | $27,500 | $26,012 | $27,500 |
| 0161 | Soil test (7613000000-N) | EACH | 5 | $3,000.00 | $3,400.00 | $3,120.00 | $3,000.00 | $3,204.09 | $3,000.00 |
| 0162 | Drilled pier foundation (7614100000-E) | CY | 30 | $1,750.00 | $1,983.00 | $1,820.00 | $1,750.00 | $2,049.09 | $1,750.00 |
| 0163 | Mast arm with metal pole design (7631000000-N) | EACH | 1 | $100.00 | $113.50 | $104.00 | $100.00 | $280.00 | $100.00 |
| 0164 | Sign for signals (7636000000-N) | EACH | 8 | $550.00 | $623.50 | $572.00 | $550.00 | $754.09 | $550.00 |
| 0165 | Type II pedestal with foundation (7642200000-N) | EACH | 4 | $3,500.00 | $3,966.00 | $3,640.00 | $3,500.00 | $3,866.97 | $3,500.00 |
| 0166 | Signal cabinet foundation (7684000000-N) | EACH | 2 | $1,500.00 | $1,700.00 | $1,560.00 | $1,500.00 | $3,625.15 | $1,500.00 |
| 0167 | Contlrs with CBNT (**************) - (2070LX, base mounted) (7696000000-N) | EACH | 2 | $22,500 | $25,498 | $23,400 | $22,500 | $25,706 | $22,500 |
| 0168 | Detector card (type 170) (7744000000-N) | EACH | 8 | $200.00 | $226.50 | $208.00 | $200.00 | $301.21 | $200.00 |
| 0169 | Cabinet base extender (7901000000-N) | EACH | 2 | $500.00 | $566.50 | $520.00 | $500.00 | $576.97 | $500.00 |
| 0170 | Generic signal item (EA) - ethernet edge switch (7980000000-N) | EACH | 2 | $2,500.00 | $2,833.00 | $2,600.00 | $2,500.00 | $4,294.40 | $2,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
Every contract let that day: NCDOT letting of March 17, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.