NCDOT contract C205011 bid tabulation
BRIDGE PRESERVATION. BRIDGE #100007 OVER FRENCH BROAD RIVER/NSRR ON SR-1620 (FLETCHER MARTIN RD). Let by North Carolina DOT on October 21, 2025, Buncombe. 7 bids received; low bid $3,436,533 by Lorr Construction, Inc..
- Owner
- North Carolina DOT
- Letting
- 21 OCT 2025
- Pay items
- 41
- Data through
- 20 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Lorr Construction, Inc. | $3,436,533 | Low |
| 2 | Saffo Contractors Inc | $3,897,777 | +13% |
| 3 | American Contracting & Services Inc | $4,514,513 | +31% |
| 4 | Mountain Creek Contractors Inc | $4,790,841 | +39% |
| 5 | American Civil Constructors West Coast LLC | $4,800,000 | +40% |
| 6 | Ipc Paving LLC DBA Ipc Structures LLC | $5,158,235 | +50% |
| 7 | Lanford Brothers Co., Inc. | $5,800,530 | +69% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Lorr Construction, Inc. | 2. Saffo Contractors Inc | 3. American Contracting & Services Inc | 4. Mountain Creek Contractors Inc | 5. American Civil Constructors West Coast LLC | 6. Ipc Paving LLC DBA Ipc Structures LLC |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Mobilization (0000100000-N) | LS | 1 | $171,800 | $194,889 | $265,000 | $240,000 | $300,000 | $270,660 |
| 0002 | Incidental milling (1330000000-E) | SY | 375 | $25.00 | $25.00 | $25.00 | $18.95 | $25.00 | $25.00 |
| 0003 | Asphalt conc surface course, type S9.5B (1519000000-E) | TON | 11 | $400.00 | $1,000.00 | $1,700.00 | $350.00 | $1,250.00 | $1,700.00 |
| 0004 | Asphalt binder for plant mix (1575000000-E) | TON | 5 | $800.00 | $1,000.00 | $680.00 | $750.00 | $350.00 | $680.00 |
| 0005 | Flowable fill (2275000000-E) | CY | 0.50 | $2,480.00 | $7,000.00 | $10,000 | $18,158 | $12,000 | $3,700.00 |
| 0006 | Work zone signs (stationary) (4400000000-E) | SF | 72 | $20.00 | $11.00 | $20.00 | $10.75 | $12.00 | $7.25 |
| 0007 | Work zone signs (portable) (4405000000-E) | SF | 192 | $25.00 | $9.00 | $30.00 | $8.55 | $20.00 | $38.00 |
| 0008 | Drums (4430000000-N) | EACH | 50 | $55.00 | $50.00 | $65.00 | $46.00 | $50.00 | $60.00 |
| 0009 | Cones (4435000000-N) | EACH | 50 | $28.00 | $25.00 | $55.00 | $22.00 | $40.00 | $30.00 |
| 0010 | Flagger (4455000000-N) | DAY | 90 | $275.00 | $200.00 | $1,000.00 | $2,500.00 | $800.00 | $1,850.00 |
| 0011 | Thermoplastic pavement marking lines (4", 90 mils) (4685000000-E) | LF | 310 | $4.00 | $6.75 | $3.75 | $4.00 | $4.50 | $3.75 |
| 0012 | Thermoplastic pavement marking lines (24", 90 mils) (4709000000-E) | LF | 25 | $25.00 | $40.50 | $22.50 | $15.00 | $25.00 | $22.50 |
| 0013 | Paint pavement marking lines (4") (4810000000-E) | LF | 2,000 | $1.25 | $1.80 | $1.00 | $1.50 | $1.20 | $1.00 |
| 0014 | Paint pavement marking lines (24") (4835000000-E) | LF | 20 | $7.00 | $10.80 | $6.00 | $5.00 | $7.00 | $6.00 |
| 0015 | Polyurea lines (**", *** mils) - (4", 30 mils) (4846000000-E) | LF | 2,000 | $3.00 | $4.95 | $2.75 | $3.50 | $3.00 | $2.75 |
| 0016 | Generic pavement marking item (EA) - inlaid cradle markers (4895000000-N) | EACH | 15 | $340.00 | $585.00 | $325.00 | $10.00 | $500.00 | $325.00 |
| 0017 | Generic miscellaneous item (day) - railroad contractor protective services (0000820000-N) | DAY | 60 | $1,450.00 | $2,000.00 | $1,500.00 | $3,000.00 | $2,000.00 | $2,600.00 |
| 0018 | Grooving bridge floors (8161000000-E) | SF | 16,264.50 | $0.70 | $1.22 | $1.50 | $1.96 | $1.50 | $1.35 |
| 0019 | Pollution control (8296000000-N) | LS | 1 | $15,000 | $2,500.00 | $2,750.00 | $2,500.00 | $46,081 | $300,000 |
| 0020 | Class II, surface preparation (8559000000-E) | SY | 277 | $470.00 | $183.00 | $150.00 | $300.00 | $800.00 | $400.00 |
| 0021 | Class III, surface preparation (8566000000-E) | SY | 2.90 | $1,160.00 | $1,586.00 | $1,500.00 | $16,000 | $12,000 | $8,000.00 |
| 0022 | Concrete repairs (8660000000-E) | CF | 20 | $1,090.00 | $725.00 | $800.00 | $725.00 | $825.00 | $900.00 |
| 0023 | Shotcrete repairs (8664000000-E) | CF | 861.20 | $1,090.00 | $725.00 | $800.00 | $725.00 | $825.00 | $700.00 |
| 0024 | Epoxy resin injection (8678000000-E) | LF | 18.50 | $128.00 | $200.00 | $220.00 | $200.00 | $275.00 | $200.00 |
| 0025 | Generic structure item (LS) - cleaning and repainting of bridge #100007 (8860000000-N) | LS | 1 | $270,000 | $417,441 | $313,500 | $285,000 | $370,000 | $626,000 |
| 0026 | Generic structure item (LS) - painting containment for bridge #100007 (8860000000-N) | LS | 1 | $213,000 | $532,441 | $440,000 | $400,000 | $475,000 | $300,000 |
| 0027 | Generic structure item (LS) - volumetric mixer (8860000000-N) | LS | 1 | $35,730 | $6,100.00 | $5,000.00 | $49,000 | $25,000 | $10,000 |
| 0028 | Generic structure item (LF) - foam joint seals for preservation (8867000000-E) | LF | 234 | $84.00 | $146.40 | $200.00 | $81.20 | $120.00 | $300.00 |
| 0029 | Generic structure item (LF) - pourable silicone joint sealant (8867000000-E) | LF | 97 | $49.00 | $109.80 | $150.00 | $97.94 | $100.00 | $140.00 |
| 0030 | Generic structure item (CY) - latex modified concrete overlay - very early strength (8881000000-E) | CY | 88.50 | $1,900.00 | $1,830.00 | $2,800.00 | $5,100.00 | $1,450.00 | $1,060.00 |
| 0031 | Generic structure item (CF) - elastomeric concrete for preservation (8882000000-E) | CF | 51 | $604.00 | $976.00 | $1,400.00 | $670.59 | $400.00 | $1,000.00 |
| 0032 | Generic structure item (LB) - beam repair cut out (8889000000-E) | LB | 6,650 | $59.00 | $110.00 | $120.00 | $110.00 | $120.00 | $105.00 |
| 0033 | Generic structure item (SF) - bridge joint demolition (8892000000-E) | SF | 370 | $78.00 | $36.60 | $30.00 | $61.62 | $140.00 | $225.00 |
| 0034 | Generic structure item (SF) - epoxy coating (8892000000-E) | SF | 538.60 | $15.00 | $5.00 | $10.00 | $5.00 | $6.00 | $25.00 |
| 0035 | Generic structure item (SF) - silane barrier rail treatment (8892000000-E) | SF | 1,628 | $8.00 | $5.00 | $15.00 | $3.44 | $7.00 | $15.00 |
| 0036 | Generic structure item (SF) - surface preparation for concrete barrier rail (8892000000-E) | SF | 1,628 | $6.00 | $5.00 | $10.00 | $6.39 | $7.00 | $30.00 |
| 0037 | Generic structure item (SY) - hydro-demolition of bridge deck (8893000000-E) | SY | 1,823.80 | $130.00 | $115.90 | $210.00 | $215.00 | $185.00 | $180.00 |
| 0038 | Generic structure item (SY) - placing & finishing of latex modified concrete - very early strength (8893000000-E) | SY | 1,823.80 | $120.00 | $115.90 | $210.00 | $250.00 | $167.00 | $250.00 |
| 0039 | Generic structure item (SY) - scarifying bridge deck (8893000000-E) | SY | 1,823.80 | $30.00 | $46.36 | $55.00 | $54.18 | $42.00 | $70.00 |
| 0040 | Generic structure item (EA) - bearing replacement (8897000000-N) | EACH | 60 | $2,570.00 | $2,000.00 | $2,750.00 | $2,500.00 | $5,000.00 | $5,000.00 |
| 0041 | Generic structure item (EA) - type II bridge jacking bridge no 100007 (8897000000-N) | EACH | 12 | $10,510 | $15,000 | $16,500 | $15,000 | $20,000 | $15,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
Every contract let that day: NCDOT letting of October 21, 2025. Compiled by Mirage Metrics.