NCDOT contract C205202 bid tabulation
BRIDGE PRESERVATION., GRADING, DRAINAGE, PAVING, AND CULVERT. BRIDGE #400052 OVER DEEP RIVER TRIBUTARY 1 ON SR-1332 (SCIENTIFIC ST). Let by North Carolina DOT on August 18, 2026, Guilford. 5 bids received; low bid $5,089,693 by Triangle Grading & Paving Inc.
- Owner
- North Carolina DOT
- Letting
- 18 AUG 2026
- Pay items
- 134
- Data through
- 20 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Triangle Grading & Paving Inc | $5,089,693 | Low |
| 2 | Ace Avant Concrete Construction Co Inc | $5,124,036 | +1.0% |
| 3 | Mountain Creek Contractors Inc | $5,157,444 | +1.0% |
| 4 | Yates Construction Co., Inc. | $5,161,390 | +1.0% |
| 5 | Smith-Rowe, LLC | $5,549,943 | +9.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Triangle Grading & Paving Inc | 2. Ace Avant Concrete Construction Co Inc | 3. Mountain Creek Contractors Inc | 4. Yates Construction Co., Inc. | 5. Smith-Rowe, LLC |
|---|---|---|---|---|---|---|---|---|
| 0001 | Mobilization (0000100000-N) | LS | 1 | $240,000 | $186,836 | $248,500 | $250,000 | $277,475 |
| 0002 | Construction surveying (0000400000-N) | LS | 1 | $80,000 | $52,672 | $25,665 | $98,000 | $22,500 |
| 0003 | Generic miscellaneous item (day) - railroad contractor protective services (0000820000-N) | DAY | 60 | $3,000.00 | $2,107.00 | $1,750.00 | $600.00 | $2,400.00 |
| 0004 | Supplementary clearing & grubbing (0050000000-E) | ACRE | 1 | $1,000.00 | $17,310 | $4,087.99 | $1.00 | $1.00 |
| 0005 | Undercut excavation (0057000000-E) | CY | 530 | $60.00 | $49.60 | $67.72 | $25.00 | $23.00 |
| 0006 | Grading (0063000000-N) | LS | 1 | $1,046,500 | $284,222 | $202,318 | $450,500 | $664,844 |
| 0007 | Borrow excavation (0106000000-E) | CY | 13,310 | $24.00 | $22.33 | $34.46 | $16.00 | $0.01 |
| 0008 | Drainage ditch excavation (0134000000-E) | CY | 440 | $16.00 | $17.00 | $42.83 | $39.00 | $23.20 |
| 0009 | Select granular material (0195000000-E) | CY | 1,145 | $26.00 | $94.52 | $67.60 | $50.00 | $0.01 |
| 0010 | Geotextile for soil stabilization (0196000000-E) | SY | 1,145 | $5.00 | $4.85 | $5.17 | $4.50 | $2.50 |
| 0011 | Temporary shoring (0199000000-E) | SF | 627 | $87.00 | $175.57 | $100.00 | $110.00 | $188.08 |
| 0012 | Foundation conditioning material, minor structures (0318000000-E) | TON | 30 | $65.00 | $80.91 | $107.50 | $75.00 | $90.35 |
| 0013 | FND condit geotextile (4A) (0321000000-E) | SY | 95 | $5.00 | $4.85 | $3.24 | $8.00 | $8.30 |
| 0014 | 15" drainage pipe (0335200000-E) | LF | 120 | $90.00 | $75.70 | $87.96 | $138.00 | $97.07 |
| 0015 | 18" drainage pipe (0335300000-E) | LF | 48 | $98.00 | $100.33 | $147.43 | $143.00 | $155.16 |
| 0016 | 15" RC pipe culverts, class IV (0448200000-E) | LF | 28 | $110.00 | $103.50 | $216.06 | $140.00 | $134.10 |
| 0017 | 30" RC pipe culverts, class IV (0448500000-E) | LF | 68 | $220.00 | $168.95 | $286.01 | $235.00 | $297.41 |
| 0018 | Pipe removal (0995000000-E) | LF | 168 | $25.00 | $60.40 | $30.54 | $25.00 | $37.71 |
| 0019 | Pipe clean out (0996000000-N) | EACH | 1 | $4,600.00 | $13,238 | $4,863.83 | $5,000.00 | $6,171.64 |
| 0020 | Incidental stone base (1220000000-E) | TON | 61 | $60.00 | $102.47 | $81.11 | $75.00 | $78.00 |
| 0021 | Incidental milling (1330000000-E) | SY | 500 | $26.00 | $29.26 | $15.00 | $18.00 | $30.85 |
| 0022 | Asphalt conc base course, type B25.0C (1491000000-E) | TON | 985 | $108.00 | $145.14 | $112.00 | $129.00 | $112.00 |
| 0023 | Asphalt conc intermediate course, type I19.0C (1503000000-E) | TON | 805 | $108.00 | $151.11 | $112.00 | $129.00 | $112.00 |
| 0024 | Asphalt conc surface course, type S9.5B (1519000000-E) | TON | 850 | $116.00 | $138.12 | $113.00 | $130.00 | $113.00 |
| 0025 | Asphalt binder for plant mix (1575000000-E) | TON | 140 | $790.00 | $1,055.77 | $1,000.00 | $945.00 | $945.00 |
| 0026 | Asphalt plant mix, pavement repair (1693000000-E) | TON | 15 | $275.00 | $1,055.77 | $250.00 | $300.00 | $355.00 |
| 0027 | Right-of-way markers (2000000000-N) | EACH | 22 | $400.00 | $234.10 | $450.00 | $350.00 | $325.00 |
| 0028 | Pipe collars (2253000000-E) | CY | 7.90 | $1,100.00 | $2,443.04 | $1,047.31 | $1,800.00 | $2,789.02 |
| 0029 | Masonry drainage structures (2286000000-N) | EACH | 2 | $4,400.00 | $6,189.04 | $4,460.88 | $6,800.00 | $4,790.40 |
| 0030 | Frame with two grates, STD 840.29 (2367000000-N) | EACH | 1 | $1,100.00 | $1,472.16 | $1,141.20 | $3,800.00 | $1,271.55 |
| 0031 | Frame with cover, STD 840.54 (2396000000-N) | EACH | 1 | $1,200.00 | $1,345.75 | $914.58 | $2,500.00 | $1,191.28 |
| 0032 | Concrete transitional section for drop inlet (2451000000-N) | EACH | 1 | $2,200.00 | $2,995.34 | $2,000.00 | $5,000.00 | $2,000.00 |
| 0033 | 6" concrete driveway (2612000000-E) | SY | 30 | $125.00 | $526.71 | $100.00 | $130.00 | $137.85 |
| 0034 | Generic paving item 852 (SY) - 6" monolithic concrete islands (keyed in) (2739000000-E) | SY | 110 | $135.00 | $134.60 | $100.00 | $115.00 | $100.00 |
| 0035 | Adjustment of manholes (2830000000-N) | EACH | 4 | $2,300.00 | $2,155.27 | $850.00 | $2,200.00 | $4,413.80 |
| 0036 | Adjustment of meter boxes or valve boxes (2845000000-N) | EACH | 8 | $900.00 | $1,315.18 | $850.00 | $2,000.00 | $1,034.56 |
| 0037 | Steel beam guardrail (3030000000-E) | LF | 537.50 | $24.50 | $56.18 | $25.30 | $28.25 | $24.50 |
| 0038 | Steel beam guardrail, shop curved (3045000000-E) | LF | 112.50 | $26.00 | $50.33 | $30.00 | $30.00 | $26.00 |
| 0039 | Additional guardrail posts (3150000000-N) | EACH | 5 | $1.00 | $58.52 | $10.00 | $2.00 | $1.00 |
| 0040 | Guardrail end units, type at-1 (3195000000-N) | EACH | 2 | $850.00 | $2,575.05 | $1,430.00 | $980.00 | $850.00 |
| 0041 | Guardrail end units, type TL-3 (3287000000-N) | EACH | 2 | $3,200.00 | $9,129.72 | $3,000.00 | $3,700.00 | $3,200.00 |
| 0042 | Rip rap, class II (3635000000-E) | TON | 350 | $95.00 | $107.27 | $154.90 | $125.00 | $88.00 |
| 0043 | Rip rap, class B (3649000000-E) | TON | 210 | $75.00 | $86.67 | $117.59 | $95.00 | $86.00 |
| 0044 | Geotextile for drainage (3656000000-E) | SY | 1,341 | $5.00 | $4.85 | $5.82 | $6.50 | $5.30 |
| 0045 | Work zone signs (stationary) (4400000000-E) | SF | 563 | $6.75 | $7.32 | $6.95 | $10.50 | $9.00 |
| 0046 | Work zone signs (barricade mounted) (4410000000-E) | SF | 110 | $6.50 | $8.19 | $8.15 | $9.50 | $8.00 |
| 0047 | Drums (4430000000-N) | EACH | 35 | $80.00 | $52.67 | $45.00 | $75.00 | $138.00 |
| 0048 | Barricades (type III) (4445000000-E) | LF | 100 | $19.00 | $37.46 | $18.00 | $30.00 | $25.00 |
| 0049 | Flagger (4455000000-N) | DAY | 10 | $700.00 | $1,755.72 | $1,194.27 | $550.00 | $1,055.00 |
| 0050 | Tubular markers (fixed) (4520000000-N) | EACH | 42 | $250.00 | $292.62 | $75.00 | $86.00 | $100.00 |
| 0051 | Thermoplastic pavement marking lines (4", 90 mils) (4685000000-E) | LF | 5,357 | $1.20 | $3.51 | $1.20 | $1.44 | $1.20 |
| 0052 | Thermoplastic pavement marking lines (8", 90 mils) (4695000000-E) | LF | 33 | $6.00 | $7.02 | $6.00 | $7.20 | $6.00 |
| 0053 | Thermoplastic pavement marking lines (16", 90 mils) (4704000000-E) | LF | 45 | $12.00 | $14.05 | $12.00 | $14.40 | $12.00 |
| 0054 | Thermoplastic pavement marking lines (24", 90 mils) (4709000000-E) | LF | 104 | $15.00 | $21.07 | $15.00 | $18.00 | $15.00 |
| 0055 | Thermoplastic pavement marking character (90 mils) (4720000000-E) | EACH | 2 | $200.00 | $585.24 | $200.00 | $240.00 | $200.00 |
| 0056 | Paint pavement marking lines (4") (4810000000-E) | LF | 4,696 | $0.60 | $1.76 | $0.60 | $0.72 | $0.60 |
| 0057 | Paint pavement marking lines (8") (4820000000-E) | LF | 100 | $1.75 | $3.51 | $1.75 | $2.10 | $1.75 |
| 0058 | Paint pavement marking lines (16") (4830000000-E) | LF | 45 | $8.00 | $7.02 | $8.00 | $9.60 | $8.00 |
| 0059 | Paint pavement marking lines (24") (4835000000-E) | LF | 70 | $5.00 | $10.53 | $5.00 | $6.00 | $5.00 |
| 0060 | Paint pavement marking character (4840000000-N) | EACH | 2 | $100.00 | $234.10 | $100.00 | $120.00 | $100.00 |
| 0061 | **" water line - (36") (5325000000-E) | LF | 226 | $800.00 | $828.82 | $1,200.00 | $952.00 | $1,073.63 |
| 0062 | 12" water line (5326200000-E) | LF | 365 | $210.00 | $173.17 | $300.00 | $388.00 | $567.95 |
| 0063 | DI H2O pipe fittings (5329000000-E) | LB | 15,690 | $17.50 | $10.89 | $25.00 | $18.50 | $14.68 |
| 0064 | **" valve - (36") (5534000000-E) | EACH | 2 | $96,000 | $104,278 | $175,000 | $105,000 | $96,093 |
| 0065 | 6" valve (5540000000-E) | EACH | 2 | $3,100.00 | $3,540.59 | $5,000.00 | $3,756.00 | $3,453.64 |
| 0066 | 8" valve (5546000000-E) | EACH | 1 | $3,900.00 | $4,433.07 | $6,000.00 | $11,647 | $12,238 |
| 0067 | 12" tapping sleeve & valve (5572200000-E) | EACH | 3 | $16,500 | $12,456 | $18,500 | $17,957 | $19,749 |
| 0068 | Relocate water meter (5648000000-N) | EACH | 3 | $950.00 | $5,075.31 | $2,500.00 | $7,000.00 | $3,274.60 |
| 0069 | Reconnect water meter (5649000000-N) | EACH | 1 | $1,500.00 | $5,454.55 | $3,500.00 | $8,000.00 | $4,799.07 |
| 0070 | Relocate fire hydrant (5672000000-N) | EACH | 3 | $2,600.00 | $3,591.60 | $5,000.00 | $10,000 | $9,301.73 |
| 0071 | Fire hydrant leg (5673000000-E) | LF | 63 | $120.00 | $124.21 | $200.00 | $100.00 | $95.49 |
| 0072 | 12" line stop (5679000000-E) | EACH | 1 | $28,000 | $38,544 | $20,000 | $28,975 | $31,209 |
| 0073 | **" water service line - (2") (5686000000-E) | LF | 118 | $135.00 | $97.69 | $115.00 | $65.00 | $86.99 |
| 0074 | Water service line (<2") (5686500000-E) | LF | 67 | $110.00 | $130.16 | $100.00 | $50.00 | $55.81 |
| 0075 | 8" sanitary gravity sewer (5691300000-E) | LF | 939 | $165.00 | $99.38 | $250.00 | $300.00 | $654.99 |
| 0076 | 20" sanitary gravity sewer (5691800000-E) | LF | 113 | $455.00 | $434.94 | $750.00 | $1,337.00 | $582.84 |
| 0077 | Sanitary sewer clean-out (5768000000-N) | EACH | 4 | $1,650.00 | $1,144.56 | $2,500.00 | $4,500.00 | $4,993.92 |
| 0078 | Sewer service line (5768500000-E) | LF | 108 | $95.00 | $37.01 | $100.00 | $60.00 | $160.77 |
| 0079 | Ductile iron sewer pipe fittings (5769000000-E) | LB | 495 | $22.00 | $17.10 | $35.00 | $50.00 | $10.84 |
| 0080 | 4' dia utility manhole (5775000000-E) | EACH | 12 | $4,200.00 | $5,578.62 | $10,000 | $5,995.00 | $8,682.20 |
| 0081 | 5' dia utility manhole (5776000000-E) | EACH | 4 | $4,700.00 | $8,386.38 | $15,000 | $11,150 | $13,156 |
| 0082 | Utility manhole wall 4' dia (5781000000-E) | LF | 10.50 | $850.00 | $851.56 | $850.00 | $400.00 | $666.60 |
| 0083 | Utility manhole wall 5' dia (5782000000-E) | LF | 41 | $950.00 | $1,074.24 | $950.00 | $550.00 | $691.89 |
| 0084 | Abandon **" utility pipe - (21") (5798000000-E) | LF | 88 | $25.00 | $179.91 | $40.00 | $45.00 | $107.74 |
| 0085 | Abandon **" utility pipe - (36") (5798000000-E) | LF | 189 | $28.00 | $181.01 | $140.00 | $105.00 | $143.11 |
| 0086 | Abandon 8" utility pipe (5801000000-E) | LF | 1,058 | $16.00 | $28.02 | $15.00 | $8.00 | $24.24 |
| 0087 | Abandon 12" utility pipe (5804000000-E) | LF | 162 | $18.00 | $24.38 | $30.00 | $13.00 | $72.02 |
| 0088 | Abandon utility manhole (5816000000-N) | EACH | 6 | $1,750.00 | $5,151.57 | $3,000.00 | $2,000.00 | $2,005.19 |
| 0089 | Remove utility manhole (5828000000-N) | EACH | 4 | $1,200.00 | $1,645.76 | $2,350.00 | $4,000.00 | $2,144.18 |
| 0090 | **" encasement pipe - (42") (5835000000-E) | LF | 66 | $878.00 | $968.06 | $700.00 | $995.00 | $490.82 |
| 0091 | **" encasement pipe - (48") (5835000000-E) | LF | 80 | $836.00 | $889.31 | $715.00 | $935.00 | $528.06 |
| 0092 | 16" encasement pipe (5835700000-E) | LF | 50 | $207.57 | $231.42 | $180.00 | $255.00 | $383.91 |
| 0093 | 24" encasement pipe (5836000000-E) | LF | 80 | $280.00 | $267.57 | $350.00 | $195.00 | $491.27 |
| 0094 | Bore & jack **" - (16") (5872500000-E) | LF | 50 | $1,357.00 | $2,080.07 | $1,000.00 | $1,600.00 | $1,546.27 |
| 0095 | Bore & jack **" - (42") (5872500000-E) | LF | 66 | $1,230.00 | $1,772.07 | $900.00 | $1,450.00 | $5,579.29 |
| 0096 | Bore & jack **" - (48") (5872500000-E) | LF | 80 | $1,044.00 | $1,498.38 | $800.00 | $1,235.00 | $2,704.51 |
| 0097 | Concrete piers (5875000000-N) | EACH | 2 | $3,200.00 | $15,072 | $20,000 | $15,000 | $10,245 |
| 0098 | Temporary silt fence (6000000000-E) | LF | 2,975 | $2.85 | $3.51 | $3.25 | $3.30 | $2.75 |
| 0099 | Stone for erosion control, class A (6006000000-E) | TON | 90 | $70.00 | $82.68 | $115.96 | $90.00 | $94.35 |
| 0100 | Stone for erosion control, class B (6009000000-E) | TON | 655 | $75.00 | $82.68 | $117.59 | $95.00 | $0.01 |
| 0101 | Sediment control stone (6012000000-E) | TON | 255 | $65.00 | $82.68 | $101.79 | $85.00 | $84.55 |
| 0102 | Temporary mulching (6015000000-E) | ACRE | 3 | $1,600.00 | $1,545.03 | $1,595.00 | $1,850.00 | $1,250.00 |
| 0103 | Seed for temporary seeding (6018000000-E) | LB | 200 | $2.00 | $5.62 | $0.95 | $2.30 | $3.00 |
| 0104 | Fertilizer for temporary seeding (6021000000-E) | TON | 1 | $1,000.00 | $1,945.33 | $1,350.00 | $1,150.00 | $1,250.00 |
| 0105 | Temporary slope drains (6024000000-E) | LF | 415 | $28.00 | $23.02 | $27.37 | $22.00 | $0.01 |
| 0106 | Safety fence (6029000000-E) | LF | 660 | $3.00 | $3.16 | $1.49 | $3.50 | $2.30 |
| 0107 | Silt excavation (6030000000-E) | CY | 940 | $5.00 | $44.60 | $9.89 | $22.00 | $0.01 |
| 0108 | Matting for erosion control (6036000000-E) | SY | 10,090 | $1.70 | $2.34 | $1.62 | $1.95 | $1.68 |
| 0109 | Coir fiber mat (6037000000-E) | SY | 100 | $7.00 | $19.66 | $4.60 | $8.00 | $30.00 |
| 0110 | 1/4" hardware cloth (6042000000-E) | LF | 285 | $6.00 | $5.85 | $6.25 | $6.00 | $5.00 |
| 0111 | **" temporary pipe - (42") (6045000000-E) | LF | 150 | $175.00 | $185.60 | $109.45 | $121.00 | $232.55 |
| 0112 | Stilling basins (6069000000-E) | CY | 554 | $14.00 | $53.36 | $20.61 | $23.00 | $5.10 |
| 0113 | Special stilling basins (6070000000-N) | EACH | 1 | $1,100.00 | $7,386.61 | $799.40 | $880.00 | $1,718.85 |
| 0114 | Flocculant (6071002000-E) | LB | 90 | $5.00 | $11.70 | $13.25 | $10.00 | $1.00 |
| 0115 | Coir fiber baffle (6071030000-E) | LF | 155 | $8.50 | $7.58 | $6.95 | $9.80 | $15.00 |
| 0116 | Seeding and mulching (6084000000-E) | ACRE | 6 | $2,800.00 | $3,499.73 | $2,495.00 | $3,220.00 | $1,895.00 |
| 0117 | Mowing (6087000000-E) | ACRE | 3 | $250.00 | $1,463.10 | $325.00 | $290.00 | $200.00 |
| 0118 | Seed for repair seeding (6090000000-E) | LB | 50 | $4.50 | $6.32 | $8.95 | $5.25 | $5.00 |
| 0119 | Fertilizer for repair seeding (6093000000-E) | TON | 0.25 | $1,100.00 | $1,545.04 | $1,300.00 | $1,300.00 | $1,000.00 |
| 0120 | Seed for supplemental seeding (6096000000-E) | LB | 100 | $4.50 | $6.67 | $8.95 | $5.25 | $4.00 |
| 0121 | Fertilizer topdressing (6108000000-E) | TON | 2.50 | $950.00 | $1,545.04 | $1,689.00 | $1,100.00 | $800.00 |
| 0122 | Impervious dike (6111000000-E) | LF | 200 | $110.00 | $404.73 | $122.47 | $135.00 | $120.00 |
| 0123 | Specialized hand mowing (6114500000-N) | MHR | 10 | $16.00 | $702.29 | $95.00 | $35.00 | $150.00 |
| 0124 | Response for erosion control (6117000000-N) | EACH | 25 | $200.00 | $292.62 | $95.00 | $230.00 | $50.00 |
| 0125 | Concrete washout structure (6117500000-N) | EACH | 1 | $1,300.00 | $6,611.96 | $292.39 | $325.00 | $1,000.00 |
| 0126 | Reforestation (6123000000-E) | ACRE | 0.10 | $25,000 | $58,524 | $6,000.00 | $29,000 | $4,500.00 |
| 0127 | Generic erosion control item (EA) - prefabricated concrete washout (6132000000-N) | EACH | 3 | $250.00 | $3,320.98 | $582.71 | $800.00 | $658.00 |
| 0128 | Generic erosion control item (SY) - permanent soil reinforcement mat, type 1 (6141000000-E) | SY | 35 | $4.00 | $292.62 | $15.00 | $4.75 | $5.00 |
| 0129 | Remv exist STR ****** BRG (402) - (14+37.00 -L-) (8035000000-N) | LS | 1 | $55,000 | $44,371 | $39,884 | $154,000 | $44,132 |
| 0130 | Asbestos assessment (8065000000-N) | LS | 1 | $1,600.00 | $2,341.00 | $1,400.00 | $1,540.00 | $1,559.99 |
| 0131 | Box culv excav @ ******** - (14+37.00 -L-) (8130000000-N) | LS | 1 | $85,000 | $22,160 | $200,422 | $112,000 | $93,950 |
| 0132 | Foundation conditioning material, box culvert (8133000000-E) | TON | 188 | $65.00 | $92.77 | $104.89 | $116.00 | $98.08 |
| 0133 | Class A concrete (culvert) (8196000000-E) | CY | 366.60 | $900.00 | $1,931.64 | $825.90 | $909.00 | $884.52 |
| 0134 | Reinforcing steel (culvert) (8245000000-E) | LB | 43,313 | $2.25 | $0.95 | $2.09 | $2.30 | $1.67 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
Every contract let that day: NCDOT letting of August 18, 2026. Compiled by Mirage Metrics.