NCDOT contract C204829 bid tabulation

GRADING, DRAINAGE, PAVING, AND STRUCTURE., GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURE. BRIDGE #780140 OVER DAN RIVER ON SR-1138. Let by North Carolina DOT on August 19, 2025, Rockingham. 4 bids received; low bid $12,940,824 by Blythe Construction Inc.

Owner
North Carolina DOT
Letting
19 AUG 2025
Pay items
177
Data through
20 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Blythe Construction Inc$12,940,824Low
2Vecellio & Grogan Inc$13,560,000+5.0%
3Smith-Rowe, LLC$15,268,472+18%
4W C English Incorporated$15,586,469+20%
NCDOT contract C204829: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Blythe Construction Inc2. Vecellio & Grogan Inc3. Smith-Rowe, LLC4. W C English Incorporated
0001Mobilization (0000100000-N)LS1$645,000$672,000$763,400$780,000
0002Construction surveying (0000400000-N)LS1$215,000$180,000$52,061$182,408
0003Undercut excavation (0036000000-E)CY950$20.00$12.50$1.00$23.75
0004Supplementary clearing & grubbing (0050000000-E)ACRE1$10,000$15,000$1.00$6.75
0005Grading (0063000000-N)LS1$1,400,000$213,198$1,526,810$666,510
0006Borrow excavation (0106000000-E)CY37,260$30.00$17.50$0.01$11.68
0007Drainage ditch excavation (0134000000-E)CY525$9.35$35.00$14.85$18.65
0008Select granular material (0195000000-E)CY800$62.00$85.00$0.01$85.10
0009Geotextile for soil stabilization (0196000000-E)SY3,200$3.00$5.75$3.25$3.55
0010Temporary shoring (0199000000-E)SF365.40$40.00$55.00$56.03$56.00
0011Rock plating (0223000000-E)SY400$26.00$100.00$110.85$134.80
0012Generic grading item (LS) - type 1 bridge approach fill, station 18+80.50 -L- (0248000000-N)LS1$25,000$60,000$21,750$14,269
0013Generic grading item (LS) - type 2 bridge approach fill, station 18+80.50 -L- (0248000000-N)LS1$20,000$85,000$32,630$15,288
0014Foundation conditioning material, minor structures (0318000000-E)TON215$47.00$50.00$61.75$56.55
0015FND condit geotextile (4A) (0321000000-E)SY1,536$4.00$2.00$3.15$3.80
001615" side drain pipe (0343000000-E)LF152$52.00$75.00$78.43$71.95
001715" RC pipe culverts, class III (0366000000-E)LF8$87.00$100.00$324.62$132.20
001818" RC pipe culverts, class III (0372000000-E)LF336$80.00$110.00$94.42$104.00
001936" RC pipe culverts, class III (0390000000-E)LF64$190.00$250.00$220.65$188.15
002015" RC pipe culverts, class IV (0448200000-E)LF292$63.00$100.00$85.98$94.75
002118" RC pipe culverts, class IV (0448300000-E)LF304$75.00$115.00$103.09$104.70
002215" CS pipe culverts, 0.064" thick (0582000000-E)LF28$65.00$95.00$125.40$99.30
002318" CS pipe culverts, 0.064" thick inlet used based on county (0588000000-E)LF56$60.00$120.00$124.88$104.35
0024**" CS elbow *****" thick - (15", 0.064") (0636000000-E)EACH2$500.00$2,300.00$241.63$450.00
0025**" CS elbow *****" thick - (18", 0.064") (0636000000-E)EACH4$320.00$2,300.00$336.24$493.00
0026Generic pipe item (LF) - 36" welded steel pipe, 0.079" thick, grade B in soil (under RR) (0986000000-E)LF66$1,750.00$2,100.00$1,744.93$1,284.00
0027Generic pipe item (LF) - 36" welded steel pipe, 0.079" thick, grade B not in soil (under RR) (0986000000-E)LF66$5,800.00$6,500.00$3,149.42$5,778.00
0028Shallow undercut (1099500000-E)CY100$16.00$25.00$36.55$23.80
0029Class IV subgrade stabilization (1099700000-E)TON200$42.00$42.00$61.00$42.45
0030Geotextile for subgrade stabilization (1112000000-E)SY300$7.10$6.00$6.40$6.40
0031Aggregate base course (1121000000-E)TON310$37.69$50.00$72.60$47.35
0032Incidental stone base (1220000000-E)TON76$44.92$45.00$72.70$53.50
0033Mill asp PVMT *****" DTH - (1-1/2") (1297000000-E)SY16,650$1.67$1.45$3.51$10.28
0034Incidental milling (1330000000-E)SY540$13.58$15.00$23.35$22.85
0035Asphalt conc base course, type B25.0C (1491000000-E)TON1,010$130.00$151.64$130.00$136.50
0036Asphalt conc intermediate course, type I19.0C (1503000000-E)TON1,425$130.00$151.64$130.00$136.50
0037Asphalt conc surface course, type S9.5B (1519000000-E)TON2,800$130.00$151.64$130.00$136.50
0038Asphalt binder for plant mix (1575000000-E)TON300$865.00$1,008.96$865.00$908.25
0039Asphalt plant mix, pavement repair (1693000000-E)TON18$176.71$408.25$422.60$196.60
0040Subdrain excavation (2022000000-E)CY45$35.00$40.00$44.27$42.45
0041Geotextile for subsurface drains (2026000000-E)SY200$12.00$14.00$4.15$4.00
0042Subdrain coarse aggregate (2036000000-E)CY34$85.00$100.00$97.41$86.35
00436" perforated subdrain pipe (2044000000-E)LF200$17.00$20.00$7.00$15.65
0044Subdrain pipe outlet (2070000000-N)EACH1$400.00$450.00$533.00$365.35
00456" outlet pipe (2077000000-E)LF6$20.00$45.00$61.85$64.70
0046Endwalls (2209000000-E)CY3.53$900.00$2,750.00$3,181.26$1,999.65
0047Masonry drainage structures (2286000000-N)EACH12$2,100.00$4,500.00$4,421.73$4,520.80
0048Masonry drainage structures (2308000000-E)LF1.40$600.00$220.00$860.81$1,021.20
0049Frame with two grates, STD 840.29 (2367000000-N)EACH9$1,300.00$895.00$1,274.14$941.85
0050Frame-GRT-HD 840.03 ** - (G) (2374000000-N)EACH3$1,400.00$895.00$1,491.65$1,412.75
00512'-6" concrete curb & gutter (2549000000-E)LF380$39.05$46.00$33.00$47.25
0052Shoulder berm gutter (2556000000-E)LF970$39.60$46.00$45.00$47.85
00534" concrete sidewalk (2591000000-E)SY305$59.60$69.50$92.55$69.25
0054Concrete curb ramps (2605000000-N)EACH2$2,650.00$3,000.00$4,460.00$2,835.50
0055Steel beam guardrail (3030000000-E)LF1,062.50$23.50$28.00$23.50$25.15
0056Steel beam guardrail, shop curved (3045000000-E)LF112.50$30.00$35.50$30.00$32.10
0057Steel beam guardrail terminal sections (3105000000-N)EACH2$100.00$115.00$100.00$107.00
0058Additional guardrail posts (3150000000-N)EACH10$50.00$60.00$1.00$53.50
0059Guardrail end units, type cat-1 (3210000000-N)EACH1$950.00$1,135.00$950.00$1,016.50
0060Guardrail anchor units, type III (3215000000-N)EACH4$2,350.00$2,800.00$2,350.00$2,514.50
0061Guardrail end units, type TL-3 (3287000000-N)EACH3$3,200.00$3,825.00$3,200.00$3,424.00
0062Guardrail end units, type TL-2 (3288000000-N)EACH2$3,100.00$3,700.00$3,100.00$3,317.00
0063Woven wire fence, 47" fabric (3503000000-E)LF590$8.00$10.00$8.00$8.55
00644" timber fence posts, 7'-6" long (3509000000-E)EACH37$42.00$59.00$42.00$44.95
00655" timber fence posts, 8'-0" long (3515000000-E)EACH10$48.00$65.00$48.00$51.35
0066CHN LK fence **" fabric - (72") (3533000000-E)LF110$23.00$45.00$23.00$24.60
0067Met line PST **" CL fen - (72") (3539000000-E)EACH2$80.00$295.00$80.00$85.60
0068Met term PST **" CL fen - (72") (3545000000-E)EACH6$250.00$945.00$250.00$267.50
0069DBL gate **high, **wide, **open - (72", 20', 40') (3565000000-E)EACH1$3,800.00$10,000$3,800.00$4,066.00
0070Generic fencing item (LF) - pedestrian safety rail (3575000000-E)LF56$300.00$410.00$285.50$321.00
0071Rip rap, class I (3628000000-E)TON10$54.00$118.00$105.65$145.70
0072Rip rap, class II (3635000000-E)TON95$55.00$125.00$89.00$85.40
0073Rip rap, class B (3649000000-E)TON766$54.00$80.00$84.75$69.40
0074Geotextile for drainage (3656000000-E)SY4,575$3.00$4.00$2.22$3.00
0075Supports, 3-LB steel U-channel (4072000000-E)LF207$7.65$8.46$10.00$10.97
0076Sign erection, type D (4096000000-N)EACH3$285.00$110.81$175.00$107.00
0077Sign erection, type E (4102000000-N)EACH7$225.00$110.81$100.00$90.95
0078Sign erect, reloc ** GRD MTD - (D) (4116100000-N)EACH2$250.00$145.81$250.00$107.00
0079Disposal of sign system, U-channel (4155000000-N)EACH18$15.00$17.50$2.00$21.40
0080Disposal of support, U-channel (4192000000-N)EACH2$15.00$17.50$2.00$21.40
0081Work zone signs (stationary) (4400000000-E)SF491$7.15$8.16$10.00$7.50
0082Work zone signs (portable) (4405000000-E)SF96$8.55$17.50$29.21$18.75
0083Work zone signs (barricade mounted) (4410000000-E)SF122$8.75$8.17$7.00$7.75
0084Drums (4430000000-N)EACH100$46.00$75.00$83.33$55.70
0085Cones (4435000000-N)EACH50$22.00$25.00$1.00$52.70
0086Barricades (type III) (4445000000-E)LF136$24.00$28.00$28.00$23.55
0087Pedestrian channelizing devices (4447000000-E)LF450$45.00$30.00$100.00$18.20
0088Flagger (4455000000-N)DAY255$327.74$375.00$395.00$430.85
0089Temporary crash cushions (4465000000-N)EACH2$5,200.00$13,500$8,095.00$5,543.00
0090Portable concrete barrier (4485000000-E)LF220$52.00$70.00$50.15$56.00
0091Generic traffic control item (LS) - protective canopy (4589000000-N)LS1$20,000$12,648$20,000$36,942
0092Temporary raised pavement markers (4650000000-N)EACH40$9.90$11.90$10.00$10.70
00934" cold appl plstic lines type ** - (IV) (4770000000-E)LF2,284$2.90$3.49$3.00$3.21
0094Paint pavement marking lines (4") (4810000000-E)LF27,333$0.40$0.48$0.40$0.43
0095Paint pavement marking lines (24") (4835000000-E)LF184$7.75$9.31$5.00$5.35
0096Removal of pavement marking lines (4") (4850000000-E)LF4,054$0.40$0.48$0.55$0.59
0097Generic pavement marking item (LF) - integrated multipolymer pavement marking lines (24", 120 mils) (4890000000-E)LF99$23.00$27.99$16.00$17.12
0098Generic pavement marking item (LF) - integrated multipolymer pavement marking lines (4", 90 mils) (4890000000-E)LF15,076$1.25$1.50$2.05$2.19
0099Generic pavement marking item (LF) - integrated multipolymer pavement marking lines (8", 90 mils) (4890000000-E)LF46$31.00$37.24$3.50$3.75
0100Generic pavement marking item (EA) - integrated multipolymer pavement marking symbols (90 mils) (4895000000-N)EACH2$948.00$1,138.96$200.00$214.00
010116" water line (5326600000-E)LF604$275.00$145.80$201.17$189.20
0102DI H2O pipe fittings (5329000000-E)LB1,795$20.00$29.16$12.14$11.30
01034" valve (5538000000-E)EACH1$3,000.00$1,749.64$3,325.39$4,176.25
010416" valve (5558600000-E)EACH1$19,500$11,081$16,438$18,442
01054" force main sewer (5709200000-E)LF634$200.00$134.14$190.57$136.85
0106Ductile iron sewer pipe fittings (5769000000-E)LB305$20.00$23.33$39.87$18.75
0107Abandon **" utility pipe - (4") (5798000000-E)LF542$35.00$23.33$11.51$12.30
0108Abandon 16" utility pipe (5810000000-E)LF525$50.00$40.82$35.19$18.20
010912" encasement pipe (5835600000-E)LF40$485.00$204.13$210.83$115.60
011030" encasement pipe (5836200000-E)LF40$695.00$641.54$395.38$369.40
0111Temporary silt fence (6000000000-E)LF7,075$2.25$3.33$2.25$2.41
0112Stone for erosion control, class A (6006000000-E)TON105$55.00$95.00$87.05$67.75
0113Stone for erosion control, class B (6009000000-E)TON1,235$55.00$85.00$0.01$68.00
0114Sediment control stone (6012000000-E)TON1,075$40.11$70.00$0.01$58.90
0115Temporary mulching (6015000000-E)ACRE6$1,500.00$2,050.00$1,500.00$1,605.00
0116Seed for temporary seeding (6018000000-E)LB400$1.00$3.00$1.00$1.07
0117Fertilizer for temporary seeding (6021000000-E)TON3$2,400.00$1,130.00$600.00$642.00
0118Temporary slope drains (6024000000-E)LF400$20.00$20.00$22.40$14.25
0119Safety fence (6029000000-E)LF320$2.25$3.55$2.25$2.41
0120Silt excavation (6030000000-E)CY2,650$15.00$11.25$0.01$0.01
0121Matting for erosion control (6036000000-E)SY15,000$1.79$1.96$1.79$1.92
0122Coir fiber mat (6037000000-E)SY100$18.00$7.14$28.00$19.26
01231/4" hardware cloth (6042000000-E)LF980$3.95$5.95$3.95$4.23
0124Low permeability geotextile (6043000000-E)SY2,400$5.00$7.14$1.70$4.14
0125Special stilling basins (6070000000-N)EACH24$162.46$6,190.00$195.15$1,176.08
0126Flocculant (6071002000-E)LB365$8.00$5.95$0.01$1.07
0127Coir fiber wattle (6071012000-E)LF690$12.00$10.71$12.00$12.84
0128Coir fiber baffle (6071030000-E)LF430$10.00$10.71$10.00$10.70
0129**" skimmer - (1-1/2") (6071050000-E)EACH2$2,000.00$1,300.00$1,405.97$1,213.50
0130Seeding and mulching (6084000000-E)ACRE9$2,900.00$3,450.00$2,900.00$3,103.00
0131Mowing (6087000000-E)ACRE6$200.00$267.80$200.00$214.00
0132Seed for repair seeding (6090000000-E)LB100$6.00$5.25$6.00$6.42
0133Fertilizer for repair seeding (6093000000-E)TON0.25$1,000.00$1,428.28$1,000.00$1,070.00
0134Seed for supplemental seeding (6096000000-E)LB175$5.00$5.25$5.00$5.35
0135Fertilizer topdressing (6108000000-E)TON4.75$1,100.00$1,130.72$1,100.00$1,177.00
0136Impervious dike (6111000000-E)LF250$150.00$138.53$239.07$45.64
0137Specialized hand mowing (6114500000-N)MHR10$250.00$208.29$250.00$267.50
0138Response for erosion control (6117000000-N)EACH75$5.00$148.78$0.01$5.35
0139Concrete washout structure (6117500000-N)EACH1$1,200.00$3,352.29$1,358.95$3,093.00
0140Generic erosion control item (EA) - fabric insert inlet protection cleanout (6132000000-N)EACH54$125.00$345.17$46.05$178.20
0141Generic erosion control item (EA) - fabric insert inlet protection, type 1 (6132000000-N)EACH18$125.00$345.17$271.75$292.45
0142Generic erosion control item (EA) - prefabricated concrete washout (6132000000-N)EACH3$500.00$991.46$1,035.00$600.85
0143Two bar metal rail (8475000000-E)LF535.50$156.00$203.85$169.50$178.00
0144MSE retain wall no ** - (1) (8801000000-E)SF8,800$100.00$148.08$132.10$118.50
0145Generic ret wall item (LF) - 1'-2" X 2'-6" concrete parapet with moment slab (8839000000-E)LF543$450.00$793.20$624.50$612.00
0146Generic ret wall item (LF) - ornamental fence for retaining wall (8839000000-E)LF541.50$449.00$535.75$1,795.00$1,800.00
0147CM&R temp access *********** - (18+80.50 -L-) (8017000000-N)LS1$800,000$850,000$1,362,251$1,448,000
0148Remv exist STR ****** BRG (402) - (18+80.50 -L-) (8035000000-N)LS1$400,000$556,000$367,524$760,000
0149Asbestos assessment (8065000000-N)LS1$1,300.00$2,916.07$1,600.00$1,337.50
0150Pile excavation in soil (8096000000-E)LF54$385.00$470.57$300.00$450.00
0151Pile excavation not in soil (8097000000-E)LF24$590.00$950.00$885.00$450.00
0152**'-**" drilld pier in soil - (4'-6") (8105500000-E)LF49.80$1,200.00$2,311.25$2,111.09$2,400.00
0153**'-**" drilld pier no soil - (4'-6") (8105600000-E)LF132.40$2,300.00$2,164.26$3,095.41$2,400.00
0154Perm STL casing for ** pier - (4'-6") (8111000000-E)LF36$500.00$463.52$635.00$540.00
0155Sid inspections (8113000000-N)EACH1$500.00$1,196.34$1,750.00$560.00
0156SPT testing (8114000000-N)EACH1$500.00$1,196.34$1,155.00$560.00
0157CSL testing (8115000000-N)EACH1$6,500.00$2,990.84$5,312.00$1,115.00
0158Reinforced concrete deck slab (8147000000-E)SF19,786$50.00$49.75$47.52$38.75
0159Grooving bridge floors (8161000000-E)SF17,585$1.50$0.80$0.89$0.70
0160Class A concrete (bridge) (8182000000-E)CY321$1,300.00$1,314.44$1,205.52$1,610.00
0161BRG appr slab *********** - (18+80.50 -L-) (8210000000-N)LS1$50,000$55,221$50,265$40,000
0162Reinforcing steel (bridge) (8217000000-E)LB78,616$2.00$1.53$1.61$1.21
0163Spiral column reinforcing steel (bridge) (8238000000-E)LB13,640$2.50$3.14$3.73$2.48
0164Fib **" prestr conc girdr - (54") (8278000000-E)LF2,155.33$380.00$545.04$483.34$507.00
0165Pile DRV equip setup ** steel piles - (HP 12 X 53) (8328200000-E)EACH14$650.00$844.01$2,511.46$1,900.00
0166HP 12 X 53 steel piles (8364000000-E)LF510$55.00$90.22$50.88$90.00
0167Steel pile points (8391000000-N)EACH6$150.00$194.47$180.71$165.00
0168Pile redrives (8393000000-N)EACH8$400.00$728.09$1.00$52.00
0169Dynamic pile testing (8394000000-N)EACH1$3,000.00$4,082.50$3,408.00$2,247.00
0170Two bar metal rail (8475000000-E)LF1,104.13$156.00$200.33$169.27$175.00
01711'-**"X*****"conc parapet - (1'-2" X 2'-6") (8517000000-E)LF1,111.42$114.00$165.90$202.17$132.00
01724" slope protection (8531000000-E)SY10$500.00$389.75$781.83$210.00
0173Rip rap class II (2'-0" thick) (8608000000-E)TON708$60.00$106.85$89.62$76.00
0174Geotextile for drainage (8622000000-E)SY787$4.00$4.10$5.13$3.30
0175Elastomeric bearings (8657000000-N)LS1$20,150$78,633$15,600$64,000
0176Foam joint seals (8692000000-N)LS1$20,000$18,472$25,270$12,000
0177Generic structure item (LF) - ornamental fence (8867000000-E)LF1,106.17$440.00$517.85$1,795.00$1,800.00
NCDOT contract C204829: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.

Every contract let that day: NCDOT letting of August 19, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy