NCDOT contract C204978 bid tabulation

GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #840082 OVER THE DAN RIVER ON SR-1674 (SHEPPARD MILL ROAD). Let by North Carolina DOT on February 18, 2025, Stokes. 8 bids received; low bid $6,592,206 by Smith-Rowe, LLC.

Owner
North Carolina DOT
Letting
18 FEB 2025
Pay items
157
Data through
20 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Smith-Rowe, LLC$6,592,206Low
2Dane Construction, Inc.$7,674,174+16%
3W C English Incorporated$7,846,409+19%
4Vecellio & Grogan Inc$8,295,000+26%
5Conti Civil LLC$9,049,442+37%
6Zachry Construction Corporation$9,050,701+37%
7Blythe Construction Inc$9,650,574+46%
8Caton Construction Group Inc$9,884,245+50%
NCDOT contract C204978: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Smith-Rowe, LLC2. Dane Construction, Inc.3. W C English Incorporated4. Vecellio & Grogan Inc5. Conti Civil LLC6. Zachry Construction Corporation
0001Mobilization (0000100000-N)LS1$329,600$383,705$392,000$410,000$450,000$452,000
0002Construction surveying (0000400000-N)LS1$30,000$25,000$86,100$281,610$200,000$150,000
0003Generic miscellaneous item (LS) - bat exclusion measures (0000900000-N)LS1$10,000$10,000$18,522$15,000$10,000$100,000
0004Supplementary clearing & grubbing (0050000000-E)ACRE1$1.00$500.00$0.11$15,000$2,500.00$1.00
0005Undercut excavation (0057000000-E)CY300$17.68$30.00$14.00$9.25$45.00$26.77
0006Grading (0063000000-N)LS1$649,649$425,000$618,822$170,000$1,255,991$200,000
0007Borrow excavation (0106000000-E)CY12,600$0.01$26.00$15.50$25.00$30.00$17.16
0008Select granular material (0195000000-E)CY200$0.01$55.00$100.00$75.00$40.00$59.09
0009Geotextile for soil stabilization (0196000000-E)SY400$4.98$4.00$5.00$12.56$4.00$2.55
0010Temporary shoring (0199000000-E)SF1,290$59.19$100.00$69.00$34.00$100.00$103.37
0011Rock plating (0223000000-E)SY950$98.09$75.00$82.00$100.00$60.00$163.62
0012Generic grading item (LS) - type 1 bridge approach fill, station 14+96 -L- (0248000000-N)LS1$90,200$75,000$38,000$90,395$25,000$80,136
0013Foundation conditioning material, minor structures (0318000000-E)TON80$53.90$60.00$78.50$48.00$60.00$56.24
0014FND condit geotextile (4A) (0321000000-E)SY240$5.65$4.00$6.00$2.00$6.75$4.89
001512" drainage pipe (0335100000-E)LF64$94.60$65.00$90.50$152.69$80.00$108.09
001615" drainage pipe (0335200000-E)LF44$83.24$75.00$78.00$176.95$145.00$131.00
001718" drainage pipe (0335300000-E)LF152$77.29$75.00$91.00$165.87$150.00$142.49
001824" drainage pipe (0335400000-E)LF8$368.82$100.00$168.00$370.93$260.00$140.82
001915" RC pipe culverts, class IV (0448200000-E)LF192$125.56$75.00$116.00$129.04$150.00$128.13
002018" RC pipe culverts, class IV (0448300000-E)LF256$118.70$75.00$129.00$142.95$160.00$148.78
0021Pipe removal (0995000000-E)LF94$52.36$15.00$30.00$61.09$70.00$32.55
0022Shallow undercut (1099500000-E)CY200$18.65$45.00$23.50$45.40$38.00$21.00
0023Class IV subgrade stabilization (1099700000-E)TON400$41.82$45.00$63.50$86.60$48.00$34.00
0024Geotextile for subgrade stabilization (1112000000-E)SY600$6.25$4.00$5.00$10.41$5.50$4.50
0025Incidental stone base (1220000000-E)TON50$58.55$50.00$59.50$67.63$75.00$41.34
0026Mill asp PVMT *****" DTH - (1-1/2") (1297000000-E)SY1,100$12.11$10.00$15.75$8.54$7.70$13.06
0027Milln asphalt PVMT ***** - ***** - (0" to 1-1/2") (1308000000-E)SY1,200$11.76$10.00$15.00$8.54$7.70$12.99
0028Asphalt conc base course, type B25.0C (1491000000-E)TON755$115.00$115.00$120.75$139.88$120.00$120.00
0029Asphalt conc intermediate course, type I19.0C (1503000000-E)TON540$119.00$119.00$125.00$144.74$127.00$125.00
0030Asphalt conc surface course, type S9.5C (1523000000-E)TON500$125.00$125.00$131.25$152.04$132.00$130.00
0031Asphalt binder for plant mix (1575000000-E)TON90$755.00$755.00$792.75$918.33$796.00$800.00
0032Right-of-way markers (2000000000-N)EACH4$275.00$275.00$818.50$506.33$275.00$684.40
0033Subdrain excavation (2022000000-E)CY45$20.00$55.00$84.50$42.36$75.00$40.23
0034Geotextile for subsurface drains (2026000000-E)SY200$2.00$4.00$6.00$5.45$1.25$7.15
0035Subdrain coarse aggregate (2036000000-E)CY34$40.00$55.00$127.50$72.62$79.25$120.02
00366" perforated subdrain pipe (2044000000-E)LF200$2.00$15.00$29.00$42.36$26.00$16.96
0037Subdrain pipe outlet (2070000000-N)EACH1$200.00$475.00$1,665.50$508.30$450.00$858.43
00386" outlet pipe (2077000000-E)LF6$59.50$45.00$50.00$72.62$73.00$58.89
0039Flowable fill (2275000000-E)CY2$3,072.89$350.00$911.00$772.67$935.00$538.88
0040Masonry drainage structures (2286000000-N)EACH9$4,080.63$3,750.00$5,450.00$5,286.48$2,600.00$5,088.44
0041Masonry drainage structures (2308000000-E)LF5.70$615.70$250.00$996.00$324.31$550.00$936.11
0042Frame with two grates, STD 840.29 (2367000000-N)EACH1$2,619.37$975.00$1,589.00$1,388.58$1,600.00$1,306.89
0043Frame-GRT-HD 840.03 ** - (E) (2374000000-N)EACH1$1,335.68$975.00$1,589.00$1,388.58$1,900.00$1,549.45
0044Frame-GRT-HD 840.03 ** - (F) (2374000000-N)EACH4$1,335.68$975.00$1,800.50$1,326.53$1,900.00$1,606.43
0045Frame-GRT-HD 840.03 ** - (G) (2374000000-N)EACH2$1,335.68$975.00$1,589.00$1,388.56$1,900.00$1,606.43
0046Frame with cover, STD 840.54 (2396000000-N)EACH1$1,010.71$975.00$1,589.00$1,287.20$1,500.00$1,133.01
00472'-6" concrete curb & gutter (2549000000-E)LF1,240$32.85$36.75$50.00$39.76$46.00$42.48
00484" concrete sidewalk (2591000000-E)SY590$77.87$85.00$99.00$67.05$111.00$62.63
0049Concrete curb ramps (2605000000-N)EACH5$4,640.37$2,800.00$4,516.00$3,328.18$4,700.00$3,131.30
0050Steel beam guardrail (3030000000-E)LF300$24.00$24.00$25.92$29.79$25.00$27.00
0051Steel beam guardrail, shop curved (3045000000-E)LF62.50$28.00$28.00$30.24$34.76$29.50$35.00
0052Additional guardrail posts (3150000000-N)EACH3$1.00$1.00$1.08$1.24$1.05$2.25
0053Guardrail anchor units, type III (3215000000-N)EACH2$2,400.00$2,400.00$2,592.00$2,979.11$2,520.00$2,700.00
0054Guardrail end units, type TL-2 (3288000000-N)EACH1$3,200.00$3,200.00$3,456.00$3,972.15$3,360.00$3,500.00
0055Remove existing guardrail (3360000000-E)LF665$1.00$1.00$6.00$1.24$1.05$2.25
0056Temp GDRL anch units ****** - (thrie-beam) (3387000000-N)EACH2$2,400.00$2,400.00$2,592.00$2,979.11$2,520.00$2,200.00
0057Temp GDRL end units ***** - (TL-2) (3389150000-N)EACH1$3,000.00$3,000.00$3,240.00$3,723.89$3,150.00$2,700.00
0058Generic guardrail item (LF) - powder coated galvanized steel beam guardrail (3420000000-E)LF375$31.00$31.00$33.48$38.48$32.55$85.00
0059Generic guardrail item (EA) - powder coated galvanized additional guardrail posts (3435000000-N)EACH2$100.00$100.00$108.00$124.13$105.00$700.00
0060Generic guardrail item (EA) - powder coated galvanized guardrail anchor units, type III (3435000000-N)EACH2$3,000.00$3,000.00$3,240.00$3,723.89$3,150.00$5,700.00
0061Generic guardrail item (EA) - powder coated galvanized guardrail end units, type TL-2 (3435000000-N)EACH2$3,700.00$3,700.00$3,996.00$4,592.79$3,885.00$6,300.00
0062Rip rap, class II (3635000000-E)TON460$0.01$70.00$84.50$115.41$0.01$103.83
0063Rip rap, class B (3649000000-E)TON30$79.45$75.00$82.50$106.91$74.00$71.66
0064Geotextile for drainage (3656000000-E)SY790$4.95$4.00$4.00$4.89$3.25$4.00
0065Supports, 3-LB steel U-channel (4072000000-E)LF160$10.00$10.00$7.56$14.32$10.50$12.57
0066Sign erection, type D (4096000000-N)EACH2$200.00$200.00$135.00$286.47$210.00$139.61
0067Sign erection, type E (4102000000-N)EACH9$150.00$150.00$108.00$214.85$157.50$118.67
0068Disposal of sign system, U-channel (4155000000-N)EACH14$2.00$2.00$10.80$2.87$2.10$27.93
0069Work zone signs (stationary) (4400000000-E)SF319$12.00$12.00$7.29$14.97$12.60$8.73
0070Work zone signs (portable) (4405000000-E)SF441$19.78$9.85$14.04$12.29$37.75$18.15
0071Work zone signs (barricade mounted) (4410000000-E)SF79$8.75$8.75$8.10$10.92$9.20$9.08
0072Portable changeable message sign (short term) (4422000000-N)DAY63$111.50$85.00$42.97$112.29$75.00$31.58
0073Drums (4430000000-N)EACH100$71.66$46.00$73.00$103.56$65.00$27.91
0074Barricades (type III) (4445000000-E)LF64$25.00$25.00$55.00$31.19$26.25$26.53
0075Flagger (4455000000-N)DAY150$415.25$300.00$860.00$667.53$500.00$518.17
0076Temporary crash cushions (4465000000-N)EACH4$7,785.00$12,250$12,960$12,767$9,450.00$4,746.98
0077Remove & reset temporary crash cushion (4470000000-N)EACH5$2,405.00$7,500.00$814.75$4,114.85$2,625.00$349.04
0078Portable concrete barrier (4485000000-E)LF110$39.22$51.78$43.00$77.77$44.00$62.83
0079Portable concrete barrier (anchored) (4490000000-E)LF670$64.65$68.46$81.00$102.83$65.00$69.81
0080Remove and reset portable concrete barrier (4500000000-E)LF110$12.30$35.00$27.00$21.78$17.00$5.58
0081Remove & reset portable concrete barrier (anchored) (4505000000-E)LF710$26.22$65.00$74.50$36.31$30.00$8.37
0082Skinny drum (4516000000-N)EACH50$0.01$32.00$35.50$72.93$50.00$20.93
0083Temporary raised pavement markers (4650000000-N)EACH5$15.00$15.00$16.20$25.30$15.75$27.93
0084Paint pavement marking lines (4") (4810000000-E)LF7,315$1.50$1.50$1.62$2.53$1.58$0.42
0085Paint pavement marking lines (24") (4835000000-E)LF40$10.00$10.00$10.80$16.87$10.50$2.79
0086Removal of pavement marking lines (4") (4850000000-E)LF3,460$0.75$0.75$0.80$1.27$0.80$1.40
0087Generic pavement marking item (LF) - integrated multipolymer pavement marking lines (24", 90 mils) (4890000000-E)LF20$50.00$50.00$54.00$84.35$52.50$20.94
0088Generic pavement marking item (LF) - integrated multipolymer pavement marking lines (4", 90 mils) (4890000000-E)LF3,750$3.50$3.50$3.78$5.90$3.70$5.58
0089Generic pavement marking item (LF) - integrated multipolymer pavement marking lines (8", 90 mils) (4890000000-E)LF150$4.50$4.50$4.86$7.59$4.75$20.94
0090Generic pavement marking item (EA) - polycarbonate H-shaped markers (4895000000-N)EACH5$400.00$400.00$432.00$674.80$420.00$139.61
00916" water line (5325600000-E)LF267$197.61$226.00$143.00$102.87$250.00$155.60
0092DI H2O pipe fittings (5329000000-E)LB595$22.78$13.80$18.50$30.26$15.00$13.46
00932" air release valve (5589200000-E)EACH2$8,080.46$15,407$9,272.50$5,446.12$15,000$18,996
00948" sanitary gravity sewer (5691300000-E)LF48$1,063.89$443.00$118.00$151.28$210.00$161.22
00956" force main sewer (5709300000-E)LF569$180.33$168.00$100.00$533.84$130.00$120.68
0096Ductile iron sewer pipe fittings (5769000000-E)LB825$31.26$14.60$23.75$30.26$22.00$14.79
00975' dia utility manhole (5776000000-E)EACH1$22,294$17,890$22,485$6,656.37$19,000$17,365
0098Utility manhole wall 5' dia (5782000000-E)LF13$444.24$725.00$1,730.00$665.64$700.00$1,216.67
0099Abandon 6" utility pipe (5800000000-E)LF1,252$17.29$21.10$7.50$12.10$13.00$13.55
0100Abandon 8" utility pipe (5801000000-E)LF48$44.32$45.80$47.25$2,269.22$57.00$25.04
0101Abandon utility manhole (5816000000-N)EACH1$2,611.15$1,615.00$4,303.00$1,815.37$2,000.00$4,241.04
0102Remove utility manhole (5828000000-N)EACH2$1,154.33$2,067.00$2,854.00$3,025.62$1,450.00$3,876.93
010312" encasement pipe (5835600000-E)LF47$316.77$282.00$356.00$242.05$225.00$175.65
0104Generic utility item (LS) - 6" force main sewer suspended from bridge (5912000000-N)LS1$131,789$125,000$180,000$3,872.80$150,000$290,478
0105Temporary silt fence (6000000000-E)LF3,885$2.10$2.10$4.50$3.83$2.64$2.93
0106Stone for erosion control, class A (6006000000-E)TON240$0.01$60.00$75.75$93.78$72.00$68.48
0107Stone for erosion control, class B (6009000000-E)TON345$0.01$60.00$76.25$95.07$75.00$71.21
0108Sediment control stone (6012000000-E)TON355$0.01$55.00$65.50$87.55$71.00$55.12
0109Temporary mulching (6015000000-E)ACRE5.50$1,150.00$1,150.00$1,242.00$2,593.39$2,205.00$1,605.59
0110Seed for temporary seeding (6018000000-E)LB300$1.00$1.00$1.10$4.94$4.20$1.40
0111Fertilizer for temporary seeding (6021000000-E)TON2.50$1,000.00$1,000.00$1,080.00$1,481.94$1,260.00$1,396.17
0112Temporary slope drains (6024000000-E)LF405$21.23$15.00$19.10$31.88$33.00$37.24
0113Safety fence (6029000000-E)LF440$2.15$2.15$2.50$3.70$2.86$3.00
0114Silt excavation (6030000000-E)CY780$0.01$15.00$0.01$23.39$25.00$17.62
0115Matting for erosion control (6036000000-E)SY13,000$1.70$1.70$1.84$2.10$1.79$2.37
0116Coir fiber mat (6037000000-E)SY595$6.00$6.00$6.50$9.88$8.40$8.37
01171/4" hardware cloth (6042000000-E)LF940$4.00$4.00$4.30$7.41$5.67$5.58
0118Low permeability geotextile (6043000000-E)SY100$7.40$5.50$5.75$7.41$6.30$6.84
0119**" temporary pipe - (18") (6045000000-E)LF72$79.87$55.00$34.50$132.72$80.00$72.52
0120Floating turbidity curtain (6048000000-E)SY60$60.67$55.00$126.00$95.09$35.00$24.96
0121Special stilling basins (6070000000-N)EACH4$688.98$525.00$1,430.00$11,204$425.00$990.61
0122Flocculant (6071002000-E)LB110$1.00$15.00$17.00$6.17$5.25$1.40
0123Wattle (6071010000-E)LF140$21.00$15.00$12.00$11.11$9.45$15.36
0124Coir fiber baffle (6071030000-E)LF190$7.75$15.00$8.25$12.35$10.50$10.82
0125**" skimmer - (1-1/2") (6071050000-E)EACH2$1,330.00$1,475.00$1,504.00$4,047.92$2,150.00$1,973.80
0126Seeding and mulching (6084000000-E)ACRE6$2,725.00$2,725.00$2,943.00$3,951.83$3,360.00$3,804.57
0127Mowing (6087000000-E)ACRE6$200.00$200.00$216.00$370.48$315.00$279.23
0128Seed for repair seeding (6090000000-E)LB100$5.00$5.00$5.40$6.17$5.25$6.98
0129Fertilizer for repair seeding (6093000000-E)TON0.25$800.00$800.00$864.00$1,481.92$1,260.00$1,116.94
0130Seed for supplemental seeding (6096000000-E)LB125$3.00$3.00$3.25$4.94$4.20$4.19
0131Fertilizer topdressing (6108000000-E)TON3.25$950.00$950.00$1,026.00$1,173.20$1,000.00$1,326.36
0132Impervious dike (6111000000-E)LF280$0.01$35.00$71.00$109.03$15.00$250.00
0133Specialized hand mowing (6114500000-N)MHR10$100.00$100.00$108.00$216.12$183.75$139.61
0134Response for erosion control (6117000000-N)EACH100$0.01$50.00$108.00$185.24$157.50$139.61
0135Concrete washout structure (6117500000-N)EACH4$1,130.00$2,750.00$2,626.00$6,032.82$1,400.00$1,136.11
0136Reforestation (6123000000-E)ACRE1$3,500.00$3,500.00$3,780.00$3,087.37$2,625.00$4,886.59
0137Remv exist STR ****** BRG (402) - (14+96.00 -L-) (8035000000-N)LS1$198,718$375,000$669,000$243,028$400,000$274,724
0138Asbestos assessment (8065000000-N)LS1$1,594.56$1,285.00$2,700.00$1,936.40$1,400.00$958.15
0139**'-**" dia drilld piers - (4'-0") (8108000000-E)LF144$3,556.74$3,100.00$1,926.00$1,881.78$2,875.00$2,195.18
0140Permanent steel casing for 4'-0" dia drilled pier (8111600000-E)LF42$697.39$1,000.00$505.00$525.93$965.00$594.54
0141CSL testing (8115000000-N)EACH1$1,700.00$4,000.00$2,970.00$6,187.36$4,250.00$3,497.27
0142Uncl STR excav sta ***** - (14+96.00 -L-) (8121000000-N)LS1$37,078$45,000$60,000$47,086$45,000$35,289
0143Reinforced concrete deck slab (8147000000-E)SF17,050$62.88$58.00$68.30$69.31$75.00$125.00
0144Grooving bridge floors (8161000000-E)SF13,836$1.29$0.70$1.10$1.83$1.00$0.79
0145Class A concrete (bridge) (8182000000-E)CY182.60$1,864.91$2,625.00$1,585.00$2,083.89$2,200.00$3,000.00
0146BRG appr slab *********** - (14+96.00 -L-) (8210000000-N)LS1$84,700$61,110$58,000$79,494$95,000$77,017
0147Reinforcing steel (bridge) (8217000000-E)LB34,139$1.74$2.35$1.43$3.00$1.75$1.68
0148Spiral column reinforcing steel (bridge) (8238000000-E)LB6,352$3.50$3.75$2.33$3.63$2.90$2.89
0149Fib **" prestr conc girdr - (63") (8278000000-E)LF1,856.24$516.07$705.00$402.00$620.76$480.00$700.00
0150Pile DRV equip setup ** steel piles - (HP 12 X 53) (8328200000-E)EACH24$1,165.81$2,500.00$415.00$1,127.18$1,500.00$1,507.02
0151HP 12 X 53 steel piles (8364000000-E)LF660$44.79$40.00$85.00$155.40$85.00$87.51
0152Two bar metal rail (8475000000-E)LF729.67$162.96$175.00$180.00$228.70$156.00$219.94
01531'-**"X*****"conc parapet - (1'-2" X 3'-3") (8517000000-E)LF744.67$213.62$150.00$174.00$287.34$198.00$240.01
0154Rip rap class II (2'-0" thick) (8608000000-E)TON916$76.03$1.00$82.00$139.48$0.01$76.00
0155Geotextile for drainage (8622000000-E)SY1,017$5.00$9.73$3.30$5.58$3.20$2.79
0156Elastomeric bearings (8657000000-N)LS1$10,150$30,000$36,000$89,999$40,000$38,633
0157CM&R temp access *********** - (14+96.00 -L-) (8017000000-N)LS1$84,800$415,000$695,000$425,000$800,000$368,708
NCDOT contract C204978: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.

Every contract let that day: NCDOT letting of February 18, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy