NCDOT contract C204972 bid tabulation
GRADING, DRAINAGE, PAVING, AND STRUCTURE. BRIDGE #500070 OVER NEUSE RIVER ON US-301. Let by North Carolina DOT on January 21, 2025, Johnston. 10 bids received; low bid $9,415,625 by S T Wooten Corporation.
- Owner
- North Carolina DOT
- Letting
- 21 JAN 2025
- Pay items
- 184
- Data through
- 20 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | S T Wooten Corporation | $9,415,625 | Low |
| 2 | Sanford Contractors Inc | $10,410,900 | +11% |
| 3 | Smith-Rowe, LLC | $10,528,471 | +12% |
| 4 | FSC II LLC DBA Fred Smith Company | $10,917,000 | +16% |
| 5 | Conti Civil LLC | $11,260,442 | +20% |
| 6 | W C English Incorporated | $11,520,701 | +22% |
| 7 | Dane Construction, Inc. | $12,009,619 | +28% |
| 8 | Zachry Construction Corporation | $13,211,226 | +40% |
| 9 | Blythe Construction Inc | $13,277,165 | +41% |
| 10 | Caton Construction Group Inc | $14,115,920 | +50% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. S T Wooten Corporation | 2. Sanford Contractors Inc | 3. Smith-Rowe, LLC | 4. FSC II LLC DBA Fred Smith Company | 5. Conti Civil LLC | 6. W C English Incorporated |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Mobilization (0000100000-N) | LS | 1 | $470,000 | $520,545 | $526,400 | $550,000 | $560,000 | $576,000 |
| 0002 | Construction surveying (0000400000-N) | LS | 1 | $70,000 | $72,662 | $75,270 | $40,000 | $200,000 | $92,100 |
| 0003 | Clearing & grubbing (0001000000-E) | LS | 1 | $95,000 | $138,274 | $381,625 | $783,000 | $1,390,445 | $269,713 |
| 0004 | Supplementary clearing & grubbing (0008000000-E) | ACRE | 1 | $100.00 | $0.01 | $1.00 | $1.00 | $500.00 | $0.01 |
| 0005 | Unclassified excavation (0022000000-E) | CY | 505 | $51.00 | $0.01 | $27.35 | $16.00 | $40.00 | $93.20 |
| 0006 | Undercut excavation (0036000000-E) | CY | 200 | $37.00 | $26.00 | $37.97 | $28.00 | $45.00 | $23.40 |
| 0007 | Borrow excavation (0106000000-E) | CY | 7,665 | $12.00 | $11.50 | $0.01 | $25.00 | $0.01 | $49.50 |
| 0008 | Removal of existing asphalt pavement (0156000000-E) | SY | 660 | $5.75 | $5.26 | $15.30 | $20.00 | $26.00 | $19.15 |
| 0009 | Removal of existing concrete pavement (0163000000-E) | SY | 1,030 | $8.00 | $9.27 | $22.10 | $30.00 | $26.00 | $24.10 |
| 0010 | Select granular material (0195000000-E) | CY | 200 | $40.00 | $43.60 | $27.75 | $30.00 | $70.00 | $68.20 |
| 0011 | Geotextile for soil stabilization (0196000000-E) | SY | 300 | $3.00 | $2.33 | $5.00 | $3.00 | $3.90 | $4.70 |
| 0012 | Temporary shoring (0199000000-E) | SF | 1,025 | $36.00 | $43.48 | $73.85 | $105.00 | $150.00 | $74.00 |
| 0013 | Rock embankments (0220000000-E) | TON | 2,210 | $80.00 | $63.00 | $91.75 | $100.00 | $125.00 | $80.90 |
| 0014 | Geotextile for rock embankments (0222000000-E) | SY | 600 | $3.00 | $1.70 | $6.00 | $3.00 | $4.50 | $3.75 |
| 0015 | Rock plating (0223000000-E) | SY | 1,535 | $95.00 | $86.00 | $96.75 | $85.00 | $95.00 | $66.90 |
| 0016 | Generic grading item (LS) - type I bridge approach fill, station 19+26.00 -L- (0248000000-N) | LS | 1 | $110,000 | $116,252 | $73,300 | $114,291 | $75,000 | $45,000 |
| 0017 | Foundation conditioning material, minor structures (0318000000-E) | TON | 100 | $60.00 | $31.36 | $50.50 | $30.00 | $63.00 | $57.70 |
| 0018 | FND condit geotextile (4A) (0321000000-E) | SY | 310 | $3.00 | $1.74 | $6.00 | $3.00 | $4.75 | $3.80 |
| 0019 | 15" drainage pipe (0335200000-E) | LF | 92 | $115.00 | $56.93 | $87.17 | $55.00 | $95.00 | $63.85 |
| 0020 | 18" drainage pipe (0335300000-E) | LF | 68 | $150.00 | $62.61 | $91.42 | $65.00 | $115.00 | $85.35 |
| 0021 | **" drainage pipe elbow - (15") (0335850000-E) | EACH | 4 | $600.00 | $201.18 | $890.88 | $650.00 | $365.00 | $434.20 |
| 0022 | **" drainage pipe elbow - (18") (0335850000-E) | EACH | 2 | $660.00 | $254.46 | $980.22 | $730.00 | $495.00 | $491.40 |
| 0023 | 15" RC pipe culverts, class IV (0448200000-E) | LF | 248 | $125.00 | $73.16 | $159.37 | $90.00 | $104.00 | $87.30 |
| 0024 | 18" RC pipe culverts, class IV (0448300000-E) | LF | 504 | $138.00 | $82.76 | $143.54 | $93.00 | $120.00 | $99.85 |
| 0025 | Pipe clean out (0996000000-N) | EACH | 1 | $4,300.00 | $2,528.92 | $6,180.65 | $5,500.00 | $7,250.00 | $2,760.35 |
| 0026 | Fine grading (1011000000-N) | LS | 1 | $200,000 | $147,075 | $208,395 | $160,000 | $75,000 | $188,000 |
| 0027 | #57 stone (1077000000-E) | TON | 230 | $81.00 | $42.00 | $55.65 | $50.00 | $70.00 | $57.30 |
| 0028 | Shallow undercut (1099500000-E) | CY | 300 | $27.00 | $22.30 | $25.60 | $30.00 | $40.00 | $23.40 |
| 0029 | Class IV subgrade stabilization (1099700000-E) | TON | 600 | $31.00 | $30.00 | $37.85 | $40.00 | $55.00 | $40.50 |
| 0030 | Geotextile for subgrade stabilization (1112000000-E) | SY | 900 | $3.00 | $2.21 | $5.15 | $3.00 | $6.25 | $4.70 |
| 0031 | Incidental stone base (1220000000-E) | TON | 200 | $41.00 | $26.01 | $40.65 | $50.00 | $68.00 | $47.70 |
| 0032 | Incidental milling (1330000000-E) | SY | 340 | $22.50 | $20.00 | $31.20 | $25.00 | $15.00 | $23.45 |
| 0033 | Asphalt conc base course, type B25.0C (1491000000-E) | TON | 870 | $104.00 | $104.00 | $115.00 | $140.00 | $117.00 | $111.55 |
| 0034 | Asphalt conc intermediate course, type I19.0C (1503000000-E) | TON | 780 | $91.50 | $91.50 | $110.00 | $130.00 | $117.00 | $98.15 |
| 0035 | Asphalt conc surface course, type S9.5C (1523000000-E) | TON | 1,080 | $93.75 | $93.75 | $107.00 | $120.00 | $117.00 | $100.55 |
| 0036 | Asphalt binder for plant mix (1575000000-E) | TON | 145 | $575.00 | $575.00 | $600.00 | $700.00 | $650.00 | $616.70 |
| 0037 | Asphalt plant mix, pavement repair (1693000000-E) | TON | 200 | $225.00 | $175.00 | $200.00 | $175.00 | $150.00 | $181.35 |
| 0038 | Temporary steel plate covers for masonry drainage structure (2190000000-N) | EACH | 4 | $1,835.00 | $372.18 | $2,400.00 | $2,000.00 | $2,000.00 | $1,646.60 |
| 0039 | Pipe collars (2253000000-E) | CY | 0.89 | $4,342.00 | $1,202.82 | $5,097.17 | $4,000.00 | $4,500.00 | $2,212.95 |
| 0040 | Pipe plugs (2264000000-E) | CY | 0.05 | $18,210 | $5,922.22 | $47,552 | $3,700.00 | $28,300 | $43,914 |
| 0041 | Masonry drainage structures (2286000000-N) | EACH | 12 | $3,350.00 | $2,948.39 | $4,127.08 | $4,500.00 | $3,100.00 | $5,896.05 |
| 0042 | Masonry drainage structures (2308000000-E) | LF | 9.20 | $535.00 | $481.27 | $712.81 | $1,400.00 | $560.00 | $854.70 |
| 0043 | Frame with two grates, STD 840.29 (2367000000-N) | EACH | 4 | $1,050.00 | $938.58 | $2,006.67 | $1,100.00 | $1,480.00 | $1,047.60 |
| 0044 | Frame-GRT-HD 840.03 ** - (E) (2374000000-N) | EACH | 1 | $1,125.00 | $1,135.82 | $1,458.86 | $1,250.00 | $1,650.00 | $1,330.90 |
| 0045 | Frame-GRT-HD 840.03 ** - (F) (2374000000-N) | EACH | 3 | $1,125.00 | $1,135.81 | $1,511.95 | $1,250.00 | $1,700.00 | $1,330.90 |
| 0046 | Frame-GRT-HD 840.03 ** - (G) (2374000000-N) | EACH | 2 | $1,125.00 | $1,135.81 | $1,511.95 | $1,250.00 | $1,700.00 | $1,330.90 |
| 0047 | Frame with cover, STD 840.54 (2396000000-N) | EACH | 1 | $753.00 | $787.96 | $1,064.64 | $950.00 | $1,315.00 | $1,033.25 |
| 0048 | 2'-6" concrete curb & gutter (2549000000-E) | LF | 835 | $36.00 | $30.00 | $30.00 | $30.00 | $35.00 | $40.55 |
| 0049 | Shoulder berm gutter (2556000000-E) | LF | 102 | $63.00 | $50.00 | $50.00 | $50.00 | $55.00 | $62.00 |
| 0050 | Steel beam guardrail (3030000000-E) | LF | 962.50 | $24.50 | $24.50 | $24.50 | $24.50 | $25.00 | $26.30 |
| 0051 | Additional guardrail posts (3150000000-N) | EACH | 5 | $55.00 | $55.00 | $1.00 | $55.00 | $58.00 | $59.00 |
| 0052 | Guardrail end units, type at-1 (3195000000-N) | EACH | 1 | $1,100.00 | $1,100.00 | $1,100.00 | $1,100.00 | $1,155.00 | $1,179.75 |
| 0053 | Guardrail anchor units, type III (3215000000-N) | EACH | 4 | $2,300.00 | $2,300.00 | $2,300.00 | $2,300.00 | $2,415.00 | $2,606.20 |
| 0054 | Guardrail end units, type TL-3 (3287000000-N) | EACH | 5 | $3,450.00 | $3,450.00 | $3,450.00 | $3,450.00 | $2,622.00 | $3,700.15 |
| 0055 | Remove existing guardrail (3360000000-E) | LF | 1,319 | $1.00 | $1.00 | $1.00 | $1.00 | $1.05 | $1.10 |
| 0056 | Temporary steel beam guardrail (3380000000-E) | LF | 437.50 | $9.25 | $9.25 | $9.25 | $9.25 | $9.70 | $9.95 |
| 0057 | Temp GDRL anch units ****** - (III) (3387000000-N) | EACH | 2 | $800.00 | $800.00 | $800.00 | $800.00 | $840.00 | $858.00 |
| 0058 | Temp GDRL end units ***** - (TL-3) (3389150000-N) | EACH | 4 | $1,850.00 | $1,850.00 | $1,850.00 | $1,850.00 | $1,942.00 | $1,984.15 |
| 0059 | CHN LK fence **" fabric - (72") (3533000000-E) | LF | 155 | $35.00 | $35.00 | $35.00 | $35.00 | $36.75 | $37.55 |
| 0060 | Met line PST **" CL fen - (72") (3539000000-E) | EACH | 14 | $170.00 | $170.00 | $170.00 | $170.00 | $179.00 | $182.35 |
| 0061 | Met term PST **" CL fen - (72") (3545000000-E) | EACH | 4 | $300.00 | $300.00 | $300.00 | $300.00 | $315.00 | $321.75 |
| 0062 | Met gate PST **" CL fen D - (72") (3554000000-E) | EACH | 1 | $500.00 | $500.00 | $500.00 | $500.00 | $525.00 | $536.25 |
| 0063 | DBL gate **high, **wide, **open - (72", 12', 12') (3565000000-E) | EACH | 1 | $3,800.00 | $3,800.00 | $3,800.00 | $3,800.00 | $3,990.00 | $4,075.50 |
| 0064 | Rip rap, class II (3635000000-E) | TON | 108 | $85.08 | $59.50 | $75.45 | $80.00 | $85.00 | $73.60 |
| 0065 | Rip rap, class A (3642000000-E) | TON | 160 | $81.00 | $51.00 | $71.70 | $55.00 | $100.00 | $69.60 |
| 0066 | Rip rap, class B (3649000000-E) | TON | 201 | $81.00 | $51.00 | $73.21 | $60.00 | $100.00 | $69.85 |
| 0067 | Geotextile for drainage (3656000000-E) | SY | 1,863 | $1.00 | $1.67 | $4.97 | $1.00 | $3.25 | $3.60 |
| 0068 | Supports, 3-LB steel U-channel (4072000000-E) | LF | 107 | $7.25 | $15.00 | $15.00 | $15.00 | $7.60 | $7.80 |
| 0069 | Sign erection, type D (4096000000-N) | EACH | 2 | $200.00 | $250.00 | $250.00 | $250.00 | $210.00 | $214.50 |
| 0070 | Sign erection, type E (4102000000-N) | EACH | 3 | $125.00 | $250.00 | $250.00 | $250.00 | $131.00 | $134.05 |
| 0071 | Disposal of sign system, U-channel (4155000000-N) | EACH | 5 | $15.00 | $10.00 | $10.00 | $10.00 | $15.75 | $16.10 |
| 0072 | Work zone signs (stationary) (4400000000-E) | SF | 208 | $7.00 | $15.00 | $15.00 | $20.00 | $7.35 | $7.50 |
| 0073 | Work zone signs (portable) (4405000000-E) | SF | 160 | $27.00 | $9.75 | $32.45 | $40.00 | $16.00 | $18.65 |
| 0074 | Work zone signs (barricade mounted) (4410000000-E) | SF | 28 | $9.45 | $8.75 | $8.75 | $10.00 | $10.00 | $10.15 |
| 0075 | Portable changeable message sign (4420000000-N) | EACH | 2 | $4,800.00 | $19,300 | $11,720 | $17,000 | $30,000 | $20,408 |
| 0076 | Drums (4430000000-N) | EACH | 100 | $56.00 | $48.00 | $71.65 | $50.00 | $58.00 | $54.00 |
| 0077 | Cones (4435000000-N) | EACH | 80 | $20.00 | $28.00 | $1.00 | $20.00 | $27.00 | $54.70 |
| 0078 | Barricades (type III) (4445000000-E) | LF | 64 | $25.00 | $35.00 | $35.00 | $40.00 | $26.00 | $26.80 |
| 0079 | Flagger (4455000000-N) | DAY | 240 | $560.00 | $363.40 | $437.95 | $750.00 | $416.00 | $434.00 |
| 0080 | Temporary crash cushions (4465000000-N) | EACH | 4 | $12,500 | $12,500 | $8,350.00 | $13,500 | $8,925.00 | $9,116.25 |
| 0081 | Remove & reset temporary crash cushion (4470000000-N) | EACH | 9 | $3,250.00 | $3,250.00 | $405.00 | $3,250.00 | $3,412.50 | $3,485.65 |
| 0082 | TMA (4480000000-N) | EACH | 2 | $20,325 | $30,000 | $1.00 | $5,000.00 | $52,000 | $2,055.90 |
| 0083 | Portable concrete barrier (4485000000-E) | LF | 1,250 | $51.66 | $51.66 | $48.75 | $60.00 | $100.00 | $55.40 |
| 0084 | Portable concrete barrier (anchored) (4490000000-E) | LF | 450 | $71.04 | $71.04 | $95.15 | $70.00 | $125.00 | $76.20 |
| 0085 | Remove and reset portable concrete barrier (4500000000-E) | LF | 1,270 | $15.60 | $15.60 | $3.95 | $15.60 | $16.00 | $16.75 |
| 0086 | Law enforcement (4510000000-N) | HR | 120 | $90.00 | $175.00 | $82.85 | $90.00 | $42.00 | $107.25 |
| 0087 | Temporary raised pavement markers (4650000000-N) | EACH | 262 | $10.00 | $10.00 | $10.00 | $10.00 | $10.50 | $10.75 |
| 0088 | 4" cold appl plstic lines type ** - (IV) (4770000000-E) | LF | 3,120 | $3.00 | $3.00 | $3.00 | $3.00 | $3.15 | $3.20 |
| 0089 | Paint pavement marking lines (4") (4810000000-E) | LF | 32,433 | $0.35 | $0.35 | $0.35 | $0.35 | $0.37 | $0.40 |
| 0090 | Paint pavement marking symbol (4845000000-N) | EACH | 24 | $95.00 | $95.00 | $95.00 | $95.00 | $100.00 | $101.90 |
| 0091 | Removal of pavement marking lines (4") (4850000000-E) | LF | 22,453 | $0.60 | $0.60 | $0.60 | $0.60 | $0.65 | $0.65 |
| 0092 | Removal of pavement marking lines (12") (4865000000-E) | LF | 176 | $4.00 | $4.00 | $4.00 | $4.00 | $4.20 | $4.30 |
| 0093 | Removal of pavement marking symbols & characters (4875000000-N) | EACH | 4 | $50.00 | $50.00 | $50.00 | $50.00 | $52.50 | $53.65 |
| 0094 | Generic pavement marking item (LF) - integrated multipolymer pavement marking lines (12", 90 mils) (4890000000-E) | LF | 140 | $9.00 | $9.00 | $9.00 | $9.00 | $9.45 | $9.65 |
| 0095 | Generic pavement marking item (LF) - integrated multipolymer pavement marking lines (6", 90 mils) (4890000000-E) | LF | 6,700 | $2.38 | $2.35 | $2.35 | $2.35 | $2.45 | $2.50 |
| 0096 | Generic pavement marking item (EA) - integrated multipolymer pavement marking symbols (90 mils) (4895000000-N) | EACH | 4 | $275.00 | $275.00 | $275.00 | $275.00 | $288.75 | $294.95 |
| 0097 | Generic pavement marking item (EA) - polycarbonate H-shaped markers (4895000000-N) | EACH | 24 | $150.00 | $150.00 | $150.00 | $150.00 | $157.50 | $160.90 |
| 0098 | Permanent raised pavement markers (4900000000-N) | EACH | 10 | $10.00 | $10.00 | $10.00 | $10.00 | $10.50 | $10.75 |
| 0099 | 16" water line (5326600000-E) | LF | 475 | $790.00 | $1,466.84 | $1,877.00 | $1,160.00 | $850.00 | $727.60 |
| 0100 | DI H2O pipe fittings (5329000000-E) | LB | 1,650 | $20.50 | $17.04 | $14.71 | $16.00 | $19.00 | $17.15 |
| 0101 | **" plug valve - (12") (5563000000-E) | EACH | 4 | $8,900.00 | $11,382 | $14,437 | $12,400 | $13,000 | $13,299 |
| 0102 | **" plug valve - (8") (5563000000-E) | EACH | 2 | $4,530.00 | $6,843.00 | $8,385.74 | $7,600.00 | $7,100.00 | $8,151.00 |
| 0103 | 8" tapping sleeve & valve (5571800000-E) | EACH | 1 | $11,545 | $15,093 | $15,736 | $14,800 | $17,050 | $15,873 |
| 0104 | 16" tapping sleeve & valve (5572600000-E) | EACH | 3 | $35,763 | $45,879 | $27,925 | $53,900 | $25,650 | $57,808 |
| 0105 | **" comb air valve - (2") (5590000000-E) | EACH | 1 | $12,585 | $13,135 | $10,122 | $26,100 | $12,700 | $27,992 |
| 0106 | 3/4" water meter (5643100000-E) | EACH | 1 | $1,625.00 | $2,729.69 | $2,754.09 | $2,500.00 | $1,400.00 | $2,681.25 |
| 0107 | Fire hydrant (5666000000-N) | EACH | 1 | $9,330.00 | $10,398 | $8,741.25 | $12,700 | $8,100.00 | $13,621 |
| 0108 | Fire hydrant leg (5673000000-E) | LF | 9 | $143.00 | $158.55 | $174.97 | $302.00 | $345.00 | $323.90 |
| 0109 | 16" line stop (5679200000-E) | EACH | 2 | $24,360 | $65,268 | $35,604 | $17,800 | $25,750 | $19,091 |
| 0110 | 8" line stop with bypass (5684600000-E) | EACH | 1 | $29,415 | $22,845 | $21,686 | $26,400 | $60,000 | $28,314 |
| 0111 | Water service line (<2") (5686500000-E) | LF | 18 | $76.00 | $36.96 | $92.18 | $125.00 | $285.00 | $134.05 |
| 0112 | 8" force main sewer (5709400000-E) | LF | 32 | $711.00 | $307.82 | $379.00 | $459.00 | $210.00 | $492.30 |
| 0113 | 12" force main sewer (5709600000-E) | LF | 974 | $212.00 | $1,046.43 | $277.16 | $213.00 | $276.00 | $591.85 |
| 0114 | Ductile iron sewer pipe fittings (5769000000-E) | LB | 4,485 | $22.00 | $18.99 | $28.51 | $20.00 | $15.00 | $21.45 |
| 0115 | Utility vault (5773000000-N) | EACH | 2 | $118,000 | $77,277 | $24,404 | $76,000 | $40,000 | $81,510 |
| 0116 | Abandon 8" utility pipe (5801000000-E) | LF | 688 | $9.50 | $44.66 | $19.88 | $10.00 | $12.00 | $30.45 |
| 0117 | Abandon 16" utility pipe (5810000000-E) | LF | 449 | $1.40 | $65.26 | $26.18 | $55.00 | $30.00 | $30.45 |
| 0118 | Remove water meter (5815000000-N) | EACH | 1 | $189.00 | $1,183.61 | $1,202.96 | $1,300.00 | $460.00 | $1,394.25 |
| 0119 | Remove fire hydrant (5815500000-N) | EACH | 1 | $1,630.00 | $1,775.42 | $1,061.25 | $2,900.00 | $900.00 | $3,110.25 |
| 0120 | 24" encasement pipe (5836000000-E) | LF | 370 | $1,350.00 | $296.32 | $1,740.92 | $1,360.00 | $1,350.00 | $323.85 |
| 0121 | Bore & jack **" - (24") (5872500000-E) | LF | 80 | $600.00 | $1,050.41 | $806.32 | $610.00 | $1,000.00 | $917.00 |
| 0122 | Temporary silt fence (6000000000-E) | LF | 3,290 | $2.85 | $3.00 | $2.85 | $5.10 | $2.70 | $3.70 |
| 0123 | Stone for erosion control, class A (6006000000-E) | TON | 225 | $90.00 | $51.00 | $71.85 | $60.00 | $80.00 | $62.35 |
| 0124 | Stone for erosion control, class B (6009000000-E) | TON | 150 | $89.00 | $51.00 | $76.65 | $60.00 | $80.00 | $63.05 |
| 0125 | Sediment control stone (6012000000-E) | TON | 590 | $80.00 | $0.01 | $45.75 | $40.00 | $65.00 | $30.25 |
| 0126 | Temporary mulching (6015000000-E) | ACRE | 2.60 | $1,800.00 | $1,700.00 | $1,800.00 | $1,300.00 | $1,940.00 | $1,984.15 |
| 0127 | Seed for temporary seeding (6018000000-E) | LB | 200 | $3.50 | $4.00 | $3.50 | $5.90 | $2.10 | $2.15 |
| 0128 | Fertilizer for temporary seeding (6021000000-E) | TON | 2 | $1,200.00 | $1,100.00 | $1,200.00 | $1,240.00 | $1,150.00 | $1,171.15 |
| 0129 | Temporary slope drains (6024000000-E) | LF | 5,340 | $1.00 | $10.70 | $0.01 | $1.00 | $5.00 | $14.40 |
| 0130 | Safety fence (6029000000-E) | LF | 640 | $3.00 | $2.60 | $3.00 | $3.90 | $2.05 | $3.05 |
| 0131 | Silt excavation (6030000000-E) | CY | 410 | $23.00 | $0.01 | $0.01 | $6.65 | $25.00 | $0.01 |
| 0132 | Matting for erosion control (6036000000-E) | SY | 5,370 | $1.55 | $1.50 | $1.55 | $3.00 | $2.10 | $2.15 |
| 0133 | Coir fiber mat (6037000000-E) | SY | 960 | $4.25 | $5.00 | $4.25 | $6.80 | $4.60 | $4.70 |
| 0134 | 1/4" hardware cloth (6042000000-E) | LF | 645 | $3.75 | $5.00 | $3.75 | $8.20 | $3.95 | $4.00 |
| 0135 | Low permeability geotextile (6043000000-E) | SY | 100 | $7.09 | $20.00 | $5.95 | $14.00 | $1.90 | $4.70 |
| 0136 | Floating turbidity curtain (6048000000-E) | SY | 255 | $41.00 | $12.84 | $34.05 | $75.00 | $70.00 | $120.55 |
| 0137 | Special stilling basins (6070000000-N) | EACH | 16 | $680.20 | $0.01 | $0.01 | $521.00 | $380.00 | $2,118.10 |
| 0138 | Flocculant (6071002000-E) | LB | 35 | $10.00 | $10.00 | $10.00 | $24.50 | $8.40 | $25.50 |
| 0139 | Coir fiber wattle (6071012000-E) | LF | 110 | $13.00 | $10.00 | $13.00 | $19.75 | $15.25 | $15.55 |
| 0140 | Coir fiber wattle barrier (6071014000-E) | LF | 350 | $12.00 | $10.00 | $12.00 | $27.25 | $15.25 | $15.55 |
| 0141 | Coir fiber baffle (6071030000-E) | LF | 70 | $10.00 | $7.00 | $10.00 | $7.15 | $9.00 | $9.15 |
| 0142 | **" skimmer - (1-1/2") (6071050000-E) | EACH | 1 | $5,000.00 | $1,323.92 | $1,330.00 | $2,000.00 | $1,935.00 | $1,325.80 |
| 0143 | Seeding and mulching (6084000000-E) | ACRE | 2.60 | $2,800.00 | $2,500.00 | $2,800.00 | $4,475.00 | $4,175.00 | $3,732.30 |
| 0144 | Mowing (6087000000-E) | ACRE | 1.30 | $300.00 | $450.00 | $300.00 | $500.00 | $310.00 | $316.40 |
| 0145 | Seed for repair seeding (6090000000-E) | LB | 50 | $10.00 | $8.00 | $10.00 | $6.50 | $4.35 | $4.45 |
| 0146 | Fertilizer for repair seeding (6093000000-E) | TON | 0.25 | $1,200.00 | $1,300.00 | $1,200.00 | $1,266.00 | $1,145.00 | $1,171.15 |
| 0147 | Seed for supplemental seeding (6096000000-E) | LB | 75 | $7.00 | $8.00 | $7.00 | $6.50 | $5.25 | $5.35 |
| 0148 | Fertilizer topdressing (6108000000-E) | TON | 2.25 | $1,200.00 | $1,300.00 | $1,200.00 | $1,266.00 | $1,145.00 | $1,171.15 |
| 0149 | Specialized hand mowing (6114500000-N) | MHR | 10 | $110.00 | $75.00 | $110.00 | $175.00 | $79.00 | $80.45 |
| 0150 | Manual litter removal (6114800000-N) | MHR | 1 | $250.00 | $300.00 | $216.15 | $75.00 | $45.00 | $232.60 |
| 0151 | Litter disposal (6114900000-E) | TON | 1 | $500.00 | $500.00 | $390.00 | $760.00 | $300.00 | $2,080.20 |
| 0152 | Response for erosion control (6117000000-N) | EACH | 18 | $400.00 | $200.00 | $400.00 | $245.00 | $105.00 | $107.25 |
| 0153 | Concrete washout structure (6117500000-N) | EACH | 2 | $7,500.00 | $321.00 | $1,650.00 | $2,423.00 | $1,200.00 | $3,168.45 |
| 0154 | Reforestation (6123000000-E) | ACRE | 0.10 | $6,000.00 | $7,500.00 | $2,500.00 | $5,102.00 | $2,045.00 | $2,091.40 |
| 0155 | Generic erosion control item (EA) - fabric insert inlet protection cleanout (6132000000-N) | EACH | 30 | $96.00 | $150.00 | $195.00 | $500.00 | $250.00 | $211.15 |
| 0156 | Generic erosion control item (EA) - fabric insert inlet protection, type 1 (6132000000-N) | EACH | 10 | $170.00 | $150.00 | $245.00 | $470.00 | $350.00 | $262.70 |
| 0157 | CM&R temp access *********** - (19+26.00 -L-) (8017000000-N) | LS | 1 | $300,000 | $640,000 | $250,025 | $401,000 | $600,000 | $1,163,171 |
| 0158 | Remv exist STR ****** BRG (402) - (19+26.00 -L-) (8035000000-N) | LS | 1 | $350,000 | $400,000 | $319,271 | $422,000 | $200,000 | $1,000,000 |
| 0159 | Asbestos assessment (8065000000-N) | LS | 1 | $1,500.00 | $2,500.00 | $1,583.92 | $3,000.00 | $1,300.00 | $2,700.00 |
| 0160 | **'-**" drilld pier in soil - (4'-6") (8105500000-E) | LF | 123.80 | $1,650.00 | $1,218.12 | $2,420.03 | $1,580.00 | $1,600.00 | $1,700.00 |
| 0161 | **'-**" drilld pier no soil - (4'-6") (8105600000-E) | LF | 105.90 | $1,650.00 | $1,218.12 | $2,420.03 | $1,630.00 | $1,650.00 | $1,740.00 |
| 0162 | Perm STL casing for ** pier - (4'-6") (8111000000-E) | LF | 127 | $378.00 | $378.00 | $523.30 | $415.00 | $400.00 | $445.00 |
| 0163 | Sid inspections (8113000000-N) | EACH | 2 | $500.00 | $500.00 | $2,875.00 | $500.00 | $525.00 | $590.00 |
| 0164 | CSL testing (8115000000-N) | EACH | 2 | $2,500.00 | $2,500.00 | $1,750.00 | $2,500.00 | $2,625.00 | $2,950.00 |
| 0165 | Uncl STR excav sta ***** - (19+26.00 -L-) (8121000000-N) | LS | 1 | $95,000 | $4,342.24 | $37,500 | $90,000 | $50,000 | $40,000 |
| 0166 | Reinforced concrete deck slab (8147000000-E) | SF | 22,228 | $51.00 | $51.18 | $54.22 | $51.50 | $50.00 | $49.10 |
| 0167 | Grooving bridge floors (8161000000-E) | SF | 23,271 | $0.66 | $0.81 | $1.05 | $0.85 | $0.72 | $0.85 |
| 0168 | Class A concrete (bridge) (8182000000-E) | CY | 305.50 | $1,127.00 | $1,750.00 | $1,223.22 | $1,300.00 | $1,550.00 | $1,420.00 |
| 0169 | BRG appr slab *********** - (19+26.00 -L-) (8210000000-N) | LS | 1 | $125,000 | $145,000 | $137,000 | $157,000 | $150,000 | $110,000 |
| 0170 | Reinforcing steel (bridge) (8217000000-E) | LB | 77,644 | $1.50 | $0.81 | $1.62 | $2.25 | $1.65 | $1.20 |
| 0171 | Spiral column reinforcing steel (bridge) (8238000000-E) | LB | 11,840 | $3.00 | $1.85 | $3.53 | $3.00 | $3.05 | $2.20 |
| 0172 | Fib **" prestr conc girdr - (63") (8278000000-E) | LF | 2,690.83 | $450.00 | $433.00 | $480.33 | $450.00 | $400.00 | $425.00 |
| 0173 | Pile DRV equip setup ** steel piles - (HP 12 X 53) (8328200000-E) | EACH | 22 | $1,325.00 | $4,500.00 | $1,411.98 | $1,940.50 | $3,200.00 | $445.00 |
| 0174 | HP 12 X 53 steel piles (8364000000-E) | LF | 880 | $65.00 | $0.01 | $42.42 | $42.25 | $80.00 | $92.00 |
| 0175 | Steel pile points (8391000000-N) | EACH | 22 | $155.00 | $112.35 | $181.00 | $223.00 | $150.00 | $120.00 |
| 0176 | Pile redrives (8393000000-N) | EACH | 11 | $144.00 | $0.01 | $1.00 | $39.00 | $1,600.00 | $575.00 |
| 0177 | Dynamic pile testing (8394000000-N) | EACH | 1 | $4,750.00 | $2,500.00 | $3,400.00 | $2,150.00 | $2,000.00 | $2,520.00 |
| 0178 | Two bar metal rail (8475000000-E) | LF | 660.90 | $190.00 | $192.99 | $162.72 | $149.00 | $155.00 | $180.00 |
| 0179 | 1'-**"X*****"conc parapet - (1'-1 1/2" X 3'-6") (8517000000-E) | LF | 387.30 | $268.00 | $205.78 | $272.20 | $284.00 | $171.00 | $146.00 |
| 0180 | 1'-**"X*****"conc parapet - (1'-2" X 2'-6") (8517000000-E) | LF | 676.60 | $193.00 | $181.73 | $205.22 | $173.00 | $156.00 | $133.00 |
| 0181 | Rip rap class II (2'-0" thick) (8608000000-E) | TON | 802 | $1.00 | $49.00 | $64.84 | $1.00 | $0.01 | $1.00 |
| 0182 | Geotextile for drainage (8622000000-E) | SY | 1,994 | $1.00 | $3.75 | $5.13 | $4.00 | $2.90 | $3.50 |
| 0183 | Elastomeric bearings (8657000000-N) | LS | 1 | $20,750 | $17,688 | $16,700 | $17,235 | $70,000 | $50,000 |
| 0184 | 16" valve (5558600000-E) | EACH | 2 | $17,800 | $23,874 | $16,882 | $21,700 | $16,075 | $60,275 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
Every contract let that day: NCDOT letting of January 21, 2025. Compiled by Mirage Metrics.