NCDOT contract C205213 bid tabulation
MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 5 SECTIONS OF US-117, 3 SECTIONS OF NC-133, AND 46 SECTIONS OF SECONDARY ROADS. Let by North Carolina DOT on June 16, 2026, New Hanover. 3 bids received; low bid $5,331,174 by Barnhill Contracting Company.
- Owner
- North Carolina DOT
- Letting
- 16 JUN 2026
- Pay items
- 59
- Data through
- 20 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Barnhill Contracting Company | $5,331,174 | Low |
| 2 | King Asphalt Inc | $5,461,927 | +2.0% |
| 3 | S T Wooten Corporation | $6,493,060 | +22% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Barnhill Contracting Company | 2. King Asphalt Inc | 3. S T Wooten Corporation |
|---|---|---|---|---|---|---|
| 0001 | Mobilization (0000100000-N) | LS | 1 | $266,500 | $228,950 | $320,000 |
| 0002 | Unclassified excavation (0022000000-E) | CY | 18 | $130.00 | $140.00 | $428.00 |
| 0003 | Borrow excavation (0106000000-E) | CY | 1,236 | $50.00 | $29.00 | $40.55 |
| 0004 | Removal of existing asphalt pavement (0156000000-E) | SY | 75 | $32.00 | $13.35 | $99.00 |
| 0005 | Incidental stone base (1220000000-E) | TON | 232 | $115.00 | $68.00 | $187.00 |
| 0006 | Shoulder reconstruction (1245000000-E) | SMI | 19.96 | $3,800.00 | $2,600.00 | $7,370.00 |
| 0007 | Mill asp PVMT *****" DTH - (1-1/2") (1297000000-E) | SY | 40,193 | $3.40 | $1.50 | $3.70 |
| 0008 | Milln asphalt PVMT ***** - ***** - (0" to 1") (1308000000-E) | SY | 22,452 | $3.00 | $2.80 | $3.50 |
| 0009 | Milln asphalt PVMT ***** - ***** - (0" to 1-1/2") (1308000000-E) | SY | 4,939 | $3.50 | $3.70 | $3.45 |
| 0010 | Incidental milling (1330000000-E) | SY | 18,875 | $6.00 | $3.50 | $4.70 |
| 0011 | Asphalt conc base course, type B25.0C (1491000000-E) | TON | 2,469 | $83.00 | $72.15 | $145.00 |
| 0012 | Asphalt conc surface course, type S9.5B (1519000000-E) | TON | 5,628 | $70.00 | $72.80 | $97.00 |
| 0013 | Asphalt conc surface course, type S9.5B (leveling course) (1520000000-E) | TON | 35 | $100.00 | $146.00 | $275.00 |
| 0014 | Asphalt conc surface course, type S9.5C (1523000000-E) | TON | 14,820 | $70.00 | $68.00 | $86.00 |
| 0015 | Asphalt conc surface course, type S9.5C (leveling course) (1524000000-E) | TON | 20 | $100.00 | $146.00 | $275.00 |
| 0016 | Asphalt conc surface course, type S4.75A (1526000000-E) | TON | 4,179 | $82.00 | $103.30 | $133.00 |
| 0017 | Asphalt binder for plant mix (1575000000-E) | TON | 1,798 | $685.00 | $750.00 | $545.00 |
| 0018 | Patching existing pavement (mill) (1705500000-E) | TON | 3,142 | $170.00 | $140.45 | $175.00 |
| 0019 | Generic paving item (TON) - asphalt conc surface course, type S4.75A (leveling course) (1880000000-E) | TON | 60 | $145.00 | $156.00 | $275.00 |
| 0020 | Generic paving item (LF) - sinusoidal milled rumble strips, (14") (1881000000-E) | LF | 25,849 | $0.33 | $0.33 | $0.42 |
| 0021 | Generic paving item (LF) - sinusoidal milled rumble strips, (8") (1881000000-E) | LF | 60,162 | $0.33 | $0.33 | $0.37 |
| 0022 | Generic paving item (LF) - remove and replace 2'-6" concrete curb & gutter (2752000000-E) | LF | 758 | $70.00 | $120.00 | $85.00 |
| 0023 | Generic paving item (EA) - adjustment of monuments (2759000000-N) | EACH | 66 | $1,050.00 | $1,050.00 | $400.00 |
| 0024 | Adjustment of drop inlets (2815000000-N) | EACH | 2 | $1,050.00 | $1,050.00 | $1,000.00 |
| 0025 | Adjustment of manholes (2830000000-N) | EACH | 44 | $1,050.00 | $1,050.00 | $900.00 |
| 0026 | Adjustment of meter boxes or valve boxes (2845000000-N) | EACH | 30 | $1,050.00 | $1,050.00 | $825.00 |
| 0027 | Work zone advance/general warning signing (4413000000-E) | SF | 1,760 | $6.75 | $6.75 | $6.75 |
| 0028 | Temporary traffic control (4457000000-N) | LS | 1 | $50,600 | $183,225 | $329,240 |
| 0029 | Law enforcement (4510000000-N) | HR | 360 | $65.00 | $110.00 | $87.10 |
| 0030 | Thermoplastic pavement marking lines (4", 90 mils) (4685000000-E) | LF | 15,449 | $0.47 | $0.47 | $0.47 |
| 0031 | Thermoplastic pavement marking lines (6", 90 mils) (4688000000-E) | LF | 315,241 | $0.63 | $0.63 | $0.63 |
| 0032 | Thermoplastic pavement marking lines (12", 90 mils) (4700000000-E) | LF | 4,611 | $2.23 | $2.23 | $2.23 |
| 0033 | Thermoplastic pavement marking lines (24", 90 mils) (4709000000-E) | LF | 728 | $18.60 | $18.60 | $18.60 |
| 0034 | Thermoplastic pavement marking character (90 mils) (4720000000-E) | EACH | 72 | $148.00 | $148.00 | $148.00 |
| 0035 | Thermoplastic pavement marking symbol (90 mils) (4725000000-E) | EACH | 188 | $148.00 | $148.00 | $148.00 |
| 0036 | Heated-in-place thermoplastic pavement marking symbol (90 mils) (4726110000-E) | EACH | 6 | $600.00 | $600.00 | $600.00 |
| 0037 | Paint pavement marking lines (4") (4810000000-E) | LF | 6,242 | $0.50 | $0.50 | $0.50 |
| 0038 | Paint pavement marking lines (24") (4835000000-E) | LF | 253 | $7.32 | $7.32 | $7.32 |
| 0039 | Paint pavement marking character (4840000000-N) | EACH | 355 | $20.00 | $20.00 | $20.00 |
| 0040 | Paint pavement marking symbol (4845000000-N) | EACH | 30 | $20.00 | $20.00 | $20.00 |
| 0041 | Removal of pavement marking lines (4") (4850000000-E) | LF | 888 | $2.50 | $2.50 | $2.50 |
| 0042 | Generic PVMT marking item (LF) 1205 - integrated multipolymer pavement marking lines (6") (4891000000-E) | LF | 888 | $6.00 | $6.00 | $6.00 |
| 0043 | Generic pavement marking item (EA) - polycarbonate H-shaped markers (4895000000-N) | EACH | 1,101 | $44.00 | $44.00 | $44.00 |
| 0044 | Permanent raised pavement markers (4900000000-N) | EACH | 125 | $8.60 | $8.60 | $8.60 |
| 0045 | Portable lighting (5255000000-N) | LS | 1 | $30,000 | $43,535 | $150,000 |
| 0046 | Temporary silt fence (6000000000-E) | LF | 1,103 | $4.27 | $5.00 | $4.15 |
| 0047 | Stone for erosion control, class B (6009000000-E) | TON | 278 | $1.00 | $97.24 | $162.47 |
| 0048 | Sediment control stone (6012000000-E) | TON | 278 | $1.00 | $65.52 | $133.79 |
| 0049 | Temporary mulching (6015000000-E) | ACRE | 11.08 | $1,050.00 | $2,600.00 | $1.00 |
| 0050 | Seed for temporary seeding (6018000000-E) | LB | 560 | $4.97 | $6.00 | $0.01 |
| 0051 | Fertilizer for temporary seeding (6021000000-E) | TON | 2.76 | $763.05 | $1,100.00 | $100.00 |
| 0052 | Matting for erosion control (6036000000-E) | SY | 160 | $2.20 | $4.00 | $2.00 |
| 0053 | 1/4" hardware cloth (6042000000-E) | LF | 560 | $3.50 | $7.00 | $0.01 |
| 0054 | Wattle (6071010000-E) | LF | 230 | $15.00 | $12.00 | $16.00 |
| 0055 | Seeding and mulching (6084000000-E) | ACRE | 10.68 | $3,850.00 | $3,600.00 | $3,750.00 |
| 0056 | Seed for repair seeding (6090000000-E) | LB | 560 | $4.97 | $6.00 | $4.00 |
| 0057 | Fertilizer for repair seeding (6093000000-E) | TON | 2.76 | $763.05 | $1,200.00 | $100.00 |
| 0058 | Response for erosion control (6117000000-N) | EACH | 36 | $50.94 | $300.00 | $1,500.00 |
| 0059 | Inductive loop sawcut (7444000000-E) | LF | 3,880 | $10.00 | $12.00 | $12.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
Every contract let that day: NCDOT letting of June 16, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.