NCDOT contract C205092 bid tabulation
GRADING, DRAINAGE, PAVING, SIGNALS, AND CULVERTS. SR-1203 (ALLEN RD) FROM SR-1467 (STANTONSBURG RD) TO US-13 (DICKINSON AVE EXT). Let by North Carolina DOT on October 21, 2025, Pitt. 3 bids received; low bid $47,191,561 by Barnhill Contracting Company.
- Owner
- North Carolina DOT
- Letting
- 21 OCT 2025
- Pay items
- 311
- Data through
- 20 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Barnhill Contracting Company | $47,191,561 | Low |
| 2 | FSC II LLC DBA Fred Smith Company | $53,456,789 | +13% |
| 3 | S T Wooten Corporation | $59,599,410 | +26% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Barnhill Contracting Company | 2. FSC II LLC DBA Fred Smith Company | 3. S T Wooten Corporation |
|---|---|---|---|---|---|---|
| 0001 | Mobilization (0000100000-N) | LS | 1 | $2,359,500 | $2,600,000 | $2,979,000 |
| 0002 | Construction surveying (0000400000-N) | LS | 1 | $470,000 | $460,000 | $600,000 |
| 0003 | Clearing & grubbing (0001000000-E) | LS | 1 | $3,091,120 | $3,600,000 | $2,951,000 |
| 0004 | Supplementary clearing & grubbing (0008000000-E) | ACRE | 1 | $100.00 | $20,000 | $25,000 |
| 0005 | Sealing abandoned wells (0015000000-N) | EACH | 2 | $2,325.00 | $3,500.00 | $2,500.00 |
| 0006 | Unclassified excavation (0022000000-E) | CY | 38,000 | $12.50 | $28.00 | $30.00 |
| 0007 | Undercut excavation (0036000000-E) | CY | 1,500 | $23.40 | $25.00 | $30.00 |
| 0008 | Borrow excavation (0106000000-E) | CY | 48,000 | $22.00 | $22.00 | $10.00 |
| 0009 | Drainage ditch excavation (0134000000-E) | CY | 216 | $15.00 | $40.00 | $35.00 |
| 0010 | Removal of existing asphalt pavement (0156000000-E) | SY | 12,100 | $8.25 | $13.00 | $11.00 |
| 0011 | Select granular material (0195000000-E) | CY | 1,500 | $21.70 | $22.00 | $65.00 |
| 0012 | Geotextile for soil stabilization (0196000000-E) | SY | 3,700 | $3.25 | $4.00 | $2.00 |
| 0013 | Temporary shoring (0199000000-E) | SF | 4,700 | $95.00 | $60.00 | $120.00 |
| 0014 | Rock plating (0223000000-E) | SY | 45 | $100.00 | $160.00 | $100.00 |
| 0015 | Foundation conditioning material, minor structures (0318000000-E) | TON | 2,660 | $50.00 | $50.00 | $25.00 |
| 0016 | FND condit geotextile (4A) (0321000000-E) | SY | 8,360 | $4.00 | $3.50 | $2.00 |
| 0017 | 12" drainage pipe (0335100000-E) | LF | 124 | $87.50 | $85.00 | $118.00 |
| 0018 | 15" drainage pipe (0335200000-E) | LF | 892 | $110.60 | $95.00 | $112.00 |
| 0019 | 18" drainage pipe (0335300000-E) | LF | 620 | $127.40 | $104.00 | $121.50 |
| 0020 | 24" drainage pipe (0335400000-E) | LF | 532 | $138.20 | $118.00 | $147.50 |
| 0021 | 30" drainage pipe (0335500000-E) | LF | 176 | $181.50 | $152.00 | $186.50 |
| 0022 | 36" drainage pipe (0335600000-E) | LF | 56 | $265.00 | $190.00 | $262.50 |
| 0023 | 42" drainage pipe (0335700000-E) | LF | 20 | $332.60 | $290.00 | $410.75 |
| 0024 | 15" RC pipe culverts, class III (0366000000-E) | LF | 2,024 | $85.90 | $100.00 | $112.00 |
| 0025 | 18" RC pipe culverts, class III (0372000000-E) | LF | 576 | $133.60 | $111.00 | $121.50 |
| 0026 | 24" RC pipe culverts, class III (0378000000-E) | LF | 1,476 | $123.50 | $120.00 | $147.50 |
| 0027 | 30" RC pipe culverts, class III (0384000000-E) | LF | 96 | $230.00 | $175.00 | $190.00 |
| 0028 | 36" RC pipe culverts, class III (0390000000-E) | LF | 104 | $265.00 | $200.00 | $262.50 |
| 0029 | ***" RCP culv class IV - (60") (0448000000-E) | LF | 92 | $755.00 | $600.00 | $850.00 |
| 0030 | 15" RC pipe culverts, class IV (0448200000-E) | LF | 6,996 | $102.15 | $107.00 | $112.00 |
| 0031 | 18" RC pipe culverts, class IV (0448300000-E) | LF | 5,198 | $141.80 | $130.00 | $130.00 |
| 0032 | 24" RC pipe culverts, class IV (0448400000-E) | LF | 1,488 | $155.75 | $148.00 | $164.00 |
| 0033 | 30" RC pipe culverts, class IV (0448500000-E) | LF | 496 | $171.10 | $200.00 | $225.00 |
| 0034 | 36" RC pipe culverts, class IV (0448600000-E) | LF | 168 | $292.00 | $215.00 | $316.00 |
| 0035 | 42" RC pipe culverts, class IV (0448700000-E) | LF | 180 | $336.50 | $280.00 | $365.00 |
| 0036 | **" RC pipe culv class V - (15") (0449000000-E) | LF | 2,104 | $105.50 | $110.00 | $120.00 |
| 0037 | **" RC pipe culv class V - (18") (0449000000-E) | LF | 860 | $142.10 | $125.00 | $141.00 |
| 0038 | **" RC pipe culv class V - (24") (0449000000-E) | LF | 380 | $182.60 | $154.00 | $185.00 |
| 0039 | **" RC pipe culv class V - (36") (0449000000-E) | LF | 160 | $265.00 | $285.00 | $356.00 |
| 0040 | **" RC pipe culv class V - (42") (0449000000-E) | LF | 180 | $405.00 | $350.00 | $450.00 |
| 0041 | 6" CS pipe culverts, 0.064" thick (spring box) (0570000000-E) | LF | 80 | $68.00 | $65.00 | $121.00 |
| 0042 | Pipe removal (0995000000-E) | LF | 6,316 | $16.00 | $20.00 | $43.50 |
| 0043 | Fine grading (1011000000-N) | LS | 1 | $2,654,775 | $4,150,000 | $6,200,000 |
| 0044 | #57 stone (1077000000-E) | TON | 91 | $60.00 | $65.00 | $78.00 |
| 0045 | Shallow undercut (1099500000-E) | CY | 14,050 | $28.35 | $28.00 | $35.00 |
| 0046 | Class IV subgrade stabilization (1099700000-E) | TON | 39,750 | $27.25 | $33.00 | $40.00 |
| 0047 | Class IV aggregate stabilization (1111000000-E) | TON | 500 | $41.00 | $45.00 | $48.00 |
| 0048 | Geotextile for subgrade stabilization (1112000000-E) | SY | 61,170 | $2.75 | $3.50 | $5.00 |
| 0049 | Aggregate base course (1121000000-E) | TON | 100 | $55.00 | $60.00 | $75.00 |
| 0050 | Incidental stone base (1220000000-E) | TON | 500 | $125.00 | $75.00 | $75.00 |
| 0051 | Mill asp PVMT *****" DTH - (1-1/2") (1297000000-E) | SY | 700 | $15.00 | $15.00 | $11.00 |
| 0052 | Incidental milling (1330000000-E) | SY | 6,100 | $12.00 | $13.00 | $7.50 |
| 0053 | Asphalt conc base course, type B25.0C (1491000000-E) | TON | 26,900 | $74.00 | $90.00 | $102.00 |
| 0054 | Asphalt conc intermediate course, type I19.0C (1503000000-E) | TON | 24,800 | $74.00 | $88.50 | $101.00 |
| 0055 | Asphalt conc surface course, type S9.5B (1519000000-E) | TON | 520 | $120.00 | $125.00 | $181.00 |
| 0056 | Asphalt conc surface course, type S9.5C (1523000000-E) | TON | 24,300 | $74.50 | $85.00 | $98.00 |
| 0057 | Asphalt binder for plant mix (1575000000-E) | TON | 3,870 | $575.00 | $625.00 | $490.00 |
| 0058 | Asphalt plant mix, pavement repair (1693000000-E) | TON | 1,200 | $235.00 | $200.00 | $300.00 |
| 0059 | Generic grading item (EA) - reset right of way markers (2021000000-N) | EACH | 10 | $1,560.00 | $500.00 | $450.00 |
| 0060 | Subdrain excavation (2022000000-E) | CY | 1,736 | $35.00 | $65.00 | $35.00 |
| 0061 | Geotextile for subsurface drains (2026000000-E) | SY | 7,750 | $12.00 | $10.00 | $12.00 |
| 0062 | Subdrain coarse aggregate (2036000000-E) | CY | 1,302 | $85.00 | $200.00 | $85.00 |
| 0063 | 6" perforated subdrain pipe (2044000000-E) | LF | 7,750 | $17.00 | $14.00 | $17.00 |
| 0064 | Subdrain pipe outlet (2070000000-N) | EACH | 16 | $400.00 | $950.00 | $400.00 |
| 0065 | 6" outlet pipe (2077000000-E) | LF | 96 | $40.00 | $105.00 | $40.00 |
| 0066 | Endwalls (2209000000-E) | CY | 5 | $5,000.00 | $2,200.00 | $3,700.00 |
| 0067 | Reinforced endwalls (2220000000-E) | CY | 5.60 | $5,000.00 | $2,500.00 | $3,300.00 |
| 0068 | Pipe collars (2253000000-E) | CY | 4.15 | $2,500.00 | $3,500.00 | $4,200.00 |
| 0069 | Flowable fill (2275000000-E) | CY | 11 | $1,200.00 | $1,150.00 | $2,300.00 |
| 0070 | Masonry drainage structures (2286000000-N) | EACH | 348 | $4,225.00 | $4,150.00 | $5,150.00 |
| 0071 | Masonry drainage structures (2297000000-E) | CY | 18.49 | $4,100.00 | $1,300.00 | $5,500.00 |
| 0072 | Masonry drainage structures (2308000000-E) | LF | 77 | $435.00 | $700.00 | $1,025.00 |
| 0073 | Frame with two grates, STD 840.16 (2364000000-N) | EACH | 78 | $735.00 | $1,250.00 | $1,450.00 |
| 0074 | Frame with two grates, STD 840.20 (2364200000-N) | EACH | 29 | $650.00 | $1,200.00 | $1,500.00 |
| 0075 | Frame with two grates, STD 840.24 (2366000000-N) | EACH | 9 | $650.00 | $1,200.00 | $1,450.00 |
| 0076 | Frame-GRT-HD 840.03 ** - (E) (2374000000-N) | EACH | 43 | $825.00 | $1,250.00 | $1,525.00 |
| 0077 | Frame-GRT-HD 840.03 ** - (F) (2374000000-N) | EACH | 104 | $825.00 | $1,300.00 | $1,560.00 |
| 0078 | Frame-GRT-HD 840.03 ** - (G) (2374000000-N) | EACH | 87 | $825.00 | $1,300.00 | $1,560.00 |
| 0079 | Frame with cover, STD 840.54 (2396000000-N) | EACH | 6 | $475.00 | $1,000.00 | $825.00 |
| 0080 | Concrete transitional section for catch basin (2440000000-N) | EACH | 4 | $1,100.00 | $1,100.00 | $1,295.00 |
| 0081 | Concrete transitional section for drop inlet (2451000000-N) | EACH | 75 | $1,100.00 | $1,100.00 | $1,295.00 |
| 0082 | **"X**" concrete curb - (8" X 18") (2535000000-E) | LF | 60 | $35.00 | $35.00 | $57.70 |
| 0083 | **'-**" concrete curb & gutter - (2'-9") (2538000000-E) | LF | 2,600 | $28.00 | $28.00 | $33.80 |
| 0084 | 1'-6" concrete curb & gutter (2542000000-E) | LF | 8,700 | $22.00 | $24.00 | $22.85 |
| 0085 | 2'-6" concrete curb & gutter (2549000000-E) | LF | 29,800 | $24.00 | $26.00 | $28.85 |
| 0086 | Modified concrete flume (2570000000-N) | EACH | 1 | $2,100.00 | $2,242.82 | $3,075.00 |
| 0087 | 4" concrete sidewalk (2591000000-E) | SY | 14,300 | $37.00 | $40.00 | $50.65 |
| 0088 | Concrete curb ramps (2605000000-N) | EACH | 52 | $1,950.00 | $2,150.00 | $2,775.00 |
| 0089 | 6" concrete driveway (2612000000-E) | SY | 1,500 | $75.00 | $82.00 | $107.50 |
| 0090 | 5" monolithic concrete islands (keyed in) (2655000000-E) | SY | 8,000 | $69.00 | $76.00 | $84.00 |
| 0091 | Generic paving item (LF) - block wall reconstruction (2752000000-E) | LF | 30 | $156.18 | $400.00 | $500.00 |
| 0092 | Adjustment of manholes (2830000000-N) | EACH | 1 | $2,500.00 | $1,250.00 | $3,550.00 |
| 0093 | Adjustment of meter boxes or valve boxes (2845000000-N) | EACH | 69 | $1,200.00 | $750.00 | $1,700.00 |
| 0094 | Convert existing drop inlet to junction box (2905000000-N) | EACH | 1 | $17,660 | $3,500.00 | $9,200.00 |
| 0095 | Steel beam guardrail (3030000000-E) | LF | 850 | $24.00 | $24.00 | $24.00 |
| 0096 | 25' clear span guardrail sections (3140000000-E) | EACH | 1 | $1,500.00 | $1,500.00 | $1,500.00 |
| 0097 | Additional guardrail posts (3150000000-N) | EACH | 10 | $11.00 | $11.00 | $11.00 |
| 0098 | Guardrail end units, type cat-1 (3210000000-N) | EACH | 6 | $850.00 | $850.00 | $850.00 |
| 0099 | Guardrail end units, type TL-3 (3287000000-N) | EACH | 6 | $3,250.00 | $3,250.00 | $3,250.00 |
| 0100 | Remove existing guardrail (3360000000-E) | LF | 50 | $1.00 | $1.00 | $1.00 |
| 0101 | Generic fencing item (LF) - pedestrian safety rail (3575000000-E) | LF | 520 | $285.00 | $260.00 | $264.00 |
| 0102 | Rip rap, class I (3628000000-E) | TON | 222 | $95.00 | $100.00 | $86.00 |
| 0103 | Rip rap, class B (3649000000-E) | TON | 339 | $85.00 | $100.00 | $86.00 |
| 0104 | Geotextile for drainage (3656000000-E) | SY | 3,758 | $2.50 | $3.00 | $1.00 |
| 0105 | Supports, 3-LB steel U-channel (4072000000-E) | LF | 2,700 | $9.00 | $7.75 | $9.00 |
| 0106 | Sign erection, type D (4096000000-N) | EACH | 7 | $150.00 | $250.00 | $150.00 |
| 0107 | Sign erection, type E (4102000000-N) | EACH | 156 | $75.00 | $215.00 | $75.00 |
| 0108 | Sign erection, type F (4108000000-N) | EACH | 10 | $150.00 | $225.00 | $150.00 |
| 0109 | Disposal of sign system, U-channel (4155000000-N) | EACH | 67 | $2.00 | $5.00 | $2.00 |
| 0110 | Stockpile sign, D, E or F (4237000000-N) | EACH | 1 | $2.00 | $300.00 | $2.00 |
| 0111 | Work zone signs (stationary) (4400000000-E) | SF | 1,035 | $10.00 | $7.50 | $8.00 |
| 0112 | Work zone signs (portable) (4405000000-E) | SF | 400 | $30.00 | $22.00 | $8.30 |
| 0113 | Work zone signs (barricade mounted) (4410000000-E) | SF | 292 | $16.00 | $9.00 | $7.95 |
| 0114 | Flashing arrow board (4415000000-N) | EACH | 6 | $4,030.00 | $1,500.00 | $2,295.00 |
| 0115 | Portable changeable message sign (4420000000-N) | EACH | 2 | $10,775 | $22,500 | $8,995.00 |
| 0116 | Drums (4430000000-N) | EACH | 900 | $80.00 | $45.00 | $23.86 |
| 0117 | Sequential flashing warning lights (4434000000-N) | EACH | 20 | $250.00 | $150.00 | $200.00 |
| 0118 | Cones (4435000000-N) | EACH | 50 | $30.00 | $30.00 | $19.95 |
| 0119 | Barricades (type III) (4445000000-E) | LF | 240 | $50.00 | $23.00 | $22.95 |
| 0120 | Pedestrian channelizing devices (4447000000-E) | LF | 150 | $65.00 | $45.00 | $17.95 |
| 0121 | Flagger (4455000000-N) | DAY | 240 | $1,000.00 | $915.00 | $850.00 |
| 0122 | Temporary crash cushions (4465000000-N) | EACH | 6 | $9,500.00 | $12,500 | $12,500 |
| 0123 | Remove & reset temporary crash cushion (4470000000-N) | EACH | 6 | $5,000.00 | $3,250.00 | $3,250.00 |
| 0124 | TMA (4480000000-N) | EACH | 4 | $2,500.00 | $12,500 | $9,300.00 |
| 0125 | Portable concrete barrier (4485000000-E) | LF | 900 | $58.00 | $60.00 | $59.71 |
| 0126 | Portable concrete barrier (anchored) (4490000000-E) | LF | 650 | $75.00 | $80.00 | $79.08 |
| 0127 | Water filled barrier (4507000000-E) | LF | 250 | $100.00 | $65.00 | $75.00 |
| 0128 | Law enforcement (4510000000-N) | HR | 48 | $100.00 | $100.00 | $125.00 |
| 0129 | Temporary raised pavement markers (4650000000-N) | EACH | 330 | $9.70 | $15.00 | $9.70 |
| 0130 | Thermoplastic pavement marking lines (6", 90 mils) (4688000000-E) | LF | 57,859 | $0.80 | $0.80 | $0.80 |
| 0131 | Thermoplastic pavement marking lines (12", 90 mils) (4700000000-E) | LF | 9,909 | $1.62 | $1.62 | $1.62 |
| 0132 | Thermoplastic pavement marking lines (16", 90 mils) (4704000000-E) | LF | 210 | $17.80 | $17.80 | $17.80 |
| 0133 | Thermoplastic pavement marking lines (24", 90 mils) (4709000000-E) | LF | 1,200 | $19.20 | $19.20 | $19.20 |
| 0134 | Thermoplastic pavement marking character (90 mils) (4720000000-E) | EACH | 56 | $145.00 | $145.00 | $145.00 |
| 0135 | Thermoplastic pavement marking symbol (90 mils) (4725000000-E) | EACH | 225 | $145.00 | $145.00 | $145.00 |
| 0136 | Paint pavement marking lines (4") (4810000000-E) | LF | 21,610 | $0.18 | $0.85 | $0.18 |
| 0137 | Paint pavement marking lines (8") (4820000000-E) | LF | 455 | $0.83 | $1.00 | $0.83 |
| 0138 | Paint pavement marking lines (12") (4825000000-E) | LF | 75 | $2.34 | $3.00 | $2.34 |
| 0139 | Paint pavement marking lines (24") (4835000000-E) | LF | 50 | $8.40 | $10.00 | $8.40 |
| 0140 | Paint pavement marking character (4840000000-N) | EACH | 20 | $53.00 | $53.00 | $53.00 |
| 0141 | Paint pavement marking symbol (4845000000-N) | EACH | 20 | $53.00 | $53.00 | $53.00 |
| 0142 | Removal of pavement marking lines (4") (4850000000-E) | LF | 3,600 | $1.25 | $1.25 | $1.25 |
| 0143 | Removal of pavement marking lines (8") (4860000000-E) | LF | 300 | $4.55 | $4.55 | $4.55 |
| 0144 | Generic pavement marking item (LF) - yield line thermoplastic pavement marking (24", 90 mils) (4890000000-E) | LF | 35 | $52.00 | $52.00 | $52.00 |
| 0145 | Generic pavement marking item (EA) - inlaid cradle markers (4895000000-N) | EACH | 1,173 | $35.00 | $35.00 | $35.00 |
| 0146 | 6" water line (5325600000-E) | LF | 274 | $115.00 | $125.00 | $184.00 |
| 0147 | 8" water line (5325800000-E) | LF | 2,192 | $110.00 | $120.00 | $220.00 |
| 0148 | 10" water line (5326000000-E) | LF | 13 | $350.00 | $380.00 | $1,300.00 |
| 0149 | 12" water line (5326200000-E) | LF | 89 | $285.00 | $310.00 | $375.00 |
| 0150 | 24" water line (5327400000-E) | LF | 11,666 | $380.00 | $425.00 | $490.00 |
| 0151 | 30" water line (5328000000-E) | LF | 763 | $260.00 | $286.00 | $217.00 |
| 0152 | DI H2O pipe fittings (5329000000-E) | LB | 88,230 | $7.00 | $7.00 | $25.75 |
| 0153 | 2" valve (5536000000-E) | EACH | 3 | $2,000.00 | $2,200.00 | $1,785.00 |
| 0154 | 6" valve (5540000000-E) | EACH | 33 | $2,700.00 | $2,950.00 | $2,675.00 |
| 0155 | 8" valve (5546000000-E) | EACH | 16 | $3,500.00 | $3,750.00 | $4,230.00 |
| 0156 | 10" valve (5552000000-E) | EACH | 1 | $5,300.00 | $5,750.00 | $6,400.00 |
| 0157 | 12" valve (5558000000-E) | EACH | 2 | $6,500.00 | $7,150.00 | $9,200.00 |
| 0158 | 24" valve (5559400000-E) | EACH | 14 | $20,000 | $22,000 | $38,575 |
| 0159 | 6" tapping sleeve & valve (5571600000-E) | EACH | 1 | $11,500 | $12,500 | $10,400 |
| 0160 | 20" tapping sleeve & valve (5573000000-E) | EACH | 1 | $20,000 | $22,000 | $22,650 |
| 0161 | 24" tapping sleeve & valve (5573400000-E) | EACH | 2 | $25,000 | $27,500 | $53,600 |
| 0162 | *" air release valve - (24") (5588000000-E) | EACH | 7 | $7,500.00 | $8,250.00 | $8,760.00 |
| 0163 | Relocate water meter (5648000000-N) | EACH | 20 | $4,500.00 | $4,950.00 | $1,500.00 |
| 0164 | Reconnect water meter (5649000000-N) | EACH | 19 | $5,600.00 | $6,100.00 | $2,200.00 |
| 0165 | Fire hydrant (5666000000-N) | EACH | 31 | $11,000 | $12,000 | $7,500.00 |
| 0166 | Fire hydrant leg (5673000000-E) | LF | 152 | $85.00 | $95.00 | $178.00 |
| 0167 | **" water service line - (2") (5686000000-E) | LF | 384 | $95.00 | $105.00 | $103.00 |
| 0168 | Water service line (<2") (5686500000-E) | LF | 2,820 | $37.50 | $40.00 | $97.00 |
| 0169 | **" sanitary gravity sewer - (14") (5691000000-E) | LF | 177 | $195.00 | $215.00 | $425.00 |
| 0170 | 12" sanitary gravity sewer (5691500000-E) | LF | 162 | $130.00 | $142.00 | $334.00 |
| 0171 | 4' dia utility manhole (5775000000-E) | EACH | 4 | $16,000 | $17,500 | $11,900 |
| 0172 | Utility manhole wall 4' dia (5781000000-E) | LF | 26 | $450.00 | $490.00 | $1,020.00 |
| 0173 | Abandon 6" utility pipe (5800000000-E) | LF | 715 | $6.75 | $7.25 | $37.75 |
| 0174 | Abandon 8" utility pipe (5801000000-E) | LF | 1,813 | $7.50 | $8.25 | $31.25 |
| 0175 | Abandon 12" utility pipe (5804000000-E) | LF | 492 | $8.85 | $9.50 | $33.00 |
| 0176 | Abandon 24" utility pipe (5813000000-E) | LF | 12,228 | $22.00 | $24.00 | $20.50 |
| 0177 | Remove fire hydrant (5815500000-N) | EACH | 5 | $2,000.00 | $2,200.00 | $2,105.00 |
| 0178 | Abandon utility manhole (5816000000-N) | EACH | 1 | $2,500.00 | $2,750.00 | $2,550.00 |
| 0179 | Remove utility manhole (5828000000-N) | EACH | 3 | $2,500.00 | $2,750.00 | $1,500.00 |
| 0180 | **" encasement pipe - (48") (5835000000-E) | LF | 686 | $785.00 | $700.00 | $592.00 |
| 0181 | 12" encasement pipe (5835600000-E) | LF | 303 | $205.00 | $175.00 | $167.00 |
| 0182 | 16" encasement pipe (5835700000-E) | LF | 961 | $250.00 | $210.00 | $221.00 |
| 0183 | 30" encasement pipe (5836200000-E) | LF | 203 | $585.00 | $470.00 | $275.00 |
| 0184 | Bore & jack **" - (12") (5872500000-E) | LF | 303 | $620.30 | $575.00 | $593.00 |
| 0185 | Bore & jack **" - (16") (5872500000-E) | LF | 595 | $675.00 | $525.00 | $525.00 |
| 0186 | Bore & jack **" - (30") (5872500000-E) | LF | 203 | $875.00 | $625.00 | $850.00 |
| 0187 | Bore & jack **" - (48") (5872500000-E) | LF | 531 | $1,175.00 | $925.00 | $1,100.00 |
| 0188 | Direct drill **" - (30") (5872600000-E) | LF | 763 | $400.00 | $440.00 | $285.00 |
| 0189 | Direct drill **" - (4") (5872600000-E) | LF | 214 | $39.50 | $45.00 | $39.50 |
| 0190 | Direct drill **" - (6") (5872600000-E) | LF | 632 | $62.20 | $70.00 | $62.20 |
| 0191 | 2" gas line (5879200000-E) | LF | 746 | $11.35 | $11.35 | $11.35 |
| 0192 | 4" gas line (5879400000-E) | LF | 1,662 | $14.50 | $14.50 | $14.50 |
| 0193 | 6" gas line (5879600000-E) | LF | 12,994 | $17.00 | $17.00 | $17.00 |
| 0194 | 8" gas line (5879800000-E) | LF | 218 | $20.25 | $20.25 | $20.25 |
| 0195 | 2" gas valve (5880200000-E) | EACH | 8 | $227.00 | $227.00 | $227.00 |
| 0196 | 4" gas valve (5880400000-E) | EACH | 2 | $304.00 | $304.00 | $304.00 |
| 0197 | 6" gas valve (5880600000-E) | EACH | 9 | $397.00 | $397.00 | $397.00 |
| 0198 | Generic utility item (EA) - gas casing vent (5882000000-N) | EACH | 2 | $250.00 | $250.00 | $250.00 |
| 0199 | Generic utility item (EA) - reconnect gas service (5882000000-N) | EACH | 10 | $677.00 | $677.00 | $677.00 |
| 0200 | Generic utility item (LF) - 2" gas service line (5888000000-E) | LF | 140 | $10.50 | $10.50 | $10.50 |
| 0201 | Generic utility item (LF) - 3/4" gas service line (5888000000-E) | LF | 896 | $9.25 | $9.05 | $9.05 |
| 0202 | Generic utility item (CY) - anti-seep pipe collar (5894000000-E) | CY | 1 | $1,500.00 | $4,950.00 | $7,919.17 |
| 0203 | Generic utility item (LS) - abandon gas pipe (5912000000-N) | LS | 1 | $1,700.00 | $32,000 | $32,300 |
| 0205 | Temporary silt fence (6000000000-E) | LF | 91,660 | $2.70 | $2.70 | $1.25 |
| 0206 | Stone for erosion control, class A (6006000000-E) | TON | 1,680 | $60.00 | $70.00 | $78.00 |
| 0207 | Stone for erosion control, class B (6009000000-E) | TON | 4,110 | $75.00 | $35.00 | $45.00 |
| 0208 | Sediment control stone (6012000000-E) | TON | 5,590 | $50.00 | $27.00 | $40.00 |
| 0209 | Temporary mulching (6015000000-E) | ACRE | 145 | $800.00 | $1,000.00 | $1,900.00 |
| 0210 | Seed for temporary seeding (6018000000-E) | LB | 7,000 | $5.65 | $1.00 | $1.00 |
| 0211 | Fertilizer for temporary seeding (6021000000-E) | TON | 35.50 | $1,200.00 | $420.00 | $275.00 |
| 0212 | Temporary slope drains (6024000000-E) | LF | 465 | $27.75 | $30.00 | $20.00 |
| 0213 | Safety fence (6029000000-E) | LF | 380 | $2.50 | $4.00 | $1.80 |
| 0214 | Silt excavation (6030000000-E) | CY | 31,960 | $1.00 | $1.00 | $5.00 |
| 0215 | Matting for erosion control (6036000000-E) | SY | 22,770 | $2.00 | $1.75 | $1.75 |
| 0216 | Coir fiber mat (6037000000-E) | SY | 415 | $9.00 | $6.00 | $5.25 |
| 0217 | 1/4" hardware cloth (6042000000-E) | LF | 14,700 | $4.50 | $4.00 | $5.75 |
| 0218 | Low permeability geotextile (6043000000-E) | SY | 900 | $2.65 | $10.00 | $6.40 |
| 0219 | Floating turbidity curtain (6048000000-E) | SY | 100 | $170.00 | $50.00 | $57.89 |
| 0220 | Special stilling basins (6070000000-N) | EACH | 12 | $1,000.00 | $975.00 | $1,000.00 |
| 0221 | Flocculant (6071002000-E) | LB | 2,000 | $8.50 | $4.50 | $1.00 |
| 0222 | Coir fiber wattle (6071012000-E) | LF | 3,180 | $10.70 | $10.00 | $13.00 |
| 0223 | Coir fiber wattle barrier (6071014000-E) | LF | 3,630 | $10.70 | $12.00 | $13.00 |
| 0224 | Coir fiber baffle (6071030000-E) | LF | 295 | $8.00 | $8.00 | $6.00 |
| 0225 | **" skimmer - (1-1/2") (6071050000-E) | EACH | 4 | $1,475.00 | $2,300.00 | $4,300.00 |
| 0226 | **" skimmer - (2") (6071050000-E) | EACH | 8 | $1,630.00 | $2,450.00 | $6,300.00 |
| 0227 | **" skimmer - (2-1/2") (6071050000-E) | EACH | 10 | $1,865.00 | $2,650.00 | $6,500.00 |
| 0228 | **" skimmer - (3") (6071050000-E) | EACH | 2 | $2,070.00 | $3,200.00 | $6,800.00 |
| 0229 | Seeding and mulching (6084000000-E) | ACRE | 102 | $2,600.00 | $1,850.00 | $2,000.00 |
| 0230 | Mowing (6087000000-E) | ACRE | 93 | $150.00 | $175.00 | $175.00 |
| 0231 | Seed for repair seeding (6090000000-E) | LB | 1,500 | $7.00 | $4.25 | $5.00 |
| 0232 | Fertilizer for repair seeding (6093000000-E) | TON | 4 | $1,600.00 | $1,250.00 | $400.00 |
| 0233 | Seed for supplemental seeding (6096000000-E) | LB | 2,450 | $5.50 | $4.25 | $5.00 |
| 0234 | Sodding (6102000000-E) | SY | 8,569 | $9.20 | $25.00 | $9.20 |
| 0235 | Water (6105000000-E) | M/G | 432 | $40.00 | $30.00 | $40.00 |
| 0236 | Fertilizer topdressing (6108000000-E) | TON | 73.25 | $1,150.00 | $500.00 | $400.00 |
| 0237 | Impervious dike (6111000000-E) | LF | 1,056 | $70.00 | $75.00 | $70.00 |
| 0238 | Specialized hand mowing (6114500000-N) | MHR | 10 | $200.00 | $250.00 | $55.00 |
| 0239 | Response for erosion control (6117000000-N) | EACH | 100 | $200.00 | $150.00 | $450.00 |
| 0240 | Concrete washout structure (6117500000-N) | EACH | 3 | $1,000.00 | $2,000.00 | $1,200.00 |
| 0241 | Culvert diversion channel (6120000000-E) | CY | 1,786 | $23.00 | $30.00 | $40.00 |
| 0242 | Reforestation (6123000000-E) | ACRE | 1 | $5,000.00 | $2,500.00 | $2,580.00 |
| 0243 | Generic erosion control item (EA) - prefabricated concrete washout (6132000000-N) | EACH | 18 | $1,000.00 | $1,250.00 | $1,200.00 |
| 0244 | Fringe tree - (B&B,1-1/2" cal) (6255000000-N) | EACH | 65 | $420.00 | $525.00 | $420.00 |
| 0245 | Yaupon holly - (B&B,1-1/2" cal) (6390000000-N) | EACH | 83 | $420.00 | $613.00 | $420.00 |
| 0246 | Big blue liriope - (1 gal) (6455000000-N) | EACH | 52 | $16.00 | $14.00 | $16.00 |
| 0247 | Generic planting item (EA) 1670 - muhlenbergia capillarius 'gulf coast', gulf coast pink muhly grass (6640000000-N) | EACH | 649 | $45.00 | $19.50 | $45.00 |
| 0248 | Generic planting item (EA) 1670 - schizachyrium scoparium, the little bluestem (6640000000-N) | EACH | 414 | $45.00 | $25.50 | $45.00 |
| 0249 | Mulch for planting (6650000000-E) | CY | 447 | $60.00 | $65.00 | $60.00 |
| 0250 | Topsoil (6900000000-E) | CY | 1,329 | $60.00 | $55.00 | $60.00 |
| 0251 | Pedestrian signal head (16", 1 section W/countdown) (7048500000-E) | EACH | 20 | $975.00 | $975.00 | $975.00 |
| 0252 | Signal cable (7060000000-E) | LF | 14,464 | $4.00 | $4.00 | $4.00 |
| 0253 | Vehicle signal head (12", 3 section) (7120000000-E) | EACH | 64 | $1,400.00 | $1,400.00 | $1,400.00 |
| 0254 | Vehicle signal head (12", 4 section) (7132000000-E) | EACH | 19 | $1,526.00 | $1,526.00 | $1,526.00 |
| 0255 | Messenger cable (****") - (1/4") (7240000000-E) | LF | 27,540 | $5.00 | $5.00 | $5.00 |
| 0256 | Messenger cable (3/8") (7264000000-E) | LF | 2,999 | $7.00 | $7.00 | $7.00 |
| 0257 | Tracer wire (7279000000-E) | LF | 2,530 | $1.00 | $1.00 | $1.00 |
| 0258 | Paved trench (***********) - (1, 2") (7288000000-E) | LF | 100 | $48.00 | $48.00 | $48.00 |
| 0259 | Unpaved trench (***********) - (1, 2") (7300000000-E) | LF | 1,292 | $11.00 | $11.00 | $11.00 |
| 0260 | Unpaved trench (***********) - (2, 2") (7300000000-E) | LF | 607 | $14.00 | $14.00 | $14.00 |
| 0261 | Unpaved trench (***********) - (4, 2") (7300000000-E) | LF | 32 | $25.00 | $25.00 | $25.00 |
| 0262 | Direct drill (***********) - (2, 2") (7301000000-E) | LF | 838 | $46.00 | $46.00 | $46.00 |
| 0263 | Junction box (***************) - (special sized) (7312000000-N) | EACH | 2 | $4,209.00 | $4,209.00 | $4,209.00 |
| 0264 | Junction box (standard size) (7324000000-N) | EACH | 18 | $768.00 | $768.00 | $768.00 |
| 0265 | Junction box (over-sized, heavy duty) (7348000000-N) | EACH | 19 | $1,453.00 | $1,453.00 | $1,453.00 |
| 0266 | Wood pole (7360000000-N) | EACH | 9 | $2,352.00 | $2,352.00 | $2,352.00 |
| 0267 | Guy assembly (7372000000-N) | EACH | 58 | $960.00 | $960.00 | $960.00 |
| 0268 | 1" riser with weatherhead (7408000000-E) | EACH | 2 | $583.00 | $583.00 | $583.00 |
| 0269 | 2" riser with weatherhead (7420000000-E) | EACH | 6 | $1,037.00 | $1,037.00 | $1,037.00 |
| 0270 | 2" riser with heat shrink tubing (7432000000-E) | EACH | 9 | $1,169.00 | $1,169.00 | $1,169.00 |
| 0271 | Lead-in cable (14-2) (7456100000-E) | LF | 4,590 | $3.00 | $3.00 | $3.00 |
| 0272 | Communications cable (** fiber) - (48) (7516000000-E) | LF | 30,030 | $5.00 | $5.00 | $5.00 |
| 0273 | Drop cable (7528000000-E) | LF | 4,310 | $4.00 | $4.00 | $4.00 |
| 0274 | Splice enclosure (7540000000-N) | EACH | 8 | $2,777.00 | $2,777.00 | $2,777.00 |
| 0275 | Modify splice enclosure (7541000000-N) | EACH | 1 | $1,720.00 | $1,720.00 | $1,720.00 |
| 0276 | Interconnect center (7552000000-N) | EACH | 9 | $2,576.00 | $2,576.00 | $2,576.00 |
| 0277 | Fiber-optic transceiver, drop & repeat (7564000000-N) | EACH | 5 | $4,327.00 | $4,326.00 | $4,327.00 |
| 0278 | Delineator marker (7566000000-N) | EACH | 18 | $162.00 | $162.00 | $162.00 |
| 0279 | Remove existing communications cable (7575160000-E) | LF | 1,680 | $1.00 | $1.00 | $1.00 |
| 0280 | Back pull fiber optic cable (7575170000-E) | LF | 1,370 | $3.00 | $3.00 | $3.00 |
| 0281 | Metal strain signal pole (7576000000-N) | EACH | 8 | $22,510 | $22,510 | $22,510 |
| 0282 | Metal pole with single mast arm (7588000000-N) | EACH | 1 | $50,000 | $50,000 | $50,000 |
| 0283 | Metal pole with dual mast arm (7590000000-N) | EACH | 1 | $70,000 | $70,000 | $70,000 |
| 0284 | Soil test (7613000000-N) | EACH | 10 | $1,946.00 | $1,946.00 | $1,946.00 |
| 0285 | Drilled pier foundation (7614100000-E) | CY | 100 | $2,595.00 | $2,595.00 | $2,595.00 |
| 0286 | Mast arm with metal pole design (7631000000-N) | EACH | 2 | $125.00 | $125.00 | $125.00 |
| 0287 | Sign for signals (7636000000-N) | EACH | 24 | $749.00 | $749.00 | $749.00 |
| 0288 | Type II pedestal with foundation (7642200000-N) | EACH | 18 | $3,610.00 | $3,610.00 | $3,610.00 |
| 0289 | Signal cabinet foundation (7684000000-N) | EACH | 3 | $2,946.00 | $2,946.00 | $2,946.00 |
| 0290 | Contlrs with CBNT (**************) - (type 2070LX, base mounted) (7696000000-N) | EACH | 4 | $28,174 | $28,174 | $28,174 |
| 0291 | Cabinet base extender (7901000000-N) | EACH | 3 | $748.00 | $748.00 | $748.00 |
| 0292 | Generic signal item (EA) - cabinet without controller (type 170) (7980000000-N) | EACH | 3 | $20,581 | $20,581 | $20,581 |
| 0293 | Generic signal item (EA) - ethernet edge switch (7980000000-N) | EACH | 4 | $1,817.00 | $1,817.00 | $1,817.00 |
| 0294 | Generic signal item (EA) - install department supplied 2070 controller (7980000000-N) | EACH | 3 | $1,003.00 | $1,003.00 | $1,003.00 |
| 0295 | Generic signal item (EA) - microwave vehicle detection system - multiple zones (7980000000-N) | EACH | 43 | $13,441 | $13,441 | $13,441 |
| 0296 | Generic signal item (EA) - protective coating for dual mast arm pole (black) (7980000000-N) | EACH | 1 | $2,991.00 | $2,991.00 | $2,991.00 |
| 0297 | Generic signal item (EA) - protective coating for single mast arm pole (black) (7980000000-N) | EACH | 1 | $2,692.00 | $2,692.00 | $2,692.00 |
| 0298 | Generic signal item (EA) - protective coating for strain pole (black) (7980000000-N) | EACH | 8 | $1,794.00 | $1,794.00 | $1,794.00 |
| 0299 | Generic signal item (EA) - protective coating for type II signal pedestal (black) (7980000000-N) | EACH | 18 | $150.00 | $150.00 | $150.00 |
| 0300 | Remv exist STR ****** culv (402) - (127+58.00 -L-) (8056000000-N) | LS | 1 | $65,000 | $20,000 | $65,000 |
| 0301 | Remv exist STR ****** culv (402) - (26+44.00 -L-) (8056000000-N) | LS | 1 | $65,000 | $20,000 | $65,000 |
| 0302 | Remv exist STR ****** culv (402) - (64+00.00 -L-) (8056000000-N) | LS | 1 | $75,000 | $30,000 | $75,000 |
| 0303 | Box culv excav @ ******** - (127+58.00 -L-) (8130000000-N) | LS | 1 | $65,000 | $325,000 | $82,395 |
| 0304 | Box culv excav @ ******** - (26+44.00 -L-) (8130000000-N) | LS | 1 | $85,000 | $225,000 | $102,395 |
| 0305 | Box culv excav @ ******** - (64+00.00 -L-) (8130000000-N) | LS | 1 | $92,500 | $300,756 | $109,895 |
| 0306 | Foundation conditioning material, box culvert (8133000000-E) | TON | 623 | $75.00 | $85.00 | $75.00 |
| 0307 | Class A concrete (culvert) (8196000000-E) | CY | 908.40 | $999.00 | $1,150.00 | $999.00 |
| 0308 | Reinforcing steel (culvert) (8245000000-E) | LB | 126,317 | $2.75 | $2.50 | $2.75 |
| 0309 | Rip rap, class ** - (I) (8590000000-E) | TON | 625 | $130.00 | $80.00 | $95.00 |
| 0310 | Geotextile for drainage (8622000000-E) | SY | 625 | $2.55 | $6.00 | $2.00 |
| 0311 | Portable lighting (5255000000-N) | LS | 1 | $175,000 | $1,250,000 | $750,000 |
| 0312 | Generic utility item (EA) - utility pole stabilization (5882000000-N) | EACH | 20 | $1,600.00 | $3,000.00 | $12,900 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
Every contract let that day: NCDOT letting of October 21, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.