NCDOT contract C205136 bid tabulation
MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 14 SECTIONS OF SECONDARY ROADS. Let by North Carolina DOT on October 21, 2025, Wake. 5 bids received; low bid $4,408,885 by Blythe Construction Inc.
- Owner
- North Carolina DOT
- Letting
- 21 OCT 2025
- Pay items
- 54
- Data through
- 20 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Blythe Construction Inc | $4,408,885 | Low |
| 2 | Barnhill Contracting Company | $4,767,803 | +8.0% |
| 3 | FSC II LLC DBA Fred Smith Company | $4,836,636 | +10% |
| 4 | Sunrock Industries LLC DBA Carolina Sunrock LLC | $5,231,358 | +19% |
| 5 | S T Wooten Corporation | $5,397,303 | +22% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Blythe Construction Inc | 2. Barnhill Contracting Company | 3. FSC II LLC DBA Fred Smith Company | 4. Sunrock Industries LLC DBA Carolina Sunrock LLC | 5. S T Wooten Corporation |
|---|---|---|---|---|---|---|---|---|
| 0001 | Mobilization (0000100000-N) | LS | 1 | $130,000 | $148,550 | $240,000 | $282,788 | $260,000 |
| 0002 | Removal of existing asphalt pavement (0156000000-E) | SY | 83 | $40.00 | $40.00 | $40.00 | $40.00 | $40.00 |
| 0003 | Incidental stone base (1220000000-E) | TON | 330 | $100.00 | $49.50 | $35.00 | $98.50 | $150.00 |
| 0004 | Shoulder reconstruction (1245000000-E) | SMI | 13.25 | $4,450.00 | $5,640.00 | $2,000.00 | $6,190.00 | $6,125.00 |
| 0005 | Aggregate shoulder borrow (1260000000-E) | TON | 613 | $50.00 | $51.00 | $35.00 | $28.00 | $35.00 |
| 0006 | Mill asp PVMT *****" DTH - (1-1/2") (1297000000-E) | SY | 256,964 | $1.65 | $2.35 | $1.60 | $2.20 | $2.15 |
| 0008 | Incidental milling (1330000000-E) | SY | 33,914 | $5.50 | $6.00 | $5.95 | $8.60 | $6.00 |
| 0009 | Asphalt conc surface course, type S9.5B (1519000000-E) | TON | 11,339 | $56.00 | $61.70 | $65.00 | $68.25 | $82.00 |
| 0010 | Asphalt conc surface course, type S9.5C (1523000000-E) | TON | 12,529 | $50.50 | $59.00 | $68.00 | $69.70 | $75.75 |
| 0011 | Asphalt binder for plant mix (1575000000-E) | TON | 1,545 | $600.00 | $550.00 | $560.00 | $510.00 | $425.00 |
| 0012 | Patching existing pavement (1704000000-E) | TON | 1,492 | $135.00 | $210.00 | $110.00 | $173.00 | $220.00 |
| 0013 | 2'-6" concrete curb & gutter (2549000000-E) | LF | 533 | $40.00 | $40.00 | $40.00 | $40.00 | $40.00 |
| 0014 | 4" concrete sidewalk (2591000000-E) | SY | 214 | $60.00 | $60.00 | $60.00 | $60.00 | $60.00 |
| 0015 | Concrete curb ramps (2605000000-N) | EACH | 1 | $2,150.00 | $2,150.00 | $2,150.00 | $2,150.00 | $2,150.00 |
| 0016 | Remove and replace concrete curb ramps (2612500000-N) | EACH | 131 | $2,150.00 | $2,150.00 | $2,150.00 | $2,150.00 | $2,150.00 |
| 0017 | 5" monolithic concrete islands (keyed in) (2655000000-E) | SY | 4 | $300.00 | $300.00 | $300.00 | $300.00 | $300.00 |
| 0018 | Generic paving item (SY) - remove 4" concrete sidewalk (2738000000-E) | SY | 100 | $40.00 | $40.00 | $40.00 | $40.00 | $40.00 |
| 0019 | Generic paving item (SY) - remove 5" monolithic concrete islands (keyed in) (2738000000-E) | SY | 12 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 |
| 0020 | Generic paving item (SY) - remove and replace 4" concrete sidewalk (2738000000-E) | SY | 300 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 |
| 0021 | Generic paving item (SY) - remove and replace 5" monolithic concrete islands (keyed in) (2738000000-E) | SY | 10 | $400.00 | $400.00 | $400.00 | $400.00 | $400.00 |
| 0022 | Generic paving item (SY) - remove driveway apron (2738000000-E) | SY | 5 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 |
| 0023 | Generic paving item (LF) - remove 2'-6" concrete curb and gutter (2752000000-E) | LF | 31 | $40.00 | $40.00 | $40.00 | $40.00 | $40.00 |
| 0024 | Generic paving item (LF) - remove and replace 2'-6" concrete curb and gutter (2752000000-E) | LF | 594 | $65.00 | $65.00 | $65.00 | $65.00 | $65.00 |
| 0025 | Generic paving item (EA) - remove concrete curb ramps (2759000000-N) | EACH | 33 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 |
| 0026 | Adjustment of manholes (2830000000-N) | EACH | 1 | $900.00 | $900.00 | $900.00 | $900.00 | $900.00 |
| 0027 | Adjustment of meter boxes or valve boxes (2845000000-N) | EACH | 12 | $900.00 | $900.00 | $900.00 | $900.00 | $900.00 |
| 0028 | Work zone advance/general warning signing (4413000000-E) | SF | 1,261 | $5.35 | $5.05 | $8.50 | $8.00 | $6.50 |
| 0029 | Pedestrian channelizing devices (4447000000-E) | LF | 262 | $50.00 | $50.00 | $80.00 | $50.00 | $50.00 |
| 0030 | Temporary traffic control (4457000000-N) | LS | 1 | $101,500 | $38,000 | $250,000 | $202,400 | $330,000 |
| 0031 | Law enforcement (4510000000-N) | HR | 640 | $80.00 | $83.00 | $85.00 | $100.00 | $100.00 |
| 0032 | Generic traffic control item (EA) - audible warning devices (4600000000-N) | EACH | 6 | $500.00 | $500.00 | $1,050.00 | $500.00 | $500.00 |
| 0033 | Generic traffic control item (EA) - pedestrian transport service (4600000000-N) | EACH | 40 | $250.00 | $250.00 | $250.00 | $250.00 | $250.00 |
| 0034 | Thermoplastic pavement marking lines (6", 90 mils) (4688000000-E) | LF | 248,780 | $0.81 | $0.81 | $0.81 | $0.81 | $0.81 |
| 0035 | Thermoplastic pavement marking lines (8", 90 mils) (4695000000-E) | LF | 2,006 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 0036 | Thermoplastic pavement marking lines (12", 90 mils) (4700000000-E) | LF | 2,740 | $2.50 | $2.50 | $2.50 | $2.50 | $2.50 |
| 0037 | Thermoplastic pavement marking lines (24", 90 mils) (4709000000-E) | LF | 2,681 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 0038 | Thermoplastic pavement marking character (90 mils) (4720000000-E) | EACH | 76 | $95.00 | $95.00 | $95.00 | $95.00 | $95.00 |
| 0039 | Thermoplastic pavement marking symbol (90 mils) (4725000000-E) | EACH | 285 | $115.00 | $115.00 | $115.00 | $115.00 | $115.00 |
| 0040 | Heated-in-place thermoplastic pavement marking symbol (90 mils) (4726110000-E) | EACH | 7 | $300.00 | $300.00 | $300.00 | $300.00 | $300.00 |
| 0041 | 6" cold appl plstic lines type ** - (II) (4775000000-E) | LF | 1,966 | $4.00 | $4.00 | $4.00 | $4.00 | $4.00 |
| 0042 | 8" cold appl plstic lines type ** - (II) (4780000000-E) | LF | 62 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 |
| 0043 | Paint pavement marking lines (6") (4815000000-E) | LF | 193,505 | $0.10 | $0.10 | $0.10 | $0.10 | $0.10 |
| 0044 | Paint pavement marking lines (8") (4820000000-E) | LF | 1,632 | $0.45 | $0.45 | $0.45 | $0.45 | $0.45 |
| 0045 | Paint pavement marking lines (12") (4825000000-E) | LF | 2,650 | $0.70 | $0.70 | $0.70 | $0.70 | $0.70 |
| 0046 | Paint pavement marking lines (24") (4835000000-E) | LF | 2,885 | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 |
| 0047 | Paint pavement marking character (4840000000-N) | EACH | 76 | $30.00 | $30.00 | $30.00 | $30.00 | $30.00 |
| 0048 | Paint pavement marking symbol (4845000000-N) | EACH | 267 | $30.00 | $30.00 | $30.00 | $30.00 | $30.00 |
| 0049 | Removal of pavement marking lines (6") (4855000000-E) | LF | 195,471 | $0.05 | $0.05 | $0.05 | $0.05 | $0.05 |
| 0050 | Removal of pavement marking lines (8") (4860000000-E) | LF | 1,694 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 0051 | Removal of pavement marking lines (12") (4865000000-E) | LF | 2,650 | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 |
| 0052 | Removal of pavement marking lines (24") (4870000000-E) | LF | 2,585 | $4.00 | $4.00 | $4.00 | $4.00 | $4.00 |
| 0053 | Removal of pavement marking symbols & characters (4875000000-N) | EACH | 343 | $40.00 | $40.00 | $40.00 | $40.00 | $40.00 |
| 0054 | Seeding and mulching (6084000000-E) | ACRE | 8.15 | $3,300.00 | $3,300.00 | $2,000.00 | $3,300.00 | $1.00 |
| 0055 | Inductive loop sawcut (7444000000-E) | LF | 8,556 | $11.50 | $11.50 | $11.50 | $11.50 | $11.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
Every contract let that day: NCDOT letting of October 21, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.