NCDOT contract C205103 bid tabulation

MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. 10 SECTIONS OF SECONDARY ROADS. Let by North Carolina DOT on May 20, 2025, Person, Caswell. 3 bids received; low bid $1,465,373 by Sunrock Industries LLC DBA Carolina Sunrock LLC.

Owner
North Carolina DOT
Letting
20 MAY 2025
Pay items
16
Data through
20 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Sunrock Industries LLC DBA Carolina Sunrock LLC$1,465,373Low
2Adams Construction Company$1,584,100+8.0%
3FSC II LLC DBA Fred Smith Company$1,645,435+12%
NCDOT contract C205103: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Sunrock Industries LLC DBA Carolina Sunrock LLC2. Adams Construction Company3. FSC II LLC DBA Fred Smith Company
0001Mobilization (0000100000-N)LS1$41,913$38,334$80,000
0002Incidental stone base (1220000000-E)TON436$84.00$50.20$80.00
0003Shoulder reconstruction (1245000000-E)SMI17.37$2,760.00$2,500.00$2,600.00
0004Aggregate shoulder borrow (1260000000-E)TON1,607$26.00$50.20$40.00
0005Mill asp PVMT *****" DTH - (1-1/2") (1297000000-E)SY3,878$6.00$2.50$5.75
0006Milln asphalt PVMT ***** - ***** - (0" to 1-1/2") (1308000000-E)SY138$18.00$26.30$6.50
0007Incidental milling (1330000000-E)SY2,824$11.00$14.10$6.40
0008Asphalt conc surface course, type S9.5B (1519000000-E)TON9,378$63.90$66.85$67.00
0009Asphalt binder for plant mix (1575000000-E)TON655$525.00$530.00$550.00
0010Patching existing pavement (1704000000-E)TON950$169.00$220.00$220.00
0011Work zone advance/general warning signing (4413000000-E)SF1,008$6.25$7.20$8.80
0012Temporary traffic control (4457000000-N)LS1$36,920$85,500$80,000
0013Thermoplastic pavement marking lines (4", 90 mils) (4685000000-E)LF145,176$0.61$0.45$0.61
0014Thermoplastic pavement marking lines (24", 90 mils) (4709000000-E)LF97$20.00$12.00$20.00
0015Thermoplastic pavement marking character (90 mils) (4720000000-E)EACH14$150.00$220.00$150.00
0016Thermoplastic pavement marking symbol (90 mils) (4725000000-E)EACH4$200.00$310.00$200.00
NCDOT contract C205103: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.

Every contract let that day: NCDOT letting of May 20, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy