NCDOT contract C205060 bid tabulation

MILLING, AND RESURFACING. 2 SECTIONS OF US-19. Let by North Carolina DOT on March 18, 2025, Cherokee, Swain. 2 bids received; low bid $5,492,217 by Site Development Corporation.

Owner
North Carolina DOT
Letting
18 MAR 2025
Pay items
14
Data through
20 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Site Development Corporation$5,492,217Low
2Apac Atlantic Inc Asheville Division$5,795,277+6.0%
NCDOT contract C205060: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Site Development Corporation2. Apac Atlantic Inc Asheville Division
0001Mobilization (0000100000-N)LS1$271,939$289,000
0002Mill asp PVMT *****" DTH - (1-1/2") (1297000000-E)SY95,257$4.00$4.82
0003Incidental milling (1330000000-E)SY3,100$12.50$12.00
0004Asphalt conc surface course, type S9.5C (1523000000-E)TON22,430$128.50$127.00
0005Asphalt binder for plant mix (1575000000-E)TON1,444$615.00$760.00
0006Patching existing pavement (1704000000-E)TON2,500$180.00$188.00
0007Generic paving item (LF) - centerline milled rumble strips (asphalt concrete), 18" (1881000000-E)LF35,000$0.80$0.55
0008Work zone advance/general warning signing (4413000000-E)SF2,128$8.35$9.00
0009Temporary traffic control (4457000000-N)LS1$95,000$199,000
0010Thermoplastic pavement marking lines (6", 90 mils) (4688000000-E)LF385,196$0.80$0.62
0011Thermoplastic pavement marking lines (24", 90 mils) (4709000000-E)LF415$12.00$10.00
0012Thermoplastic pavement marking symbol (90 mils) (4725000000-E)EACH27$160.00$130.00
0013Generic pavement marking item (EA) - polycarbonate H-shaped markers (4895000000-N)EACH1,966$60.00$55.00
0014Inductive loop sawcut (7444000000-E)LF125$32.00$15.00
NCDOT contract C205060: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NCDOT's tabulation for this contract. NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.

Every contract let that day: NCDOT letting of March 18, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy