ODOT contract 250005 bid tabulation
CLE-/WAR CS FY2025 (CRACK SEALING). Let by Ohio DOT on January 16, 2025, CLE. 3 bids received; low bid $474,526 by Russell Standard Corporation and Subsidiary, -1.8% against the engineer's estimate of $483,000.
- Owner
- Ohio DOT
- Letting
- 16 JAN 2025
- Pay items
- 20
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Russell Standard Corporation and Subsidiary | $474,526 | Low | -2.0% |
| 2 | Strawser Construction Inc | $502,221 | +6.0% | +4.0% |
| 3 | Scodeller Construction Inc | $569,259 | +20% | +18% |
Engineer's estimate: $483,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Russell Standard Corporation and Subsidiary | 2. Strawser Construction Inc | 3. Scodeller Construction Inc |
|---|---|---|---|---|---|---|
| 1 | Crack sealing, type II, as per plan (423E00205) | SY | 572,252 | $0.49 | $0.45 | $0.70 |
| 2 | Edge line, 6", type 1A (642E00114) | MI | 50.81 | $360.00 | $385.00 | $345.00 |
| 3 | Lane line, 6", type 1A (642E00214) | MI | 4.66 | $300.00 | $300.00 | $270.00 |
| 4 | Center line, type 1A (642E00310) | MI | 25.28 | $450.00 | $470.00 | $425.00 |
| 5 | Channelizing line, 12", type 1A (642E00414) | FT | 10,932 | $1.25 | $1.10 | $1.10 |
| 6 | Stop line, type 1A (642E00510) | FT | 1,016 | $3.00 | $2.75 | $2.75 |
| 7 | Crosswalk line, 12", type 1A (642E00640) | FT | 1,504 | $2.75 | $2.25 | $2.25 |
| 8 | Transverse/diagonal line, type 1A (642E00710) | FT | 1,624 | $3.00 | $2.50 | $2.50 |
| 9 | Chevron marking, type 1A (642E00730) | FT | 690 | $3.00 | $2.50 | $2.50 |
| 10 | Island marking, type 1A (642E00912) | SF | 508 | $2.75 | $2.25 | $2.25 |
| 11 | Lane arrow, type 1A (642E01310) | EACH | 121 | $55.00 | $50.00 | $50.00 |
| 12 | Two way left turn arrow, type 1A (642E01354) | EACH | 24 | $115.00 | $100.00 | $100.00 |
| 13 | Word on pavement, 72", type 1A (642E01406) | EACH | 4 | $90.00 | $75.00 | $75.00 |
| 14 | Dotted line, 6", type 1A (642E01516) | FT | 715 | $1.25 | $1.00 | $1.00 |
| 15 | Speed measurement marking (642E40000) | EACH | 20 | $40.00 | $35.00 | $35.00 |
| 16 | Pavement marking, misc.: DO not block intersection (642E50010) | EACH | 1 | $400.00 | $355.00 | $355.00 |
| 17 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 200 | $80.00 | $90.00 | $90.00 |
| 18 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $1,000.00 | $3,500.00 | $4,500.00 |
| 19 | Maintaining traffic (614E11000) | LS | 1 | $60,000 | $99,500 | $36,000 |
| 20 | Mobilization (624E10000) | LS | 1 | $45,000 | $55,215 | $45,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of January 16, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.